HomeMy WebLinkAboutNCC202553_NOT Closeout Documents_20221213North Carolina Department of Environmental Quality
Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville, NC 28301-5094
(910) 433-3300
FB-Airfield Electrical System
County: Cumberland Project: Rehabilitation -Taxiway North River basin: Cape Fear
Person financially responsible: US Army Public Works Department - Monica Project #: CUNME-2020-198
Stephenson, Directorate NCC202553
Address: 2175 Reilly Road, Stop A, Fort Bragg, NC
1. Project Location: Surveyor Street, Fort Bragg
Pictures: No
2. Weather and soil conditions: Cloudy/light rain/Workable soils Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name): Mike Himes Title: Corp -Rep
Inspection report: Sent Report Date given/sent: December 08, 2022
9. Corrective action needed:
10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional
self -monitoring or self -inspections are required. Project is in compliance and released under
the SPCA. Termination of coverage under the NPDES General Stormwater Permit for
Construction Activities (NCGO1) must be requested by the permittee via a Notice of
Termination (NOT). The NOT is available at:
https://edocs.deq.nc.gov/Fonns/NCGOI-Termination. Please note that this correspondence
must be uploaded as part of completing the NOT process.
Reported by: Penny Markle Others present: Lee Ward
Date of inspection: December 07, 2022 Time arriving on site: 10:30 AM Time leaving site: 11:49 AM
cc: