Loading...
HomeMy WebLinkAboutSW6221201_Supplement-EZ Form_20221209)UrrLC1Y1Cll I -CL %.+V V r-M I-MUC FORMS LOADED ROJECT INFORMATION 1 Protect Name OMPLIANCE WITH 02H .1003(4) 7 Width of ve etated setbacks provided(feet) the veastated setback remain 9 IlfBUAisproposed in the setback does it meet NCAC 02H.1003 4 c-d ? 10 lis streambank stabilization proposed on this proiect? Ample Storage 6.18 _ 0 0 High No UMBER AND TYPE OF SCMs: 11 Infiltration S stem 12 Bioretention Cell 13 Wet Pond 1 14 Stormwater Wetland 15 Permeable Pavement 16 Sand Filter 17 Rainwater Harvesting RWH 18 Green Roof 19 Level Spreader -Filter Stri LS-FS 20 Disconnected Impervious Surface DIS 21 Treatment Swale 22 Dry Pond 23 StormFilter 24 Silva Cell 25 Bayffiter 26 lFilterra FORMS LOADED ESIONER CERTIFICATION 27 Name and Title: John F. Oglesby, PE - Sr. Project Manager 28 Organization: CSD Engineering 29 Street address: 115 E. Third Street 30 City, State Zip: Wendell, NC 27591 31 Phone numbers : _ @19) 624-0997 32 Email: John-engineering.com Certification Statement: I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. i a SEAL • 032721 = 0016, - • Sigrsigner Date f 0-10- i MAI NAV C ARCH) 1 Is this a hi h densi ro'ect? Yes 2 If so, number of drainage areas/SCMs 1 3 Does this ro'ect have low density areas? No 4 If so number of low density drains a areas 0 5 Is all/part of this project subject to previous rule versions? No FORMS LOADED RAJ AREA INFORMATION Entire Site 1 Wet Pond 202,525 202,525 0 170952 sf n/a 4 Type of SCM Total drainage area (sq ft 6 Onsite drainage areas ft 7 Offsite drainage area (sq ft) Total BUA in prolect (sq ft) i New BUA on subdivided lots (subject to ft 8 170952 sf 9permitting) 10permitting) New BUA not on subdivided lots (subject to s n/a 11 Offsite BUA_(sq TL ______. 170952 sf 170952 sf 12 Breakdown of new BUA not on subdivided lots: - Parking s ft 65074 sf 65074 sf -Sidewalk ft) 925 sf 925 sf - Roof Csq ft 104953 sf 104953 sf - Roadway ft - Future ft - Other, please specify in the comment box below ft 13 New infiltrating permeable pavement on subdivided lots ft 14 New infiltrating permeable pavement not on subdivided lots ft 13016 sf 15 Existing BUA that will remain (not subject to ermittin�c�q�__ 16 Existin BUA that is alread erm17 Existin BUA that will be remove13016 Ift Percent BUA Desi n storm inches sf 18 84% 19 1.0 in 16833 cf 20 Desi n volume of SCM cu ft Calculation method for design vo INFORMATION 21 Simple Method DDITIONAL 22 1drainage Please use this space to provide any additional information about the area(s): rainage area for pre -post development analysis is the drainage area to the oposed wet pond. The existing drainage patterns do not change with spect to the site drainage outfall (lowest point on property). All new ipervious will drain to wetpond; remaining area on property that does not I'M I rvINIIJ Drainage area number 1 2iMinimum required treatment volume (cu ft) �13651 cf MW MDC FROM 02H .1050 3 Is the SCM sized to treat the SW from all surfaces at build -out? Yes 4 Is the SCM located awa from contaminated soils? Yes 5 What are the side slopes of the SCM H:V)? 3:1 6 Does the SCM have retaining walls, gabion walls or other en ineerad side slopes? No 7 Are the inlets, outlets, and receiving stream protected from erosion 10 ear storm)? Yes 8 Is there an overflow or bypass for inflow volume in excess of the design volume? No 9 What is the method for dewatering the SCM for maintenance? Pum (preferred)- 1 o If applicable, will the SCM be cleaned out after construction? Yes 11 Does the maintenance access comply with General MDC (8)? Yes 12 Does the drains a easement comply with General MDC (9)? Yes 13 If the SCM is on a single family lot, does (will?) the plat comply with General MDC 10 ? WA 14 Is there an O&M Agreement that complies with General MDC (11)? Yes 15 Is there an O&M Plan that complies with General MDC (12)? Yes 16 Does the SCM follow the device specific MDC? Yes 17 Was the SCM desi nod by an NC licensedprofessional? Yes ET POND MDC FROM 02H .1053 18 Sizing method used SA/DA 19 Has a stage/storage table been provided in the calculations? Yes 20 Elevation of the excavated main pool depth (bottom of sediment Lem oval fmsl) 183.00 21 Elevation of the main pool bottom (top of sediment removal) (fmsl) 185.00 22 Elevation of the bottom of the vegetated shelf (fmsl) 191.00 23 Elevation of the permanent pool (fms 192.00 24 Elevation of the top of the vegetated shelf (fmsD 193.00 256Elevation of the temporary pool (fmsl) 193.36 26 Surface area of the main permanent pool (square feet) 10035 27 Volume of the main permanent pool (cubic feet) 22545 cf 28 Avers a depth of the main pool (feet) 3.18 ft 29 Average depth equation used Equation 3 30 If using equation 3, main pool perimeter (feet) 549.5 ft 31 If using equation 3, width of submerged veg. shelf feet 500.4 ft 32 Volume of the foreba cubic feet 3959 cf 33 Is this 15-20% of the volume in the mainpool? Yes 34 Clean -out depth for forebay (inches) 12 in W Design volume of SCM cu ft 16833 cf 36 Is the outlet an orifice or a weir? Orifice 37 If orifice, orifice diameter inches 1.5 in 38 If weir, weir height inches 39 If weir, weir length (inches) 40 Drawdown time for the tempos pool (days) 2.4 41 Are the inlet(s) and outlet located in a manner that avoids short- circuitin ? Yes 42 Are berms or baffles provided to improve the flow path? Yes 43 Depth of forebay at entrance inches 60 in 44 Depth of forebay at exit inches 12 in 45 Does water flow the forebay in a non -erosive manner? Yes 46 _out _of Width of the vegetated shelf feet 12 ft 47 Slope of vegetated shell H: 6:1 48 Does the orifice drawdown from below the top surface of the permanentpool? Yes 49 Does the pond minimize impacts to the receiving channel from the 1- r, 24-hr storm? Yes 50 Are fountains proposed? (If Y, please provide documentation that MDC is at No 51 Is a trash rack or other device provided to protect the outlet system? Yes 52 Are the dam and embankment planted in non -clumping turf grass? Yes 53 Species of turf that will be used on the dam and embankment Bermudagrass 54 Hasa planting plan been Erovided for the vegetated shelf? Yes DDIT FONAL INFORMATIO Please use this space to provide any additional information about the wet pond(s): arm is used to direct inflow to shallow end of foreba , away from outlet