Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
NCC224080_Site Plan or Location Map_20221213
��0111111/0/CARO Fis 033602E IF IF TS . TOWN OF PITTSBORO ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH z TOWN OF PITTSBORO STANDARDS AND SPECIFICATIONS. CHATHAM COUNTY NORTH CAROLINAUj J 0 z z ov w w � � CONSTRUCTION DRAWINGS O w CIVIL DRAWING INDEX: U) o o �_ z O U U d OU LU REGULATORY REVIEW SET ISSUED: NOVEMBER 12, 2021 LU COVER SHEET C-01 PARTIAL EROSION CONTROL PLAN 4-INITIAL PHASE C-65 cn Q Q o 0 z 0 REVISED: JANUARY 10, 2022 OVERALL EXISTING CONDITIONS PLAN C-02 PARTIAL EROSION CONTROL PLAN 5-INITIAL PHASE C-66 W _ o o > o SHEET INDEX & OVERALL SITE LAYOUT PLAN C-03 PARTIAL EROSION CONTROL PLAN 6-INITIAL PHASE C-67 w w w w w REVISED: FEBRUARY 16, 2022 PARTIAL SUBDIVISION LAYOUT & UTILITY PLAN 1 C-04 PARTIAL EROSION CONTROL PLAN 7-INITIAL PHASE C-68 a a a a a REVISED: APRIL 12, 2022 PARTIAL SUBDIVISION LAYOUT & UTILITY PLAN 2 C-05 PARTIAL EROSION CONTROL PLAN 8-INITIAL PHASE C-69 w N N N N N N 0 RUSSE L H E CHu CH R REVISED: JULY 27, 2022 PARTIAL SUBDIVISION LAYOUT & UTILITY PLAN 3 C-06 PARTIAL EROSION CONTROL PLAN 9-INITIAL PHASE C-70 0 N 0 0 0 0 0 0 REVISED: AUGUST 16, 2022 PARTIAL SUBDIVISION LAYOUT & UTILITY PLAN 4 C-07 PARTIAL EROSION CONTROL PLAN 10-INITIAL PHASE C-71 J REVISED: NOVEMBER 1, 2022 PARTIAL SUBDIVISION LAYOUT & UTILITY PLAN 5 C-08 PARTIAL EROSION CONTROL PLAN 11-INITIAL PHASE C-72 O 9� PARTIAL SUBDIVISION LAYOUT & UTILITY PLAN 6 C-09 PARTIAL EROSION CONTROL PLAN 12-INITIAL PHASE C-73 N "' CIVIL SERIES DRAWING ABBREVIATIONS: PARTIAL SUBDIVISION LAYOUT & UTILITY PLAN 7 C-10 PARTIAL EROSION CONTROL PLAN 13-INITIAL PHASE C-74 U) PARTIAL SUBDIVISION LAYOUT & UTILITY PLAN 8 C-11 PARTIAL EROSION CONTROL PLAN 14-INITIAL PHASE C-75 co /-AT - - - J DS DOWNSPOUT MECH MECHANICAL R/W RIGHT OF WAY C-12 - - rn AC -ACRE - - PARTIAL SUBDIVISION LAYOUT &UTILITY PLAN 9 OVERALL EROSION CONTROL PLAN FINAL PHASE C 76 a EA -EACH MH MANHOLE RE D RE UIRED Q Q - - - C� CL AFG ABOVE FINISHED GRADE - PARTIAL SUBDIVISION LAYOUT & UTILITY PLAN 10 C 13 PARTIAL EROSION CONTROL PLAN 1 FINAL PHASE C 77 N EIP EXISTING IRON PIPE MIN MINIMUM RCP REINFORCED CONCRETE PIPE H L o Z W APPR-APPROXI MATE - - - ELEC ELECTRICAL MJ MECHANICAL JOINT SAN SANITARY SEWER PARTIAL SUBDIVISION LAYOUT & UTILITY PLAN 11 C-14 PARTIAL EROSIONCONTROL PLAN 2-FINAL PHASE C-78 — cn ASSY-ASSEMBLY E/P-EDGE OF PAVEMENT NIC-NOT IN CONTRACT SDWK-SIDEWALK W Z B/C-BOTTOM OF CURB EX -EXISTING OHE OVERHEAD ELECTRIC SF SQUARE FOOT PARTIAL SUBDIVISION LAYOUT &UTILITY PLAN 12 C 15 PARTIAL EROSION CONTROL PLAN 3-FINAL PHASE C -79 w u1 U Z BOC-BACK OF CURB - - - — F/C FACE OF CURB OHP OVERHEAD POWER SPT SPOT GRADE PARTIAL SUBDIVISION LAYOUT &UTILITY PLAN 13 C 