HomeMy WebLinkAboutNC0026000_Plan of Action_20170522TECHNICAL MEMORANDUM FOR THE Town of Tabor City Wastewater Treatment Plant Facility Assessment and Corrective Action Plan WKD Project No.: 20150187.00.CL Issued: March 31, 2017 FOR Town of Tabor City PO Box 655 Tabor City, NC 28463-0655 Copyright ©, WK Dickson & Co., Inc. All rights reserved. Reproduction or use of the contents of this document; additions or deletions to this document, in whole or in part without written consent of WK Dickson & Co., Inc., is protubited. Only copies from the original of this document, marked with an original signature and seal shall be considered to be valid, true copies. WK Dickson & Co., Inc. 616 Colonnade Drive Charlotte, North Carolina 28205 (t) 704- 334- 5348 www.wkd!dmn.com NC License No. F-0374 Table of Contents Section Page Section 1-Introduction 1-1 Section 2-Facility Assessment 2-1 Section 3-Corrective Action Plan 3-1 Appendix A — Anticipated Schedule A-1 Appendix B — W WTP Drawing and Hydraulic Profile B-1 Appendix C — W WTP Proposed Schematic C-1 Appendix D — Mercury Minimization Plan D-1 W I� Town of Tabor City D I C I<SO N Facility Assessment and Corrective Action Plan commuNW intwsb tuts consuitcnK 20150187.00.CL Issue Date: March 31, 2017 Page TaborClty 6MMMIM—,. Section 1- Introduction Section 1 - Introduction The Town of Tabor City is located in Columbus County, North Carolina. Columbus County is located in the southeastern part of the state along the South Carolina border and separated from the Atlantic Ocean by Brunswick County. The Town population is approximately 4,300 according to the most recent statistics. The Town is accessed by US Highway 701, NC Highway 904 and NC Highway 410. The Carolina Southern Railroad passes north to south through the center of Town. Neighboring municipalities include Fair Bluff, Chadboum, Whiteville, and Loris, South Carolina. The Town of Tabor City owns and operates the town of Tabor City Wastewater Treatment Plant (W WTP), located at 244 US Hwy 701 Bypass N. Initial construction of the Tabor City W WTP was completed in 1973, making the plant more than 42 years old. Pressure filters were added in 1999 to assist with solids removal from the plant effluent; however the filters were never operated consistently and were abandoned years ago. In 2007, a major plant upgrade was undertaken, which saw replacement of the two existing aeration basins with new concrete aeration basins, construction of a lined equalization basin, and upgrades to the headworks including a new auto screening system, upgraded grit removal, and a new flow sputter box. Currently, the plant has a permitted capacity of 1.1 MGD and consists of the following components: a triplex influent pumping station, mechanical screening, grit removal, equalization basin, two aeration basins (upper and lower), two secondary clarifiers (upper and lower), influent and effluent samplers, gaseous chlorine/sulfur-dioxide feed system, influent and effluent ultrasonic flow meters, a back- up power generator, aerated sludge holding basin, and chlorine contact basin. W.K. Dickson was retained to perform a Facility Assessment and Corrective Action Plan of the wastewater treatment plant as defined by the permit (NC0026000). Overall objectives of the Plan are as follows: 1. Evaluate the physical and operational condition and performance of the entire treatment facility. The assessment shall identify deficiencies and operational difficulties in the treatment facility which affect performance or permit compliance, and identify potential improvements to correct those shortcomings. Included in the facility Assessment the Permittee shall: a. Evaluate the adequacy of the entire headworks at average and peak flows. b. Evaluate the cause of the hydraulic issue at the upper secondary clarifier (#1). 2. Develop a Corrective Action Plan (CAP) which includes a strategy for the repair, modification, and/or replacement of deficiencies in the treatment facility in order that P%wI< Town of Tabor City D I C I<SO N Facility Assessment and Corrective Action Plan cmnmunlly inaosswcNre ccnwHwft 20wch 3 , 2017 Issue Date: March 31, 2017 Page 1-1 Section 1 - Introduction equipment functions as designed and in order to consistently comply with the effluent limitations of this permit. The CAP shall: a. Identify corrective actions needed in the headworks structures and establish an effective and reliable diversion plan to the side -stream surge basin. b. Identify actions needed to rehabilitate the upper secondary clarifier (#1) and its connective piping to function as designed. c. Identify operational changes or strategies needed to improve facility performance. d. Provide specific dates for completion or implementation of each action. The Facility Assessment was conducted on December 8-9, 2015. During the evaluation each unit process was carefully inspected for functionality and efficiency with the overall goal to assess the operational performance of the Town of Tabor City WWTP. Figure 1-1 Aerial view of the Town of Tabor City Wastewater Treatment Plant. End of Section Town of Tabor City DIIC i<SO N Facility Assessment and Corrective Action Plan communtty rottosm Lure consunonts 20150187.00.CL Issue Date: March 31, 2017 Page 1-2 Fmi Section 2 — Process Evaluations Section 2 — Facility Assessment Each of the unit processes are required by regulatory requirements to have a sufficient number of units to ensure that if the largest flow capacity unit was out of service, the remaining units will have a design flow capacity of 50% the total design average flow. The unit processes have each been evaluated on their condition and operation which may include: ♦ Defects ♦ Properly operating unit processes and components ♦ Up to date maintenance ♦ Neat and orderly workspaces A. Triplex Influent Pumping Station The mechanical screen is designed to remove solids larger than 0.125 inches from the wastewater stream flow. The mechanical screen automatically cleans itself and is designed to run routinely either based on a timer or differential water level, but it is not designed to run constantly. During the evaluation it was observed that the level transducers may not be in proper working order. The mechanical screen is currently being operated on timers. Wastewater enters the WWTP through a 24-inch ductile iron pipe (DIP). The plant influent comes into a pump station consisting of three large pumps. One 50 horsepower (hp) pump, one 40 hp pump, and one 30 hp pump. The 50 hp and 40 hp pumps are the main pumps, with the 30 hp pump only used as a backup as necessary. The flow enters through an initial wet well with a coarse bar screen at the bottom of the approximately 20 feet deep well. The flow is then split to two other wet wells just behind the first. Influent Pumps #1 & #2 (40 hp and 50 hp) pull from one well while backup Influent Pump #3 pulls from the other. During the facility assessment, it was noted that the bar screen in the initial wet well was full of large rags and debris. An operator is required to manually scrape the screen numerous times daily to remove the debris. IICKSON communRy nuoMtr Iurs CWsullonb Town of Tabor City Facility Assessment and Corrective Action Plan 20150187.00.CL Issue Date: March 31, 2017 Page 2-1 Section 2 — Facility Assessment Figure 2-1 Influent Triplex Pump Station B. Flow Equalization Basin An HDPE lined Equalization (EQ) Basin is used at the WWTP to divert flow from the influent pump station during extreme high flow situations. The basin is capable of storing up to 1.7 MGD of water. The EQ basin contains two floating aerators and a floating decanter. Currently, the operator is required to WD IICKSON communft InoosUucture consultants Town of Tabor City Facility Assessment and Corrective Action Plan 20150187.00.CL Issue Date: March 31, 2017 Page 2-2 u Section 2 — Facility Assessment manually open or close the valves leading to and from the EQ basin as high flows enter and recede from the plant. Figure 2-2 Flow Equalization Basin C. Headworks The Headworks at the Tabor City WWTP consist of a mechanical bar screen and a grit removal system. The mechanical bar screen is a Mellegard Cross Screen, a large step type screen, with self-cleaning capabilities. The openings on the screen can range in size from 0.5 — 6 millimeters (mm). The mechanical bar screen begins operation any time a pump at the influent pump station turns on. Observations of the bar screen at both peak and average flow showed that the screens operate frequently, even if screening is not necessary at the time. However, large quantities of grit were not removed during the self-cleaning operation of the mechanical screen. Whatever grit and debris was removed during self-cleaning of the screen was captured in a large garbage dumpster. Only a very small amount of debris was observed coming off the screen during the plant assessment. The dumpster had been emptied 2 weeks before the WK Dickson team visited the plant and during our assessment, the dumpster was less than 1/10th full. WD IICKSON community IMeoiftmwre cwtutionR Town of Tabor City Facility Assessment and Corrective Action Plan 20150187.00.CL Issue Date: March 31, 2017 Page 2-3 Section 2 — Facility Assessment Figure 2-3 Mechanical Bar Screen During the plant assessment a peak flow of approximately 2 MGD was observed twice while assessing the mechanical bar screen. The rubber lining the sides of the mechanical step bar screen was not flush to the screen, but instead curled up in certain locations. It was noted that, especially during peak flow, a steady flow of wastewater was moving through the openings left by the warped rubber and was not being properly screened. Also, there was grit and debris built up in the overflow chamber of the bar screen, which is used in high flow situations when the 3rd influent pump turns on. Figure 2-4 Overflow Chamber WDIICKSON commuolN InM1atleuCtute cMsullOnK Town of Tabor City Facility Assessment and Corrective Action Plan 20150187.00.CL Issue Date: March 31, 2017 Page 2-4 Section 2 — Facility Assessment Figure 2-5 Backside of Mechanical Screen After passing through the bar screens, the wastewater flow moves to a grit removal system. The system is a rolling grit