Loading...
HomeMy WebLinkAbout20221563 Ver 1_Voodoo Valley Minutes_20221201From: Davis, Erin B To: Baker, Caroline D Subject: FW: [External] Voodoo Valley Minutes Date: Monday, December 12, 2022 2:33:42 PM Attachments: IRT Site Walk Meeting Minutes 10-26-22.odf Laserfiche Upload: Email & Attachment DW R#: 20221563 v.1 Doc Date: 12/1/22 Doc Type: Mitigation — Site Visit Doc Name: General topic of email title From: John Hutton <jhutton@wildlandseng.com> Sent: Thursday, December 1, 2022 2:08 PM To: Kim Browning < Kimberly. D.Browning@usace.army.mil>; Tugwell, Todd J CIV USARMY CESAW (US) <Todd.J.Tugwell@usace.army.mil>; Davis, Erin B <erin.davis@ncdenr.gov>; Hughes, Travis G SAC <Travis.G.Hughes@usace.army.mil>; kathryn—matthews@fws.gov Subject: [External] Voodoo Valley Minutes CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Hi All, I'm finally getting around to getting meeting minutes out for the voodoo valley site visit. I think I captured the key discussion points here but let me know there is any needed clarification. Kim — Is there anything I need to do to withdraw the site from consideration under the current pre - prospectus? Kathy — we had a good meeting with our landowners last week. Do you have some availability in the next couple weeks to talk through the format of a proposal for a species bank? Thanks everyone and appreciate all the discussion at this site. ................................................................................................ John Hutton I Vice President 0: 919.851.9986 x102 M: 919.723.8203 Wildlands Engineering. Inc. 312 W. Millbrook Rd, Suite 225 Raleigh, NC 27609