16 PARTIAL EROSION I N CONTROL PLAN 4 FINAL CO PHASE O S C80 C� B/L -BASE LINE - - - FDC FIRE DEPARTMENT CONNECTION OHT OVERHEAD TELEPHONE SS SANITARY SEWER Z C/) PARTIALSUBDIVISION LAYOUT & UTILITY PLAN 14 C-17 PARTIAL EROSION CONTROL PLAN 5-FINAL PHASE C-81BM-BOOK OF MAPS FDPS-FULL DEPTH PAVED SHOULDER PB-PLAT BOOK STA-STATION I? W u1 BMP-BEST MANAGEMENT PRACTICE FFE-FINISHED FLOOR ELEVATION PC -POINT OF CURVATURE STD -STANDARD OFFSITE WATER LINE PLAN -OLD GRAHAM ROAD C-18 PARTIAL EROSION CONTROL PLAN 6-FINAL PHASE C-82 z m BW-BOTTOM OF WALL FG-FINISHED GRADE PED-PEDESTRIAN STM-STORM CB -CATCH BASIN FH-FIRE HYDRANT PG -PAGE STMH-STORM SEWER MANHOLE MAIL KIOSK SITE, GRADING, & DRAINAGE PLAN C-19 PARTIAL EROSION CONTROL PLAN 7-FINAL PHASE C-83 a Z vs C&G-CURB AND GUTTER F/L-FLOW LINE PH -PHASE SWM-STORMWATER MANAGEMENT ON -SITE WASTEWATER SOILS MAP C-20 PARTIAL EROSION CONTROL PLAN 8-FINAL PHASE C-84 = ® C/L-CENTERLINE FM -FORCE MAIN PI -POINT OF INTERSECTION T-TELEPHONE C/) ®� CL-CLASS FT -FOOT PIV-POST INDICATOR VALVE TB -THRUST BLOCKING PARTIAL GRADING & DRAINAGE PLAN 1 C-21 PARTIAL EROSION CONTROL PLAN 9-FINAL PHASE C-85 CMP-CORRUGATED METAL PIPE G-GAS PKG-PARKING T/C-TOP OF CURB PARTIAL GRADING & DRAINAGE PLAN 2 C-22 PARTIAL EROSION CONTROL PLAN 10-FINAL PHASE C-86 CO-CLEANOUT GND-GROUND P/L-PROPERTY LINE TCM-TELEPHONE MANHOLE PARTIAL GRADING & DRAINAGE PLAN 3 C-23 PARTIAL EROSION CONTROL PLAN 11-FINAL PHASE C-87 COMM-COMMUNICATIONS GV-GATE VALVE PS -PUMP STATION TS&V-TAPPING SLEEVE AND VALVE CONC-CONCRETE HDPE-HIGH DENSITY POLYETHYLENE PT -POINT OF TANGENCY UGE-UNDERGROUND ELECTRIC PARTIAL GRADING & DRAINAGE PLAN 4 C-24 PARTIAL EROSION CONTROL PLAN 12-FINAL PHASE C-88 CONN-CONNECTION HORIZ-HORIZONTAL PP -POWER POLE UNK-UNKNOWN PARTIAL GRADING & DRAINAGE PLAN 5 C-25 PARTIAL EROSION CONTROL PLAN 13-FINAL PHASE C-89 CY-CUBIC YARD IN -INCHES PVC -POLYVINYL CHLORIDE UP -UTILITY POLE DB-DEED BOOK INV-INVERT PVMT-PAVEMENT VAR -VARIABLE PARTIAL GRADING & DRAINAGE PLAN 6 C-26 PARTIAL EROSION CONTROL PLAN 14-FINAL PHASE C-90 DCV-DOUBLE CHECK VALVE IP-IRON PIPE PWR-POWER VERT-VERTICAL PARTIAL GRADING & DRAINAGE PLAN 7 C-27 OFFSITE WATER MAIN EROSION CONTROL PLAN C-91 VICINITY MAP DDCV-DOUBLE DECTECTOR CHECK VALVE IPS-IRON PIPE SET R-RADIUS W/-WITH DI -DROP INLET L-LENGTH RD-ROOF DRAIN WM-WATER METER PARTIAL GRADING &DRAINAGE PLAN 8 C-28 STREAM CROSSING 1 DETAILS C-92 DIP -DUCTILE IRON PIPE LF-LINEAR FOOT RJ-RESTRAINTED JOINT W/O -WITHOUT PARTIAL GRADING & DRAINAGE PLAN 9 C-29 STREAM CROSSING 2 DETAILS C-93 SCALE: 1 "=2 000' DR -DRIVEWAY LP -LIGHT POLE RPZ-REDUCED PRESSURE ZONE W/L-WATERLINE LS-LIFT STATION WSEL-WATER SERVICE ELEVATION PARTIAL GRADING &DRAINAGE PLAN 10 C-30 LOT SEPTIC AREAS & OFFSITE EASEMENT MAP C-94 WV -WATER VALVE PARTIAL GRADING & DRAINAGE PLAN 11 C-31 STORMWATER SCM 1 SECTIONS & DETAILS SW-01 PARTIAL GRADING & DRAINAGE PLAN 12 C-32 STORMWATER SCM 4 SECTIONS & DETAILS SW-02 w � LEGEND PARTIAL GRADING & DRAINAGE PLAN 13 C-33 STORMWATER SCM 6 SECTIONS & DETAILS SW-03 J N PARTIAL GRADING & DRAINAGE PLAN 14 C-34 STORMWATER SCM 8 SECTIONS & DETAILS SW-04 a U WATER SITE DEVELOPMENT MISCELLANEOUS UTILITIES STORM DRAINAGE STRUCTURE SCHEDULE C-35 STORMWATER SCM 9 SECTIONS & DETAILS SW-05 LU CQ w w EXISTING WATERLINE EX. STORM SEWER PIPE EX. LIGHT POLE STREAM CROSSING CULVERT PLAN & SECTIONS C-36 STORMWATER SCM 10 SECTIONS & DETAILS SW-06 Z co o- Ur — CORBETT DRIVE PLAN &PROFILE 1 C-37 STORMWATER SCM 11 SECTIONS &DETAILS SW-074 w r o W[if WATERLINE ❑ CORBETT DRIVE PLAN & PROFILE 2 C-38 a o z PROPOSED STORM SEWER EX. LIGHT (WALL PACK) STORMWATER SCM 12 SECTIONS & DETAILS SW-08 0 o pQ EX. VALVE CORBETT DRIVE PLAN & PROFILE 3 C-39 — } 0 ■ EX. STORM STRUCTURE H" PROPOSED LIGHT POLE STORMWATER SCM 13 SECTIONS & DETAILS SW-09 J rn CORBETT DRIVE PLAN & PROFILE 4 C-40 p rn Uj H PROPOSED WATER VALVE PRE -DEVELOPMENT HYDROLOGY MAP SW-10co w ,��, ;;;;;; CATCH BASIN EX. UTILITY POLE REXFORD LANE PLAN & PROFILE 1 C-41 _ o POST INDICATOR VALE (Plv) POST -DEVELOPMENT HYDROLOGY MAP SW-11 DESIGNED BY: WZS z ® DROP INLET UTILITY POLE REXFORD LANE PLAN & PROFILE 2 C-42 DRAWN BY: WZS Q POST -DEVELOPMENT SCM HYDROLOGY MAP SW-12 = O EX. WATER METER HART LANE & QUINN TERRACE PLAN & PROFILE C-43 CHECKED BY: WZS co co 'jOD EX. STORM SEWER MANHOLE EX. GUY WIRE AUGUST TRACE DRIVE PLAN &PROFILE 1 C-44 STORMWATER ROUTING HYDROLOGY DATA SW-13 DRAWING DATE: 02/15/2021 �/�/M WATER METER O STORM SEWER MANHOLE EX. ELECTRICAL METER AUGUST TRACE DRIVE PLAN & PROFILE 2 C-45 LANDSCAPING PLAN L-01 SE PROJECT#: 2020-031 0LU STORMWATER SCM PLANTING PLAN I L-02 o z Z. EX. FIRE HYDRANT EX. ELECTRICAL EQUIPMENT BUCK TERRACE PLAN & PROFILE 1 C-46 CO _ RD EX. ROOF DRAIN LEADER I- z BUCK TERRACE PLAN & PROFILE 2 C-47 STORMWATER SCM PLANTING PLAN II L-03 � z FIRE HYDRANT ASSEMBLY OHP EX. OVERHEAD ELECTRIC LINE RD ROOF DRAIN LEADER BUCK TERRACE PLAN & PROFILE 3 C-48 STORMWATER SCM PLANTING PLAN III L-04 O 0 o NOTES &DETAILS D-01 Z D REDUCER FITTING O OHP PROPOSED OVERHEAD ELECTRIC LINE CLARA WAY & PRESTON TRACE PLAN & PROFILE C-49 _ Uj EX. ROOF DRAIN DOWNSPOUT GAINES TRAIL PLAN &PROFILE 1 C-50 SITE DETAILS I D-02 J o PLUG FITTING UGP O EX. UNDERGROUND ELECTRIC LINE GAINES TRAIL PLAN &PROFILE 2 C-51 ROOF DRAIN DOWNSPOUT zo SITE DETAILS II D-03 Q 0 w WATERLINE TEE UGP PROPOSED UNDERGROUND ELECTRIC LINE GAINES TRAIL PLAN &PROFILE 3 C-52 U LU EX. CURB AND GUTTER SITE DETAILS III D-04 3 GAINES TRAIL PLAN & PROFILE 4 C-53 UTILITY DETAILS I D-05 Q = ° WATERLINE CROSS T EX. TELEPHONE