Loading...
HomeMy WebLinkAboutNCS000251_Inspection Report_20221207Compliance Inspection Report Permit: NCS000251 Effective: 02/01/11 Expiration: 01/31/16 Owner: Bakelite Chemicals LLC SOC: Effective: Expiration: Facility: Conway Resins Plant County: Northampton 200 Ampac Rd Region: Raleigh Conway NC 27820 Contact Person: Tim Riddick Title: Phone: 252-585-3819 Directions to Facility: System Classifications: SWNC, Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 12/07/2022 Primary Inspector: Lauren Garcia Secondary Inspector(s): Entry Time 01:55PM Reason for Inspection: Routine Permit Inspection Type: Stormwater Discharge, Individual Facility Status: Compliant ❑ Not Compliant Question Areas: Storm Water (See attachment summary) Certification: Phone: Exit Time: 03:30PM Phone: 919-707-3648 Inspection Type: Compliance Evaluation Page 1 of 3 Permit: NCS000251 Owner - Facility: Bakelite Chemicals LLC Inspection Date: 12/07/2022 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: Inspection was in response to permit renewal. There have been no changes in industrial activity since the application was submitted. The facility has three main process, formaldehyde, resin manufacturing and spray dry. The resin manufacturing area drains mainly to outfall 1 and slightly to outfall 4. The formaldehyde manufacturing area drains to outfall 2. The formaldehyde manufacturing is operated continuously. The spray dry area drains to outfall three and partially to outfall 1. There is a dry product warehouse within the drainage area to outfall 1. Onsite there are also spray fields and waste water lagoons, covered under separate permits. Outfall 1 currently has stormwater comingled with non contact cooler/boiler blowdown water. It is likely the current outfall 1 will be removed from the stormwater permit as this technically makes the comingled water wastewater. The stormwater only discharges from the western side of the facility will need to be identified and sampled. There are multiple holding areas onsite where stormwater is held and checked for formaldehyde before it is released to drain through outfalls. The water is tested with "chemets". There is also a way for the water to be diverted to the onsite waste water lagoons if the water tests positive for contaminants. All storage tanks were observed to have secondary containment. Diesel tanks had propper secondary containment. All dry products produced/used onsite are stored under cover in teh dry storage warehouse. Industrial processes for the spray dry appear to take place within the building under cover. The industrial process for the resin and formaldehyde processes are contained, but there are exposed pipes and storage tanks outside. All of the tanks and exposed areas have secondary containment. The facility appeared to be kept neatly. No issues with pollution prevention and good house keeping were observed. All required documentation was present. The stormwater pollution prevention plan was thorough and addresses all permit requirements. DMRs were provided. Page 2 of 3 Permit: NCS000251 Owner - Facility: Bakelite Chemicals LLC Inspection Date: 12/07/2022 Inspection Type: Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? ❑ ❑ ❑ # Does the Plan include a BMP summary? ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ ❑ ❑ # Does the facility provide and document Employee Training? 0 ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? 0 ❑ ❑ ❑ # Is the Plan reviewed and updated annually? 0 ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ❑ ❑ ❑ Comment: Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring? 0 ❑ ❑ ❑ Comment: Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? 0 ❑ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? 0 ❑ ❑ ❑ Comment: Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? 0 ❑ ❑ ❑ # Were all outfalls observed during the inspection? ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ❑ # Has the facility evaluated all illicit (non stormwater) discharges? 0 ❑ ❑ ❑ Comment: Page 3 of 3