January 30, 2015 _ -
DWR 4 15 -0032
Jackson County
David. and Donna Jones
1250 Waegle Way....
Naples, FL 34108
Subject: APPROVAL OF 401 WATER QUALITY CERTIFICATION
Stone Bridge Road Lot 2 _
Dear Mr. & Mrs. Jones
In accordance with your application dated December 18, 2014, approval has been granted for the impacts listed
in the table below. This approval requires you to follow the conditions . listed in the enclosed certification(s)
or general permit and any additional conditions listed below.
Project impacts are covered by the attached Water Quality General Certification Number 3898 and the
conditions listed below. This certification is associated with the use of General Permit Number 30 issued by the
U.S. Army Corps of Engineers. Please note that you should obtain or otherwise comply with any other federal,
state or local permits before proceeding with your project, including those required by (but not limited to)
Erosion and Sediment Control, Water Supply Watershed and Trout Buffer regulations.
IMPACTS APPROVED -
The following. impacts are hereby approved provided that all of the other specific and general conditions of the
Certification, General Permit and/or Buffer Rules are met. No other impacts are approved, . including incidental
impacts.
Type of Impact
Amount Approved -
Permanent
Open Waters
Above Pool
I Below Pool
0.013 (acres). _
0.013 (acres)
Water Quality Regional Operations— Asheville Regional Office,
2090 US Hwy 70, Swannanoa, He 28]]8
Phone: 828 - 291 FAX 828- 299 -7043
Internet: hips :llporteLnc4enr.orgM1vebAvglws
An Equal Opportunity k AtOrmai Action Employer
David @DomaJones
Jmua 30, 2015
Page 2.0
ADDITIONAL CONDITIONS
1. This approval is for the purpose and design described in your application. The plans and specifications
for this project are incorporated by reference as part of the Certification/Authorization. If you change
your project, you mustnotify the Division and you may be required to submit a new application package
with the appropriate fee. If the property is sold, the new owner must be given a copy of this approval
letter and General Certification (s) /Permit/Authorization and is responsible for complying with all
conditions.
2. All banks shall be laid back to at least a 2 :1 (length: height) slope and riprap applied at the water/ land
interface (at full pool). Ripmp shall be placed as a linear protective measure upon the regraded slopes.
Stone used in stabilization shall be of a size and density sufficient to prevent movement by wave or
current action and shall consist of clean rock or masonry material free of debris or toxic pollutants. The
rip -rap shall be installed over a toed in filter fabric to prevent soil erosion behind the stabilized
area. This authorization shall in no way be construed as allowing the installation of a bulkhead or
seawall.
3. Replant or allow the re- establishment of native vegetation in areas within the project'
boundary where it has been removed. Per Exhibit 1 of the Duke Shoreline Management
Guidelines. -
This approval and its conditions are final and binding unless contested.
This Certification can be contested as provided in Articles 3 and 4 of General Statute 150B by filing . a written
petition for an administrative hearing to the Office of Administrative Hearings (hereby known as CAD) within
sixty (60) calendar days: -
A petition form may be obtained from the OAH at http://www,ncoah.cc or by calling the OAR Clerk's
Office at (919) 431 -3000 for information. A petition is considered filed when the original and one (1) copy
along with any applicable OAH filing fee is received in the OAH during normal office hours (Monday through
- Friday between 8:00am and 5:00pm, excluding official state holidays).
The petition may be faxed to the OAH at (919) 431 -3100, provided the original and one copy of the petition
along with any applicable OAH filing fee is received by the OAH within five (5) business days following the
faxed transmission.
Mailing address for the OAH:
Ifsending via US Postal Service:
Office of Administrative Hearings
6714 Mail Service Center
Raleigh, NC 27699 -6714
Ifsending via delivery service (UPS,
FedEx, etc):
Office of Administrative Hearings
1711 New Hope Church Road
Raleigh, NC 27609 -6285
David &Donna Jones
J.11a 3q 2015 -
Page 3of3
One (1). copy of the petition must also be served to DENR: -
John Evans, General Counsel
Department of Environment and Natural Resources.
1601 Mail Service Center
Raleigh, NC 27699 -1601 '..
This letter completes the review of the Division under section 401 of the Clean Water Act as described in 15A
NCAC 02H 0.500. Please contact Tim Fox at 828- 296 -4664 or tim.foxgncdem.eov if you have any questions
or concerns. -
Sincerely, _
G. Landon Davidson,P.G., Regional Supervisor
Water Quality Regional Operations
Asheville Regional Office
Enclosures: GC 3898
.Certificate of Completion
cc: DWRARO401 files
ec: Bob Martin — Bobs Docks
Kevin Holland Duke Energy
David Brown - USACE Asheville Regulatory Field Office
Laura Herbert — DEMLR
Ashley Rodgers - DEMLR
G: \WR \WQ \Jackson \401sINon- DOTliones -Stone Bridge Road Lot 2\APRVL.401Jones -Stone Bridge Road Lott 1- 30- 2015.doc