Loading...
HomeMy WebLinkAbout20140813 Ver 2_401 Application_20150215W'�WK LETTER OF TRANSMITTAL WDICKSON community infrastructure consultants 720 Corporate Center Drive Raleigh, North Carolina 27607 919 782 0495 tel 919 782 9672 fax TO: NC DWQ WBSCP Unit 512 North Salisbury Street Raleigh, NC 27604 -1170 ATTENTION: Alan lohnson DATE: January 30, 2015 RE- Dale Landing City of Belmont We are sending via ® Overnight ❑ Regular Mad ❑ Pick -up ❑ Hand Delivered The following items ❑ Correspondence ❑ Plans ❑ Specifications ® Other as listed below COPIES DATE NO. DESCRIPTION 1 1 Agent Authorization Form 1 2 Check for Review Fees 5 3 PCN Forms (1 Original, 4 Copies) 5 4 Supplemental Narrative Copies 5 5 Quad Map Excerpts 5 6 Deed Copies 5 7 Soils Map 5 8 Aerial Exhibit Copies 5 9 Impact Exhibit Copies 3 10 11x17 Plan Sets 2 11 Full Size Plan Sets THESE ARE TRANSMITTED as checked below ❑ Foi Approval ❑ As Requested ❑ For Your Use ❑ Foi Review and Comment REMARKS: ❑ Approved as Submitted ❑ Returned for Corrections ❑ Approved as Noted ❑ Forward to Subcontractor COPY TO 20110214 00 RA SIGNED Randy Brookshire, PE Agent Authorization Form LOT NO Parcel #214172 PLAN NO PARCEL ID: PIN# 3595808285 STREET ADDRESS: Please print: Property Owner: Property Owner: 1400 E Catawba Street, Belmont, NC 28012 City of Belmont The undersigned, registered property owners of the above noted property, do hereby authorize Randall Brookshire (Contractor / Agent) of WK Dickson (Name of consulting firm) to act on my behalf and take all actions necessary for the processing, issuance and acceptance of this permit or certification and any and all standard and special conditions attached. Property Owner's Address (if different than property above): PO Box 431, Belmont, NC 28012 Telephone: 704-901-2067 We hereby certify the above information submitted in this application is true and accurate to the best of our knowledge. e Authonze—ffSign re Date: t laq Z/--f Authorized Signature Date: p��QY. Lea A rEq /0 613 Office Use Only Corps action ID no DWQ project no Form Version 1 4 January 2009 'UUI FEa 0 2 2 015 1 DENR -1AA! Eh kc5uURCES P ge 401 & BUFFER PERMITTING 1 of 10 PCN Form —Version 14 January 2009 Pre - Construction Notification (PCN) Form A. Applicant Information 1. Processing la Type(s) of approval sought from the Corps Section 404 Permit Section 10 Permit 1 b Specify Nationwide Permit (NWP) number or General Permit (GP) number 30 1c Has the NWP or GP number been verified by the Corps? Yes XNo 1d Type(s) of approval sought from the DWQ (check all that apply) X401 Water Quality Certification — Regular Non -404 Jurisdictional General Permit 401 Water Quality Certification — Express Riparian Buffer Authorization 1 e Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification Yes XNo For the record only for Corps Permit Yes No 1f Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program Yes No 1g Is the project located in any of NC's twenty coastal counties If yes, answer 1 h below Yes No 1h Is the project located within a NC DCM Area of Environmental Concern (AEC)? Yes No 2. Project Information 2a Name of project Kevin Loftin Riverfront Park —Dale Landing (Boat Launch Site) 2b County Gaston 2c Nearest municipality / town City of Belmont 2d Subdivision name 2e NCDOT only, T I P or state project no 3. Owner Information 3a Name(s) on Recorded Deed City of Belmont 3b Deed Book and Page No DB 4717 PG 1957 3c Responsible Party (for LLC if applicable) 3d Street address PO Box 431 (115 North Main Street) 3e City, state, zip Belmont, NC 28012 3f Telephone no 704 - 901 -2067 3g Fax no 3h Email address i r 'UUI FEa 0 2 2 015 1 DENR -1AA! Eh kc5uURCES P ge 401 & BUFFER PERMITTING 1 of 10 PCN Form —Version 14 January 2009 4. Applicant Information (if different from owner) 4a Applicant is Agent Other, specify City Manager 4b Name Barry Webb 4c Business name (if applicable) City of Belmont 4d Street address PO Box 431 (115 North Main Street) 4e City, state, zip Belmont, NC 28012 4f Telephone no 704 - 901 -2067 4g Fax no 4h Email address amiller @cityofbelmont org 5. Agent/Consultant Information (if applicable) 5a Name Randall Brookshire 5b Business name (if applicable) WK Dickson 5c Street address 720 Corporate Center Drive 5d City, state, zip Raleigh, NC 27607 5e Telephone no 919 - 782 -0495 5f Fax no 919 - 782 -9672 5g Email address rbrookshire @wkdickson com Page 2 of 10 B. Project Information and Prior Project History 1 Property Identification 1a Property identification no (tax PIN or parcel ID) PIN# 3595808285 1 b Site coordinates (in decimal degrees) Latitude 35 244841 Longitude -81 01827 1c Property size 1 4193acres 2 Surface Waters 2a Name of nearest body of water to proposed project Lake Wylie 2b Water Quality Classification of nearest receiving water Critical Area - WSIV 2c River basin Catawba 3. Project Description 3a Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application The existing conditions consist of a concrete boat launch ramp that is connected to a gravel parking and turnaround area The parcel is a small peninsula on Lake Wylie used for boating /fishing 3b List the total estimated acreage of all existing wetlands on the property 0 3c List the total estimated linear feet of all existing streams (intermittent and perennial) on the property 0 3d Explain the purpose of the proposed project The proposed project will add fixed piers on both sides of the existing boat ramp, a five slip floating dock system, and a canoe /kayak launch (concrete) The fixed piers and floating dock system will have concrete ramps that connect them to the existing grade dust above pond full elevation 3e Describe the overall project in detail, including the type of equipment to be used The fixed piers and floating docks will be constructed per the included structural plans The concrete canoe launch will be cast in place construction 4 Jurisdictional Determinations 4a Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the past? Yes XNo Unknown Comments 4b If the Corps made the jurisdictional determination, what type of determination was made? Preliminary Final 4c If yes, who delineated the jurisdictional areas? Name (if known) Agency /Consultant Company Other 4d If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation 5. Project History 5a Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? XYes No Unknown 5b If yes, explain in detail according to "help file" instructions The adjacent park parcel to the south of this site has been approved through DWR for Riparian Buffer Impact Authorizations This boat launch site will also be coordinated with the Regional DWR office for approval of lake impacts The dock plans will also be submitted to Duke Energy for review against their Shoreline Management Guidelines 6. Future Project Plans 6a Is this a phased project? Yes XNo 6b If yes, explain Page 3 of 10 PCN Form —Version 14 January 2009 C. Proposed Impacts Inventory 1. Impacts Summary la Which sections were completed below for your project (check all that apply) Wetlands Streams — tributaries Buffers XOpen Waters Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted 2a Wetland impact number Permanent (P) or Temporary T 2b Type of impact 2c Type of wetland 2d Forested 2e Type of jurisdiction Corps (404,10) or DWQ (401, other) 2f Area of impact (acres) W1 W2 W3 W4 W5 W6 2g Total Wetland Impacts: 2h Comments 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted 3a Stream impact number Permanent (P) or Temporary (T) 3b Type of impact 3c Stream name 3d Perennial (PER) or intermittent (INT)? 3e Type of jurisdiction 3f Average stream width (feet) 3g Impact length (linear feet) S1 S2 S3 S4 S5 S6 3h Total stream and tributary impacts 31 Comments Page 4 of 10 PCN Form — Version 1 4 January 2009 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U S then indivii ually list all open water impacts below 4a Open water impact number Permanent (P) or Temporary 4b Name of waterbody (if applicable 4c Type of impact 4d Waterbody type 4e Area of impact (acres) 01 P Lake Wylie Fill Lake 244 SF 02 P Lake Wylie Fill Lake 175 SF 03 P Lake Wylie FIII Lake 214 SF 04 P Lake Wylie FIII Lake 38 SF 4f Total open water impacts 1,071 SF or 0 025 Ac 4g Comments Impacts are due to concrete ramps that lead up to the new docks and the concrete area of the canoe launch All proposed concrete falls within the limits of the Lake Wylie "pond full" elevation of 569 4', therefore they are considered open water impacts 5. Pond or Lake Construction If pond or lake construction proposed, then complete the chart below 5a Pond ID number 5b Proposed use or purpose of pond 5c Wetland Impacts (acres) 5d Stream Impacts (feet) 5e Upland (acres) Flooded Filled Excavated Flooded Filled Excavated P1 P2 5f Total: 5g Comments 5h Is a dam high hazard permit required? Yes No If yes, permit ID no 51 Expected pond surface area (acres) 5j Size of pond watershed (acres) 5k Method of construction 6 Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below If yes, then individually list all buffer impacts below If any impacts require mitigation. then vou MUST fill out Section D of this form 6a. Project is in which protected basin? Neuse Tar - Pamlico Catawba Randleman Other 6b Buffer Impact number — Permanent (P) or Temporary 6c Reason for impact 6d Stream name 6e Buffer mitigation required? 6f Zone 1 impact (square feet ) 6g Zone 2 impact (square feet 131 B2 B3 B4 B5 B6 6h Total Buffer Impacts- 61 Comments Page 5 of 10 D. Impact Justification and Mitigation 1. Avoidance and Minimization 1 a Specifically describe measures taken to avoid or minimize the proposed impacts in designing project Ramps are required to give ADA access to the dock facilities and a clear path must be provided above the pond full elevation of 569 4' The concrete ramps extend just beyond this elevation at a minimum S'C' c �„dC�Q S N���e InL'►, �'ti f �d ✓`tt �y{„ lb Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques Docks will be constructed using piles to minimize impact to waters 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a Does the project require Compensatory Mitigation for impacts to Waters of the U S or Waters of the State? Yes XNo 2b If yes, mitigation is required by (check all that apply) DWQ Corps 2c If yes, which mitigation option will be used for this project Mitigation bank Payment to in -lieu fee program Permittee Responsible Mitigation 3 Complete if Using a Mitigation Bank 3a Name of Mitigation Bank 3b Credits Purchased (attach receipt and letter) Type Type Type Quantity Quantity Quantity 3c Comments 4. Complete if Making a Payment to In -lieu Fee Program 4a Approval letter from in -lieu fee program is attached Yes 4b Stream mitigation requested linear feet 4c If using stream mitigation, stream temperature 4d Buffer mitigation requested (DWQ only) square feet 4e Riparian wetland mitigation requested acres 4f Non - riparian wetland mitigation requested acres 4g Coastal (tidal) wetland mitigation requested acres 4h Comments 5 Complete if Using a Permittee Responsible Mitigation Plan 5a If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan Page 6 of 10 PCN Form — Version 1 4 January 2009 6 Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? Yes XNo 6b If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation Calculate the amount of mitigation required Zone 6c Reason for impact 6d Total impact (square feet) Multiplier 6e Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1 5 6f Total buffer mitigation required- 6g If buffer mitigation is required, discuss what type of mitigation is proposed (e g , payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund) 6h Comments Page 7 of 10 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan la Does the project include or is it adjacent to protected riparian buffers identified XYes No within one of the NC Riparian Buffer Protection Rules? 1 b If yes, then is a diffuse flow plan included? If no, explain why Impacts are within open waters only as defined by the pond full elevation of 569 4' This pond full line is Yes XNo indicated on the included exhibits and Sheet S7 0 Concrete that is shown is necessary for proposed facilities due to ADA access and Duke Shoreline Management Guidelines 2 Stormwater Management Plan 2a What is the overall percent imperviousness of this project? 2b Does this project require a Stormwater Management Plan? Yes XNo 2c If this project DOES NOT require a Stormwater Management Plan, explain why The only increase in impervious area is for ramps to dock facilities 2d If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan 2e Who will be responsible for the review of the Stormwater Management Plan? 3. Certified Local Government Stormwater Review 3a In which local government's jurisdiction is this project? Phase II 3b Which of the following locally - implemented stormwater management programs NSW USMP apply (check all that apply) XWater Supply Watershed Other 3c Has the approved Stormwater Management Plan with proof of approval been Yes XNo attached? 4. DWQ Stormwater Program Review Coastal counties HQW 4a Which of the following state - implemented stormwater management programs apply ORW (check all that apply) Session Law 2006 -246 Other 4b Has the approved Stormwater Management Plan with proof of approval been Yes No attached 5. DWQ 401 Unit Stormwater Review 5a Does the Stormwater Management Plan meet the appropriate requirements? Yes No 5b Have all of the 401 Unit submittal requirements been met? Yes No Page 8 of 10 PCN Form — Version 1 4 January 2009 F. Supplementary Information 1 Environmental Documentation (DWQ Requirement) 1 a Does the project involve an expenditure of public (federal /state /local) funds or the XYes No use of public (federal /state) land? 1 b If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State Yes XNo (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter) Yes No Comments 2. Violations (DWQ Requirement) 2a Is the site in violation of DWQ Wetland Rules (15A NCAC 2H 0500), Isolated Wetland Rules (15A NCAC 2H 1300), DWQ Surface Water or Wetland Standards, Yes XNo or Riparian Buffer Rules (15A NCAC 2B 0200)? 2b Is this an after - the -fact permit application? Yes XNo 2c If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s) 3. Cumulative Impacts (DWQ Requirement) 3a Will this project (based on past and reasonably anticipated future impacts) result in Yes XNo additional development, which could impact nearby downstream water quality? 3b If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy If you answered "no," provide a short narrative description 4. Sewage Disposal (DWQ Requirement) 4a Clearly detail the ultimate treatment methods and disposition (non - discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility Page 9 of 10 PCN Form — Version 1 4 January 2009 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a Will this project occur in or near an area with federally protected species or Yes XNo habitat'? — 5b Have you checked with the USFWS concerning Endangered Species Act Yes XNo impacts? — 5c If yes, indicate the USFWS Field Office you have contacted 5d What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? NC State Historic Preservation Office Nothing occurs on this parcel, but there is a threatened species on the east side of the river Distance from site 0 4 miles, Species Name Symphyotnchum Georgianum, Common Name Georgia Aster, NC Status Threatened, Element of Occurance ID 26921 6 Essential Fish Habitat (Corps Requirement) 6a Will this project occur in or near an area designated as essential fish habitat? Yes XNo 6b What data sources did you use to determine whether your site would impact Essential Fish Habitat? 7 Historic or Prehistoric Cultural Resources (Corps Requirement) 7a Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation Yes XNo status (e g , National Historic Trust designation or properties significant in — North Carolina history and archaeology)? 7b What data sources did you use to determine whether your site would impact historic or archeological resources? Per North Carolina State Historic Preservation Office, the site is near "determined eligible" sites but they are not officially designated GS 1483 Belmont National Guard Armory 2010 & GS Sloans Ferry Bridge 2005 are the references 8. Flood Zone Designation (Corps Requirement) 8a Will this project occur in a FEMA- designated 100 -year floodplain? XYes No 8b If yes, explain how project meets FEMA requirements WKD has determined that there will be no significant impact to flood waters with these proposed features 8c What source(s) did you use to make the floodplain determination? Online at ncfloodmaps com carry L CJI 1U l'rPpl,canj, /2`lftJ— 113 0/t Applicant/Agent's Printed Na'm'e Applicant /Agent's Signature (,agent's Date signature is valid only if an authorization letter from the applicant is provided Page 10 of 10 DWR — Open Water Impact Justification Narrative Kevin Loftin Riverfront Park — Dale Landing (Boat Launch Site) The following are supplemental narrative items related to the PCN form for the Kevin Loftin Riverfront Park — Dale Landing (Boat Launch Site)- D. Impact Justification and Mitigation 1a Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project Lake Wylie's target year round water surface elevation is 566.4' The "pond full" elevation as controlled by the dam is 569 4' For reference, Exhibit 2 shows that the location of the 569 4' elevation for this boat launch site falls within the existing gravel driveway and turnaround area The following impacts are shown on the included Exhibit 2 map 01— Open Water Impact This impact is a result of installing a stepped concrete canoe launch that will be partially submerged throughout the year Park users will be able to walk their canoe down the steps and place it parallel to the long ended side of the launch This launch layout allows users to load supplies and enter the canoe from the side. 02 & 03 — Open Water Impacts This impact is a result of providing ramps to the fixed piers adjacent to the existing concrete boat ramp Per the Duke Energy Shoreline Management Guidelines (SMG) which are required to be met with this work, fixed piers must be at a minimum 1' above the pond full elevation of 569.4' We have proposed the fixed piers at 570.4' due to this requirement. Part of the gravel drive and turnaround area is submerged during the pond full event Therefore, we have extended concrete ramps to just above the 569 4' elevation. These ramps also provide ADA access with running slopes less than 5% It is important to note that the concrete ramps will not be submerged in water for the majority of the year since the target pond full elevation is most likely to hover around 566 4' 04 — Open Water Impact Justification for the impact of 04 is similar to that of 02 & 03 above, however, we had to extend the ramp a bit farther to hit the 569.4' elevation while also maintaining part of the gravel access trail leading to the south of the docks. The separation of the right fixed pier and the boat slips is based on the requirements with the Duke Energy SMG The boat slips must have at least twice of the length of the slip in clear space beyond the end of the slip. WDICKSON BELMONT QUADRANGLE NORTH CAROLINA -SOUTH CAROLINA 7.5- MINUTE SERIES 2'30" 81 °00' 49Q 47 498 499 1 400 000 FEET (NC) 35 °15' LINCOLN ST f i , / �- .,� 600 CEDAR ST G SRC�p , TD 1 T DD ST F WOODROWgVE <yilT ~ \ �S� I 74 y PF bS - 550 000 W WOODROW AVE ( 1 / 650 FEET (NC) '00 4 HOWES ,-,PROJECT SI. � y� p�� MV LAVE "'- B'ELMONT 7 �. A yJT c pe? ,,TyrT �05� 3900 MU S '4,f* I� -- Dq r sT 2. Gateway Park bso p ST MCLEOD AVE S MA'N �S� 1p�RsS N LAYS ST I Greenwood VE Cem z :� PIEDMOp ^� J0 PARKDALE DR AST Q� � � --- - 110 3899 m a v � BRIGHT RD _ I RD R �/ /r� j. South Q 5 sT t Belmont o PINKNEYDR DE u 6so ATOND - = DORIE DR R OSPV '\ 650 VER WALK kqy -M98 2 ! S DR `� \ 650 N n IR M STO C 4:b 2� r Smith:_- _ P cv� n o _Cem \ BOWEN DR I ( i`'✓ L LEy AVE - l.� l �� ( �� /(l�L:� t`,-- 600 NOBS" 3897 650 / LL 5 _ f `i A, � - - - "EVAa � � - 3896 R. _ l C I t qR/ 1 J 0' Mt Pleasant C>.1" Cem ❑ pyE�.� �� •j �� Page h of 4 i ! 1 1 t Doc ID 016058270004 Type CRP 1'f Recorded 02 /19/2014 at 01 53 29 Pry Fee Amt $136 00 Pape 1 of 4 Revenue Tax $110 00 Instrq 201400026690 Gaston, NC t , - Susan S LockridAe Register of Deeds 8x4717 PG1957 -1960 R CORDNG FER �- ; EXCISE TAX PAID I , ti NORTH CAROLINA NON - WARRANTY DEED Excise TaY $ 11000 ` Parcel Identifier Nd _ Verified by County on the —_ day oL 20_ By 1 Mail/Box to Crantee Parks H Wilson Jr, Attorney at Law RE401Il PO Box 2187 Gastonia_ NC 28053 This SnstruihcnY was prepared by _ Y i ) _ _ Brief descnptto� for the Irdex:'LOT Deed Drawn Only, No I the Exam, THIS D] ED ma�� this 19th dayof February 20 14 by and between GRANTOR , GRANTEE ROGFR DAI E WILLAR$, Utunarri4 ~� ` CITY OF BELMONT 1 - a North Carolina municipal corporation PO Box 431 1 Belmont, NC 28012 Enter in appropriate block for each GranueYand Grantee named mailtgg address, and, if appropriate character of entity, e g corporation or partnership The designation Grantor and Grantee as uged hereinlshail include said 4rtiesl, their heirs, successors, and assigns, and shall include singular, plural, masculine, feminine or neuter as required by' context I WITtN'ESSFTH, that the Grantor, for a valuable consideration paid by tfr- Ctran&L, the receipt of which is hereby acknowledged, has and by these presents does grant, bargain, sell and convey tNdAhe Grantee in -fee simple, all that certain lot or parcel of land situated in the Cityof —_`__ Belmont I Southootmt _ `Iowirshipi Qastcm County, North Carolina and more particularly described as follows ! SFb AFTACHED SHEET FOR LEGAL DESCRIPTW )N ! The property heremabove described was acquired by Grantor by instrument; r4ordcd 114 f Bogk __ i page .l 1 All or a portion of the property herein conveyed —includes or X does not include the phinary residence off Grantor NC Bar Assoclat,nn Fwri No 729 1 /If2010 ~- Punted by Agreement with the NC Bar Assmianon ' _ ` r I ry 1 1 t 4 ` r Book. 4717 Page. 107 c `eq. 1 Page 12 of 4 r r� TO HA'1!E AND TO HOLD the aforesaid lot or parcel of land and all privileges and appurftances thereto belongmg to the Grantee in foe Fhnple The Grantor iit�= no warranty, express or implied, as to title to the property hereuiabove described j IN: WITKFSS WHEREOF, the Grantor has caused this instrument to y ex eh k4g,,� -1. Name) R )ALE W I LLARD Aj 'S \.BY President ATfW r Secretary (Corporate Seal) (SEAL,) (SEAL) AC=iy of Gallon ry fibhc of the County and State aforesaid, certify that ROGER DALE W ILLARD, Unmarried �O personally appeared before me this day and acknowledged ' mg mstrimietvt for the purposes therein expressed Witness my ]land and Notarial stamp or seal this Wary 20 14 \ovember 9 „-2017 'r k4 Notary Public Marleffe H Isenhour State of North Carolina - County 4f r I, the undersigned Notary Public of die county and State aforesaid, certify that personally came before me this day and acknowledged than ji., is thb _ of a North Carolina or corporations meted liability conopany /gthetal pdtlneishipAimmted paitnershtp (strike through the inapphcable), and that by authority duly given and as the act of-such entity, __hi soied the foregoing instrument in its name on its behalf as its act and deed Witness my hand and Notarial staeip or seal, tiffs ._ ,•'day of , 20_ My Commission Expires _ _ tary Public State of North Carolina - County of - I, the undersigned Notary Pubic of %b Il aaty ` , W State aforesaid, terrify that ' r Witness my band and Notarial stamp or seal, this dgy of ' J 20_ My Commission Expires otary Public The foregoing %,mUU ate(s) of istam certified to be correct. This instrument and an the fast page hereof By Am-duly registered at the date and time and'ipthe Book and Page shown for t,^.*y n v Deputy/Assistant - Regai of Ifeedl NC Bar Association Form No U7 @1-977, 2002 r r Printed by Agreement with the NC Bar Association -1981 SoftPro Corporation;.J33,P Sue Forks Rd., Raleigh, NC 27609 r L � . r r i I r LM Book: 4717 Page 1 $�57 Seq. 2 I N Page ti of 4 , r t 'I r - ' tr EXHIBIT "A" t ' i3F,GtNN1NG at an iron situate North 41 degrees 18 minutes 10 seconds East 39 22 feet from the souttleaste -inmost corner of Willard, now or formerly, as described in Deed Book 2334 at Page 769 and rurmng thei1cf, from said Beginning Point with division line of Willard, North 41 degrees 18 minutes 10 secondg Fast 84 92 feet to an iron thence the following seventy -three (73) courses and distances (1) ti s''`outh r01 degrees 26 minutes 00 seconds East 7 76 feet to a point, (2) South 36 degrees 44 minutes 38 seconds East 11 4-2,Teet to a point, (3) South 33 degrees 54 minutes 30 seconds East 32 05 feet to a point, (4), gouth 49, degrees ,l3 minutes 43 seconds East 31 71 feet to a point, (5) South 21 degrees 56 minutes 48 seconds 'Past 25 50, feet to a point, (6) South 44 degrees 05 minutes 15 seconds East 56 46 feet to a piomt, (7) ,South 49 degrees 17 minutes 06 seconds East 5198 feet to a point, (8) South 72 degrees 54 minutes 17 seconds East 39 12 feet to a point (9) South 59 degrees 12 minutes l5 seconds East 14 24 feet to a\ point, (1-0) South'00 degree 55 minutes 34 seconds East 15 60 feet to a point, (11) North 76 degrees 23 minutes 27 seconds Egst,2,8 88 feet to a point, (12) South 36 degrees 50 minutes 17 seconds East 8 86 feet to a point, (13) South 33 aegees 23 minutes 02 seconds East 13 86 feet to a point, (14) South 55 degrees A mmutgs 37 seconds East 17 52 feet to a point, (15) North 37 degrees 30 minutes 15 seconds East 19 67,1'eet t' a,'potnt, (L6) North 49 degrees 47 minutes 33 seconds East 13 39 feet to a point, (17) North 14 degr=4 0( minuti~s 43 seconds East 26 56 feet to a point, (18) North 08 degrees 35 minutes 47 seconds East 3 (`7_I feet tq a point, (19) N'orth'49 degrees 23 minutes 43 seconds East 12 73 feet to a point, (20) North 74 degrees 04 mimites 46 seconds East 15 84 feet to a point, (21) North 10 degrees 42 minutes 28 seconds-East ;9'23 feet tp a point,-(22) North 87 degrees 23 minutes 44 seconds East 18 04 feet to a point, (23) North -03 degrePG 12 minutes 40 seconds East 46 00 feet to a point, (24) North 35 degrees 09 minutes 50 seconds East' 79 98 feet W a point, (25) North 85 degrees 58 minutes 35 seconds East 15 41 feet to a 1: ))nt, (26) 196rth ,'00 degle� 55 T'0wi)tes 52 seconds East 7 21 feet to a point, (27) South 74 degrees l 1 mmul'es l- l`secolids East ? 33--tfet to'�,pomt, (28) South 27 degrees 00 minutes 27 seconds East 14 18 feet to a point, (29) South JO degrees 39 minutes 44 seconds East 10 65 feet to a point, (30) South 32 degrees 01 iminutes 31,ieconds East,8 37 feet to a point, (31) South 08 degrees 28 minutes 08 seconds East 26 01 (:eet to a point; (32) Soulh'43 degrees 49 minutes 32 seconds East 13 54 feet to a point, (33) South 08 degrees 53; minufgs 03 sebAds Fast 18 14 feet to a point, (34) South 06 degrees 42 minutes 16 seconds East 56 04 feet to a point, (35)J �dutk 17 degrees 29 minutes 15 seconds East 100 35 feet to a point, (36) South 10 degree% 16 mirrVte's 371 sceonis East 10 22 feet to a point, (37) South 27 degrees 15 minutes 00 seconds- Lgsj,i3 69 feet t(�a point, (38),South 31 degrees 10 minutes 51 seconds East 15 59 feet to a point, (39) South 50 degrees 13•gifrytes,36 seconds East 12 90 feet to a point, (40) South 16 degrees 45 minutes 26 seconds 3�ast 2 25 feat to a point, (41) South 58 degrees I I minutes 54 seconds East 12 58 feet to a point, (42) South 10 degrees 25 minutes 02 seconds East 6 42 feet to a point, (43) North 85 degrees 28 minutes 54 seconds East 2 72 feet to a point, (44) South 80 degrees 30 minutes 05 seconds East 13 28 feet to a pomr, (451 South 48 degftes 39 minutes 09 seconds East 18 18 feet to a point, (46) South 03 degrees 29 mmutes,44,seconds East 20 12 feet to a point, (47) South 19 degrees 27 minutes 32 seconds Fast 12 62 feet to a pyoint, (48) South l`�rees 26 minutes 32 seconds East 16 26 feet to a point, (49) South 22 degrees 46 minutes 05 §eaonds East 7 04 feet to a point, (50) South 04 degrees 09 minutes 37 seconds East 21 21 feet to a point, (5)) South' 6 degrees 09 minutes 45 seconds East 18 77 feet to a point, (52) South 72 degrees -09 mjintrtes 46 sends East 7,24'feet to a point, (53) South 21 degrees 07 degrees 46 seconds East 1121 feet t» aipomt, (54) iouth 37 degrees 49 minutes 46 seconds East 16 02 feet to a point, (55) South 24 degrees 39 Immutel; 41; seeorids East 15 416 feet to a point, (56) North 39 degrees 47 minutes 16 seconds East 7 41 feet to it point, (579?iroft`s �4,degrees 45 minutes 12 seconds East 10 70 feet to a point, (58) North 45 degrees 12.4mintws 48 se onrls Fast 12 96 f k 1 r _ ' r 1 ' 4 , Book.4717 Page. 147 <eq. 3 Page N of 4 4 r / r � r - ' + feet �o q point, (59) North 18 degrees 11 minutes 56 seconds Last 12 68 feet to a point, (60) North 42 degrees 23 minutes 11 seconds East 12 21 feet to a point, (61) North 07 degrees 44 minutes 05 seconds East 10 69 feet to a point, (62) North 18 degrees 52 minutes 25 seconds East 34 12 feet to a point, (63) North 25 degrees 00 minutes 19 seconds East 40 81 feet to a point, (64) North 58 degrees 40 minutes 23 seconds ant 42 65 feet to a point, (65) North 67 degrees 56 minutes 13 seconds East 23 45 feet to a pglnt, ((A) North 58 degrees 28 minutes 16 seconds East 31 81 feet to d point, (67) North 40 degrees 10 minute,4 14 seconds East 42 17 feet to a point, (68) North 31 degrees 28 minutes 18 seconds East 59 44 ' Meet to a point, (69) North 22 degrees 55 minutes 15 seconds East 73 03 feet to a point, (70) North 28 �- degcr e&-57, minutes 41 seconds East 56 68 feet to a point, (71) North 19 degrees 12 minutes 33 seconds East 9 i8 feet to a point, (72) North 49 degrees 25 minutes 34 seconds East 16 86 feet to a point, and (73) North 34 degrees 20 minutes 04 seconds East 42 52 feet to the point and place of Beginning and - srcontailiing 1 403 acres, more or less The foregoing descnp{ion is designated as Tract A on an unrecorded survey entitled 'Survey Made At the Request of City of Bolmont' prepared by Tanner & McConnaughey, P A R S and dated February 2, 2007 I Grantor 'further grants, quitclaims and conveys without warranty the rights to use the waters of the Catawba Aiver or Its trk ips relating to the above described real property and contiguous to the property described in,9ook 2334,at Page 769 for boating, fishing and other rights and uses as described therein together with all rights desGnbed and stated in Deed Book 1270 at Page 471, Deed Book 348 at Page 147, Ned Took 279 at +P�ge 36 and Deed Book 155 at Page 343, all recorded in the Gaston County Registry, mdad glrhose arias esignated the rPjn as partly covered by eater f Grantor further grants and conveys +h ,right of way for access, ingress, egress and regress as currently cxists ovcr and acroas the:roaldway on t�6 real ' property described in Deed Book 2334 at Page 769 to the real property being herein Wnveyed For chain of title reference is herby made to'those cprtw,! deeds recorded in Deed Book 2334 at Page 769, Deed Book 1270 at Page 471, Deed Book 349'at Page 147, Deed Book 279 at Page 36 and Deed Book 155 at Page 343, all recopd in the Gaston:County Registry, together with all prior deeds and conveyances and land grants refgrenced in Ditd.Book 155`4t Page 343, Gaston County Registry I f ' + J , 1 t r • ,• � I ^ f w , r _ r + I ` i t r •r Book 4717 Page 1$ -57 <eq.4 P b 35° 14'43° N 35" 14 38" N 498970 498990 499010 499030 3 Map Scale: 1:801 if printed on A portrait (8.5" x 11 ") sheet. Meters m NN 0 10 20 40 60 Feet A 0 35 70 140 210 Map projed": Web Mercator Corner coordinates: WGS84 Edge tics: UM Zane 17N WGS84 USDA Natural Resources Web Soil Survey aM Conservation Service National Cooperative Soil Survey Soil Map — Gaston County, North Carolina a 35" 1443'N }QOy F1 499050 499070 8N T r1 O 8� O� M O N P M O 8N 4� t+� N 8M N M O 35° 14' W N 3 1/30/2015 Page 1 of 3 m C O m U L 0 O Z C 0 O U C O N m m m 0 Z O NC I.L O LL Z a 0 Z W 0 W J a. C MEOW O O N N O a) �a T a) > ) >' O > U) O O m O � � n O m O m C O m Z a) N a, d 2 0� N (D > R m 3 N C i0 O Z U Win\ O C T a) a) m O C) O Q7 (D N y O m U m C In O Q N L 3 10 O m > a) O U m ` N U N m m p m a f)J y U C C( O V > R L N N 7 `p a) N O N O C y O. U asU oN 7 cc U a) a) C U m R O `N � � 9 m d U C R O m E L O n d m 5 y a U m , E O O p uvi R C E (7 N> UJ O L O y> L Z C) o N U E N L O w E m O y w a _ a) C N j 7 Q L 0 0 $ C w S M- m m E U ._ m m p Q N U) Z o L m c ` CC a m m Y N E m U y 0 U-C O S] n L 1, p C N(u fn Q TU) m y n m C N y O Q a m o y ° a m r 3 m o m a a a>i L °NO afO L c O N Q) Q) a m y�c�m > 'O .O a) E 3 E O 0L U c °n o L E md y E L U o m o `� C C d 1% a L a) o n i5 'o m U) a) a) o '� L c o O .y U m n a) m 0 D O T m O y m C T T a ymoa) L a —ZoQO ° a) U as Q1 �� a �Qa)E L no ay m m U C N > ID c N = y C .N E m m> v Z �Q ° W n a)= m o� o m m E O) E R L a) - N j R l4 N y m y 3 o Y . Lon a C O N m U ED a)a m 0 01 a) N y m Q m E O a T 7 O (n C m �' 7 OU O C >` (% L a N O a Q So E y C E aJ a) c6 E N 2 (n a) O m E M 7 C p O m Q 0 .0 N ca 7 p 'm 2 N > Q 7 n R N m n m C L a 7 C E o) E m o U N a) 7 m m U '-C-O p L p U n :.° a) N N >> O T R v C a o E E m C n m :o W E n v, m a) a E O >> O O u) > U R O u L_ R n a Q U L O F- O O U) In O U) O R O Cq m H L) . O MEOW O O N N O a) �a T a) > ) >' O > U) O O m O � � n O m O m C O m Z a) N a, d 2 0� N (D > R m 3 N C i0 O Z U Win\ w N VI l0 Ol O T C S y U) n m E @ o d C >. d U 1 O N L Q y C l0 U) {U U 0 ID c � m LL 0 h i c }} A {J 1 3 o Y . m O y C O 1 m c y c o y m �pp a M a° y n n 3 m o a n a .�. a o O a >. o d c Q LL O 3U) N m _ _ LL N T O O O V ?i > C y Q O co O U) O n C O •o in a0 aN U O U (? 0 2 y w O w C U) (n U) c 0 U) O U) a c a � o Q W MEOW O O N N O a) �a T a) > ) >' O > U) O O m O � � n O m O m C O m Z a) N a, d 2 0� N (D > R m 3 N C i0 O Z U Win\ a Soil Map — Gaston County, North Carolina Map Unit Legend Gaston County, North Carolina (NC071) Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI ChA Chewacla loam, 0 to 2 percent 1.1 46.9% slopes, frequently flooded W Water 1.2 53.1% Totals for Area of Interest 2.3 100.0% USDA Natural Resources Web Soil Survey 1/30/2015 Conservation Service National Cooperative Soil Survey Page 3 of 3 ► IA Mom 7W a TTXED PIERS, SEE SHEET S&O. S•.0, AND 510.0 FOR DETAILS V577N CONCRETE BOAT RAMP EL 370.40 NOTE: THE LABELS 01. 02. 03, AND 04 ABOVE ARE IN REFERENCE TO THE INCLUDED PCN FORM WITH THIS SUBMISSION. LEGEND OPEN WATER IMPACT LIMITS (PROPOSED CONCRETE) 0 m�e4T.d�=M;mre �ne�a� T, —p—bn. Wale, Reaw 1 Uroan Devebprn- - Ga—k. 616 Cdonade Drive Charlotte, NC 28205 (v) 704.334.5348 www.vAcdkkeon.wm FOR REVIEW ONLY DO NOT USE FOR CONSTRUCTION Fuu scALe: P • c;O 0 10 20 Y1 c' Q N O � o_ ao U to O LL 2 WW LO S W m at d R�� LLQu j ix �mC O zOi 5 FELL I , -I UO Z O O W 0 $ 2 W i 2 m m$ ed 11! 0 _ r L) z W WWI 2 0:0 2— 0 PROJ. DATE D.c.: D.C. DATE: DRAWING NUMBER: EXHIBIT 2 PROJ. NO.: 20110214.00.RA xntr s,,* -%SY 10.21.2011 O 1207 P.m. 01- 244 SF CANOE/KAYAK LAUNCH, SEE SHEET MO. S•.0, AND 510.0 FOR DETALS so Ji • ° • EL 570.40 EL 570.40 "OF EL -SM40 EL 56&00 TOP OF CONCRETE �••�..• ' EA]STMG GYWCRVrE EL 389.50 EL:56&DO TOP OF • CONCRETE `+— • BGAT RAMP l fXISTMG� • / 7RASH CAN GENERAL AREA OF GENERAL AREA OF BROKEN CONCRETE r^ • v •• —� EL•57QA0 l FCS°/0.10 CoSM0 EDGE OF BROKEN CONCRETE - • i1LL rt P01m �D.E�AU°N.s66'� t • EL:370.40 � • 02 -175 SF EL:se&4s • �"� A 03-214 SF 04— 438 SF EDGE EL 589.{5 • / I OF]S7NC OF CRAVFI(7YP.) EL 366.45 EXISTING IA700 m PROPERTY TY BQllARO(TYPJ A rm.) BOUAR BOlARD(7YP) Of T Oe 1]t] 17 PC PC 1957 Q !C4 • I / EX"S"`O TREE CTrP.AJ I DO NOT OS7URB NOTE: THE LABELS 01. 02. 03, AND 04 ABOVE ARE IN REFERENCE TO THE INCLUDED PCN FORM WITH THIS SUBMISSION. LEGEND OPEN WATER IMPACT LIMITS (PROPOSED CONCRETE) 0 m�e4T.d�=M;mre �ne�a� T, —p—bn. Wale, Reaw 1 Uroan Devebprn- - Ga—k. 616 Cdonade Drive Charlotte, NC 28205 (v) 704.334.5348 www.vAcdkkeon.wm FOR REVIEW ONLY DO NOT USE FOR CONSTRUCTION Fuu scALe: P • c;O 0 10 20 Y1 c' Q N O � o_ ao U to O LL 2 WW LO S W m at d R�� LLQu j ix �mC O zOi 5 FELL I , -I UO Z O O W 0 $ 2 W i 2 m m$ ed 11! 0 _ r L) z W WWI 2 0:0 2— 0 PROJ. DATE D.c.: D.C. DATE: DRAWING NUMBER: EXHIBIT 2 PROJ. NO.: 20110214.00.RA EXISTING —q�w— -- -20 - -- X— I I -- -SS - -- do d rte, o 'b' o e INV R/W EG EP EC EL GN RCP CPP CIP PVC SSMH SDMH R 4 PROPERTY BOUNDARY PROPOSED - -- -- -- RIGHT -OF -WAY - - -- CONSTRUCTION EASEMENT —CE— MAJOR CONTOUR —100 — MINOR CONTOUR — 96 — STORM DRAINAGE PIPE CABLE TELEVISION RISER STORM DRAINAGE STRUCTURE ■ STORM DRAINAGE MANHOLE TELEPHONE RISER HYDROLOGIC FEATURE — — FENCE - - --- SIGN T CURB AND GUTTER TELEPHONE LINE CONCRETE WALK/PAD FIBER OPTIC LINE SANITARY SEWER — ss — SANITARY SEWER MANHOLE OVERHEAD POWER SANITARY SEWER CLEAN OUT • BOTTOM OF BANK — BB — TOP OF BANK —TB— DITCH LINE — OVERHEAD WIRE —OW— UNDERGROUND ELECTRIC — UE — FIBER OPTIC CABLE —FO— UNDERGROUND GAS — G UNDERGROUND TELEPHONE — UT— POWER POLE / LIGHT POLE x GUY WIRE SHRUB LINE TREE LINE WATER LINE —w— GATE VALVE ►� WATER METER ■_1 FIRE HYDRANT -� -'�T PERMANENT DIVERSION DITCH — TEMPORARY DIVERSION DITCH — TDD� -- TEMPORARY SILT FENCE --- a ---a- TREE 0 SHRUB O SPOT ELEVATION EL EV o BENCHMARK ELEVATION TEMPORARY SEEDING 1`+ PERMANENT SEEDING PS TELEPHONE PEDESTAL TELEVISION PEDESTAL FIBER OPTIC PEDESTAL MAILBOX INVERT ROAD RIGHT OF WAY EDGE OF GRAVEL EDGE OF PAVEMENT EDGE OF CONCRETE ELEVATION GROUND REINFORCED CONCRETE PIPE CORRUGATED PLASTIC PIPE CAST IRON PIPE POLYVINYL CHLORIDE PIPE SANITARY SEWER MANHOLE STORM SEWER MANHOLE PROPERTY LINE KEVIN LOFTIN RIVERFRONT PARK FOR THE CITY OF BELMONT BELMONT, NORTH CAROLINA JANUARY 2015 WK DICKSON PROJECT NO 20110214 00 RA PARK ADDRESS 1400 EAST CATAWBA STREET ELECTRIC METER 8 MONITORING WELL D ELECTRIC VAULT ® ELECTRIC MANHOLE IN ELECTRIC TRANSFORMER @ CABLE TELEVISION RISER O TELEPHONE MANHOLE @ TELEPHONE RISER ® UTILITY MANHOLE GAS VALVE —A— TELEVISION LINE cc. TELEPHONE LINE ro — FIBER OPTIC LINE Ar UTILITY POLE E OVERHEAD POWER o BOLLARD/POST FOR THE CITY OF BELMONT BELMONT, NORTH CAROLINA JANUARY 2015 WK DICKSON PROJECT NO 20110214 00 RA PARK ADDRESS 1400 EAST CATAWBA STREET c OAT LAUNCH 7r SITE a 5 `3,i VICINITY MAP NTS LIST OF DRAWINGS CIVIL DRAWINGS SHEET ARCHITECTURAL DRAWINGS SHEET COVER SHEET C -1 APPENDIX B Al 0 GENERAL NOTES & C -2 FLOOR PLAN RCP SCHEDULES A20 EXISTING CONDITIONS DOOR DETAILS DEMOLITION PLAN C -3 ELEVATIONS ROOF PLAN A30 AND DETAILS DEMOLITION PLAN C -4 WALL SECTIONS A40 SITE PLAN C -5 FLOATING DOCK DETAILS AS 0 SITE PLAN C -6 ELECTRICAL SCHEDULES El GRADING AND DRAINAGE PLAN C -7 LEGENDS, AND NOTES GRADING AND DRAINAGE PLAN C -8 ELECTRICAL SHELTER PLANS Ell SCHEDULES, DETAILS AND RISER UTILITY PLAN C -9 ELECTRICAL SITE PLAN - E7 2 UTIUTY PLAN C -10 RESTROOM & PICNIC SHELTERS EROSION CONTROL PLAN PH 1 C -11 AMPHITHEATER ELECTRICAL PLAN E13 SCHEDULE DETAILS AND RISER EROSION CONTROL PLAN PH 2 C -12 ELECTRICAL DETAILS Et 4 PLANTING PLAN C -13 MECHANICAL PLAN M10 EROSION CONTROL C -14 NOTES & DETAILS PLUMBING LEGEND SCHEDULE POI AND DETAILS EROSION CONTROL DETAILS C -15 PLUMBING RISER DIAGRAMS P02 UTILITY DETAILS C -16 PLUMBING FLOOR PLAN P11 UTILITY DETAILS C -17 DRAINAGE DETAILS C -18 STRUCTURAL DRAWINGS DRAINAGE DETAILS C -19 FOUNDATION PLAN & SECTIONS sl0 SITE DETAILS C -20 FRAMING PLANS S20 SITE DETAILS C -21 BUILDING SECTIONS S30 SHELTER DETAILS C -22 OBSERVATION DECK AND PIER S40 PLANS AND SECTIONS SITE AMENITIES C -23 OBSERVATION DECK AND PIER S50 SITE AMENITIES C -24 SECTIONS AMPHITHEATER DETAILS C -25 OBSERVATION DECK AND PIER S51 SECTIONS SEGMENTAL BLOCK WALL DETAILS C -26 WALKWAY PLANS AND SECTIONS S60 BOAT LAUNCH SITE DRAWINGS GENERAL LAYOUT PLAN S70 FLOATING DOCK PLAN S80 FIXED PIERS AND S81 CANOE /KAYAK LAUNCH PLANS FLOATING DOCK FRAMING PLAN 590 FIXED PIER FRAMING PLANS S91 FIXED PIER FLOATING DOCK 5100 AND CANOE /KAYAK SECTIONS • . Know whafs below Call before you dig Ell > y 098086 W_ 1 ¢� ','`�AIIBj LWi1� CONSULTANTS \\��11111 I M W WILLARD ARCHITECT PLLC 3519 STRATFORD BLVD WILMINGTON NC 28403 (910)297 -3665 MWWILLIARDGICLOUD COM CHEATHAM & ASSOCIATES, P A. CONSULTING ENGINEERS 3412 ENTERPRISE DRIVE WILMINGTON NC (910)452 -4210 OFFICEOCHEATHAMPA COM NC LICENSE Ik C -1073 STRUCTURAL ENC�NEER DAVID TERKELTOUB AND ASSOCIATES PC CONSULTING ENGINEERS 902 PINE GROVE DRIVE WILMINGTON NC 28409 (910)794 -3070 WK616 COLONNADE DRIW WK CHARLOIIE NC 28205 DICKSON Dfr ce Lowtiuna �' J'F5348 community Inhvstructum corlsWtmts swm C—I�a a Georgia K uosnc xa r-ons W K DICKSON PROJECT NO 20110214 00 RA _ = gip' -S-``= VICINITY MAP NTS LIST OF DRAWINGS CIVIL DRAWINGS SHEET ARCHITECTURAL DRAWINGS SHEET COVER SHEET C -1 APPENDIX B Al 0 GENERAL NOTES & C -2 FLOOR PLAN RCP SCHEDULES A20 EXISTING CONDITIONS DOOR DETAILS DEMOLITION PLAN C -3 ELEVATIONS ROOF PLAN A30 AND DETAILS DEMOLITION PLAN C -4 WALL SECTIONS A40 SITE PLAN C -5 FLOATING DOCK DETAILS AS 0 SITE PLAN C -6 ELECTRICAL SCHEDULES El GRADING AND DRAINAGE PLAN C -7 LEGENDS, AND NOTES GRADING AND DRAINAGE PLAN C -8 ELECTRICAL SHELTER PLANS Ell SCHEDULES, DETAILS AND RISER UTILITY PLAN C -9 ELECTRICAL SITE PLAN - E7 2 UTIUTY PLAN C -10 RESTROOM & PICNIC SHELTERS EROSION CONTROL PLAN PH 1 C -11 AMPHITHEATER ELECTRICAL PLAN E13 SCHEDULE DETAILS AND RISER EROSION CONTROL PLAN PH 2 C -12 ELECTRICAL DETAILS Et 4 PLANTING PLAN C -13 MECHANICAL PLAN M10 EROSION CONTROL C -14 NOTES & DETAILS PLUMBING LEGEND SCHEDULE POI AND DETAILS EROSION CONTROL DETAILS C -15 PLUMBING RISER DIAGRAMS P02 UTILITY DETAILS C -16 PLUMBING FLOOR PLAN P11 UTILITY DETAILS C -17 DRAINAGE DETAILS C -18 STRUCTURAL DRAWINGS DRAINAGE DETAILS C -19 FOUNDATION PLAN & SECTIONS sl0 SITE DETAILS C -20 FRAMING PLANS S20 SITE DETAILS C -21 BUILDING SECTIONS S30 SHELTER DETAILS C -22 OBSERVATION DECK AND PIER S40 PLANS AND SECTIONS SITE AMENITIES C -23 OBSERVATION DECK AND PIER S50 SITE AMENITIES C -24 SECTIONS AMPHITHEATER DETAILS C -25 OBSERVATION DECK AND PIER S51 SECTIONS SEGMENTAL BLOCK WALL DETAILS C -26 WALKWAY PLANS AND SECTIONS S60 BOAT LAUNCH SITE DRAWINGS GENERAL LAYOUT PLAN S70 FLOATING DOCK PLAN S80 FIXED PIERS AND S81 CANOE /KAYAK LAUNCH PLANS FLOATING DOCK FRAMING PLAN 590 FIXED PIER FRAMING PLANS S91 FIXED PIER FLOATING DOCK 5100 AND CANOE /KAYAK SECTIONS • . Know whafs below Call before you dig Ell > y 098086 W_ 1 ¢� ','`�AIIBj LWi1� CONSULTANTS \\��11111 I M W WILLARD ARCHITECT PLLC 3519 STRATFORD BLVD WILMINGTON NC 28403 (910)297 -3665 MWWILLIARDGICLOUD COM CHEATHAM & ASSOCIATES, P A. CONSULTING ENGINEERS 3412 ENTERPRISE DRIVE WILMINGTON NC (910)452 -4210 OFFICEOCHEATHAMPA COM NC LICENSE Ik C -1073 STRUCTURAL ENC�NEER DAVID TERKELTOUB AND ASSOCIATES PC CONSULTING ENGINEERS 902 PINE GROVE DRIVE WILMINGTON NC 28409 (910)794 -3070 WK616 COLONNADE DRIW WK CHARLOIIE NC 28205 DICKSON Dfr ce Lowtiuna �' J'F5348 community Inhvstructum corlsWtmts swm C—I�a a Georgia K uosnc xa r-ons W K DICKSON PROJECT NO 20110214 00 RA • . Know whafs below Call before you dig Ell > y 098086 W_ 1 ¢� ','`�AIIBj LWi1� CONSULTANTS \\��11111 I M W WILLARD ARCHITECT PLLC 3519 STRATFORD BLVD WILMINGTON NC 28403 (910)297 -3665 MWWILLIARDGICLOUD COM CHEATHAM & ASSOCIATES, P A. CONSULTING ENGINEERS 3412 ENTERPRISE DRIVE WILMINGTON NC (910)452 -4210 OFFICEOCHEATHAMPA COM NC LICENSE Ik C -1073 STRUCTURAL ENC�NEER DAVID TERKELTOUB AND ASSOCIATES PC CONSULTING ENGINEERS 902 PINE GROVE DRIVE WILMINGTON NC 28409 (910)794 -3070 WK616 COLONNADE DRIW WK CHARLOIIE NC 28205 DICKSON Dfr ce Lowtiuna �' J'F5348 community Inhvstructum corlsWtmts swm C—I�a a Georgia K uosnc xa r-ons W K DICKSON PROJECT NO 20110214 00 RA *560.85 560.64 *560.72 *560.66 FIXED PIERS, SEE SHEET S&0. -\ FLOATING _.. ... S9.0, AND 510.0 DOCKS, SEE FOR DETALS \ SHEET S&O. S9.0. AND SIO.0 % FOR DETAILS EL 570.40 EL -SM40 }560.22 EJ33'7NC CONOE7E 8017 562 RAMP _ _� _ KHNNr 564 . SHEET A0, SAO, AND SIOA FOR DETAILS Y,- .` BOTTOM OF _ .,, 507 -El ¢ FL 570.40 - EL-57CAO TO^ OF EL. 570.40 O E1: 568.00 •.:..., - _ - - _ CONCRETE , . f . f O H ' - _ - T'.. N 530126.49 N 5501{242 ---E 139970¢77_ _ "•' EXISANG CWOETE EL 56&00 �./,)/ E 139970226 :`�' -�. .. BOAT RAMP :. e, E 1550034. 350636.99 � N 56001321 Boom TOP Ci' `l .. __ O. _ i �, ., .�Q .� E 1]99U2.29 OONMAEIE Ettsrwc.a': -- •.o:' / MASH CAN . - - '' .. � • BROIE(EN LYMCREIE • . • - ' - 1 T .:: _ FL•57040 - GENERAL AREA C•.