Loading...
HomeMy WebLinkAboutSW6221201_O&M Agreement/Plan_20221209Project Name: JAmple Storage Project Location: Erwin, Harnett County, North Carolina Maintenance records shall be kept on the following SCM(s). This maintenance record shall be kept in a log in a known set location. Any deficient SCM elements noted in the inspection will be corrected, repaired, or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the pollutant removal efficiency of the SCM(s). The SCM(s) on this project include (check all that apply & co, Infiltration Basin Quantity: Infiltration Trench Quantity: Bioretention Cell Quantity: Wet Pond Quantity: Stormwater Wetland Quantity: Permeable Pavement Quantity: Sand Filter Quantity: Rainwater Harvesting Quantity: Green Roof Quantity: Level Spreader - Filter Strip Quantity: Proprietary System Quantity: Treatment Swale Quantity: Dry Pond Quantity: Disconnected Impervious Surface Present: User Defined SCM Present: Low Density Present: )onding O&M sheets will Location(s): Location(s): Location(s): 1 Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): No Location(s). No Location(s) No Type be added a ISite I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed for each SCM above, and attached O&M tables. I agree to notify NCDEQ of any problems with the system or prior to any changes to the system or responsible party. Responsible Party: Title & Organization: Street address: City, state, zip: Phone number(s): Email: Signature: Guy Lampe, Jr. Manager / vice President - Turtle Run, LLC 225 Peedin Road Smithfield, NC 27577 (9191934-3041 h Cc i7 ce 1 r ��trr, a Notary Public for the State of Date: -� County of T- r 4 , do hereby certify that L C11, personally appeared before me this day of 6 and acknowledge the due execution of the Operations and Maintenance,Agreement, Witness my hand and official seal, �/ / ' BENS G)S O. Qca1 STORM-EZ Version 1.5 My commission expires � a O&M Agreement 11 /17/2022 Page 1 of 1 Important operation and maintenance procedures: Immediately after the wet detention basin is established, the plants on the vegetated shelf and - perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). No portion of the wet pond should be fertilized after the initial fertilization that is required to establish the plants on the vegetated shelf. Stable groundcover will be maintained in the drainage area to reduce the sediment load to the wet pond. If the pond must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain will be minimized as much as possible. At least once annually, a dam safety expert will inspect the embankment. Any problems that are found will be repaired immediately. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. After the wet pond is established, it will be inspected quarterly and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County) . Records of operation and maintenance shall be kept in a known set location and shall be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. SCM element: Potential problem: How to remediate the problem: The entire wet pond Trash/debris is present. Remove the trash/debris. Areas of bare soil and/or Regrade the soil if necessary to remove the gully, plant ground The perimeter of the erosive gullies have cover and water until it is established. Provide lime and a one wet pond formed. time fertilizer application. The inlet pipe is clogged Unclog the pipe. Dispose of the sediment off -site. (if applicable). The inlet pipe is cracked or otherwise damaged (if Repair or replace the pipe. The inlet device applicable). Regrade the swale if necessary and provide erosion control Erosion is occurring in the devices such as reinforced turf matting or riprap to avoid swale (if applicable). future problems with erosion. Sediment has accumulated to a depth Search for the source of the sediment and remedy the proble rr greater than the original if possible. Remove the sediment and dispose of it in a design depth for sediment location where it will not cause impacts to streams or the SCM storage. The forebay Provide additional erosion protection such as reinforced turf Erosion has occurred. matting or riprap if needed to prevent future erosion problems. Remove the weeds, preferably by hand. If pesticide is used, Weeds are present. wipe it on the plants rather than spraying. Yliet Pr►nd Maateriance Requirrnent�Ctnu+ecj` SCM element: Potential problem: How to remediate the problem: for the source of the sediment and remedy the proble rr Sediment accumulated has to a depth Search greater than the original if possible. Remove the sediment and dispose of it in a design sediment storage location where it will not cause impacts to streams or the SCM depth. Consult a professional to remove and control the algal growth. The main treatment Algal growth covers over area 50% of the area. Remove the plants by wiping them with pesticide (do not Cattails, phragmites or other invasive plants cover 50% of the basin spray). surface. Best professional practices show that pruning is needed to Prune according to best professional practices. maintain optimal plant health. Determine the source of the problem: soils, hydrology, The vegetated shelf Plants are dead, diseased disease, etc. Remedy the problem and replace plants. Provid fertilizer application to establish the ground cover if or dying. a one-time a soil test indicates it is necessary. Remove the weeds, preferably by hand. If pesticide is used, Weeds are present. wipe it on the plants rather than spraying. Remove shrubs immediately. Shrubs have started to grow on the embankment. Evidence of muskrat or Consult a professional to remove muskrats or beavers and beaver activity is present. repair any holes or erosion. Consult a dam safety specialist to remove the tree. The embankment A tree has started to grow on the embankment. An annual inspection by an appropriate professional shows that Make all needed repairs immediately. the embankment needs repair. Clean out the outlet device and dispose of any sediment in a Clogging has occurred. location where it will not cause impacts to streams or the SCM The outlet device The outlet device is Repair or replace the outlet device. damaged. Remove the weeds or trees. Weeds or volunteer trees are growing on the mat. The anchor cable is Floating wetland island (if applicable) damaged, disconnected Restore the anchor cable to its design state. or missing. SCM element: I Potential problem: I How to remediate the problem: The receiving water Erosion or other signs of damage have occurred at I Repair the damage and improve the flow dissipation structure. the outlet. Discharges from the wet pond are causing erosion or sedimentation in the receiving water. Contact the local NCDEQ Regional Office. WET POND ID Wet Pond Pretreatment No other than Has Veg. Filter? No FOREBAY Permanent Pool El Temporary Pool El:IE Clean Out Depth: Sediment Removal E Bottom Elevation: ATTACH ADDITIONAL SHEETS IF NECESSARY MAIN POND Permanent Pool EI. 183 Temporary Pool El: 192 Clean Out Depth: -2 Sediment Removal E 185 Bottom Elevation: 183