removal system manufactured by Walker Process Equipment. As the wastewater enters the grit removal tank, it is pre -aerated to assist with separation of the grit from the wastewater flow. As the grit settles in the tank, it is pumped to an inclined screw grit washer located on the end of the grit removal tank. The accumulated grit is conveyed through grit washer to a hopper where it is collected in a large dumpster. Though a large amount of grit was observed in the bottom of the grit removal tank, large quantities were not being collected in the dumpster. The on -site operator stated that the collector dumpster is cleared of grit very infrequently, maybe once a month. IDIICKSON communrry wicstruclure cO sullcnh Town of Tabor City Facility Assessment and Corrective Action Plan 20150187.00.CL Issue Date: March 31, 2017 Page 2-5 TaborCity Figure 2-6 Grit Removal System Section 2 — Facility Assessment After the grit removal system, the flow is sent to a flow splitter box which separates the flow for the upper and lower extended aeration clarifiers. During the plant assessment, the wastewater entering the flow splitter box was observed to be a dull blue-green color. According to the operators, this coloring of the water happens often, at least 50% of the time. The coloring is believed to be due to upstream industrial user located near the W WTP. Figure 2-7 Flow Splitter Box WDIICKSON co munHy MM1a3huclure co Mamf Town of Tabor City Facility Assessment and Corrective Action Plan 20150187.00.CL Issue Date: March 31, 2017 Page 2-6 Section 2 — Fqcih!3, Assessment D. Upper Aeration Basin & Clarifier #1 The WWTP employs an activated sludge treatment process, which is designed to be split between two (2) aeration basins and 2 clarifiers. Biological treatment begins in the Aeration Basins, which receive flow from the flow sputter box after the grit collection system. Upper Aeration Basin #1 is a large rectangular concrete basin, 160ft x 117ft. The sides are sloped. Three (3) floating mechanical surface aerators provide mixing of the aeration basin and aeration of the wastewater. During the plant assessment, only 2 of the surface aerators in the upper basin were operational, so it was difficult to gauge how efficient the mixing in the basin was. There were no Variable Flow Drives (VFD's) on the aerators for the upper aeration basin, although there are VFD's on the lower aeration basin #2 surface aerators. Figure 2-8 Upper Aeration Basin #1 Aeration Basin #1 was not treating any wastewater during the WK Dickson site visit. Because the upper clarifier #1 was not operational, the upper aeration basin was being used as a holding tank for water diverted during heavy rains. During observation of the aeration basin, it was noted that the return activated sludge (RAS) line, which returns sludge from the Upper Clarifier #1 back to the aeration basin to maintain the activated sludge process, enters the aeration basin almost directly adjacent to the one of the effluent weirs from the aeration basin to Clarifier #1. There is approximately 2 feet of spacing in between the RAS line and effluent weir. This indicates that RAS flow from the clarifiers is not getting sufficient aeration or detention time before returning to clarification. WDIICKSON commumiy mnosvucmre consmtonts Town of Tabor City Facility Assessment and Corrective Action Plan 20150187.00.CL Issue Date: March 31, 2017 Page 2-7 r, ZaborCjty I� Figure 2-9 Upper Aeration Basin #1 Effluent Weir Section 2 — Facility Assessment Upper Clarifier #1 was not in operation during the site visit and plant assessment. Tabor City has often had issues with this clarifier. Wastewater from Upper Aeration Basin #1 flows through 8-inch D1P to Upper Clarifier #1, which is approximately 60 feet in diameter. Solids are separated by gravity and the clarifier effluent exits the clarifier across a v-notch weir. Solids that settle to the bottom of the clarifier are removed by RAS/WAS pumps. The RAS is pumped via a 6-inch force main (FM) back to the Upper Aeration Basin #1. The potential short circuiting issue that arises from the location of this RAS line is discussed in the previous paragraph. Another issue is that the RAS control valve was not able to be located. Although these RAS pumps and line have not been operational in more than a year, the plant operators have no way of controlling the RAS flow rate, or adjusting to meet the operational needs of the WWTP. The Waste Activated Sludge (WAS) is supposed to be pumped through a 6-inch FM to the Aerobic Digester. However, a small plastic 4-inch PVC pipe from the upper pump station to the Aerobic Digester appears to be the line used to convey the WAS. According to the operator, the WAS line for the upper clarifier #1 has not been in operation in over a year. WD IICKSON COIIImUnllr IMOW.a WEB consultants Town of Tabor City Facility Assessment and Corrective Action Plan 20150187.00.CL Issue Date: March 31, 2017 Page 2-8 Section 2 — Facility Assessment Figure 2-10 #1 Clarifier Influent Box In regards to the operation of the Upper Clarifier #1, a former operator indicated that when the