Loading...
HomeMy WebLinkAboutHunter's Moon Meeting SummaryFrom: Davis, Erin B To: Baker, Caroline D Subject: FW: [External] RE: Hunter"s Moon Meeting Summary Date: Monday, December 12, 2022 2:28:48 PM Attachments: Hunters Moon Post Contract IRT Site Visit Summary 12-1-22.odf Laserfiche Upload: Email & Attachment DWR#: 20221567 v.l Doc Date: 12/1/22 Doc Type: Mitigation — Site Visit Doc Name: General topic of email title -----Original Message ----- From: Jeff Keaton <jkeaton@wildlandseng.com> Sent: Thursday, December 1, 2022 2:12 PM To: Kim Browning <Kimberly.D.Browning( usace.army.mil> Cc: Tugwell, Todd J CIV USARMY CESAW (US)<Todd.J.Tugwell@usace.army.mil>; Davis, Erin B <erin.davis(0ncdenr.gov>; John Hutton <jhutton@wildlandseng.com>; Crocker, Lindsay <L indsay .Crocker(0ncdenr.gov> Subject: [External] RE: Hunter's Moon Meeting Summary CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. <mailto:report.spamCanc. go Kim - Here is a revised meeting summary that addresses your comments below. Let me know if you have any more comments. Jeff -----Original Message ----- From: Isenhour, Kimberly T CIV USARMY CESAW (USA) <Kimberly.D.Browning(a�usace.army.mil> Sent: Monday, November 21, 2022 3:18 PM To: Jeff Keaton <jkeaton@wildlandseng.com> Cc: Tugwell, Todd J CIV USARMY CESAW (USA)<Todd.J.Tugwell@usace.army.mil>; erin.davis@ncdenr.gov; John Hutton <jhutton@wildlandseng.com>; Crocker, Lindsay <Lindsay.Crocker&cdenr.gov> Subject: RE: Hunter's Moon Meeting Summary These look ok to me Jeff. I'd also add that you should mention the need for berm removal on the upper portions of Quaker Creek. We'd also like to see the buffer here expanded to the top of the ridge. Lastly, I noted several existing walnut trees in the buffer. You all should discuss whether you'll be keeping these or removing them. Thanks Kim Kim Isenhour Mitigation Project Manager, Regulatory Division I U.S. Army Corps of Engineers 1 919.946.5107 -----Original Message ----- From: Jeff Keaton <jkeaton@wildlandseng.com> Sent: Monday, November 21, 2022 2:47 PM To: Tugwell, Todd J CIV USARMY CESAW (USA)<Todd.J.Tugwell@usace.army.mil>; Isenhour, Kimberly T CIV USARMY CESAW (USA) <Kimberly.D.Browning(ousace.army.mil>; Erin Davis <erin.davis&cdenr.gov> Cc: Crocker, Lindsay <Lindsay.Crocker&cdenr.gov>; John Hutton <jhutton@wildlandseng.com> Subject: [URL Verdict: Neutral][Non-DoD Source] Hunter's Moon Meeting Summary All - The Hunter's Moon post -contract IRT site visit meeting summary is attached. Let me know if you have questions, comments, or revisions. Thanks. Jeff Keaton, PE I Senior Water Resources Engineer 0: 919.851.9986 x103 M: 919.302.6919 Wildlands Engineering, Inc. <Blockedhttp://www.wildlandseng.com/> 312 West Millbrook Road, Suite 225 Raleigh, NC 27609