Loading...
HomeMy WebLinkAbout20140662 Ver 1_Stormwater Approval_20150129 (2)LETTER OF TRANSMITTAL To Mrs Cherne Smith MCADAMS Date NC Division of Water Resources Wetlands and Stormwater Branch 1650 Mail Service Center Raleigh, North Carolina 27699 Re NTA Yard Expansion DWQ 401 Submittal I am sending you the following item(s) January 27. 2015 REGULAR MAIL Job No DKE -14000 COPIES DATE NO. DESCRIPTION 1 Digital Copy of Approved Stormwater Management Plan These are transmitted as checked below ❑ As requested ❑ For approval ❑ For review and comment Remarks Copy to ❑ For your use ® For Review Signed George Buchholz, RE PWS Environmental Consultant/Project Manager Raleigh- Durham Charlotte 2905 Meridian Parkway 11301 Carmel Commons Blvd , Suite 111 Durham, North Carolina 27713 Charlotte, North Carolina 28226 (919) 361 -5000 (704) 527 -0800 Designing Tomorrow's Infrastructure & Communities McAdamsCoxom The John R McAdams Company, Inc Raleigh / Durham, NC 2905 Meridian Parkway Durham, North Carolina 27713 (919) 361 -5000 Charlotte, NC 11301 Carmel Commons Blvd, Suite 111 Charlotte North Carolina 28226 (704) 527 -0800 �J McADAMS January 27, 2015 Mrs. Cheme Smith NC Division of Water Resources Wetlands and Stormwater Branch 1650 Mail Service Center Raleigh, North Carolina 27699 0P @rR 0WLT JAN 2 9 2015 DENR -WATER RESOURCES Re: Approval of 401 Water Quality Certification with Additional Conditions (DWR #14 -0662) Duke Energy Progress — Garner Mechanical Boulevard Complex — NTA Yard Expansion Garner, Wake County, North Carolina DKE -14000 Dear Mrs. Smith: Condition Number 2 of the issued Approval of 401 Water Quality Certification with Additional Conditions (DWR #14 -0662; July 22, 2014), requires the applicant to provide one copy (hard copy or digital) of the approved Stormwater Water Management Plan, including plan details on full - sized plan sheets, with proof of the Town of Garner's approval. Therefore attached is a digital CD of the approved Stormwater Water Management Plan, including plan details on full -sized plan sheets, with proof of the Town of Garner's approval. If you should have any questions or require additional information, please do not hesitate to contact me at (919) 287 -0890. Sincerely, The John R. McAdams Company, Inc. George Buchholz, REM, PVroject Environmental Consultant/ Manager Attachments: Listed above McAdamsCo com Designing Tomorrow's Infrastructure & Communities U.S. ARMY CORPS OF ENGINEERS COPY WILMINGTON DISTRICT Action Id. SAW- 2010 -00578 County: Wake U.S.G.S. Quad: NC -LAKE WHEELER GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION Permitee: JLL -Duke Energy Patrick O'Toole Address: 411 Fayetteville Street Raleigh, North Carolina, 27601 Telephone Number: 919 -546 -3571 Size (acres) 69.1 Nearest Town Garner Nearest Waterway Wildcat Branch River Basin Neuse USGS HUC 3020201 Coordinates Latitude: 35.7223 Longitude: - 78.63045 Location description: The project area is located at the northern side of the intersection of Mechanical Boulevard and Loop Road. PIN: 1701977908. Description of projects area and activity: This verification authorizes the placement of fill material in 94.5 linear feet of stream to facilitate the expansion of narking and staging areas at the Duke Energy Progress, Garner Mechanical Boulevard Complex. Applicable Law: . ® Section 404 (Clean Water Act, 33 USC 1344) Section 10 (Rivers and Harbors Act, 33 USC 403) Authorization: Nationwide Permit Number: 39 SEE ATTACHED NWP GENERAL AND REGIONAL CONDITIONS Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the enclosed Conditions, your application signed and dated June 23, 2014, and the enclosed plan Figure 4 and Inset 1. Any violation of the attached conditions or deviation from your submitted plans may subject the permittee to a stop work order, a restoration order, a Class I administrative penalty, and /or appropriate legal action. This verification will remain valid until the expiration date identified below unless the nationwide authorization is modified, suspended or revoked. If, prior to the expiration date identified below, the nationwide permit authorization is reissued and /or modified, this verification will remain valid until the expiration date identified below, provided it complies with all requirements of the modified nationwide permit. If the nationwide permit authorization expires or is suspended, revoked, or is modified, such that the activity would no longer comply with the terms and conditions of the nationwide permit, activities which have commenced (i.e., are under construction) or are under contract to commence in reliance upon the nationwide permit, will remain authorized provided the activity is completed within twelve months of the date of the nationwide permit's expiration, modification or revocation, unless discretionary authority has been exercised on a case -by -case basis to modify, suspend or revoke the authorization. Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You should contact the NC Division of Water Quality (telephone 919- 807 -6300) to determine Section 401 requirements. For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area Management Act (LAMA), prior to beginning work you must contact the N.C. Division of Coastal Management in Morehead City, NC, at (252) 808 -2808. This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other required Federal, State or local approvals /permits. If there are any questions regarding this verification, any of the conditions of the Port-nit, or the Corps of Engineers regulatory program, please contact David Shaeffer at 919 -554 -4884 X31 or David .L.Shaeffer(a,usace.army.mil. Corps Regulatory Official: — Date: 7/15/2014 Expiration Date of Verification: 3/18/2017 SAW- 2010 -00578 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete our customer Satisfaction Survey online at http: / /re ug latory.usacesurvey.com /. Copy furnished: Agent: The John R. McAdams Company Geor$e Buchholz Address: 2905 Meridian Parkway Durham, North Carolina, 27713 Telephone Number: 919- 287 -0890 Action ID Number: SAW-2010-00578 County: Wake Permittee: JLL-Duke Energy Patrick O'Toole Project Name: Duke Energy Progress, Garner Mechanical Boulevard Complex Date Verification Issued: 7/15/2014 Project Manager: David Shaeffer Upon completion of the activity authorized by this permit and any mitigation required by the permit, sign this certification and return it to the following address: US ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Attn: David Shaeffer Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of Engineers representative. Failure to comply with any terms or conditions of this authorization may result in the Corps suspending, modifying or revoking the authorization and/or issuing a Class I administrative penalty, or initiating other appropriate legal action. I hereby certify that the work authorized by the above referenced permit has been completed in accordance with the terms and condition of the said permit, and required mitigation was completed in accordance with the permit conditions. Signature of Permittee Date MOTES PIN'S: 1701982082 1711084402 LAT: 35.7232786 °N LOG: 78.6338028 °W HUC: 03020201 DWQ STREAM INDEX NUMBER: STREAM P WILDCAT BRANCH; 27 -34 -7 UT TO WI BIG BRANCH; 27-34-11 176 L.F. DWQ STREAM CLASSIFICATION: 50' NEU`. WILDCAT BRANCH; CLASS C & RIPARIAI NUTRIENT SENSITIVE WATERS BIG BUFFER BRANCH; CLASS C & NUTRIENT LINEAR W SENSITIVE WATERS 1,342 S.F 0.03 AC. WETLAND A 525 S.F. 0.01 AC. WETLAND B 3,080 S.F. 0.07 AC, LEGEND PROPERTY B OU N D A Y --------- - --------- +/- ACREAGE = 69.1 ACRES WETLANDS +/- TOTAL ACREAGE = 0.148 ACRES STREAMS +/- TOTAL LINEAR FEET = 950 FEET 50' NEUSE RIVER BUFFERS +/- TOTAL ACREAGE = 1.76 ACRES TREE CONSERVATION AREA +/- TOTAL ACREAGE = 6.91 ACRES PROPOSED STREAM IMPACTS +/- TOTAL LINEAR FEET = 94.5 FEET PROPOSED NEUSE BUFFER IMPACTS +/- TOTAL ACREAGE = 0.09 ACRES ig a JUN 2 4 2014 RALEIGH REGULATORY FIELD OFFICE ,M D 1 BIG BRANCH F. 1 z u 2 M p ldm l` G NNMU u, �z p p i (so FFF Q g CJ • s • . O O 1 (D O N 00 N LiO II , Y CD O W O 0 z E W d 11 I MCADAMS JUN 2 4 2014 / — - �x x— : x PROPOSED x �` STREAM IMPACT /� Ijllll�lll �•�: I \ \ \ WETLAND C g4.5 L.F. — \ 1,369 S.F. x / \ \ —0.03 AC. �' '- - "- `y�- "•�- `� °•���= ��_���� �\ \ II j! /III lll' I �_ /J/ l i — STREAM C - \— / co / _UT TO WILDCAT BRANCH __179 L.F. \`I /�J _ — —ter �� l l I 'I •!� ~'\ A_ ow Cb- cg, aN LEGEND EXISTING STREAM FEATURE C 179 L.F. PROPOSED STREAM FEATURE C IMPACT (FILL IMPACTS) 94.5 L.F GRAPHIC SCALE 50 0 25 50 100 I inch = 50 ft. J, i PROJECT NO. DKE 14000 NL���111 JJJ��� EXPANSION . --. ,�...,,... MS 'i2� JOHN H' IVfS 0 n '_, °..'..'. ' ..° .. �' FILENAME: OKE14000 —INSET 1 ... INSET �( �,�y Js �!'y\gP�p� ('q� {'�Tr r -�yi P MIN E AINISId.V TTY GARNER, NORT-i CAROLINA , INC. COMP!lNY, INC. 2905 Meridian Parkway Durham, North Carolina 27713 License No.: C -0293 CADA� (800J 733 -5848 o McP.damsCo.com STREAM B SCALE: 1„ _ 50'._.. \ \ \ �- �\ \ \ UT TO WILDCAT BRANCH I\ 184 L.F. \ \ JUN 2 4 2014 / — - �x x— : x PROPOSED x �` STREAM IMPACT /� Ijllll�lll �•�: I \ \ \ WETLAND C g4.5 L.F. — \ 1,369 S.F. x / \ \ —0.03 AC. �' '- - "- `y�- "•�- `� °•���= ��_���� �\ \ II j! /III lll' I �_ /J/ l i — STREAM C - \— / co / _UT TO WILDCAT BRANCH __179 L.F. \`I /�J _ — —ter �� l l I 'I •!� ~'\ A_ ow Cb- cg, aN LEGEND EXISTING STREAM FEATURE C 179 L.F. PROPOSED STREAM FEATURE C IMPACT (FILL IMPACTS) 94.5 L.F GRAPHIC SCALE 50 0 25 50 100 I inch = 50 ft. J, M PROJECT NO. DKE 14000 NL���111 JJJ��� EXPANSION . --. ,�...,,... MS 'i2� JOHN H' IVfS 0 n '_, °..'..'. ' ..° .. �' FILENAME: OKE14000 —INSET 1 ... INSET �( �,�y Js �!'y\gP�p� ('q� {'�Tr r -�yi P MIN E AINISId.V TTY GARNER, NORT-i CAROLINA , INC. COMP!lNY, INC. 2905 Meridian Parkway Durham, North Carolina 27713 License No.: C -0293 CADA� (800J 733 -5848 o McP.damsCo.com SCALE: 1„ _ 50'._.. DATE: 06 -16- 2014. Mr. Brandon Finch PE McAdams Company 3905 Meridian Parkway Durham, NC 27713 Town of Garner 900 7th Avenue • Garner, North Carolina 27529 Phone (919) 772 -4688 • Fax (919) 662 -8874 • www.GarnerNC.gov November 20, 2014 Re: Duke Energy NTA Yard Expansion Nitrogen Offset Payment Dear Mr. Finch: The project referenced above has been reviewed and approved by the Town of Garner. As a part of the approval process it has been determined that nitrogen offset buy own in the amount of 13.98 per year for a project development acreage of 69.10 are due and payable to a private mitigation bank within the Neuse 03020201. If there are no such credits available from said banks, documentation indicating there are no available credits should be presented along with payment to the North Carolina Ecosystem Enhancement Program (NC DENR EEP) by the developer for development located in Neuse 03 02020 1. The calculation is as follows: 13.98 pounds per year * 30 years = 419.33 total pounds to be offset by nitrogen buy down. By copy of this letter the developer of the referenced project is hereby directed to make payment to a private mitigation bank or the NC DENR EEP, in the event that there are no available credits, in the amount of 419.33 total pounds. The nutrient offset program and further information regarding private mitigation banks can be found on the following website: http: / /portal.ncdenr.or web /wq /smT /ws /401 /certsandpennits /miti agation Final approval of construction plans and/or issuance of a building permit will be withheld until the Town of Garner has acknowledged receipt of the required offset payment. If you should have any questions concerning this matter, please call. Sincerely, a�' ag k<a Rametta Stormwater Engineer NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Governor July 22, 2014 ILL -Duke Energy Attn: Patrick O'Toole 411 Fayetteville St. Raleigh, NC 27601 John E. Skvarla, III Secretary DWR # 14 -0662 Wake County Subject: APPROVAL OF 401 WATER QUALITY CERTIFICATION WITH ADDITIONAL CONDITIONS Duke Energy Progress — Garner Mechanical Boulevard Complex — NTA Yard Expansion Dear Mr. O'Toole: You have our approval for the impacts listed below for the purpose described in your application dated June 23, 2014 and received by the Division of Water Resources (Division) on June 27, 2014. These impacts are covered by the attached Water Quality General Certification Number 3890 and the conditions listed below. This certification is associated with the use of Nationwide Permit Number 39 once it is issued to you by the U.S. Army Corps of Engineers. Please note that you should get any other federal, state or local permits before proceeding with your project, including those required by (but not limited to) Sediment and Erosion Control, Non - Discharge, and Water Supply Watershed regulations. This approval requires you to follow the conditions listed in the enclosed certification and the following additional conditions: 1. The following impacts are hereby approved provided that all of the other specific and general conditions of the Certifications, General Permit and /or Buffer Rules are met. No other impacts are approved, including incidental impacts. Type of Impact Amount Approved Amount Approved (units) (units) Permanent Temporary Stream 94.5 (linear feet) 0 (linear feet) Noe AatCarol uwZ North Carolina Division of Water Resources 1628 Mail Service Center Raleigh, NC 27699 -1628 Phone (919) 791 -4200 Customer Service Internet: www.ncwaterquality.org Location: 3800 Barrett Drive Raleigh, NC 27609 Fax (919) 788 -7159 1- 877 - 623 -6748 An Equal opportunity /Affirmative Action Employer — 50% Recycled110% Post Consumer Paper Duke Energy Progress — Garner Mechanical Blvd Complex DWR # 14 -0662 401 APPROVAL Page 2 of 4 2. Stormwater Management Plan (SMP) Approval from Local Community Required You are required to provide one copy (hard copy or digital) of the approved SMP, including plan details on full -sized plan sheets, with proof of the Town of Garner's approval. The approved SMP shall be submitted to the DWR Webscape Unit (1650 Mail Service Center, Raleigh, NC 27699 -1650) before any impacts authorized in this certification occur. After it is approved and submitted to the Division, the SMP may not be modified without prior written authorization from the Town of Garner. If the SMP is modified in the future, then you shall provide one modified SMP with proof of approval to the DWR Webscape Unit prior to the commencement of the modifications. 3. No Waste, Spoil, Solids, or Fill of Any Kind No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Pre - Construction Notification. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur. 4. Protective Fencin The outside buffer, wetland or water boundary and along the construction corridor within these boundaries approved under this authorization shall be clearly marked with orange warning fencing (or similar high visibility material) for the areas that have been approved to infringe within the buffer, wetland or water prior to any land disturbing activities to ensure compliance with 15 NCAC 02H.0500. This approval is for the purpose and design described in your application. The plans and specifications for this project are incorporated by reference as part of the Certification. If you change your project, you must notify the Division and you may be required to submit a new application package with the appropriate fee. If the property is sold, the new owner must be given a copy of this approval letter and General Certification and is responsible for complying with all conditions. 6. This approval and its conditions are final and binding unless contested. This Certification can be contested as provided in Articles 3 and 4 of General Statute 150B by filing a written petition for an administrative hearing to the Office of Administrative Hearings (hereby known as OAH). A petition form may be obtained from the OAH at http: / /www.ncoah.com/ or by calling the OAH Clerk's Office at (919) 431 -3000 for information. Within thirty (30) calendar days of receipt of this notice, a petition must be filed with the OAH. A petition is considered filed when the original and one (1) copy along with any applicable OAH filing Duke Energy Progress — Garner Mechanical Blvd Complex DWR # 14 -0662 401 APPROVAL Page 3 of 4 fee is received in the OAH during normal office hours (Monday through