Loading...
HomeMy WebLinkAboutNCS000136_Inspection Report_20221208Compliance Inspection Report Permit: NCS000136 Effective: 12/01/11 Expiration: 11/30/16 Owner: Specgx LLC SOC: Effective: Expiration: Facility: Mallinckrodt - Raleigh Pharmaceutical Plant County: Wake 8801 Capital Blvd Region: Raleigh Raleigh NC 276163116 Contact Person: Tim Roberts Title: Phone: 919-878-2895 Directions to Facility: System Classifications: SWNC, Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 12/08/2022 Primary Inspector: Lauren Garcia Secondary Inspector(s): Entry Time 01:OOPM Reason for Inspection: Routine Permit Inspection Type: Stormwater Discharge, Individual Facility Status: Compliant ❑ Not Compliant Question Areas: Storm Water (See attachment summary) Certification: Phone: Exit Time: 03:OOPM Phone: 919-707-3648 Inspection Type: Compliance Evaluation Page 1 of 3 Permit: NCS000136 Owner - Facility: Specgx LLC Inspection Date: 12/08/2022 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: Inspeciton was in response to permit renewal. Facility manufactures Acetaminophen (APAP) and PAP. Acetic acid and ammonia sulfate are generated during the processing. The facility currently has three outfalls. Outfalls 1 and 2 receive stormwater at the southern sides of the facility. Outfall 1 receives water from a shipping and receiving bay as well an emergency equipment shed and fire water tower. Outfall 2 receives water from a fire training area and the dry storage warehouse. The APAP product is stored in the onsite warehouse and is shipped out from the bay. The remainder of the site, including the majority of the industrial operations, drains to outfall 3. Outfall 3 is located at the manual siphon at Lake Burkott. The lake was designed as a fail safe where in the event of a major spill, any spilled material would be contained in the lake or be contained before reaching the lake. The lake does not have an outfall or emergency spillway and water levels are controlled manually as needed. Stormwater discharging through zone 3 of the facility travels approximately'/4 mile through spray fields and under a railroad track to reach the pond. Stormwater travels to the pond through open swales and stormwater pipes to reach the pond. There is an onsite wastewater treatment plant that functions as a pre-treatment plant before the effluent is piped to the City of Raleigh WWTP. Several tanker trucks were parked onsite in the fire training area and contained wastewater. The fire training area is bermed. There are diesel tanks located in Zone 2 (draining to outfall 2), and are stored in proper secondary containment. There were empty totes stored in several areas onsite, but were reported to have been emptied and cleaned and were waiting to be sold. All chemical tanks used in the processing were observed to be stored in concrete bermed areas/secondary containment. A moderate amount of pallets were also observed stored onsite. The pallets were not stored under cover. A hazardous waste pad is located in Zone 3. The facility is a large quantity generator. The hazardous waste pad is within a storm -resistant shelter. All containers were labelled. There is a used oil storage building in zone 3. Containers were stored in proper secondary containment. All necessary paperwork was available onsite. The SWPPP is updated annually and all components were present. Page 2 of 3 Permit: NCS000136 Owner - Facility: Specgx LLC Inspection Date: 12/08/2022 Inspection Type: Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? ❑ ❑ ❑ # Does the Plan include a BMP summary? ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ ❑ ❑ # Does the facility provide and document Employee Training? 0 ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? 0 ❑ ❑ ❑ # Is the Plan reviewed and updated annually? 0 ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ❑ ❑ ❑ Comment: Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring? ❑ ❑ ❑ ❑ Comment: Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? 0 ❑ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? 0 ❑ ❑ ❑ Comment: Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? 0 ❑ ❑ ❑ # Were all outfalls observed during the inspection? ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ❑ # Has the facility evaluated all illicit (non stormwater) discharges? 0 ❑ ❑ ❑ Comment: Page 3 of 3