clarifier has been drained in the past, large rags and debris have been found in the 8" DIP line leading to the clarifier. Some sand/grit and other solids were also seen. A jet flusher has been inserted into the piping to clean it; however it would regularly become stuck. The pipe enters at the bottom of the clarifier and enters after a sharp bend. Figure 2-11 #1 Clarifier �D IICKSON community ineosiruclure consunan% Town of Tabor City Facility Assessment and Corrective Action Plan 20150187.00.CL Issue Date: Marcie 31, 2017 Page 2-9 Section 2 — Facility Assessment E. Lower Aeration Basin & Clarifier #2 The Lower Aeration Basin #2 is a rectangular concrete basin, 198ft x 96ft, with sloped sides. Three (3) floating mechanical surface aerators provide mixing of the aeration basin and aeration of the wastewater. Each of the aerators have a VFD, however the VFD's controls are not tied to the information gathered from the DO probe in the basin. During the assessment, it was noted that the most efficient mixing in the lower aeration basin took place in the middle of the basin. The observation was made that the sides of the basin had low mixing and some sludge was settled along the sides. Figure 2-12 Lower Aeration Basin Because the upper activated sludge train was non -operational, all wastewater treatment was being performed in the lower aeration basin and clarifier #2. Wastewater flow from the lower aeration basin is conveyed through an 8-inch DIP to the approximately 48 feet diameter Lower Clarifier #2. Similar to the process and setup in the upper clarifier, solids are separated by gravity and the clarifier effluent exits through a v-notch weir. The solids that settle to the bottom of the clarifier are removed through RAS/WAS pumps. The RAS/WAS process in the Lower Clarifier #2 is operational, unlike in the upper clarifier. The RAS is pumped through a 4-inch FM to a manhole where it is mixed with influent flow before entering the lower aeration basin through an influent weir. The WAS is pumped through a 4-inch FM to the Aerobic Digester. The RASJWAS flow in the lower clarifier #2 is controlled by an on/off switch. The flow can be increased or decreased through the valves. WD IICKSON commune InhOslrucWre Consullann Town of Tabor City Facility Assessment and Corrective Action Plan 20150187.00.CL Issue Date: March 31, 2017 Page 2-10 Section 2 — Facility Assessment Figure 2-13 Lower RAS The Lower Clarifier #2 does cease operating correctly at times, according to plant operators. Heavy amounts of duckweed were observed during the plant assessment visit. The duckweed can clog up the clarifier so that it does not drain or pump properly. Figure 2-14 #2 Clarifier WDIICKSON cammunlry Intia,iructure cww11an% Town of Tabor City Facility Assessment and Corrective Action Plan 20150187.00.CL Issue Date: March 31, 2017 Page 2-11 'jabo Section 2 — Facility Assessment F. Aerobic Digester The two WAS lines bring waste activated sludge to the concrete lined Aerobic Digester from the upper and lower clarifiers. A 15 hp suspended mixer is used to mix the sludge. The mixer is run 2 to 3 times a week, and continuously during wasting. The on -site operator indicated that there is a short or some kind of malfunction in the electrical controls for the mixer that prevents it from running on a continuous basis or on auto. It is clear from observation that sufficient mixing is not achieved in the digester. The layer of sludge on the top is very thick and the color could indicate anaerobic conditions. Though there is a sludge loading dock for sludge removal, it is not used. A truck comes periodically to draw sludge off the top of the digester. Figure 2-15 Aerobic Digester G. Disinfection Treated wastewater from the clarifiers flows to chlorine contact basin. Chlorine and sulfur from large cylinders are used to disinfect the effluent prior to discharge. Calculations show that the chlorine contact basin detention time is within the accepted limit at 1.1 MGD flow. Instantaneous peak flows of almost 2 MGD were observed during the plant assessment. At these flows, the contact time is only about half of what is required. According to the operators on site, the concrete walls of the chlorine contact basin are weak and crumbling. Leaks have developed as a result. WDIlCKSON community Initastrudare consultants Town of Tabor City Facility Assessment and Corrective Action Plan 20150187.00.CL Lssue Date: March 31, 2017 Page 2-12 Figure 2-16 Disinfection End of Section W DIIC KSON communal InM1wtrucsure consuncnts Section 2 — Facility Assessment Town of Tabor City Facility Assessment and Corrective Action Plan 20150187.00.CL Issue Date: March 31, 2017 Page 2-13 Section 3 Corrective Action Plan Section 3 - Corrective Action Plan Influent Pumping, Flow Equalization Basin, and Headworks For the Tabor City W WTP to achieve at optimal treatment, changes and updates will be required. In the influent pump station, flow equalization (EQ) basin, and headworks areas, the following corrective actions are proposed: • Install VFD's on the influent pumps and same size motors to allow a constant flow of wastewater into the plant. Schedule: Completed in conjunction with CAP and permit approvals, funding availability, and construction schedule as approved by DWI. • Rotate use evenly between all three influent pumps to cut down on one pump becoming more fatigued and having a potentially shorter useful life. Schedule: Completed in conjunction with CAP and permit approvals, funding availability, and construction schedule as approved by DWI. • Install automated valves on the piping between the Influent Pump Station and EQ basin to improve the reliability of diverting flow to the basin as needed so that influent flow to the plant will stay at a constant level. Schedule: Completed in conjunction with CAP and permit approvals, funding availability, and construction schedule as approved by DWI. • Add a staff gauge to the EQ basin to regulate levels within the basin. Schedule: Completed in conjunction with CAP and permit approvals, funding availability, and construction schedule as approved by DWI. • Evaluate the options for relocation of existing headworks during the design process of the proposed upgrades to the facility to be located prior to the influent pump station. This evaluation shall include relocation of headworks, or resizing within same location of current configuration to be able to best accommodate design flows and to meet the intent of the original design. This may include replacement of either bar screen and grit removal or neither depending upon design evaluation and concurrence with DEQ. Schedule: Completed in conjunction with CAP and permit approvals, funding availability, and construction schedule as approved by DWI. • Efforts are being made to identify and address I/I sources in the collection system. Schedule: Completed in conjunction with CAP and permit approvals, funding availability, and construction schedule as approved by DWI. WD IICKSON community Town of Tabor City Facility Assessment and Corrective Action Plan 20150187.00.CL Issue Date: March 31, 2017 Page 3-1 C Aeration Basins and Clarifiers Section 3 Corrective Action Plan Many hydraulic issues arise from the continued operational problems with the Upper Aeration Basin and Clarifier #1. Proposed corrective actions for these areas include: • Move RAS piping from location at end of Clarifier #1 directly adjacent to effluent weir to area that is more conducive to proper mixing/aeration and detention times for RAS flow. Suggested location is North side of Upper Aeration Basin #1 near the start of the tank, directly across from the influent flow weir. Re-laying this pipe will remove the possibility of short circuiting of the RAS flow. It is believed that this short circuiting may have caused solids over -loading in Upper Clarifier #1. Schedule: Completed in conjunction with CAP and permit approvals, funding availability, and construction schedule as approved by DWI. • Install valves on piping and flow meters to be able to control RASIWAS flow to/from Upper Clarifier #1 (also if there is not a flow meter on RAS/WAS valves for Lower Clarifier #2, install flow meter on that piping as well). Schedule: Completed in conjunction with CAP and permit approvals, funding availability, and construction schedule as approved by DWI. • Dig and replace/reconfigure piping leading into Upper Clarifier #1. Use larger pipe sizes and less severe bend angles to reduce possibility of pipes clogging. For all piping between Upper Aeration Basin #1 and Upper Secondary Clarifier #1 with a complete clarifier redesign and rehabilitation. Schedule: Completed in conjunction with CAP and permit approvals, funding availability, and construction schedule as approved by DWI. • A condition assessment will be made on all pipes with low flow or that are suspected of clogging. Identified problems will be addressed to ensure proper flow rates are maintained. WAS piping shall also be evaluated and addressed for redesign and rehabilitation. Schedule: Completed in conjunction with CAP and permit approvals, funding availability, and construction schedule as approved by DWI. For Lower Aeration Basin #2: • Tie DO level results from DO probe in Lower Aeration Basin #2 to existing VFD's on the three floating aerators. This will allow for more efficient power usage so that aerators are not operating continuously and will only turn on as needed to keep oxygen at required levels. Schedule: Completed in conjunction with CAP and permit approvals, funding availability, and construction schedule as approved by DWI. PSWTown of Tabor City I C I<SO N Facility Assessment and Corrective Action Plan community mtroarualiw• c=uuann 20150187.00.CL Issue Date: March 31, 2017 Page 3-2 Section 3 Corrective Action Plan Aerobic Digester and Chlorine Contact Basin Rehabbing the digester and chlorine contact basin will help improve plant performance. Corrective actions for these areas include the following: • Replace the mixer in the Aerobic digester with a larger size mixer/aerator. This will result in better mixing and aeration for the aerobic digester. Schedule: Completed in conjunction with CAP and permit approvals, funding availability, and