•'. 6/040 W.� �. •.i `- • ,fig P0M0 FULL LA1E ATHIN 539.4' •. • _ ;..f ` ... . r, ' i • / N 550111.11 9 •. • EL: 570.40 X565.3_ EN1399678.25 *589.7 E 1399674.51 Si, 9. a.+' 6 . N 550059.78 _ .• 1� //( EL•539.45 E 1399652.82 •,..0_ / 569 »d • N 5500746- 53936' ♦ .•. EL 569.50 • �- J *569.45 N 550082,63 1 E 1359663.03 E 1399661.29 O' REIAO♦E • EL: 589.13 BOLLARDS / / I EXTSRNG EDGE OF GRAMt2(TYPJ EL 569.45 EXIS77NG ww PARK PROPERTY y BOLARD(T7P.J // I 589.7, . �'e •� 09SAING ILDm oOF B LM NT any BOEL+IIO(T71?) aF 06MO1T 569.86 DR 4717 PG 1957 ` I � h • �� / • i O 569.79. w / 3 I EXISIINC TREE (M..,L DO NOT DISTURB `S6a. <5 GENERAL NOTES 1. EIOSTING SITE FEATURES SHALL NOT BE DISTURBED DURING CONSTRUCTION. ANY DAMAGE TO EXISTNO FACILITIES OR TREES SHALL BE REPAIRED TO THE OWNER'S SATISFACTION AND AT NO ADDITIONAL EXPENSE TO THE OWNER. 2. SEE SHEET C -1 FOR VICINITY MAP OF BOAT LAUNCH STE. 3. CONSTRUCTION OF FLOATING DOCKS, FIXED PIERS. AND CODE /KAYAK LAUNCH IS CONTINGENT ON APPROVAL THROUGH DUKE ENEROYS SHORELINE MANAGEMENT GUIDELINES AND THE ARMY CORPS OF ENGINEERS. AS A RESULT. CONSTRUCTION OF THESE ITEMS WILL NEED TO OCCUR TOWMDS THE END OF THE PROJECT CONSTRUCTION SCHEDULE. THESE PERMITS WILL BE PROVIDED BY THE ENGINEER DAVID TERKELTOUB AND ASSOCIATES, P.C. CONSULTING ENGINEERS MAPPING NOTES 902 PINE GROVE ORIVE 1. EXSTING INFORMATION SHOW I N ON THESE PLANS WAS TAKEN FROM SURVEY CdLPLETED BY WELINGTON. NC 23409 SOUTHEAST GEOMATICS GROUP. INC.. DATED OCTOBER 21ST, 2014. HORIZONTAL COORDINATES PHONE: (910) 794 -7070 FAX: (910) 794 -3090 WN SHO ARE BASED UPON THE NORTH AMERICAN DATUM OF 19&T /.- 2011. ELEVATIONS DT PROJECT N0. 14022 BASED ON NAVD 88 /GEOID 2012 2 CONTRACTOR TO VERIFY EXISTING CONDITIONS AND REPORT ANY DISCREPANCIES TO TIME OWNER PRIOR TO CONSTRUCTION INCLUDING ANY UTILITIES SHOWN OR NOT SHOWN. r of o =pert r lea o . %�� m �9R.9 W Aa M6rmce.. rdlwKema T- p.bd.. WYNRsavra+F Urbw DSVa6pnW + GIK-0 a 616 COI r DNve Dwbtle, NC 28205 (v) 704.334.5318 www.WkOidlaOn.cOm xcucuWexn 1 MINI, ISM ro '' %h� TERKE� "�• / z3 )S FULL SCALE: 1­ 10 0 10 20 Ul N CGO OQ S1 O QQ O W LL Y D: Q a O�� z a >_DD S z0Z U. OO2 J m w W rOr Y t z LU U O O p$m a 0 PRow. DATE QC.: O.C. DATE DRAWING NUMBER: S7.0 PROJ, NO.: 20110214.00.RA r 0 a� r`o z 4 D 0 4 4 4 ELEV REF SHT �v 4 \ ° S70 ° o 4 4 q J 4 0 4 4 \ r`O � ° 4 4 0 4 oa{t ? 47 -3 4 -6' 10 -0" 4 -6" 10 -0 6 -6" PILE GUIDE 8 0 PILE W/ ° o ELEV REF SHT TYP 16 -0" 4 S70 EMBEDMENT i 4 D PTH AND 6 -0' ABOVE POND FULL ELEVATION 4 0 4 o T1P e IY 4 4 10' CLEAT ° TYP 1 COORDINATE of .� 4 .� zs -9 zt -6 4 LOCATION _ ° ELEV REF SHT TO AVOID CONFLICT v 4 ° o S70 W/ SPLI CE t6 -6 32 -6 PLATES b AND 2 -o CONNECTION ANGLES { -o a -a a -o' a -o 32 -6 ALUMINUM A14 4 RAMP W/MAX 1 12 SLOPE 0 4 v 4 - 4° 4 m ° 4 a 4 1 4 4 ° a -o a -m a -o a -o a -o 24 -6 CONCRETE ACCESS B 0 PILE W/ 12 -0- RAMP EMBEDMENT DEPTH TYP O ACCESS PIER 0 FLOATING DOCK PLAN S$ O SCALE 3/16" = V -0" Nil T -0 4 -6 10 -0 jig, { -6 1pJ -9 ­5 { -6 t9 -0 6 -6 57 -o- TERKELT AND ASSOCIATES, P C ®DAVID CONSULTING ENGINEERS 902 PINE DROVE ORIVE NILMINGTON NC 28409 PHONE (91 0) 794 -3070 FAX (910) 794-3090 DT PROJECT NO 14022 P3DC110011" tpmrlmmmwln6 vaemn6wt6nh TmnsputO m a VV m Rfimwae6 Udum Davek* —t + Gamma 616 Colomde Dm Clbtte NC 28205 IV) 704 334 6348 wrrx wkdlck6 tom ,,ppopmm�mqq,�, B�pS� CAROIi'3 �20 O i tmn 4F. Qy INE�� TIE / -Z3 -Is Imo � N O� I I i 0 - I y I� m0 ww K 0' l z� RR o K0= VI � ZOz z z 000 Qlpm -i LL c w� = m m w W �oz Lu F 0 U U 2 3 z�=W a O i 0< i 2 PROJ DATE a O C DATE DRAWING NUMBER S80 PROJ NO 20110214 00 RA ELEV REF SHT S) 17 I 84 -0' 61 -0 2X6 COMPOSITE DECKING ATTACH TO EA STRINGER W/ (2) 5 S SCREWS 10" CLEAT 72 -0' OC 0 I 1 -0 ELEV REF SHT S70 FIXED PIER A PLAN S$ SCALE 3/16" = 1 -0' 89 -0" 2X6 COMPOSITE DECKING ATTACH TO EA STRINGER W/ (2) SS SCREWS i ELEV REF SHT S70 a 4 4 4 4 o O a 4 o q o C G r 4 4 O d a 4 4 ELEV REF SHT S7 0 3 CANOE / KAYAK LAUNCH PLAN S81 114 =1-V 13-9 10' CLEAT 12 -0' OC 2 FIXED PIER B PLAN S`$ SCALE 3116"= 1' -D" G STRUCTURAL NOTES GENERAL 11 DESIGN UVE LOADS FIXED PIER - 40 PSF FLOATING DOCK = 20 PSF BASIC WIND DESIGN VELOCITY 95 MPH (N C STATE BUILDING CODE LATEST EDITION) LAYOUT 1 THE CONTRACTOR SHALL PROVIDE ALL LAYOUT REQUIRED TO CONSTRUCT HIS WORK FOl1N0ATON 1 PILING SHALL BE ROUND TIMBER PILES CONFORMING TO ASTM D25 HUNG SHALL BE PRESSURE TREATED W/ CCA TO 2 5 PCF RETENTION PILES SHALL HAVE A MINIMUM EMBEDMENT DEPTH AS SPECIFIED ON PLANS BUT NOT LESS THAN 8 FEET AND A MINIMUM WORKING LOAD CAPACITY OF 1 TON CTRUCTURAI TIMBER i LUMBER SHALL BE SOUTHERN YELLOW PINE GRADE 2 MINIMUM 2 ALL WORK SHALL COMPLY WITH THE N C STATE BUILDING CODE (LATEST EDITION) WOOD CONNECTIONS AND DETAILS NOT SHOW ON THE DRAWINGS SHALL BE IN ACCORDANCE WITH THE 'WOOD CONSTRUCTION' CHAPTER AND THE FASTENING SCHEDULES OF THE N C STATE BUILDING CODE 3 LUMBER ABOVE GROUND AND EXPOSED TO WEATHER SHALL BE PRESSURE TREATED WITH ACQ TO 0 25 PCF RETENTION FW DAVID TERKEL ING AND ASSOCIATES, P C. CONSULTING ENGINEERS 902 PINE DROVE DRIVE WILMINGTON NC 25409 PHONE (910) 794-3070 F" (910) 794 -3090 OT PROJECT NO 14022 mminalM mlmcmxkae wnwllmlla T..port.t.n + Watar Rewarwe Urban Development + Gewnetica 616 ColonaEe Dore Charlotte NC 28205 (v) 704 334 5348 WWW Wkdick 0n Writ Fr'.ula CA^r ZN R 0i �VVO TE ueaai a 9 /- Z3-1.f I O N N I�C I 0 U O iw ° O_ m r N W w w Y � a al QQ f 2 Z o i-c g R'fV QQ � mF" 0! 2CI o °zi D77 O L O0o' Z_ m w m E W C O N Y w H X'V H (7 LL y w 3 w¢zw Z o a IO<0..i 111111011111111 I ii Ilion 11 111111111111111111111 11 11 an i ELEV REF SHT S70 a 4 4 4 4 o O a 4 o q o C G r 4 4 O d a 4 4 ELEV REF SHT S7 0 3 CANOE / KAYAK LAUNCH PLAN S81 114 =1-V 13-9 10' CLEAT 12 -0' OC 2 FIXED PIER B PLAN S`$ SCALE 3116"= 1' -D" G STRUCTURAL NOTES GENERAL 11 DESIGN UVE LOADS FIXED PIER - 40 PSF FLOATING DOCK = 20 PSF BASIC WIND DESIGN VELOCITY 95 MPH (N C STATE BUILDING CODE LATEST EDITION) LAYOUT 1 THE CONTRACTOR SHALL PROVIDE ALL LAYOUT REQUIRED TO CONSTRUCT HIS WORK FOl1N0ATON 1 PILING SHALL BE ROUND TIMBER PILES CONFORMING TO ASTM D25 HUNG SHALL BE PRESSURE TREATED W/ CCA TO 2 5 PCF RETENTION PILES SHALL HAVE A MINIMUM EMBEDMENT DEPTH AS SPECIFIED ON PLANS BUT NOT LESS THAN 8 FEET AND A MINIMUM WORKING LOAD CAPACITY OF 1 TON CTRUCTURAI TIMBER i LUMBER SHALL BE SOUTHERN YELLOW PINE GRADE 2 MINIMUM 2 ALL WORK SHALL COMPLY WITH THE N C STATE BUILDING CODE (LATEST EDITION) WOOD CONNECTIONS AND DETAILS NOT SHOW ON THE DRAWINGS SHALL BE IN ACCORDANCE WITH THE 'WOOD CONSTRUCTION' CHAPTER AND THE FASTENING SCHEDULES OF THE N C STATE BUILDING CODE 3 LUMBER ABOVE GROUND AND EXPOSED TO WEATHER SHALL BE PRESSURE TREATED WITH ACQ TO 0 25 PCF RETENTION FW DAVID TERKEL ING AND ASSOCIATES, P C. CONSULTING ENGINEERS 902 PINE DROVE DRIVE WILMINGTON NC 25409 PHONE (910) 794-3070 F" (910) 794 -3090 OT PROJECT NO 14022 mminalM mlmcmxkae wnwllmlla T..port.t.n + Watar Rewarwe Urban Development + Gewnetica 616 ColonaEe Dore Charlotte NC 28205 (v) 704 334 5348 WWW Wkdick 0n Writ Fr'.ula CA^r ZN R 0i �VVO TE ueaai a 9 /- Z3-1.f I O N N I�C I 0 U O iw ° O_ m r N W w w Y � a al QQ f 2 Z o i-c g R'fV QQ � mF" 0! 2CI o °zi D77 O L O0o' Z_ m w m E W C O N Y w H X'V H (7 LL y w 3 w¢zw Z o a IO<0..i PRO' DATE QC Q C DATE DRAWING NUMBER S81 PROD NO 20110214 00 RAJ o `o :a �b 1 T 0Y -9 J 47 -3" 4 -6" 10 -0 4 -6 10 -0" 6 -6" PILE GUIDE 8 "0 PILE W/ TYP 16 -0" EMBEDMENT DEPTH AND IA I TOP o ELEV 5754 TYP 10" CLEAT TYP COORDINATE o LOCATION TO AVOID CONFLICT ,I W/ SPLICE PLATES AND - - - 25 9 CONNECTION ANGLES INSTALL _ _ AS CLOSE TO LOCATIONS \ SHOWN AS POSSIBLE J2 -e 12 -0 SPLICE PLATE - - RX12X5 W/ (4) 1v -0 4 -a 4 -0 4 -0 32 -6 ALUMINUM )CO BOLTS RAMP W /MAX 112 TYP \ SLOPE _BACK .R P ATE YX12X5 b BACK P TE X6 \ ACK R P ATE Y4X6X5 4 -0 4-0 4-0 4�4 24 - CONCRETE ACCESS 8"0 PILE W/ 12 -0" RAMP EMBEDMENT DEPTH - - TYP m ACCESS PIER #5 0 10 "0 C E TOP AND BOTTOM x I HI 10" CLEAT TYP COORDINATE LOCATION TO AVOID CONFLICT W/ SPLICE PLATES AND CONNECTION ANGLES INSTALL / \`\ / �� AS CLOSE TO LOCATION SHOWN FLOATING DOCK FRAMING PLAN AS POSSIBLE S9 0 SCALE 3/16" = 1 -0" 7'-0 4 -e 10 -0 4 -6 10 -0 ! -8 10 -0 8 -8 w -e 37 -0 ®DAVID TERKEL B AND TESL P C CONSULTING ING ENGINEERS EEFIS 902 PINE DROVE DRIVE WILMINGTON NC 28409 PHONE (910) 794 -3070 FAX (910) 794 -3090 DT PROJECT NO 14022 I / �v'< ealnnee,y �eaam�e,m coeeMlunn Transpe4elun• Weler Re¢ II Urbw DeveIomxX4 + Gearetlo 616 ColonaAe DOve Charldte NC 28205 (v) 704 3345348 W+vw wkalck— can n GG a lee cif qa F%GI0 �m "4iyWN un10`�' /- Z3- 0 I V W r � N Oo ,ate to K LL Ia Z W Ilo O y A W ¢ > lw I�� w w le ZZ d Q a z d O c ZI LL O< mK y) �LLO U 2OZ p - p H� O �y OUP z` J Z m O m S LU LL O z Y F ~ U W Z W w W W 3 Z x O a 0 O °aaf PROJ DATE OC QC DATE DRAWING NUMBER S90 PROJ NO 20110214 00 RA • 84 -0" FIXED PIER A FRAMING PLAN Sg SCALE 3/16" = 1 -0 AQ -O" o � r n 12 -0 3 CANOE / KAYAK LAUNCH REINFORCEMENT PLAN g 1 SCALE 3116" = 1 -0" 2 FIXED PIER B FRAMING PLAN S9 1 SCALE 3/16" = 1 -0" 1/20 GALV CARRIAGE - BOLTS W/ FLAT WASHERS L4X4X1 /4X8' EA SIDE OF POST (2) 1/2.0 GALV BOLTS W/ FLAT WASHER O HEAD & NUT 2"X6 RAIL CAP 2X2 PICKETS FASTEN TO HORZ RAILS W/ N16x 3/8 0 SS FLATHEAD SCREWS (2 TOP RAIL 2 BOTTOM RAIL) CHAMFER BOTTOM 45 4 "X4" RAIL POST 0 4 -0. 0C -- 2 x4' RAIL v a n '2) '/2-. GALV ANCHOR BOLTS W/ FLAT WASHER m NUT 4 FLOATING DOCK ACCESS RAMP RAIL POST CONNECTION 59 � SCALE 1/2 =1 -0° 147 DAVID 7ERKEL ING AND ENGINEERS TES, P C CONSULTING ENGINEERS 902 PINE DROVE DRIVE a1UIINGTON NC 29409 PHONE (910) 794-30]0 FAX (910) 794 -3090 DT PROJECT NO 14022 vD U<SOL, nun4y sdia W u�txe a°nN�Italb T—pod . Welwr ResaaOae Urbw Dw Iopw ffl + C—abo 616 Colowde DD Malloee NC 28205 (v1704 330 5348 www WMicloon cols ` 4cuc�rm rmi. J ��wwwwnrp� CARD qig c 1 1mn 0 x �9NeNw0� i -23 -15 v I Iwr Qo I a '- I I I I i z O z U I� O Q zw O 0 aiw�w J � I i Y I i � F ? co p OI 0 Z y0:yI 111 m � 0: R0z OZ 2 LLI O a 0 �I JO X M w Z m LL I m r A W w z ~ z 0 z° U Z w 33< y �N z(yZ- a 0 O 00.0 PRO' DATE QC Q C DATE DRAWING NUMBER S91 PROJ NO 20110214 00 RA a TREATED 4X10 NAILER CONT 1-4 3/4 0 X 18 H D GALV BOLT -I -$ kW1 12' EMBEDMENT DEPTH 4 4 a q CONCRETE ACCESS RAM O 12 0 C MAX EA W Y TOP & BOTTOM 1 -0" 1 1 REF PLAN I REF PLAN 1/20 GALV CARRIAGE — BOLTS W/ FLAT WASHERS TOP OF PIER ELEV = 570 40 W/ 3/ BOLTS OGEE WASHERS J O HEAD & NUT 8 -0 3 FLOATING DOCK ACCESS PIER BENZ 5100 SCALE 1/2 =1 -0" 8 -6" 6" WIDE COMPOSITE DECKING ATTACH TO EA STRINGER W/ (2) S S DECK SCREWS 2 %10 FACE BAND 12-0 - 2 "X6 RAIL CAP - 4 "X4" RAIL POST O 4 -0" 0 C - 2X6 COMPOSITE DECKING ATTACH TO JOISTS W/ (2) SS SCREWS O EA JOISTS - 2 x4" RAIL - 2X10 STRINGERS O 16 0 C - 2x10 (DOUBLE) - (2) 3/4 0 GALV BOLTS W/ 3 OGEE WASHERS O HEAD & NUT - 8" 0 TREATED PILE BOTTOM VARIES ATTACH TO 2X6 W / "m [-RUB RAIL CONT TYP CARRIAGE BOLTS O 6 -0" OC 4 -O X8 -0 Xt -0 FLOAT 4 -0 "X8 "Xt -0" FLOAT 2X6 FLATWISE SPACE TO MATCH LATWISE SPACE TO MATCH BOLTING PATTERN OF FLOATS DECKING ATTACH TO EA 2X6 STRINGERS O 16" 0 C +/- TRINGERS O 16 0 C +/- ATTACH TO END 2X6 W/ L 6X4X%X5" CH TO END 2X6 W/ L 6X4Xi(J(5" W /(4) )4 0 CARRIAGE BOLTS ATTACH 6 DECK SCREWS LEG TO STRINGER O STRINGER STIFFENED CORNER STIFFENED CORNER BRACKET L MXBYX%X5" ATTACH TO 2x6 W/ i6 "m CARRIAGE BOLTS O 6 ATTACH TO FRAMING W/ -RUB RAIL CONT TYP (4) )4 "0 CARRIAGE BOLTS (4) )§ 0 CARRIAGE BOLTS EA LEG ALL HARDWARE SHALL BE HOT DIP GALVANIZED s FLOATING DOCK SECTION S10 0 SCALE 3/4 " =1 -0" 510 0 SCALE 314" =1 -0" 12 -0° 4X10 GIRDER EA SIDE OF INSTALL LIGHT PILE TYP REFLECTORS 4-0 ALONG 2X10 2X10 ® 16" 0 C TYP A BAND, TYP 2X6 COMPOSITE DECKING TOP OF PIER ELEV =570 40 8'0 PILE TYP 12 -0" 1 12 -0" 1 12 -0" FIXED PIER SECTION SCALE 114 -1 -(Y' 2 "X6" RAIL CAP 2X2 PICKETS 4 X4 RAIL POST FASTEN TO HORZ RAILS W/ O 4-0* 0 C #16x 3/8 0 S S FLATHEAD SCREWS (2 TOP RAIL 2 BOTTOM RAIL) CHAMFER BOTTOM 45 2X6 COMPOSITE DECKING ATTACH TO JOISTS W/ (2) SS SCREWS O EA JOISTS 1/20 GALV CARRIAGE 2 "x4° RAIL BOLTS W/ FLAT WASHERS 2X10 STRINGERS O 16 O C 2x10 (DOUBLE) (2) 1/2 "0 GALV BOLTS Al W/ 3" OGEE WASHERS O HEAD & NUT (4) FLOATING DOCK ACCESS PIER SECTION 10 0 SCALE 1/2=1 -0" 6 -6° D "771 6" WIDE COMPOSITE LATWISE SPACE TO MATCH DECKING ATTACH TO EA ATTACH TO JOISTS W/ (2) TRINGERS O 16 0 C +/- STRINGER W/ (2) SS CH TO END 2X6 W/ L 6X4Xi(J(5" DECK SCREWS 2X10 O 16" 0 C TYP O STRINGER 2X10 FACE BAND STIFFENED CORNER ATTACH TO 2x6 W/ i6 "m CARRIAGE BOLTS O 6 -RUB RAIL CONT TYP OC (4) )§ 0 CARRIAGE BOLTS 4 -6 6 WIDE COMPOSITE DECKING ATTACH TO EA STRINGER W/ (2) S S DECK SCREWS 2X10 FACE BAND ATTACH TO 2X6 W/ ;; /-RUB RAIL CONT TYP CARRIAGE BOLTS O 6 -O" OC 8 -0° D "771 LATWISE SPACE TO MATCH NG PATTERN OF FLOATS ATTACH TO JOISTS W/ (2) TRINGERS O 16 0 C +/- CH TO END 2X6 W/ L 6X4Xi(J(5" ) )f"0 CARRIAGE BOLTS ATTACH 6 2X10 O 16" 0 C TYP O STRINGER STIFFENED CORNER BRACKET L BXtX8 x%x5" ATTACH TO FRAMING W/ I I 4X10 GIRDER EA SIDE OF PILE TYP I " (4) )§ 0 CARRIAGE BOLTS EA LEG ALL HARDWARE SHALL BE HOT DIP GALVANIZED �� "_1 FLOATING DOCK T —HEAD SECTION 510 0 SCALE 314" =1 -0" 4 -6 6 WIDE COMPOSITE DECKING ATTACH TO EA STRINGER W/ (2) S S DECK SCREWS 2X10 FACE BAND ATTACH TO 2X6 W/ ;; /-RUB RAIL CONT TYP CARRIAGE BOLTS O 6 -O" OC 8 -0° 2X6 COMPOSITE DECKING ATTACH TO JOISTS W/ (2) S S SCREWS O EA JOISTS 2X10 O 16" 0 C TYP I I 4X10 GIRDER EA SIDE OF PILE TYP I " e/ 3/4 "0 BOLT TYP (2) 3/4 "0 BOLTS TYP 8 0 PILE TYP "0 BOLT W/ WOOD SPACER 2X8 BRACE ATTACH TO PILING W/(2) Y-0 BOLTS EA END OF BRACE SEE 1/S100 FOR BRACE LOCATIONS 4- 0 "X4 -0 "X1 " FLOA STIFFENED CORNER BRACKET L BX2X8)gX%X5" ATTACH TO FRAMING W/ (4) h 0 CARRIAGE BOLTS EA LEG 2X6 STRINGERS O 16" 0 C ATTACH TO END 2X6 W/ L 6%4X3'4%5" W /(4) X 0 CARRIAGE BOLTS ATTACH 6 LEG TO STRINGER 2X6 FLATWISE SPACE TO MATCH BOLTING PATTERN OF FLOATS �,� ALL HARDWARE SHALL BE HOT DIP GALVANIZED 1 FLOATING DOCK FINGER PIER SECTION S10 0 SCALE 3/4 " =1 -0" 6 -10" 1 \ FIXED PIER SECTION S10 0 SCALE 1/2 = 1 -0 9 12-0 4 TREADS O 3-0, = 12-0' w N y5 O 10" O C E I - TOP AND BOTTOM 4 O 3-3' [41 6 1 CANOE / KAYAK LAUNCH SECTION 5100 1/4 =1 -0" -Al ANU I:LLA I bLUUK I Lsxsxt /4x6 (2) 1/2 0 BOLTS CLEAT CONNECTION, TYP S100 11/2 " =1-0 ®DAVID TERKELT AND ASSOCIATES, P C CONSULTING ENGINEERS 902 PINE DROVE DRIVE MI- MINGTON NO 26409 PHONE (910) 794-3070 FAX (910) 794-3090 DT PROJECT NO 14022 CD11 �tx C'� <50��: Nty Ir@re4uwum wmmtann Trw.pml W - W4txR -- Ut640 Develowwt - Gwme6m 616 C01ona0e D— ChaOotte NC 28205 (V) 704 334 5348 vmw wkd ft. eom �0nen�e FFeO SN CAROM E2�� mi GIN TE14u etNW 123- /f Iwo I o � N I la° i p z U O LL Ilo z ❑ o < N W I Z 0 � I yN j Z OI WZ< C It U U W K Q =O>z U E F O ❑ Z c 000 z f- w Z m O m `c LL W W i O h z Y F W C a U N L) 31❑MIZZZW a ❑ `10 Qom PROD DATE Q O C DATE DRAWING NUMBER S100 PROJ NO 20110214 00 RA