HomeMy WebLinkAboutNC0032115_Authorization to Construct_20090515.7Z wet]Ale NCtro3z/Is
Town of Banner Elk
A To C No. 032115A01
Issued March 26, 2009
Engineer's Certification
(049;lwol T
LOAN NOTION
I, Dori.» M Pde.ec , as a duly registered Professional Engineer in
the State of North Carolina, having been authorized to observe treriodicaIf 'weekly/full time)
the construction of the modifications and improvements to the BannerElk WWTP, located
' mile west of Highway 184 near Banner Elk in Avery County for the Town of Banner Elk,
hereby state that, to the best of my abilities, due care and diligence was used in the observation
of the following construction:
Installation of a 0.8 meter belt filter press capable of treating 325 pounds of dry
solids per hour, and all apputenances in conformity with the project plans,
specifications, and other supporting data subsequently filed and approved by the
Department of Environment and Natural Resources.
I certify that the construction of the above referenced project was observed to be built within
substantial compliance and intent of the approved plans and specifications.
Signature , uelid, A
Date ,$ -/ 'd'
Send to:
Registration No..2 7786
Construction Grants & Loans
DENR/DWQ
1633 Mail Service Center
Raleigh, NC 27699-1633
SEAL
2778o
A .vica
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Water Quality
Beverly Eaves Perdue Coleen H. Sullins Dee Freeman
Governor Director Secretary
March 26, 2009
Mr. John Mejaski
Town of Banner Elk
P.O. Box 2049
Banner Elk, North Carolina 28604
SUBJECT: Authorization to Construct
A to C No. 032115A01
Town of Banner Elk
Banner Elk WWTP
Avery County
Dear Mr. Mejaski:
A letter of request for an Authorization to Construct was received January 15, 2009, by
the Division of Water Quality (Division), and final plans and specifications for the subject
project have been reviewed and found to be satisfactory. Authorization is hereby granted for the
construction of modifications to the existing 0.60 MGD Wastewater Treatment Plant, with
discharge of treated wastewater into the Elk River in the Watauga River Basin.
This authorization results in no increase in design or permitted capacity and is awarded
for the construction of the following specific modifications:
Installation of a 0.8 meter belt filter press capable of treating 325 pounds of dry
solids per hour, and all appurtenances in conformity with the project plans,
specifications, and other supporting data subsequently filed and approved by the
Department of Environment and Natural Resources.
This Authorization to Construct is issued in accordance with Part III, Paragraph A of
NPDES Permit No. NC0032115 issued December 14, 2007, and shall be subject to revocation
unless the wastewater treatment facilities are constructed in accordance with the conditions and
limitations specified in Permit No. NC0032115.
The sludge generated from these treatment facilities must be disposed of in accordance
with G.S. 143-215.1 and in a manner approved by the Division.
In the event that the facilities fail to perform satisfactorily, including the creation of
nuisance conditions, the Permittee shall take immediate corrective action, including those as may
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location 512 N. Salisbury Si Raleigh. North Carolina 27604
Phone: 919-807-6300 FAX 919-807.6492Customer Service1-877.623-6748
Internet' www.ncwaterquality.org
An Equal Opportunily ' Ati';n it ne Action Employe'
NorthCarolina
Naturally
Mr. John Mejaski
March 26, 2009
Page 2
be required by the Division, such as the construction of additional or replacement wastewater
treatment or disposal facilities.
The Asheville Regional Office, telephone number (828) 296-4500, shall be notified at
least forty-eight (48) hours in advance of operation of the installed facilities so that an on site
inspection can be made. Such notification to the regional supervisor shall be made during the
normal office hours from 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State
Holidays.
Upon completion of construction and prior to operation of this permitted facility, a
certification must be received from a professional engineer certifying that the permitted facility
has been installed in accordance with the NPDES Permit, this Authorization to Construct and the
approved plans and specifications. Mail the Certification to: Construction Grants & Loans,
DWQ/DENR, 1633 Mail Service Center, Raleigh, NC 27699-1633.
Upon classification of the facility by the Certification Commission, the Permittee shall
employ a certified wastewater treatment plant operator to be in responsible charge (ORC) of the
wastewater treatment facilities. The operator must hold a certificate of the type and grade at
least equivalent to or greater than the classification assigned to the wastewater treatment
facilities by the Certification Commission.
The Permittee must also employ a certified back-up operator of the appropriate type and
grade to comply with the conditions of T15A:8G.0202. The ORC of the facility must visit each
Class I facility at least weekly and each Class II, III and IV facility at least daily, excluding
weekends and holidays, must properly manage the facility, must document daily operation and
maintenance of the facility, and must comply with all other conditions of T15A:8G.0202.
A copy of the approved plans and specifications shall be maintained on file by the
Permittee for the life of the facility.
During the construction of the proposed additions/modifications, the permittee shall
continue to properly maintain and operate the existing wastewater treatment facilities at all times,
and in such a manner, as necessary to comply with the effluent limits specified in the NPDES
Permit.
You are reminded that it is mandatory for the project to be constructed in accordance
with the North Carolina Sedimentation Pollution Control Act, and when applicable, the North
Carolina Dam Safety Act. In addition, the specifications must clearly state what the contractor's
responsibilities shall be in complying with these Acts.
Prior to entering into any contract(s) for construction, the recipient must have obtained all
applicable permits from the State.
•
Mr. John Mejaski
March 26, 2009
Page 3
Failure to abide by the requirements contained in this Authorization to Construct may
subject the Permittee to an enforcement action by the Division in accordance with North
Carolina General Statute 143-215.6A to 143-215.6C.
The issuance of this Authorization to Construct does not preclude the Permittee from
complying with any and all statutes, rules, regulations, or ordinances which may be imposed by
other govemment agencies (local, state, and federal) which have jurisdiction.
One (1) set of approved plans and specifications is being forwarded to you. If you have
any questions or need additional information, please contact Seth Robertson, P.E. at telephone
number (919) 715-6206.
Sincerely,
Coleen H. Sullins
MM:sr
cc: David W. Poore, P.E. — West Consultants, PLLC, 405 S. Sterling St.,
Morganton, NC 28655
Avery County Health Department
DWQ Asheville Regional Office, Surface Water Protection
Technical Assistance and Certification Unit
Point Source Branch, NPDES Program
Daniel Blaisdell, P.E.
Michelle McKay
ATC File