Loading...
HomeMy WebLinkAbout2022-11-23 SAW 2022-02399_Devils Alley Site Visit _ IRT CmtsCLEARWATER MITIGATION S O L U T z O N S November 23, 2022 MEETING MINUTES Devils Alley - IRT Site Visit Corps Action ID: SAW-2022-02399 DWR Project # 20221569 Site Visit Date: 11/15/2022 On November 15, 2022, the USACE, NCDWR, NCDMS, Axiom Environmental, and Clearwater Mitigation convened on -site, at 1:00pm to review the Devils Alley mitigation site. The Site is located in Chatham County, 1.8 miles southeast of the Town of Liberty. The property is situated just northeast of Flynt Road and Albright Road. Below is a list of attendees and general site visit notes. Attendees: USACE Todd Tugwell NCDWR Erin Davis NCDMS Lindsay Crocker NCDMS Jeremiah Dow Axiom Grant Lewis Clearwater Kevin Yates Site Visit Notes: The overall mitigation concept seemed accepted by the IRT. Comprehensive Site notes include the following. 1) All headwater tributaries will need flow gauges installed in the upper third of the channels to monitor consecutive days of flow. This includes UT 1, UT 3, UT 4, and UT 5. 2) Wetland Reestablishment and Wetland Rehabilitation areas will require preconstruction groundwater monitoring gauges to collect baseline measurements prior to Site modifications. 3) Wooded reaches of the Site may have understory planting conducted without success criteria being tied to the mitigation activity. Monitoring of understory planting will be conducted for information purposes only. 4) Stream Enhancement (level II) will require livestock removal and minor bank stabilization. Area of wooded reaches (or reaches with a narrow riparian fringe) will require more significant bank work to justify a 2.5:1 ratio. 5) Wetland Enhancement areas must have some gauges and/or vegetation plots to monitoring functional uplift. UT 1 1) A flow gauge has been requested in the upper reaches of UT 1 to track consecutive days of flow. The gauge should be located near the spring box at the upstream end of the Site. 2) The appropriate approach (wetland re -habilitation vs. wetland enhancement) for the wetland on the left bank near the confluence with UT 5 will be determined upon issuance of the jurisdictional determination. Page I CLEARWATER MITIGATION S D L 1U T 1 O N S 3) The crossing at the downstream extent of UT 1 is currently located in an easement break which would allow livestock to seek shade immediately downstream from the Site. The IRT would prefer the crossing to be internal and/or the easement to be extended downstream to the crossing to eliminate livestock access to the stream. Landowner negotiations will occur to determine if this is feasible. UT 2 1) UT 2 was determined to not be eligible for stream mitigation credit. This reach was determined to be a functioning wetland and therefore not suitable for stream restoration. UT 3 1) The IRT expressed concern that UT 3 was not a jurisdictional stream. This tributary will be evaluated during a formal JD with the US Army Corps of Engineers to determine its jurisdictional status. If the stream is determined to be jurisdictional, a stream gauge will be required to track flow status. UT 4 1) UT 4 is an incised headwater tributary that will require a flow gauge to be installed in the upper reaches. UT 5 1) UT 5 is a headwater tributary that has been cleared on each bank. Enhancement Level II will occur in this reach and a flow gauge will be installed in the upper reaches. UT 6 1) The upper reaches of UT 6 have been impounded by an agriculture crossing. Removal of the crossing and elimination of the impoundment serves as the primary restoration activity in this upper reach. If the impoundment and/or restoration measures do not extend upstream to the easement boundary, the portion of the reach which is not impounded will be changed to Enhancement (Level II). 2) The lower Enhancement (Level II) reach will require bank work (sloping, matting, stabilization) to warrant a 2.5:1 ratio. Please do not hesitate to contact me with questions at 919-624-6901. Kevin Yates Clearwater Mitigation Solutions 604 Macon Place Raleigh, NC 27609 919-624-6901 clearwatermitigation@gmail.com Page 2