Loading...
HomeMy WebLinkAboutNC0025453_Compliance Evaluation Inspection_20221202ROY COOPER Governor ELIZABETH S. BISER Secretary RICHARD E. ROGERS, JR. Director NORTH CAROLINA Environmental Quality December 2, 2022 Richard Cappola Jr., Interim Town Manager Town of Clayton PO Box 879 Clayton, NC 27520 Subject: Compliance Evaluation Inspection Sam's Branch WRF NPDES Permit: NC0025453 Johnston County Dear Mr. Cappola: Mitch Hayes of the Raleigh Regional Office conducted the subject inspection on November 22, 2022. The assistance of Bill Simpson WW-4 Operator in Responsible Charge (ORC) and Michael Ratley, with this inspection was greatly appreciated. Please find attached to this letter the Basinwide Information Management System (BIMS) check list summarizing the inspection. Below is list of findings developed from the inspection and review of the permit: 1. The current permit became effective March 1, 2022 and will expire March 31, 2024. 2. The facility is currently permitted to discharge 2.5 MGD of treated wastewater to the Neuse River. An amended agreement with the City of Raleigh to increase the amount of wastewater to send to the Neuse River Resource Recovery Facility from 1.0 MGD to 1.75 MGD effective December 2021. The Town of Clayton also has an agreement with Johnston County to send 1.4 MGD of wastewater to Central Johnston County WWTP. 3. The 2.5 MGD water reclamation facility consists of the following units: influent head works with a biofilter odor control system; mechanical and automatic bar screens; a vortex type grit removal system; influent pump station with three (3) 60-Hp dry pit submersible pumps and one (1) 40-Hp pump; 9-inch Parshall flume with ultrasonic flow meter; a 214,500 gallon anaerobic selector tank in front of the first stage anoxic tank; a 300,000 gallon first stage anoxic tank in front of oxidation basin # 2; two (2) — oxidation basins; a 200,000 gallon first stage anoxic tank in front of oxidation basin # 1; three (3) secondary clarifiers; Return Activated Sludge pump station; two (2) shallow bed DAVCO traveling bridge type tertiary filters; UV disinfection, two banks, with back-up chlorination / dechlorination; effluent pump station; one (1) 90,000 gallon aerated digester/sludge stabilization tank; two (2) - 360,000 gallon aerated sludge holding tanks; sludge loading station; a sludge thickening building containing two (2) rotary drum thickeners with polymer flocculation; sludge transfer pump station; sludge drying beds; North Carolina Department of Environmental Quality I Division of Water Resources Raleigh Regional Office I 3800 Barrett Dnve 1 Raleigh, North Carolina 27609 919.791.4200 in -plant non -potable water system using reclaimed treated wastewater; a reclaimed water pump station and transmission force main to the Pine Hollow Golf Course and two (2) on -site generators and one portable generator to provide back-up power. 4. At the time of inspection, all units listed in the permit were observed and no negative issues were found. The biofilter odor control system appeared to be operating normally. The automatic and manual bar screens and vortex grit removal system were functioning normally. The number 1 aerated sludge holding tank was approximately 80% full. The number 2 aerated sludge holding tank was approximately 40% full. Sludge was being off-loaded into a truck. Thickened sludge is taken to Beulaville, NC for land application. Aerators in sludge holding tank number 1 and 2 were operational. Influent in the two oxidation basins was medium brown in color with very little foam in oxidation ditch #1. Foam covered about 20% of the surface area in ditch #2. Covers have been placed over the anaerobic selector to prevent odor. The #1 secondary clarifier was not in service. Effluent appeared clear flowing off the weirs in secondary clarifiers 2 and 3. Effluent in the wet well at the tertiary filters appeared clear with no foam. The sludge drying beds had little sludge in them. 5. Permit annual fee for the period July 1, 2022 to June 30, 2023 was due July 3, 2022. r� Please remit the overdue amount of $3,440 as soon as possible. ►o4f e: papte.,has: 6r�� Receive-0 v57 6. The annual performance report was last issued August 2022 and is available on the Town's website and at the Town Hall. 7. The Annual Pollutant Scan (APS) was last completed September 2021. The permit requires the APS to be completed before the end of this year, 2022. 8. The laboratory was checked in a cursory manner. Sam's Branch WRF laboratory, certification number 348, analyzes BOD, TSS, fecal coliform, Phosphorus, Nitrate, COD and is field certified for TRC, pH, temperature, DO, specific conductance. Environment 1, certification number 10, Cameron Testing, certification number 654, and Meritech Labs, certification number 027, analyses all other parameters. 