PEDESTAL z w CURB AND GUTTER LOGGERS RUN PLAN & PROFILE C-54 UTILITY DETAILS II D-06 M O 0 w FIRE DEPARTMENT CONNECTION (FDC) O TELEPHONE PEDESTAL CAZ TRACE PLAN & PROFILE C-55 UTILITY DETAILS III D-07 LJJ o w — — EXISTING PROPERTY LINE Z WATERLINE BLOWOFF T EX. TELEPHONE MANHOLE JOHN WILLIAMS LANE PLAN & PROFILE 1 C-56 EROSION CONTROL DETAILS I D-08 zo PROPERTY LINE TOWN OF PITTSBORO JOHN WILLIAMS LANE PLAN & PROFILE 2 C-57 EROSION CONTROL DETAILS II D-09 W Z W EX. WELL CASING OLD GRAHAM ROAD WATERLINE PLAN & PROFILE I C-58 EROSION CONTROL DETAILS III D-10 a z © BENCHMARK AND/OR SURVEY OHT EX. OVERHEAD TELEPHONE LINE CONSTRUCTION PLAN APPROVAL ♦ ^ Z) w (f Y CONTROL MARKER V O zco Q SANITARY SEWER OHT OVERHEAD TELEPHONE LINE ENGINEERING: DATE: OLD GRAHAM ROAD WATERLINE PLAN & PROFILE II C-59 EROSION CONTROL & NCG01 DETAILS D-11 U z �e $ SOIL BORING LOCATION OLD GRAHAM ROAD WATERLINE PLAN & PROFILE III C-60 z z OFO EX. OVERHEAD FIBER LINE PLANNING: DATE: Q �/ z ss EXISTING SANITARY SEWER OVERALL EROSION CONTROL PLAN -INITIAL PHASE C-61 2 Q z LIMITS OF DISTURBANCE a 0 OFO OVERHEAD FIBER LINE ~ W _ 0 SAN SANITARY SEWER MAIN PUBLIC WORKS: DATE: PARTIAL EROSION CONTROL PLAN 1-INITIAL PHASE C-62 2 \ 0 o EX. TREE PARTIAL EROSION CONTROL PLAN 2-INITIAL PHASE C-63 Q O EX. SEWER MANHOLE efts © EX. CABLE PEDESTAL FIRE DEPARTMENT: DATE: U 0 w z EX. SHRUB PARTIAL EROSION CONTROL PLAN 3-INITIAL PHASE C-64 V ° o SEWER MANHOLE OHC EX. OVERHEAD COMMUNICATIONS LINE a 0-1 —,� EX. FENCE EROSION CONTROL: DATE: TOTAL NUMBER OF SHEETS: 122 = o OCO CLEANOUT OHC OVERHEAD COMMUNICATIONS LINE Z z� J 0 w � x— PROPOSED FENCE ~ UGC EX. UNDERGROUND COMMUNICATIONS LINE O n EXISTING CLEANOUT <0 EX. TOPOGRAPHIC CONTOUR Civil Engineer Land Surveyor Septic Consultant Developer w ~ �o NATURAL GAS UGC UNDERGROUND COMMUNICATIONS LINE g y p13� z, � W szs PROPOSED TOPOGRAPHIC CONTOUR 100 C) , G EX. GAS LINE OHU EX. OVERHEAD UTILITY LINE -MULTIPLE UTILITIES Z 00 TC326.25 PROPOSED SPOT ELEVATION Shipman Engineering, PLLC Infinite Land Design S&EC LU Uj BC 325.75 BOLLARD NC License # P-1963 117 N. Chatham Avenue 8412 Falls of Neuse Road The Rexford Group, LTD. O U m G GAS LINE p, 0 z EX. SIGN 137 Middlegreen Place Siler City, NC Raleigh, NC 27615 362 Mountain Laurel U) o EX. GAS VALVE T SIGN OEIP PROPERTY MARKER/IRON PIPE Holly Springs, NC 27540 919.200.8376 919.846.5900 Chapel Hill, NC 27517 z 919.900.0006 Contact: Mr. Charles Eliason PLS Contact: Mr. Rick Pontello SURVEY DATUM INFORMATION U) w EX. GAS METER E EX. SURVEY MONUMENT y Contact: Mr. Ford D Aprix SHEET NUMBER: w ® Contact: Zak Shipman, PE schedule@infintelanddesign.com rpontello@sandec.com forddaprix@me.com HORIZONTAL DATUM: NAD83 w ° VERTICAL DATUM: NAVD88 z= zak@shipmanengineering.com C-0 1