Loading...
HomeMy WebLinkAboutNCC215697_NOT Closeout Documents_20221209ROY COOPER Governor V ELIZABETH S. BISER Secretary � - ` B RIAN W RENN v Director NORTH CAROLINA Envlranmenta! QuaUty Dear Sir or Madam: Attached is a copy of the inspection report which was prepared following an on -site inspection of the subject site. This report is intended to provide you with information concerr>_ing the status of the site as it relates to compliance with the North Carolina Sedimentation Pollution Control Act on 1973. P1eise review this report carefully as it may contain corrective action,, needed or comments which will assist you in meeting the required performance standards of the Act. It is our desire that any and all possible problems be discussed and resolved at the earlies possible time. To facilitate this effort, please contact the named inspector at the address shown on the inspection report if you have any questions. Sincerely Land Quality Section Mooresville Regional Office OC 13 2022 MEME � COUNTY MANA0EA North Carolina Department of Environmental Quality . Division of Energy. Mineral and Land Resources Da EF %tooresviIle Regional Office 610 East Center Avenue, Suite 301 'Mooresville. Nash Carolina 28115 704-661-1699 North Carolina Department of Environmental Quality Land Resources: 610 East Center Avenue, Suite 301, Mooresville, NC 28115 (704) 663-1699 County: Iredell Project: Iredell Co Gov Multiple Parking Lot Improvements River basin: Yadkin-PeeDee Person financially responsible: Iredell County - Beth Mull, County Manager Project #• IREDE-2022-003 Address: 200 South Center Street, PO Box 788, Statesville, NC 28677 1. Project Location: Short Street, Statesville Pictures: No 2. Weather and soil conditions: Sunny, Workable Soils Initial inspection: No 3. is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): No One Onsite Title: Inspection report: Sent Report Date given/sent: October 07, 2022 9. Corrective action needed: 10. Comments: Overall the site has sufficient permanent ground cover to restrain erosion, however there are some bare areas that need to be stabilized. No additional self -monitoring or self -inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCGOI) must be requested by the permittee via a Notice of Termination (NOT) unless permit approval date was prior to April 2019. The NOT is available at: https:Hedocs.deq.nc.gov/FOrms/NCGO I -Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. Yes Reported by: Jeffrey Chandler Others present: Date of inspection: October 06, 2022 Time arriving on site: 12:00 PM Time leaving site: 12:30 PM Cc: