Loading...
HomeMy WebLinkAboutSW8930217_Historical File_19930402JOSEPH S. HILL, J& and ASSOCIATES CONSULTING ENGINEERS and PLANNERS MAILING ADDRESS: 1602 HARBOUR DRIVE POST OFFICE BOX 5592STA. 1 WILMINGTON, NORTH CAROLINA WILMINGTON, N.C. 28403.4155 TELEPHONE 919-799-15" March 26, 1993 Ms. Linda Lewis N.C. Division of Environmental Management 127 Cardinal Drive Extension Wilmington, North Carolina 28405-3845 Subject: Submittal of Additional Information Stormwater Project No. 930217 Ocean Side Place Dear Ms. Lewis: Enclosed is the following additional information you requested during your review of the stormwater plan submittal for Ocean Side Place. 1. Velocity calculations for main outlet swales (5:1 side slopes) showing that they will not erode are enclosed. 2. The plans have been changed to show the project name as Ocean Side Place. 3. The reserved area behind lots 198, 199, 219, 220, 221, 224, 225, and 226 is reserved as an undeveloped green area. A statement is added to the deed restrictions which prohibits impervious cover on this area. Please consider this information in continuing your review of the stormwater plan, JSH/pat attachments Sincerely, JOSEPH S. HILL, JR. and ASSOCIATES C s. , �. Jos h. S. Hill, Jr., P.E. STORMWATER U W MAR 2 6 1993 u�m �� 936Z11 Ms. Linda Lewis Ocean Side Place Page 2 VERIFICATION /��/� 7�• �Strw personally appearing before me and, being first duly sworn, says that the information contained in the application and in the exhibits attached hereto are true to the best of his/her knowledge and beliefs. This % /)day of Chu a 1993 NOTARY PUBLIC .eAy— ADDRESS My Commission Expires /C)43 93 cc: Joseph S. Hill, Jr. and Assoc. OCEAN SIDE PLACE SWALE VELOCITY CALCULATIONS MAIN OUTLET SWALES Calculate velocity in main outlet swales. "Use worst case" flow through outlet swale between lots 80 and 81 at north corner of project. Runoff Calculations Use rational formula (Q = CiA) to estimate runoff flow: Q = runoff (CFS) i = intensity (10-yr. storm) = 3.2 in/hr. A = contributing area (acres) = 7.5 AC impervious; 17.5 AC pervious Tc (time of concentration) = 35 min. STORMWATER Q(.impervious) = 1.0 x 3.2 x 7.5 = 24.0 CFS E � U L bu Q(Pervious) = .2 x 3.2 x 17.5 = 11.2 CFS Total Runoff = 35.2 CFS MAR 2 6 1993 Depth of Flow Calculate depth of flow using Manning's equation for .trapezoid channels (.see attached nomograph from figure 8.05d of-N.C., Erosion and'Sediment Control'Planni►ig aAd�Design'Manual). Given that: S = .02 Q = 35.2 N = .03 B=2 Z=5 Therefore: Qn = 1.05 d/B = 0.58' d = 0.58'(2) = 1.16' (depth of flow in channel) Channel Velocity Calculations: 1:49 x r2/3 x s1/2 Use Manning's equation V = n to determine runoff velocity through main outlet swale. V = velocity (FPS) r = hydraulic radius = .706 s = bottom slope = .002 V = 1.49(.706)'67 x .002*5 .03 V = 1.75 FPS Velocity will be less than 2.5 FPS allowable for bare soil during the establishment of grass cover. Appendices d o B N N v cp v _ NOTE: Project horizontal from Z = 0 scale 0.01 d 1 to obtain values for Z= 1 to 6 z a 0.02 B (ft) 0.03 S 40 0.1 Q n 0.04 0.08 (Ft3/S). 30 0.05 0.06 20 0.06 0.05 20 0.08 0.04 10 c 0.1 0.03 8.0 J fi.0 . c 10 0.02 5.0 c 8 4A ' 3.0 6 j 02 5 % 2.0 0.01 e 4; 0.3 Q.008` 3 0.006 \` 0.4 0.005 0.8 \\ ' \� 0.5 0.004 0.5 \ 0.4 \\ 0.6 0.003 � J*# Ocean Soda placa� 0.002 02\1% �/$ o.60 0.8 \ 1.0 � \0, Example: 0.1 0.001 0.08 Given: Find: Solution: S-0.01 d an 0.3 0.06 a = 10 ft3/S d/B = 0.14 0.05 n = 0.03 d - 0.14(4) = 0.56 ft B=4ft 0.04 Z = 4 0.03 0.02 Figure &05d Solution of Manning's equation for trapezoidal channels of various side slopes. 8.05.11 Appendices Table 8.05d Maximum Permissible Velocities for Unprotected Solis in Existing Channels. Sample Problem 8.05a Design of a grass -lined channel. Materials Maximum Permissible Velocities (fps) Pine Sand noncolloidal) 2.5 Sand Loam (noncolloidal) 2.5 Silt Loam (noncolloidal) 3.0 Ordinary Firm Loam 3.5 Fine Gravel 5.0 Stiff Clay (very colloidal) 5.0 Graded, Loam to Cobbles (noncolloidal) 5.0 Graded, Silt to Cobbles (colloidal) 5.5 Alluvial Silts (noncolloidal) 3.5 Alluvial Silts (colloidal) 5.0 Course Gravel (noncolloidal) 6.0 Cobbles and Shingles 5.5 Shales and Hard Pans 6.0 Given: Design Qto - 16.6 cfs Proposed channel grade - 20% Proposed vegetation: Tall fescue Soil: Creedmoor (easily erodible) Permissible velocity, Vp - 4.5 ft/s (Table 8.05a) Retardance class: "8' uncut, "D" cut (Table 8.05c). Trapezoidal channel dimensions: designing for low retardance condition (retardance class D) design to meet Vp. Find: Channel dimensions Solution: Make an initial estimate of channel size A - QN; 16.6 cfs/4.5 ft/sec - 3.69 ft2 Try bottom width . 3.0 ft Z-3 A=bd+Zd2 P-b+2d An iterative solution using Figure 8.05a to relate flow depth to Manning's n proceeds as follows: Manning's equation is used to check velocities d (ft) A (ft) R (ft) n V (fps) Q (cfs) Comments 0.8 4.32 0.54 0.043 3.25 14.0 V<Vp OK, Q<Qto. (too small, try deeper channel) 0.9 5.13 0.59 0.042 3.63 18.10 V<Vp, OK, Q>Qin. OK Now design for high retardance (class 13): Try d -1.5 It and trial velocity, Vt - 3.0 fVsec d (ft) A (ft) R (ft) Vt (fps) n V (fps) Q (cfs) Comments 1.5 11.25 0.90 3.0 0.08 2.5 reduce Vt 2.0 0.11 1.8 reduce Vt 1.6 0.12 1.6 18 Q>Qto OK Channel summary: Trapezoidal shape, Z-3, b-3 ft, d-1.5 ft. grade - 2% 8.059 0 Table 8.05a Maximum Allowable Design Velocities' for Vegetated Channels Typical Soil Grass Lining Channel Slope Characteristicsa Permissible Velocity3 Application for Established Grass Lining (ft/sec) 0-5% Easi Erodible Bermuda rass Non -plastic % a escue (Sands & Silts) Bahiagrass Kentucky bluegrass 4.5 Grass -legume mixture 3.5 Erosion Resistant Bermudagrass Plastic 6.0 Tall fescue (Clay mixes) Bahiagrass 5.5 5,5 Kentucky bluegrass 5.5 Grass -legume mixture 4.5 5-10% Easily Erodible Bermudagrass Non -plastic Tall fescue 4.5 (Sands & Silts) Bahiagrass 4.0 4.0 Kentucky bluegrass 4.0 Grass -legume mixture 3.0 Erosion Resistant Bermudagrass Plastic 5.5 Tall fescue (Clay Mixes) Bahiagrass 5.0 5.0 Kentucky bluegrass 5.0 Grass -legume mixture 3.5 >10% Easily Erodible Bermudagrass Non -plastic Tall fescue 3.5 (Sands & Silts) Bahiagrass 2.5 2.5 Kentucky bluegrass 2.5 Erosion Resistant Bermudagrass Plastic Tall fescue 4.5 (Clay Mixes) Bahiagrass 3.5 3.5 Kentucky bluegrass 3.5 Source: USDA-SCS Modified NOTE: 'Permissible Velocity based on 10-yr storm peak runoff ZSoil erodibility based on resistance to soil movement from concentrated flowing water. 3Before grass is established, permissible velocity is determined by the type of temporary liner used. Selecting Channel To calculate the required size of an open channel, assume the design flow is Cross -Section uniform and does not vary with time. Since actual flow conditions change throughout the length of a channel, subdivide the channel into design reaches, Geometry and design each reach to carry the appropriate capacity. The three most, commonly used channel cross-section are "W-shaped, par- abolic, and trapezoidal. Figure 8.05b gives mathematical formulas for the area, hydraulic radius and top width of each of these shapes. f ti 8.05.4 a BARRY J. SMALL GENERAL MANAGER OCEAN SIDE CORPORATION REAL ESTATE DEVELOPERS HWY. 179 IN CALABASH P.O. BOX 4640 CALABASH, NORTH CAROLINA 28470 LOCAL TELEPHONE (919) 579-3737 N.C. 1-800-422-8092 OUTSIDE N.C. 1-800-443-4819 MASON H. ANDERSON PRESIDENT W.J. McLAMB, JR. SECRETARY -TREASURER RECEIVED Ms. Linda Lewis FEB 22 1993 N.C. Division of Environmental Management 127 Cardinal Drive Extension Wilmington, North Carolina 28405 Wilmington Regional Office DEM Subject: Restrictive Covenants Limiting "Built -Upon" Area Stormwater Management Plan Ocean Side Place Brunswick County Dear Ms. Lewis: The following statements will be included in the Restrictive Covenants for Ocean Side Place. "No more than 2,450 square feet of any lot and no more than 5,200 square feet of the clubhouse area shall be covered by structures and/or paved surfaces, including walkways or patios of brick, stone, slate or similar materials.- This covenant is intended to insure continued compliance with stormwater runoff rules adopted by the State of North Carolina and, therefore, benefits may be enforced by the State of North Carolina." "Reserved area adjacent Lot 220 shall not be built upon."* "No structures and/or paved surfaces, including walkways or patios of brick, stone, slate or similar materials, shall be placed within 30 feet of the mean high water line of surface waters. This covenant is intended to insure continued compliance with stormwater runoff rules adopted by the State of North Carolina and, therefore, benefits may be enforced by the State of North Carolina." The following will be stated in the deed: "This(these) covenant(s) is(are) to run with the land and shall be binding to all parties and all persons claiming under them." STORMWATER MAP Z(o fib-1993 SIGNA Signa Date: *Without prior approval by M.' D,E.,M. D E M .0J 4 `I30z i'1 State of North Carolina Department' of FnArolnrnent, Health, and Natural Resources Wilmington Regional Office James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary March 5, 1993 DIVISION OF ENVIRONMENTAL MANAGEMENT Mr. Joseph Hill Jr., P.E. 1602 Harbour Drive Wilmington, North Carolina Dear Mr. Hill: 28401 Subject: ADDITIONAL INFORMATION Stormwater Project No. 930217 Ocean Forest West Brunswick County Bob Jamieson Regional Manager The Wilmington Regional Office received a partial Stormwater_Submittal for the Ocean Forest West Subdivision on February 22, 1993, with the remainder of the submittal on March 4, 1993. A preliminary review of that information has determined that the submittal for the subject project is not complete. The following information is needed to continue the stormwater review: 1. Please provide velocity calculations for the main outlet swales (5:1 side slopes), to verify that they will not erode. 2. The Restrictive Covenants, Operation and Maintenance Plan, and Density Limits Form show the name of the subdivision as Ocean Side Place, but the plans show Ocean Forest West. Please change these documents to indicate the correct name. (originals returned). 3. What is the purpose of the reserved area behind lots 198, 199, 219, 220, 221, 224, 225 and 226? If any impervious surfaces- are proposed, please indicate in the calculations. Also. please add to the deed restrictions a statement concerning the reserved area and its impervious cover, allowed, or that it shall not be built on. 4. Preliminary calculations indicate that if no impervious cover is proposed for the reserved area., the proposed deed restrictions will be adequate, and the project will meet density. -continued- 127 Cardinal Drive Extension, Wilmington, N.C. 28405-3845 • Telephone 919-395-3900 • Fax 919-35m004 An Equal Opportunity Affirmative Action Employer Mr. Hill March 5, 1993 Stormwater Project No. 930217 ----------------------------------------- Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to April 5, 1993, or the submittal will be returned as incomplete. If you have any questions concerning this matter please feel free to call me at (919) 395-3900. DA/arl: 930217.MAR cc: (2) Linda Lewis Central Files Sincerely, Ms. Linda Lewis Environmental Engineer 2 JOSEPH S. HH.L, JR. and ASSOCIATES CONSULTING ENGINEERS and PLANNERS 1602 HARBOUR DRIVE WILMINGTON, NORTH CAROLINA TELEPHONE 919-799-1544 r March 3; 1993 MAILING ADDRESS: POST OFFICE BOX 5592-STA. 1 WILMINGTON, N.C. 28403-4155 Ms. Linda Lewis JIM fiMQ� 4 1993 N.C. Division of Environmental Management STOK10 Yi WATEL ,n � gtoo .o 127 Cardinal Drive Extension DEianar pff;�, Wilmington,. North Carolina 28405 V. L Subject: Ocean Forest West I ll Stormwater Management Plan MAR C 4 1993 Brunswick County D E iVl Dear Ms. Lewis: 9307,11 Enclosed are two (2) copies of the Grading, Erosion Control and Stormwater Management Plan for Ocean Forest West. The Erosion Control Plan was approved September 17, 1990. The subdivision was not named at that time and approval was issued under the name "Carter Tract/Unnamed Subdivision". Plan: The following items are included as part of the Stormwater Management 1. Site plan indicating all built -upon surfaces. 