Friday between 8:00am and 5:00pm, excluding official state holidays). The petition may be faxed to the OAH at (919) 431 -3100, provided the original and one copy of the petition along with any applicable OAH filing fee is received by the OAH within five (5) business days following the faxed transmission. Mailing address for the OAH: If sending by First Class Mail via the US Postal Service: Office of Administrative Hearings 6714 Mail Service Center Raleigh, NC 27699 -6714 If sending via delivery service (e.g. UPS, FedEx): Office of Administrative Hearings 1711 New Hope Church Road Raleigh, NC 27609 -6285 One (1) copy of the petition must also be served to DENR: Lacy Presnell, General Counsel Department of Environment and Natural Resources 1601 Mail Service Center Raleigh, NC 27699 -1601 Please send one (1) copy of the petition to DWR: If sending by First Class Mail via the US Postal Service: Karen Higgins NC DENR -DWR — Webscape Unit 1617 Mail Service Center Raleigh, NC 27699 -1617 If sending via delivery service (e.g. UPS, Fed Ex): Karen Higgins NC DENR -DWR — Webscape Unit 512 N. Salisbury Street Raleigh, NC 27604 This letter completes the review of the Division under section 401 of the Clean Water Act. Please contact Cherri Smith at 919 - 791 -4251 or cherri.smith @ncdenr.gov if you have any questions or concerns. Si cer ly, Danny S th Supervisor, Water Quality Regional Operations Section Duke Energy Progress —Garner Mechanical Blvd Complex DWR # 14 -0662 401 APPROVAL Page 4 of 4 Enclosure: 3890 cc: U.S. Army Corps of Engineers; Raleigh Regulatory Field Office; 3331 Heritage Trade Drive, St. 105; Wake Forest, NC 27597 George Buchholz; The John R. McAdams Company; 2905 Meridian Parkway; Durham, NC 27713 DWR RRO 401 Files H CDENR North Carolina Department of Environment and Natural Resources Pat McCrory Governor Certificate of Approval September 16, 2014 Duke Energy Progress, Inc. Attn: Mr. Patrick O'Toole, PE PO Box 1771 Raleigh, NC 27602 RE: Approval to Construct Duke -Garner NTA Yard SWMF -4 Dam Wake County State Dam ID: WAKE -TBD Dear Mr. O'Toole: John E. Skvarla, III Secretary This is in response to your submission of plans, specifications and design data for the construction of the subject dam in compliance with the Dam Safety Law of 1967 as detailed below: 1. Construction drawings dated August 29, 2014, received on September 2, 2014 prepared under the supervision of Mr. Matthew D. Williams, PE. 2. Construction specifications dated May 16, 2014, received on May 19, 2014 prepared under the supervision of Mr. Jonathan A. Aldridge, PE. 3. Engineer's Report dated August 29, 2014, received on September 2, 2014 prepared under the supervision of Mr. Jonathan A. Aldridge, PE. The proposed dam will be located 1414 Mechanical Boulevard, Garner, NC 27529 and has been determined to be of high hazard classification. Also, Check No. 88942 in the amount of $200.00 serving as the minimum application processing fee was received on May 19, 2014. This letter constitutes approval of the proposal to construct the subject dam according to the plans and specifications received by this Division on May 19, 2014 and September 2, 2014 with the following stipulations: Project construction shall be supervised by Mr. Matthew D. Williams, PE and Mr. Jonathan A. Aldridge, PE. Mr. Matthew D. Williams, PE and Mr. Jonathan A. Aldridge, PE shall be responsible for field observation of construction as necessary to ensure compliance with approved plans. Division of Energy, Mineral, and Land Resources Energy Section • Geological Survey Section • Land Quality Section 1612 Mail Service Center, Raleigh, North Carolina 27699 - 1612.919- 707 -9200 / FAX: 919 - 715 -8801 512 North Salisbury Street, Raleigh, North Carolina 27604 • Internet: htp: / /Portal.ncdenr.org /web /Irl An Equal Opportunity 1 Affirmative Action Employer — 50% Recycled 110% Post Consumer Paper Mr. Patrick O'Toole, PE Duke -Garner NTA Yard SWMF -4 Dam Approval to Construct WAKE -TBD September 16, 2014 Page 2 of 3 2. During construction, the Division of Energy, Mineral, and band Resources