construction schedule as approved by DWI. • Coat the walls of the chlorine contact basin with a coal tar epoxy to help protect the basin walls from the corrosive nature of chlorination. Schedule: Completed in conjunction with CAP and permit approvals, funding availability, and construction schedule as approved by DWI. • Reconfigure the disinfection system to allow a portion of the system to be out of commission for maintenance without affecting disinfection capabilities during ideal flow conditions. Schedule: Completed in conjunction with CAP and permit approvals, funding availability, and construction schedule as approved by DWI. • Evaluation of disinfection system to include assessment of conversion of gaseous chlorine to liquid sodium hypochlorite, with considerations and evaluation of flow paced dosing for both options. Schedule: Completed in conjunction with CAP and permit approvals, funding availability, and construction schedule as approved by DWI. WD ICKSON COmmVnNy M(IOfINChIfB COniultanif End of Section Town of Tabor City Facility Assessment and Corrective Action Plan 20150187.00.CL lssue Date: March 31, 2017 Page 3-3 IIICKSON cammumly In11O3huclure canwtlann Appendix - A Appendix A - Anticipated Schedule Town of Tabor City Facility Assessment and Corrective Action Plan 20150187.00.CL Issue Date: March 31, 2017 Page A-1 Appendix A - Anticipated Schedule Town of Tabor City W WTP Rehabilitation Clean Water State Revolving Loan Fund CS 370609-01 Below is the anticipated project schedule as provided by Municipal Engineering Services Company, P.A. Design Package Submittal, November 3, 2017 Design Package Approval, March 2, 2018 Award Construction Contract, August 6, 2018 Notice to Proceed, September 28, 2018 Finish Construction, November 29, 2019 IDIICKSON cg unily Inhasirualure com0anb Town of Tabor City Facility Assessment and Corrective Action Plan 20150187.00.CL Issue Date: Mardi 29, 2017 Page: 1 Appendix - B W WTP Drawing and Hydraulic Profile WD IICKSON communev trtlmstmcwre eonsWtonh A}2l,en Town of Tabor City Facility Assessment and Corrective Action Plan 20150187.00.CL Issue Date: March 31, 2017 Page B-1 RECORD DRAWINGS OCTOBER 2009 REWSWN6 iORm •SAIL R-.H tV SV :-D-OI 4X RIF OAwW3 RllWfl 1.:1-0i P. A5/-'- t f fp T O AClllf� �1LSif3' I• -iS•09 TOP OF WALL: 85,75' d INFLUENT WEIR i'� k MANHOLE ELEV. 83.75' RIIM: 85.0 8• DIP DRAIN INV 68.5' INV: 69.75' EFFL. WEIR IP IX. MH INVERT: BON 6 y N yCa y b s �' � �' � IXMH N o EXISTING 16• INVERT: 87.52' STIN G 8. DIP 'OAK -AZ `/ �TBZ' , INVERT: 80.19' gg'' pp ¢ X g ? MH 0-2 INV: FL 85.61' �E9' �S Gyis.�EC -•"r,=R RIM: 75.5' EFFL.[WE 8' DIP / INV 66.2' NS. ELEV: 53.7' DIP ,EAY TOW: 62.65' �'` , Q47.dTy. INFLUENT WEIR ELEV. 76.5' -"'�Ayryl• I aT y S Jf,� INV: EX DRAIN NV:M17.81' 66.61 {C g•DIP B/. iEUX FA2'ST, R g vo'T WALLCONT Eo f� N INVERT: EX MH ' MH RIM �1C - SPUTTER 78.59 IP EX. 80X INV: 79.2' ' E". 7L5P A$ MH iI'VERT: 1 ca INV: 85:1' E% MH de ___ • D IW. off,pQ'T" _`? I INVERT: 75.53'EX `• EX MH0DGTEO W. 70.0' A SLUDGE IX CAUSTIC Qf+ 'PERj qq........ LOADING DRAIN l INV: 81.0' 6 vy cn Z.4e)*Z'��6,�• 16. INVERT: 76.04' p DP%'LH� ..._!Y" ® R �d6" 0 T PL'C {' ® W U dR E%iSfING 6• DRNN EFFL WEIRS 7 d 6*`r•' EIFV: 76.1' c ADJUSIABNAiP'." OUTLET -I EX NH MH D-I 21. RNERT' RIM: 72.5p' INV: 8J.0' �S ,y' `ry' 7f 8• G SLUDGE IL Q O w RIM: 72.98' 60.82' � � ® INV'. 82.8' TOP OF WALL: 78.5' ♦ . TOW: 75.2� DRAW -OFF Q. W INVERT: 59.08' DIP I 3 MH 0-1 a = ' EX WEIR MH 15' INVERT: 72.36' RIM: 79.06' INVERT: 72.33' U (n EX WIN E-1 J C) DIP EX MH E-3 IN INVERT: BYPASS a INVERT: 70.98' 6' BACKWASH ` LL GRAN IN BYPASS Y tSLLL INV: BJ.S' 6• INVERT: 78.53' ST A/ FX � a MANHOLE /27 PERIMETER MANHOLE TOP OF - �I N .yy�� } Z RIIM: 77.0' -�-� BANK: 77.75' INVERT: 70.A9.T FILTERED AT ER T[ INV: 63.2' _ B AVERT: 7LD' ' _ 15OVERFLOW . -'�O •. 8' UNFILTERED FORCE f e> [�y,�'_-�-�_ -- . INVERT: 72.5' MAIN MANHOLE 026 �'�'ST,{ _ _ TOP OF WALL,-72S A!� 8• FILTERED z Z RIM: 77.0' INV: 62.0' INTAKE BOAT ASSEMBLY Aerf�A I! /o-_- __ p:;/oi, WATER J a a o �p D7a1'T,�.T ®C�y LU ED U u MANHOLE /2 g Z IY 40" INVERT: 70.6' LU w 0 w qV Go UV LIGHT F W dv H DISINFECTION0 --�-_ EQUIPMENT LL DZD m o p ® MANHOVERT,LE I3 , UU C. 2 w Q 68.2 INVERT: 69.1' ?i m 67.718• INVERT: W - j 88.9J' Q y u Q YN.. =7 ® on HYDRAULIC PROFILE AND FLOW SCHEMATIC -� Nrs a 3� NOTE: 100 YEAR FLOW PLAIN ELEVATION: 72.0' n G-11 17 WDIICKSON communM Inf,owuclure cwsuuonb Appendix - C Appendix C — W WTP Proposed Schematic Town of Tabor City Facility Assessment and Corrective Action Plan 20150187.00.CL Issue Date: Much 31, 2017 Page C-1 Grit Influent Pump Station Barscreen Collector Splitter Box Lower Upper Equalization Aeration Aeration Basin Basin #2 Basin #1 Relocate RAS line farther from effluent locations to increase mixing, detention time, and decrease short circuiting. Install Valves and Flow Monitors to better regulate flow. i Aerobic Lower Upper Sludge Secondary Secondary Digester Clarifier #2 Clarifier #1 i Chlorine Sludge Contact Loading Chamber Legend ►— Existing Lines —►— Proposed Lines NOT TO SCALE -_— Tabor City Iabo WWTPProposedSchematic /^DICKSON March 2017 mint aehuchxe ca wnanro -- WKD Project No.: 20150187.00.CL WDIICKSON community Intros wute cO svlfants Appendix - D Appendix D -Mercury Minimization Plan Town of Tabor City Facility Assessment and Corrective Action Plan 20150187.00.CL Issue Date: March 31, 2017 Page D-1 TOWN TABOR CITY WASTEWATER TREATMENT PLANT MUNICIPAL MERCURY MINIMIZATION PLAN June 29, 2016 SECTION I -PURPOSE The purpose of this Mercury Minimization Plan ("MMP") is to describe best management practices through which the Town of Tabor City Wastewater Treatment Plant will seek to reduce the amount of mercury discharged into its system and, ultimately, to the environment. The MMP compiles mercury reduction - related efforts to -date and potential future action items. It is designed to be a working document to help guide Town of Tabor City (Town) in its efforts to control mercury loadings discharged into its Publicly - Owned Treatment Works (POTW) by users of the sewer system. Such a reduction in loadings to the sewer system should translate to a reduction in the amount of mercury which is discharged from the treatment plant. The management practices summarized below may also help control some of the mercury reaching our storm sewer system as well. SECTION II — FACILITY DESCRIPTION The Town operates a publicly owned treatment works (POTW), including a collection system and wastewater treatment plant (W WTP), that serves the Town of Tabor City, North Carolina. The Town W WTP operates under NPDES Permit NCO026000 with a design capacity 1.1 mgd and average daily flows of approximately 0.3 to 0.4 mgd and an apparent peak flow of approximately 1.0 mgd. The treatment process includes two (2) biological treatment trains with the following components: • Triplex influent pump station • Influent Parshall flume with ultrasonic flow meter • Mechanical bar screen and by-pass manual bar screen • Grit removal system • Side -stream emergency surge basin (1.7 MG) • One (1) extended -aeration activated sludge basin (AB 41 — 1.177 MG) with mechanical floating aerators • One (1) contact stabilization basin (AB 42 — 1.1665 MG) with mechanical aerators • Two (2) clarifiers (Clarifier #1 — 60' diameter with 12' SWD, Clarifier 42 50' diameter x 9' SWD) • Gaseous chlorine and sulfur dioxide feed systems for chlorination and dechlorination • Chlorine contact basin with ultrasonic flow meter • Aerated sludge holding basin • Back-up power generator Most municipal treatment plants are not designed to remove mercury and it is exceedingly expensive to do so to very low levels. Incidental mercury removal occurs through typical municipal treatment with trace levels of mercury (and other metals) ending up in solids removed from the raw wastewater. Mercury is not used in the treatment processes at the W WTP but may be introduced into the sewer system through a variety of sources, such as discharges from industrial users, laboratories, dental clinics, medical facilities (i.e. hospitals, clinics, nursing homes and veterinarians), schools, and hauled waste. Residual deposits of mercury are also possible in the sewer system from historic practices. Finally, trace amounts from household products and atmospheric deposition (both wet and dry) contribute to sewer system mercury loadings. While there is typically some mercury contributed to public sewer systems statewide, it is usually in minute quantities and comprises a tiny portion of the already insignificant statewide loading for all point sources - just two percent of the annual mercury loadings to all State waters. Potential non -domestic sources of mercury within the Town sewer system typically include local industries, medical facilities, dental offices and schools. The Town has a current population of approximately 4,000 people with an area of approximately 3.2 square miles. Local industrial employers within the Town include the following: Company Name Tvoe of Business Number of Employees Atlantic Corporation Paper Converters 210 Tabor City Lumber Wood Processing 30 Filtec Precise, Inc. Nylon Spinning 45 Atlantic Automotive Enterprises Auto Parts 21 *Source— www.taborci .or indus / The Town has three (3) schools consisting of Tabor City Elementary School, Tabor City Middle School and South Columbus High School. Major medical facilities include South Columbus Medical Center. Between January 2010 and May 2015, the mercury data was evaluated with the annual average found to be above the Water Quality Based Effluent Limitation (WQBEL) of 0.12ng/L, 13 times. The data also was found to be above the Technology Based Effluent Limitation (TBEL) of 47 ng/L, 2 times. Accordingly, the effluent limit of 0.12 ng/L is maintained within the NPDES Permit at a sampling frequency of monthly. Since the facility has shown significantly high concentrations within the effluent with 97% of samples between January 2010 and May 2015 greater than 1 ng/L, a Mercury Minimization Plan (MMP) is required. SECTION III — PROGRAM PLAN A. EVALUATION OF POTENTIAL NON -DOMESTIC SOURCES CONTRIBUTING MERCURY TO THE POTW Within 24 months from the NPDES required 180-day period for