2. Computations showing percentage of built -upon surfaces. 3. Copi-es of deed restrictions --and res4et ve covenants which ThaSe� bfdr+:t Prr It VS•I — 4 - State i21� t of r en9464!i- y es�"""' t-yfor aperati•en-anc# maintenance procedures. 13y ocegh S. fterettien and i ntenanee-M+anual-. 5.4e, copo. 6• ensity Limit Submittal Form. Please review this plan as soon as poss.ib:le. Please do not hesitate to contact me if you have any questions or need additional information. Sincerely, JOSEPH S. HILL, JR. and ASSOCIATES JSH/pat Jos. h.S. Hill, Jr., P.E. attachments OCEAN FOREST WEST Stormwater Management Plan Ocean Forest West is a single family home subdivision. This project is located adjacent to an unnamed.tributary to Cawcaw Creek which is classified C sw. The low density option for stormwater management allows a maximum of 30% impervious surface coverage for projects discharging to waters classified other than SA. Built -upon area will be 29.71%. Streets will be provided with asphalt curbs and gutters. Runoff collected in gutters will be discharged through asphalt flumes to roadside swales. Runoff from roadside swales will discharge to perimeter ditches after passing through swale exit sections having a minimum length of 100 feet and minimum side slopes of 5:1. Drop manholes will be provided to dissipate the grade differential between exit swales and existing perimeter ditches. The attached plan and calculations show that this project complies with N.C.D.E.M. stormwater management regulations. STORMWKILK LIB U MAR 0 4 1993 D E M -�� g3OZl? __ 0 OCEAN FOREST WEST Stormwater Management Plan Built -Upon Area Calculations Street Pavement Calculations: 22' wide pavement x 10,805 LF (streets) = 237,710 Sq. Ft. Radii at street intersections (34 x 200 Sq. Ft.) = 6,800 Sq. Ft. Cul-de-sac - 3 Total Street Pavement Built -Upon Area Calculations for Lots: 235 Lots x 2,450 Sq. Ft. = 575,750 Sq. Ft. = 13,22 AC. Built -Upon Area Calculations for Clubhouse: Clubhouse Building and Amenities = 5,200 Sq. Ft. = 0.12 AC. Total Built -Upon Area = 19.04 AC. Total Project Area = 64.09 AC. 19.04 i 64.09 = 29.71% Built -Upon Area ,850 Sq. Ft. = 248,360 Sq. Ft. = 5.70 AC. STORMW Am"IFER k 6 � 0 W t u l] V MAR 0 4 1993 DEM ..---- Project Built -Upon Area is less than the 30% maximum allowed for projects discharging to waters classified other than SA. tio BARRY J. SMALL GENERAL MANAGER OCEAN SIDE CORPORATION REAL ESTATE DEVELOPERS HWY. 179 IN CALABASH P.O. BOX 4640 CALABASH, NORTH CAROLINA 28470 LOCAL TELEPHONE (919) 579-3737 N.C. 1-800-422-8092 OUTSIDE N.C. 1-800-443-4819 MASON H. ANDERSON PRESIDENT W.J. McLAMB, JR. SECRETARY -TREASURER RECEIVED FEB 22 1993 Ms. Linda Lewis North Carolina Division of Environmental Management Wilmington Regional Office 127 Cardinal Drive Extension DEM Wilmington, North Carolina 28405 Subject: Statement of Responsibility Stormwater System Operation and Maintenance Ocean Side Place Brunswick County Dear Ms. Lewis: This letter acknowledges that a Stormwater Management Plan has been submitted on behalf of Ocean Side Place. The Ocean Side Place Homeowner's Association will be responsible for the operation and maintenance of the stormwater management system as required by DEM and the operation and maintenance procedures included as an integral part of the Stormwater Management Plan. The Ocean Side Place Homeowner's Association will be responsible for repairing or replacing any part of the stormwater management system which may become inoperable. cc: Joseph S. Hill, Jr. and Assoc. Sincerely H. Anderson ent STORMIAIATER1.9 FEB 2 2 1993 'ol a Q30M1'I