may require such progress reports as are deemed necessary. In accordance with GS 143 - 215.29 and NCAC 15A-2K.0203,.0212,.0215, and .0216, within 30 days of completion of the project, Mr. Matthew D. Williams, PE and Mr. Jonathan A. Aldridge, PE shall inspect the completed work and upon finding that the work has been done as specified and the dam is safe, shall file with the Division of Energy, Mineral, and Land Resources two sets of record drawings and a certificate stating that the work has been completed in accordance with approved plans, specifications and other requirements, and the dam is safe. 4. Prior to issuance of the Approval to Impound, an Emergency Action Plan and Operation and Maintenance Plan must be submitted and approved by this Division. 5. No water shall be impounded behind the dam until an approval to impound is issued by the Division of Energy, Mineral, and Land Resources for operation of this dam. 6. This approval does not convey the right to access the private property of others. Any required access to perform the approved work must be secured prior to initiation of construction activities. 7. You must notify Mr. John Holley, PE, Regional Engineer, Land Quality Section, 1628 Mail Service Center, Raleigh, North Carolina 27699 -1628 or 3800 Barrett Drive, Raleigh North Carolina 27609, telephone number (919) 791 -4200 ten days before the start of construction. The Army Corps of Engineers and the Division of Water Resources of this Department should be contacted to determine if additional permits are required. Also, the erosion and sediment control program having jurisdiction should be contacted to determine permit requirements. In any case, sediment shall be prevented from entering the waters of the state or flowing onto neighboring property. I am enclosing a copy of an Owner's Certification Form and an explanation of the final processing fee calculation. An additional fee will be required when the engineer's certification is submitted if the construction cost exceeds $10,001.00. In any event, the cost certification must be completed and returned with the engineer's certification before an approval to impound can be processed. The Dam Safety Law of 1967 requires that project construction commence within one year from the date of this approval, or the approval is void. For assistance, you may contact Mr. John Holley, PE in the Raleigh Regional Office at telephone number (919) 791 -4200 or the Dam Safety Program in the Raleigh Central Office at telephone number (919) 707 -9220. Sincerely, Trac E Davis, PE, CPM Director Mr. Patrick O'Toole, PE Approval to Construct September 16, 2014 Page 3 of 3 TED /smm Enclosures Duke -Garner NTA Yard SWMF -4 Dam WAKE -TBD cc; Mr. Matthew D. Williams, PE Mr. Jonathan A. Aldridge, PE Mr. John Holley, PE, Regional Engineer, Land Quality Section Surface Water Protection Regional Supervisor File name: WAKE -TBD 20140916 COAC Duke -Garner NTA SWMF 4 October 21, 2014 The John R. McAdams Company, Inc. Brandon R. Finch, PE 2905 Meridian Parkway Durham, NC 27713 RE: SP- 14 -11 -M, Duke Energy Progress Garner Mechanical Boulevard Complex Dear Mr. Finch: Your request for Site Plan review to modify an existing site design for Duke Energy Progress at 1414 Mechanical Boulevard has been approved. The modification was for: 1. The addition of two storage yards and 2. The re- grading of areas within two other storage yards Please note: 1. Tree protection shall be installed by a contractor and the Town of Garner Planning Department called for an inspection prior to grading. 2. All required landscaping shall be installed by a contractor and inspected by the Town of Garner Planning Department prior to conclusion of the project. This permit is valid for two years from the approval date. All required federal and state permits shall be secured prior to beginning work. If you have any questions, please feel free to give me a call at (919) 773 -4447. Sincerely, 14. \50-e&� Jenny Saldi, ASLA Senior Planner Cc: Duke Energy Progress Patrick O'Toole 411 Fayetteville Street Raleigh, NC 27601