development of an MMP (NPDES Permit effective date), the Town will evaluate available information to assess the potential for non -domestic users of the sewer system to contribute mercury to the system. The information to be reviewed may include: (1) POTW influent and effluent mercury data and trends; (2) industrial user permits and associated mercury monitoring data; (3) Toxics Release Inventory (TRI); (4) state hazardous site registry and the National Priority List relating to mercury contamination; and (5) historical records of industrial sites which have contributed mercury loadings to the sewer system. The Town will also survey and evaluate the following common sources of mercury in its service area: (1) dentist offices; (2) hospitals; (3) laboratories; (4) auto recyclers; and (5) other potential sources of mercury based on existing information. The Town will request that industrial related users review mercury concentrations in high -volume process chemicals and demonstrate that the mercury concentrations are below industry average. The Town will also request that alternative sources for chemicals be explored if the mercury levels are determined to be significantly higher than would normally be expected. If the mercury levels continue to be elevated and continue to create compliance issues with the permit, a pretreatment program will be implemented. The evaluation of potential non -domestic sources of mercury to the sewer system will be updated every five years, as warranted by prior sampling results and any additional new potentially significant sources to the system. B. ADDITIONAL CONTROL MEASURES This MMP identifies reasonable and cost-effective control measures to minimize mercury being discharged into the POTW. Below is a listing of initial BMPs for this POTW. Pollution Prevention Substances used at the WWTP will be evaluated to determine if they contain mercury or mercury -based compounds. Any such chemicals will be evaluated for substitution with non -mercury -containing substances. Housekeeoine. Spill Control and Collection, and Education The Town will develop procedures to minimize the possibility of any spill or release at the WWTP involving mercury containing substances. The Town will add mercury identification and proper disposal to ongoing and future operator training procedures. Public Outreach The Town will make available educational information regarding sources of household mercury and appropriate use/disposal practices. This information may be posted on the Town's website and mercury public education promoted through local news articles and flyer distribution within sewer bills. The availability of this information will be highlighted within one (1) year as an outreach to the Town's customers. The Town will also facilitate public awareness regarding community collection points for mercury -containing products from residents/customers for proper disposal. Periodic reminders of such collection programs will be provided as part of the Town's ongoing public outreach. Laboratory Practice The Town currently contracts laboratory operations for purposes of complying with state and federal monitoring and sampling requirements through a private laboratory service. The laboratory is a potential source of small quantities of mercury -containing compounds. The Town proposes to require the contract laboratory employees be trained in the proper handling and disposal of these materials as part of their contract service. The laboratories will also be requested to replace mercury thermometers with non - mercury thermometers, whenever practical. C. TRACKING AND MONITORING In order to assess the implementation of the control measures, the Town proposes to undertake the following evaluations beginning after the first full year that this MMP is implemented: 1. Survey annually at least ten percent (10%) of any non -domestic users identified as possible significant sources of mercury to the POTW; 2. Track the implementation of the programs outlined above; 3. Monitor influent mercury at least annually. Require significant non -domestic sources of mercury to monitor periodically, as warranted; and 4. Measure effluent mercury as required by the NPDES permit. These efforts will allow the Town to establish a baseline of influent and effluent mercury levels to assist in identifying any trends in mercury contributions from domestic and non -domestic users of the sewer system. This baseline will be tracked annually. Begin mercury sampling upstream and downstream of the Town's wastewater treatment plant outfall to further evaluate the potential instream mercury contribution by the Town and identify the mercury reduction potential. SECTION IV — IMPLEMENTATION OF CONTROL MEASURES The Town will implement the control measures summarized in Section III over the permit term and will update this MMP as warranted. The Town has already evaluated an industrial site and reviewed disposal management practices with entity and implemented new policies. SECTION V - REPORTING A summary of the MMP activities will be submitted as part of the NPDES permit renewal process.