Loading...
HomeMy WebLinkAbout20221070 Ver 1_USACE Correspondence_20221006Baker, Caroline D From: Thompson, Emily B CIV USARMY CESAW (USA) < Emily.B.Thompson@usace.army.mil > Sent: Thursday, October 6, 2022 1:07 PM To: Michelle Clements Cc: Tankard, Robert Subject: [External] RE: SAW-2020-01898 (Aurora Industrial Park/ Beaufort) CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Hi Michelle, Thank you providing clarification — I have responded below. Let me know if you have any questions; otherwise, please update the plan drawings according. Sincerely, Emily Emily B. Thompson Regulatory Specialist U.S. Army Corps of Engineers Washington Regulatory Field Office 2407 W. 5th Street Washington, NC 27889 (910)251-4629 Emily.B.Thompson@usace.army.mil We at the U.S. Army Corps of Engineers Regulatory Branch are committed to improving service to our customers. We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at: https://regulatory.ops.usace.army.mil/customer-service-survey/ Thank you for taking the time to visit this site and complete the survey. From: Michelle Clements <michelle.clements@eastgroup.com> Sent: Thursday, October 6, 2022 12:26 PM To: Thompson, Emily B CIV USARMY CESAW (USA) <Emily.B.Thompson@usace.army.mil> Subject: [URL Verdict: Neutral][Non-DoD Source] RE: SAW-2020-01898 (Aurora Industrial Park/ Beaufort) Hey Emily, Sorry for the slow response. In response to your comments: 1. The crossing of the storm pipe going to the stormwater pond is aerial and we do have approval from NCDEQ for this. Okay great, including it as a description on the impacts map is helpful/sufficient. 2. Yes, the existing crossing from Road 1 will be replaced and widened. We'll add that impact to the cumulative impact. I will need to see the square footage along with the LF for the impacts described on the plans I�II�jrl -11FE INV. 1.75 'I —1 �RI 1 RAP, TYP. Mf210 — FM — FM ;F PM SEMEN FES INV. 2.00 W\ 3. The force main crossing will be a directional drill under the stream so it should not impact the stream or wetlands. Okay, please describe that on the impact maps as well 4. C5.1 attached has the inverts of the piping from the cul-de-sac to the pond. We're collecting the water in the ditch around the cul-de-sac that will discharge through the 2 pipes to an open ditch on the west side of the canal. Then it will enter the 2 pipes crossing the wetlands and discharge into the pond. This is sufficient information for the Corps 5. The canal crossing north of the aerial crossing is intended to be a permanent crossing. The piping will be 56 LF with an apron that is 16' long on each end of the pipe. I'll need to see the square footage along with the LF of impacts to the feature in the description on the impacts drawings. z -E 7,0 RCP ).34% pl 0I0I 1 T- I , iR. ! � 1 �EP 8.25 56 L ! ! " II 0 0.3 ' F s V. ! + f , � 13 I 4 IIIT! So do we need to identify the impacts on the drawing with the square footage of impact and a description? See if the attached works. Temporary and permanent impacts to streams and wetlands need to be quantified on the plan drawings. It helps when impacts are shown in color, so that it's easy to discern from a busy plan drawing (the red on the attached is a great way to do that). Thanks, Michelle Clements, PE Senior Civil Engineer I Land Planning and Infrastructure Team Leader THE EAST GROUP 324 Evans Street I Greenville, NC 27858 Cell: (252) 347-9604 1 Office: (252) 758-3746 m iche Ile. cle ments(o)eastgroup. com I www.eastgroup.com This communication is for use by the intended recipient and contains information that may be privileged, confidential or copyrighted under applicable law. If you are not the intended recipient, you are hereby formally notified that any use, copying or distribution of this e-mail (including any attachments), in whole or in part, is strictly prohibited. Please notify the sender by return e-mail and delete this e-mail from your system. This e-mail does not constitute consent to the use of sender's contact information for direct marketing purposes or for transfers of data to third parties. From: Thompson, Emily B CIV USARMY CESAW (USA) <Emily.B.Thompson@usace.army.mil> Sent: Thursday, October 6, 2022 9:51 AM 3 To: Michelle Clements<michelle.clements@eastgroup.com> Cc: Tankard, Robert <robert.tankard@ncdenr.gov> Subject: RE: SAW-2020-01898 (Aurora Industrial Park/ Beaufort) Hi Michelle, Following up after reviewing again, if the stormwater pipe over the stream is aerial, then the Corps would not regulate the pipe until it reached the wetlands. You would just have to receive any required local/state approvals. I noticed the culvert crossing along the southern boundary coming from Road 1 — will the existing crossing be replaced? If the culvert would be longer, then you would need to account for the additional impacts. The proposed 4" PVC Force Main south of the cul-de-sac appears to cross the stream, so we would need to know more information about if that would be aerial as well. Also, can you provide the elevations from the cul-de-sac to the detention pond? It's hard to understand how the water would flow to the pipe in the wetlands and reach the detention pond. Thank you, Emily Emily B. Thompson Regulatory Specialist U.S. Army Corps of Engineers Washington Regulatory Field Office 2407 W. 5th Street Washington, NC 27889 (910) 251-4629 Emily. B.Thompsona-usace.army. mil We at the U.S. Army Corps of Engineers Regulatory Branch are committed to improving service to our customers. We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at: httos://reaulatorv.00s.usace.armv.mil/customer-service-survev/ Thank you for taking the time to visit this site and complete the survey From: Thompson, Emily B CIV USARMY CESAW (USA) Sent: Tuesday, October 4, 2022 5:11 PM To: michelle.clements@eastgroup.com Subject: RE: SAW-2020-01898 (Aurora Industrial Park/ Beaufort) Hi Michelle, It's been some time since we discussed this project, so I have a few questions. I see the only impacts accounted for are the utility crossing in wetlands, but I see a utility pipe going through the stream and a culvert crossing/riprap beyond the cul-de-sac that would also require authorization? Are the two stormwater pipes proposed to being constructed via HDD under the stream or is this the "aerial" crossing? I'll need to know the width of the two stormwater pipes to know the length of impact and then how wide is the actual feature if this would not be construct via HDD. I need to know the culvert width and length and the riprap measurements for the road crossing beyond the cul-de-sac. Is this crossing temporary for construction or would it be permanent. The plans need to be updated accordingly showing the quantified impacts proposed. Let me know if you have any questions. Sincerely, Emily Emily B. Thompson Regulatory Specialist U.S. Army Corps of Engineers Washington Regulatory Field Office 2407 W. 5th Street Washington, NC 27889 (910) 251-4629 Emily. B.Thompsona-usace.army. mil We at the U.S. Army Corps of Engineers Regulatory Branch are committed to improving service to our customers. We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at: https://regulatory.ops.usace.army.mil/customer-service-survey/ Thank you for taking the time to visit this site and complete the survey. From: Schaffer, Josephine L CIV USARMY CESAW (USA) <Josephine.L.Schaffer@usace.army.mil> On Behalf Of WashingtonNCREG Sent: Wednesday, August 10, 2022 12:08 PM To: michelle.clements@eastgroup.com Cc: Thompson, Emily B CIV USARMY CESAW (USA) <Emily.B.Thompson@usace.army.mil> Subject: SAW-2020-01898 (Aurora Industrial Park/ Beaufort) Good afternoon, We have received your Pre -Construction Notification (PCN) NWP request for the above project and forwarded it to Emily Thompson for further processing. Thank you, Josephine Schaffer From: laserfiche@ncdenr.gov <laserfiche@ncdenr.gov> Sent: Tuesday, August 9, 2022 1:04 PM To: WashingtonNCREG <WashingtonNCREG@usace.army.mil> Cc: SAW-PCN-RG <SAW-PCN-RG@usace.army.mil> Subject: [Non-DoD Source] PCN - Beaufort - Non -DOT A new project has been received on 8/9/2022 1:00 PM for Aurora Industrial Park. The link below will take you to the project folder. https://edocs.dea.nc.eov/laserfiche/index.asox?db=WaterResources#id=2444751:view=browse This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses aren't monitored.