Loading...
HomeMy WebLinkAboutNCC205115_NOT Closeout Documents_20221212North Carolina Department of Environmental Quality Land Resources: 943 Washington Square Mall, Washington, NC 27889 (252) 946-6481 County: Wayne Project: Stonebridge River basin: Neuse Person financially responsible: J & N Developers, LLC - Stacey Johnson, Project #: WAYNE-2021-007 Member/Manager Address: 501 S Pearl St, Princeton, NC 27569 1. Project Location: Bartlett Rd, Saulston Pictures: No 2. Weather and soil conditions: Cloudy, warm, dry Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? No Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): No one Inspection report: Sent Report Title: Date given/sent: December 7, 2022 9. Corrective action needed: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self - inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDFS 10. Comments: General Stormwater Permit for Construction Activities (NCG01) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: https://edocs.deg.nc.goy/Forms/NCGOl-Termination. Please note that this correspondence must be uploaded as pan: of completing the NOT process Reported by: Bradley West Others present: Date of inspection: December 6, 2021 Time arriving on site: 10:15 AM Time leaving site: 10:40 AM cc: