Loading...
HomeMy WebLinkAboutWLS Neuse 02 UMB, Scarborough Site (SAW-2017-02527) Year 2 Annual Monitoring Report Review and Credit Release RequestFrom: Davis. Erin B To: Baker. Caroline D Subject: FW: [External] WLS Neuse 02 UMB, Scarborough Site (SAW-2017-02527) Year 2 Annual Monitoring Report Review and Credit Release Request Date: Monday, December 12, 2022 3:00:24 PM Laserfiche Upload: Email & Attachment DW R#: 20180181 v.1 Doc Date: 11/10/22 Doc Type: Mitigation — Mitigation Information Doc Name: General topic of email title From: Dailey, Samantha J CIV USARMY CESAW (USA) <Samantha.J.Dailey@usace.army.mil> Sent: Thursday, November 10, 2022 10:29 AM To: Tugwell, Todd J CIV USARMY CESAW (US)<Todd.J.Tugwell@usace.army.mil>; Kim Browning <Kimberly.D.Browning@usace.army.mil>; Haywood, Casey M CIV USARMY CESAW (USA) <Casey.M.Haywood@usace.army.mil>; Davis, Erin B <erin.davis@ncdenr.gov>; Wilson, Travis W. <travis.wilson@ncwildlife.org>; Bowers, Todd <bowers.todd@epa.gov> Cc: Cara Conder <cara@waterlandsolutions.com> Subject: [External] WLS Neuse 02 UMB, Scarborough Site (SAW-2017-02527) Year 2 Annual Monitoring Report Review and Credit Release Request CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Good morning, *Please Note — at this time, I am not planning an IRT site visit for Year 2, so please let me know if you would like to conduct an on -site visit. The below reference bank Sponsor has submitted an Annual Monitoring Report for NCIRT review, and is requesting a release of credits. The Annual Monitoring Report has been posted to the RIBITS Cyber Repository for the bank site (see link and instructions provided below). If you are unable to access the document or prefer to have a hard copy mailed to you, please let me know as soon as possible, and I will arrange to get you a copy of the report. This review will follow the process outline for Credit Release Approval in the 2008 Mitigation Rule (Section 332.8(o)(9)), which requires an IRT review period of 15 calendar days from the date of this email notification. Please provide any comments by 5 PM on the 15-day comment deadline shown below. Comments provided after the 15-day comment deadline may not be considered. If you would like to request a site visit prior to submitting comments, please notify me as soon as possible but prior to the 15-day comment due date. If a site visit is required, the due date for IRT comments will be extended to 15 days after the date of site visit. Once I have received a request for a site visit, I will coordinate with the IRT and Sponsor to arrange for the on -site meeting; however, please note that due to workload it may take a month or longer to arrange the meeting. Within 30 days of the conclusion of the IRT review period (comment deadline), a copy of all comments will be provided to the bank Sponsor and the IRT along with District Engineer's intent to approve or disapprove this credit release. Sponsor: Water Land Solutions Bank Name: WLS Neuse 02 Umbrella Mitigation Bank Site Name: Scarborough Site USACE ID: SAW-2017-02527 River Basin: Neuse HUC: 03020202 County: Wayne Requested Credit Release: Year 2 Annual Monitoring 10% of the total stream restoration and enhancement credits: 1,086.3 Warm Water Stream Credits 10% of the total wetland restoration and enhancement credits: 10.97 Riparian Wetland Credits 15-Day Comment Start Date: November 10, 2022 15-Day Comment Deadline: November 25, 2022 45-Day Credit Release Approval Deadline: December 25, 2022 NOTE: Deadlines will be extended if an on -site meeting is requested. Please be sure to log on to RIBITS before following the link below. Once in the Cyber Repository, select the arrow beside appropriate folder to view and/or download the documents. Cyber Repository Link: https://ribits.ops.usace.army.mil/ords/f? a=107:278:17251627652425::: RP.278: P278 BANK I D:4886 I have also provided a link to videos that were too large for RIBITS: https://waterlandsolutions- my.sharepoint.com/:f:/p/cara/Esrg02aTzbZAhO2Gazd2pTcBoxvQB50DvAWWsyt4UaJomg? e=BMLAEA Thank you and please contact me with any questions, Sam Dailey (she/her) Chief, Charlotte Regulatory Field Office U.S. Army Corps of Engineers, Wilmington District 8430 University Executive Park Drive, Suite 615 Charlotte, INC 28262 Email: Samanth a.J.Dail eyna usace.army.mil Cell: (704) 589-8397