HomeMy WebLinkAboutNC0026051_Engineering Certfication_20130408Venture IV Building Suite 500 1730 Varsity Drive Raleigh, NC 27606 919.233.8091 Fax 919.233.8031 www.mckimcreed.com McKIM&CREED April 4, 2013 Mr. Kim Colson NCDENR - DWQ Infrastructure Finance Section 1633 Mail Service Center Raleigh, NC 27699-1633 ENGINEERS SURVEYORS PLANNERS M&C 01471-0004 (60/68/79) Re: Triangle WWTP Phase 3 - Engineer's Partial Certification A To C No. 026051A02 Project No. CS370575-02 Dear Mr. Colson: t , F t "PR 03 2013 nnitoce Swim Please find enclosed the Engineer's Partial Certification for the Triangle Wastewater Treatment Plant Phase 3. Please contact me with any questions or concerns. Sincerely, McKIM & CREED, INC. j an Blake, PE Senior Project Manager cc: Joseph Pearce, PE Durham County Ted Credle, PE Durham County Don Hancock, M&C Gerald Horton, PE NCDENR-Infrastructure Finance Section S: \ 1471 \ 0004 \ 60-ConAdm \ 60-Comm u n ica Lion \ 040413 Engineers Certification Let ter.docr ED Durham County A To C No. 026051A02 Project No. CS370575-02 Issued November 22, 2010 Engineer's Partial Certification APR Q 8 2013 kriiilPtifince Seem 1, Bryan F. Blake, as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (period ally/woekly/full time) the construction of the modifications and improvements to the Durham County Triangle WWTP, located on NC Highway 55 in Durham County for the County of Durham. hereby state that, to the best of my abilities, due care and diligence was used in the observation of the following construction: Installation of a 0.5 million gallon recycle stream flow equalization basin, a recycle stream flow equalization basin pump station with dual 800 gpm pumps and flow meter, two (2) 500,000 gallon sludge holding tanks. a dewatering system to include three (3) centrifuges each with a 175 gpm sludge feed rate (2 duty and 1 stand-by), and a sludge truck loading facility, in conformity with the project plans, specifications, and other supporting data subsequently filed and approved by the Department of Environment and Natural Resources. I certify that the construction of the above referenced project was observed to be built within substantial compliance and intent of the approved plans and specifications. The Contractor is currently working to complete final paving and punch list items such that the final certification can be issued. Signature Date 3/1/13 Send to: Registration No. f 1 57 U 00,0,o®ifs e,� . ' �.e M � ca c ,,, Infrastructure Finance Sectio SEAL , ) -.- - t 8 �' DENR/DWQ 1633 Mail Service Center *. 4 1 Raleigh, NC 27699-1633