Loading...
HomeMy WebLinkAboutNCC202072_Annual Fee Paid Email_20221212 (2)Holloman, Tevye L From: laserfiche@ncdenr.gov Sent: Monday, December 12, 2022 8:52 AM To: Arshad.Khan@Duke-Energy.com Cc: Holloman, Tevye L; Georgoulias, Bethany; Arshad.Khan@Duke-Energy.com Subject: Construction SW General Permit Annual Fee Resolved - NCC202072 Dear Construction General Permit Permittee: This email is to notify you that the 2022 annual fee for Certificate of Coverage (COC) no. NCC202072 has been resolved. If the permit remains active, it has been successfully renewed (as long as all other annual fees have been paid). If the permit is no longer active, no future fees will be required. This COC is for Piedmont Natural Gas - Line 291-1149 Natural Gas Pipeline Project in Burke County, issued to Piedmont Natural Gas Company, Inc.. This communication is in reference to Invoice no. NCC202072-2022. If you have any questions, please contact the Stormwater Program at (919) 707-3649, or visit https://deg.nc.gov/NCG01. The NC DEMLR Stormwater Program 512 N. Salisbury Street, Archdale Building 6th Floor, 1612 Mail Service Center, Raleigh, NC 27699-1612 This email was automatically generated by Laserfiche. Please do not respond to this email address, as responses are not monitored.