9. Results for Toxicity testing for the period September 2021 to June 2022 showed compliance with the permit. 10. Effluent and Influent flow meters were last calibrated by Chadwick Instrumentation on May 12, 2022, and is calibrated annually. 11. Discharge Monitoring Reports (DMR' s) for the period September 2021 through September 2022 were reviewed for compliance with permit limits and monitoring requirements. A Notice of Violation for exceeding Quarterly Average for Total Phosphorus for September 2022 DMR. This violation will be addressed under a separate correspondence. There were no other monitoring or limit violations. North Carolina Department of Environmental Quality I Division of Water Resources 512 North Salisbury Street 11611 Mall Service Center I Raleigh, North Carolina 27699-1611 919 707 9000 12. Commercial lab results, chain of custody records, and bench sheets were compared with data submitted on the DMR for September 2022. Results for Toxicity testing percentage was inadvertently listed as 0.2% instead of 2.0%. A revised DMR will be submitted. I would like to thank Bill Simpson and Michael Ratley with this inspection. If there are any questions about the inspection or this letter, please contact Mitch Hayes at 919.791.4261 or at mitch.ha}es;a;ncdenr.gov Laserfiche EtEci5 a rnrra' ��..r+.+ro.rtr V Sincerely, Vanessa E. Manuel, Assistant Regional Supervisor Water Quality Regional Operations Section Raleigh Regional Office NC DEQ 61111100"--- North Carolina Department of Environmental Quality I Division of Water Resources 512 North Salisbury Street 11611 Mail Service Center I Raleigh, North Carolina 27699-1611 919.707.9000 11 I I 11 /■ ■ Am x -_ -■ 'it • ■■ ■■ / ■.11 _11 • ■ L �■ UU ■■ net• • • • % ■ GIN ■ - 11 ■ _ ■ tel ■ ■ ■.1I w r I 1 I I ■ m• I ■' II L /� ..- 1~tom 11. �■. •1 ■. _■■. • J ▪ III. I' • ■ �. I d . 7 J . I_ - • /. ■ IIt 1■ J ▪ ■. ▪ ■ ▪ ■.- ■ . ■ _ ■ 11 • • I • ■ ■ • • • • r' • • • • •• • • • ■ ■ • ••I • • • • • 1 I • • ■ I ■ • • i • 1 • • • • • • I —I • • •I . _ .. j - .... L 1.- 1 .. _ l ■ ■ ■ - 4 - �- _ a • United States Environmental Protection Agency E PA Washington, D.C. 20460 Water Compliance Inspection Report Form Approved. OMB No. 2040-0057 Approval expires 8-31-98 Section A: National Data System Coding (i.e., PCS) Transaction Code NPDES yr/molday Inspection 1 iN i 2 U 3 I NC0025453 111 12 22/11/22 17 Type 18 I c I II[HI Inspector 19 I Fac Type s I 20l I 21111111111111111ill mill 1111111 III 11 l66 ` Inspection Work Days Facility Self -Monitoring Evaluation Rating B1 QA 671 I 70 �4 71 I I 72 [, l L.J LJ Reserved 73l I l74 L_L_J 71 1 1 1 1 I I 1 180 Section B: FacilityLData Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include POTW name and NPDES permit Number) Sam's Branch WRF 1000 Durham St Clayton NC 27520 Entry Time/Date 10:OOAM 22/11/22 Permit Effective Date 21/02/01 Exit Time/Date 11:30AM 22/11/22 Permit Expiration Date 24/03/31 Name(s) of Onsite Representative(stles(s)/Phone and Fax Number(s) 111 William R SimpsonlORCl919-553-1535! William R Simpson/Superintendent WRF/919-553-1355 /9195538919 Other Facility Data Name, Address of Responsible Official/Title/Phone and Fax Number Contacted Steven Biggs,PO Box 879 Clayton NC 275280879/Town Manager/919-553-5866/9195531541 No Section C: Areas Evaluated During Inspection (Check only those areas evaluated) Permit Flow Measurement Records/Reports Self -Monitoring Progran Sludge Handling Dispo: Facility Site Review Compliance Schedules Effluent/Receiving Wate Laboratory Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) (See attachment summary) Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date Mitchell S Hayes DWRIRRO WQ1919-791-42001 IdalCal ) //cc Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers '� Dale I/7/(iney04-(7 II-- *- ,,,r2-32_ er-e.--.4.-_vt 1 S 2.7.__ EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete. Page# 1 1 NPOES NC0025453 yr/mo/day 22/11/22 117 Inspection Type 18 U (Cont.) 1 Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) The current permit became effective March 1, 2022 and will expire March 31, 2024. The facility is currently permitted to discharge 2.5 MGD of treated wastewater to the Neuse River. An amended agreement with the City of Raleigh to increase the amount of wastewater to send to the Neuse River Resource Recovery Facility from 1.0 MGD to 1.75 MGD effective December 2021. The Town of Clayton also has an agreement with Johnston County to send 1.4 MGD of wastewater to Central Johnston County VWVTP. The 2.5 MGD water reclamation facility consists of the following units: influent head works with a biofilter odor control system; mechanical and automatic bar screens; a vortex type grit removal system; influent pump station with three (3) 60-Hp dry pit submersible pumps and one (1) 40-Hp pump; 9-inch Parshall flume with ultrasonic flow meter; a 214,500 gallon anaerobic selector tank in front of the first stage anoxic tank; a 300,000 gallon first stage anoxic tank in front of oxidation basin # 2; two (2) — oxidation basins; a 200,000 gallon first stage anoxic tank in front of oxidation basin # 1; three (3) secondary clarifiers; Return Activated Sludge pump station; two (2) shallow bed DAVCO traveling bridge type tertiary filters; UV disinfection, two banks, with back-up chlorination / dechlorination; effluent pump station; one (1) 90,000 gallon aerated digester/sludge stabilization tank; two (2) - 360,000 gallon aerated sludge holding tanks; sludge loading station; a sludge thickening building containing two (2) rotary drum thickeners with polymer flocculation; sludge transfer pump station; sludge drying beds; in -plant non -potable water system using reclaimed treated wastewater; a reclaimed water pump station and transmission force main to the Pine Hollow Golf Course and two (2) on -site generators and one portable generator to provide back-up power. At the time of inspection, all units listed in the permit were observed and no negative issues were found. The biofilter odor control system appeared to be operating normally. The automatic and manual bar screens and vortex grit removal system were functioning normally. The number 1 aerated sludge holding tank was approximately 80% full. The number 2 aerated sludge holding tank was approximately 40% full. Sludge was being off-loaded into a truck. Thickened sludge is taken to Beulaville, NC for land application. Aerators in sludge holding tank number 1 and 2 were operational. Influent in the two oxidation basins was medium brown in color with very little foam in oxidation ditch #1. Foam covered about 20% of the surface area in ditch #2. Covers have been placed over the anaerobic selector to prevent odor. The #1 secondary clarifier was not in service. Effluent appeared clear flowing off the weirs in secondary clarifiers 2 and 3. Effluent in the wet well at the tertiary filters appeared clear with no foam. The sludge drying beds had little sludge in them. Permit annual fee for the period July 1, 2022 to June 30, 2023 was due July 3, 2022. Please remit the overdue amount of $3,440 as soon as possible. The annual performance report was last issued August 2022 and is available on the Town's website and at the Town Hall. The Annual Pollutant Scan (APS) was last completed September 2021. The permit requires the APS to be completed before the end of this year, 2022. The laboratory was checked in a cursory manner. Sam's Branch WRF laboratory, certification number 348, analyzes BOD, TSS, fecal coliform, Phosphorus, Nitrate, COD and is field certified for TRC, pH, temperature, DO, specific conductance. Environment 1, certification number 10, Cameron Testing, certification number 654, and Meritech Labs, certification number 027, analyses all other parameters. Results for Toxicity testing for the period September 2021 to June 2022 showed compliance with the permit. Page# 2 Permit: NC0025453 Owner - Facility: Sam's Branch WRF Inspection Date: 11/22/2022 Inspection Type: Compliance Evaluation Effluent and Influent flow meters were last calibrated by Chadwick Instrumentation on May 12, 2022, and is calibrated annually. Discharge Monitoring Reports (DMR's) for the period September 2021 through September 2022 were reviewed for compliance with permit limits and monitoring requirements. A Notice of Violation for exceeding Quarterly Average for Total Phosphorus for September 2022 DMR. This violation will be addressed under a separate correspondence. There were no other monitoring or limit violations. Commercial lab results, chain of custody records, and bench sheets were compared with data submitted on the DMR for September 2022. Results for Toxicity testing percentage was inadvertently listed as 0.2% instead of 2.0%. A revised DMR will be submitted. Page# 3 Permit: NC0025453 Owner - Facility: Sam's Branch WRF Inspection Date: 11/22/2022 Inspection Type: Compliance Evaluation Compliance Schedules Yes No NA NE Is there a compliance schedule for this facility? 0 • 0 0 Is the facility compliant with the permit and conditions for the review period? • ❑ 0 0 Comment: No compliance schedules. Permit Yes No NA NE (If the present permit expires in 6 months or less). Has the permittee submitted a new ❑ ❑ • ❑ application? Is the facility as described in the permit? M 0 0 ❑ # Are there any special conditions for the permit? 0 • 0 0 Is access to the plant site restricted to the general public? • ❑ ❑ ❑ Is the inspector granted access to all areas for inspection? • ❑ ❑ ❑ Comment: No special conditons. Record Keeping Yes No NA NE Are records kept and maintained as required by the permit? • ❑ ❑ ❑ Is all required information readily available, complete and current? • ❑ ❑ 0 Are all records maintained for 3 years (lab. reg. required 5 years)? • 0 0 0 Are analytical results consistent with data reported on DMRs? • 0 ❑ 0 Is the chain -of -custody complete? • 0 0 ❑ Dates, times and location of sampling II Name of individual performing the sampling • Results of analysis and calibration li Dates of analysis • Name of person performing analyses • Transported COCs • Are DMRs complete: do they include all permit parameters? • ❑ ❑ 0 Has the facility submitted its annual compliance report to users and DWQ? • 0 0 0 (If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified 0 0 • ❑ operator on each shift? Is the ORC visitation log available and current? •❑ ❑ ❑ Is the ORC certified at grade equal to or higher than the facility classification? • 0 0 ❑ Is the backup operator certified at one grade less or greater than the facility • ❑ 0 0 classification? Is a copy of the current NPDES permit available on site? 110 ❑ ❑ Page# 4 Permit: NC0025453 Owner - Facility: Sam's Branch WRF Inspection Date: 11/22/2022 Inspection Type: Compliance Evaluation Record Keeping Facility has copy of previous year's Annual Report on file for review? Comment: Yes No NA NE • ❑ ❑ ❑ Flow Measurement - Influent Yes No NA NE # Is flow meter used for reporting? ❑ ■ ❑ ❑ Is flow meter calibrated annually? • 0 0 0 Is the flow meter operational? •❑ ❑ ❑ (If units are separated) Does the chart recorder match the flow meter? • 0 0 0 Comment: Effluent flow used for reporting. Flow Measurement - Effluent Yes No NA NE # Is flow meter used for reporting? E 0 0 0 Is flow meter calibrated annually? •❑ ❑ ❑ Is the flow meter operational? ■ ❑ ❑ ❑ (If units are separated) Does the chart recorder match the flow meter? • 0 0 0 Comment: All meters calibrated by Chadwick Mav 12, 2022. Aerobic Digester Yes No NA NE Is the capacity adequate? • 0 0 0 Is the mixing adequate? ■ ❑ ❑ ❑ Is the site free of excessive foaming in the tank? • 0 0 0 # Is the odor acceptable? • 0 0 ❑ # Is tankage available for properly waste sludge? • 0 0 0 Comment: Aerobic sludge tank. Was being off-loaded into a truck at the time of inspection. Drying Beds Yes No NA NE Is there adequate drying bed space? • 0 0 0 Is the sludge distribution on drying beds appropriate? • 0 0 0 Are the drying beds free of vegetation? • 0 0 0 # Is the site free of dry sludge remaining in beds? ❑ • ❑ ❑ Is the site free of stockpiled sludge? • 0 0 0 Is the filtrate from sludge drying beds returned to the front of the plant? • ❑ ❑ ❑ # Is the sludge disposed of through county landfill? • 0 0 ❑ Page# 5 Permit: NC0025453 Owner - Facility: Sams Branch WRF Inspection Date: 11/22/2022 Inspection Type: Compliance Evaluation Drying Beds # Is the sludge land applied? (Vacuum filters) Is polymer mixing adequate? Comment' 3 sludge drvina beds in use. Little to no sludge in drvina bed. Solids Handling Equipment Is the equipment operational? Is the chemical feed equipment operational? Is storage adequate? Is the site free of high level of solids in filtrate from filter presses or vacuum filters? Is the site free of sludge buildup on belts and/or rollers of filter press? Is the site free of excessive moisture in belt filter press sludge cake? The facility has an approved sludge management plan? Comment: Influent Sampling # Is composite sampling flow proportional? Is sample collected above side streams? Is proper volume collected? Is the tubing clean? # Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees Celsius)? Is sampling performed according to the permit? Comment: Effluent Sampling Is composite sampling flow proportional? Is sample collected below all treatment units? Is proper volume collected? Is the tubing clean? # Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees Celsius)? Is the facility sampling performed as required by the permit (frequency, sampling type representative)? Yes No NA NE • ❑ ❑ ❑ • ❑ ❑ ❑ Yes No NA NE • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ ■ ❑❑❑ ■ ❑❑❑ • ❑ ❑ ❑ Yes No NA NE ■ ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ Yes No NA NE • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ Page# 6