HomeMy WebLinkAboutNC0026051_Engineering Certfication_20130408Venture IV Building
Suite 500
1730 Varsity Drive
Raleigh, NC 27606
919.233.8091
Fax 919.233.8031
www.mckimcreed.com
McKIM&CREED
April 4, 2013
Mr. Kim Colson
NCDENR - DWQ
Infrastructure Finance Section
1633 Mail Service Center
Raleigh, NC 27699-1633
ENGINEERS
SURVEYORS
PLANNERS
M&C 01471-0004 (60/68/79)
Re: Triangle WWTP Phase 3 - Engineer's Partial Certification
A To C No. 026051A02
Project No. CS370575-02
Dear Mr. Colson:
t ,
F t
"PR 03 2013
nnitoce Swim
Please find enclosed the Engineer's Partial Certification for the Triangle
Wastewater Treatment Plant Phase 3.
Please contact me with any questions or concerns.
Sincerely,
McKIM & CREED, INC.
j
an Blake, PE
Senior Project Manager
cc: Joseph Pearce, PE Durham County
Ted Credle, PE Durham County
Don Hancock, M&C
Gerald Horton, PE NCDENR-Infrastructure Finance Section
S: \ 1471 \ 0004 \ 60-ConAdm \ 60-Comm u n ica Lion \ 040413 Engineers Certification Let ter.docr
ED
Durham County
A To C No. 026051A02
Project No. CS370575-02
Issued November 22, 2010
Engineer's Partial Certification
APR Q 8 2013
kriiilPtifince Seem
1, Bryan F. Blake, as a duly registered Professional Engineer in the State of
North Carolina, having been authorized to observe (period ally/woekly/full time) the
construction of the modifications and improvements to the Durham County Triangle
WWTP, located on NC Highway 55 in Durham County for the County of Durham.
hereby state that, to the best of my abilities, due care and diligence was used in the
observation of the following construction:
Installation of a 0.5 million gallon recycle stream flow equalization basin, a
recycle stream flow equalization basin pump station with dual 800 gpm pumps
and flow meter, two (2) 500,000 gallon sludge holding tanks. a dewatering
system to include three (3) centrifuges each with a 175 gpm sludge feed rate (2
duty and 1 stand-by), and a sludge truck loading facility, in conformity with the
project plans, specifications, and other supporting data subsequently filed and
approved by the Department of Environment and Natural Resources.
I certify that the construction of the above referenced project was observed to be built
within substantial compliance and intent of the approved plans and specifications.
The Contractor is currently working to complete final paving and punch list items such
that the final certification can be issued.
Signature
Date 3/1/13
Send to:
Registration No. f 1 57 U
00,0,o®ifs e,� .
'
�.e M � ca c ,,,
Infrastructure Finance Sectio SEAL , ) -.-
- t 8 �'
DENR/DWQ
1633 Mail Service Center *. 4 1
Raleigh, NC 27699-1633