Loading...
HomeMy WebLinkAbout20141219 Ver 2_DCM Permit_20150202Pei mit Class N iODIFICATIONAIINOI? ,�•;:; �tJA1, 41ylzi9 �. v S'L'ATE OI+ I'dr1` 'liT CAROLINA Department of Envirorim.,nt and Natural Resources and ' "'oastal Resources C rnmiss =on .Ot flit fur Y Major Development man Area of Environmental Concern pursuant to NCGS 113A -I 18 X Excavation and /or filling pursuant to NCGS 113 -229 Permit Number 10=4 -I1 Issued to N.C. Department of Transportation, 113 Airport Drive, Suite 100, Edenton, NC 27932 Authorizing development in Dare County at Atlantic Ocean and NC 12, six miles south of Oreeon Inlet Pea Tsland NWR , as requested in the permittee's application letter dated j/6/15, including the attached workplan drawings (3) dated as received on 1/6/1. This permit, issued on 1116115 _, is subject to compliance with the application (where consistent with the perinit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void. 1) Unless specifically altered herein, this minor modification and renewal authorizes the construction of a protective sand dune approximately 370 feet in length along NC 12 north of the New Inlet temporary bridge, as depicted on the attached workplan drawings. 2) Nothing in this permit authorizes any activity that has not received approval from the U.S. Fish and Wildlife Service (USFWS) for work within the Pea Island National Wildlife Refuge. 3) In accordance with commitments made by the_permittee, all work shall take place between November 15`h and April I" to avoid any potential impact to protected species. 4) No vegetated wetlands shall be excavated or filled, without permit modification. (See attached sheet for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on April 30, 2017 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DENR and the Chairman of the Coastal Resources Commission. Braxton C. Davis, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee s N.C. Department of Transportation ADDITIONAL CONDITION'S Permit 9104 -11 Page 2 of 2 The authorized dune maintenance activities shall not result in impacts to the existing dune systems that would weaken the protective values of these dune systems. 6) All work shall be accomplished in such a manner that the damage to existing vegetation is minimized. ?) All sands used to strengthen the dune must be of the same general characteristics as the sand in the existing dunes and ocean beach where it is to be placed. 4) The north end of the dune system undergoing maintenance shall be aligned to the greatest extent possible with the existing adjacent dune ridge. 9) The permittee and /or his contractor shall contact the DCM Transportation Project Field Representative in Elizabeth City at (252) 264 -3901 to request a preconstruction conference prior to project initiation. 10) This minor modification and renewal shall be attached to the original of Permit No. 104 -11, which was issued on 9/2/11, as well as all subsequent modifications and refinements, and copies of all documents shall be readily available on site when a Division representative inspects the project for compliance. 11) All conditions and stipulations of the active permit remain in force under this minor modification and renewal unless altered herein. NOTE: This minor modification and renewal does not eliminate the need to obtain any additional permits, approvals or authorizations that may be required, including but not limited to any from the U.S. Army Corps of Engineers. NOTE: The N.C. Division of Water Resources (DWR) authorized the proposed project (DWR Project No. 14 -1219 v.2) under General Water Quality Certification No. 3900.