HomeMy WebLinkAboutNCC202894_NOT Closeout Documents_20221212North Carolina Department of Environmental Quality
Land Resources: 1628 Mail Service Center, Raleigh, NC 27699 (919) 791-4200
County: Person Project: Roxboro Corrective Action Plan (CAP) River basin: Roanoke
Person financially responsible: DUKE ENERGY PROGRESS LLC - Issa Project #: PERSO-2021-001
ZarZar, GM-CCP Central Projects
Address: 410 SOUTH WILMINGTON ST, Raleigh, NC 27602
1. Project Location: Dunnaway Road, Semora
Pictures: No
2. Weather and soil conditions: Sunny and Dry Initial inspection: Yes
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name): BrianFowler
Inspection report: Sent Report
9. Corrective action needed:
Title: Environmental Field
Date given/sent: December 02, 2022
10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional
self -monitoring or self -inspections are required. Project is in compliance and released under
the SPCA. Termination of coverage under the NPDES General Stormwater Permit for
Construction Activities (NCGO1) must be requested by the permittee via a Notice of
Termination (NOT). The NOT is available at:
https://edocs.deq.nc.gov/Fonns/NCGOI-Termination. Please note that this correspondence
must be uploaded as part of completing the NOT process.
Reported by: Celina Amaya Others present: Kimberly Summers
Date of inspection: November 29, 2022 Time arriving on site: 10:00 AM Time leaving site: 10:15 AM
cc: