HomeMy WebLinkAbout20141322 Ver 1_More Info Received_20150202Montalvo, Sheri A
From: Coburn, Chad
Sent: Monday, February 02, 2015 1014 AM
To: Montalvo, Sheri A
Subject: FW Holden Beach Tower Park
Attachments: RELOCATED DOCKS pdf
Sheri,
Could you put this into laserfiche for me and change the add info received in CO under the 'Events' tab in BIMS so that it
reflects the new clock (2014 - 1322)? The clock doesn't change when I put it in for some reason.
Thanks)
Chad Coburn, Senior Environmental Specialist
NC Division of Water Resources
Water Quality Regional Operations Section
Wilmington Regional Office
127 Cardinal Drive Extension
Wilmington, NC 28405 -3845
Phone 910 - 796 -7379
email chad coburn @ncdenr gov
E -mail correspondence to and from this address may be subject to the North Carolina Public Records Law and
may be disclosed to third parties
From: Howell, Jonathan
Sent: Friday, January 09, 2015 9:52 AM
To: Coburn, Chad
Subject: FW: Holden Beach Tower Park
From: Snider, Holley
Sent: Thursday, December 18, 2014 9:21 AM
To: Howell, Jonathan
Cc: shane lippard (raepcsl (g@bellsouth.net)
Subject: FW: Holden Beach Tower Park
Good Morning Jonathan,
I dust got off the phone with the consultant (cc'ed) for this project regarding Shellfish and Sanitation's concerns about
the shellfish closure Attached is a map showing the 100 foot separation. This will increase the square footage of
coastal wetland impacted by the dredging activities and will likely lead to increased sloughing of the wetland I have
asked that the consultant work with you directly to coordinate submission of the revised drawing Please let me know if
I need to do anything on my end Please feel free to call or email me if you have any questions or I can be of assistance
to you in any way
Sincerely,
Holley Snider
„ " ' > <(((( °> „ > <((((°>
Field Representative
NC Department of Environment & Natural Resources
NC Division of Coastal Management
127 Cardinal Drive Extension
Wilmington, NC 28405
Phone (910) 796 -7215, Fax (910) 395 -3964
E -mail correspondence to and from this address
may be subject to the North Carolina Public
Records Law and may be disclosed to third parties.
Be Green - Don't print this e-mail unless required.
From: shane lippard [mai Ito: raepcsl@bellsouth.netl
Sent: Wednesday, December 03, 2014 3:24 PM
To: Snider, Holley
Subject: RE: Holden Beach Tower Park
Holley,
Take a look at this We moved it down to be 100' from the adjacent dock to the east Rotated it a little
But it still gets close to the coastal marsh
With having to get 6' depth, this is what the contours look like Do we need to show the depth contours, orjust an
overall dredge surface area?
From: Snider, Holley [ mai Ito: holley.snider @ncdenr.govl
Sent: Wednesday, December 03, 2014 11:42 AM
To: Jackson, Ed
Cc: shane hppard (raepcsl @bellsouth.net)
Subject: Holden Beach Tower Park
Good Morning Ed,
Per our discussion I understand that due to the location of the adjacent 10 -slip docking facility to the east, that the
Town's proposed 3 -slip transient docking facility will need to be shifted approximately 30 feet to the west to provide the
necessary 100 feet of separation The 100 feet of separation is required to prevent a closure to open shell fishing
waters Thank you so much for providing this clarification Please feel free to call or email me if you have any questions
or I can be of assistance to you in any way.
Sincerely,
Holley Snider
, > <((((°> > <((((2>
Field Representative
NC Department of Environment & Natural Resources
NC Division of Coastal Management
127 Cardinal Drive Extension
Wilmington, NC 28405
Phone (910) 796 -7215, Fax (910) 395 -3964
2
E -mail correspondence to and from this address
may be subject to the North Carolina Public
Records Law and may be disclosed to third parties.
Be Green - Don't print this e-mail unless required.
�1
II
Q
e Fdc Id
-02 `Itl
d
I I I I I I I II X10 O
/ II I I I I II i II I Y17, V1
11 I I I a
I I
I I I I \ 1 1 1 I I
I I I I \\ I 1 1 I
1 1
I I I I I I I 1 1 1 I
I I I I 1 1 1 I
I I I I I I I I \\ II y s II
I I
I I I
r I 1
E �bE E E 11 E EIE I ■ \\ \ \\ \ \\ \ \\ \\ \\ \ \� 1 II I 1 I 111
CEO
iE V ^A E 1 E EI I (I ` \1 1 1 11 II II II II II Ji I 111 II
F fu lL+r1 E E\ E II II \I \I 11 1 � 1 11 11 II 11 I �' II
I� E E \I E IIE II I 11 11 � 11 1 1 I 1 II I I I I
E E J E E E E E I E E IE / 1 �1 1 II �1 i ,1 11 \\ 11 11 11 II II 11
1 \ 1 1 1 1 1 1 \I 1\ 1\ 1 I II 1
I E E E E E 1 11 \\ 1 11 II 1 \\ \ 1\ \\ 1 11 II I
E dII E E 11 1 1\ 1\ II I 1 11 1 \\ \I \\ 11 11 1 II a
/E rE -4
E E VIE
^ I E \1 I 11 1`QIAI I 1 1 1 I \\ \
E E� � E E E E E "I E I E ` 11 11 1 XP
4 E E E E E E E�
\\ E
E E E E E
\ \ I II
E i i \1`rO l
d o��
E E� E
f 1r7,'E E EIII E 1
1111 �� III
\E E\
E 1 E IIE
E E I
E EI
E I I II
E E 1
f 9 EII
E I E
E EIII
E E
E `r7 l" EI
I E
E
E I E
E IIE
� E I E
I I
E E I
f I E IE
E
E II E I E
E
Ea
fl EI E
E I E IE
d
I I I I I I I II X10 O
/ II I I I I II i II I Y17, V1
11 I I I a
I I
I I I I \ 1 1 1 I I
I I I I \\ I 1 1 I
1 1
I I I I I I I 1 1 1 I
I I I I 1 1 1 I
I I I I I I I I \\ II y s II
I I
I I I
r I 1
E �bE E E 11 E EIE I ■ \\ \ \\ \ \\ \ \\ \\ \\ \ \� 1 II I 1 I 111
CEO
iE V ^A E 1 E EI I (I ` \1 1 1 11 II II II II II Ji I 111 II
F fu lL+r1 E E\ E II II \I \I 11 1 � 1 11 11 II 11 I �' II
I� E E \I E IIE II I 11 11 � 11 1 1 I 1 II I I I I
E E J E E E E E I E E IE / 1 �1 1 II �1 i ,1 11 \\ 11 11 11 II II 11
1 \ 1 1 1 1 1 1 \I 1\ 1\ 1 I II 1
I E E E E E 1 11 \\ 1 11 II 1 \\ \ 1\ \\ 1 11 II I
E dII E E 11 1 1\ 1\ II I 1 11 1 \\ \I \\ 11 11 1 II a
/E rE -4
E E VIE
^ I E \1 I 11 1`QIAI I 1 1 1 I \\ \
E E� � E E E E E "I E I E ` 11 11 1 XP
4 E E E E E E E�
\\ E
E E E E E
\ \ I II
E i i \1`rO l
d o��