HomeMy WebLinkAboutNCC224056_Site Plan or Location Map_20221209SCHEDULE OF SYMBOLS
v
0
v
a
04 NOV 2022
x
�ARO��'%,,
S1041 ,' 1'q
= SEAL
�I = 053442
LIMITS OF DISTRUBANCE UE EXISTING UNDERGROUND ELECTRIC
-XXXX- SILT FENCE of EXISTING OVERHEAD ELECTRIC
- - PROPERTY LINE w EXISTING WATER
E EXISTING POWER EASEMENT -RAW- EXISTING RAW WATER
- STONE OUTLET -6- EXISTING FIRE HYDRANT
GENERAL NOTES:
1. PERMANENT GROUND COVER SHALL BE ESTABLISHED ON ALL DITCHES, SWALES, SLOPES GREATER THAN 3:1, AND SLOPES
GREATER THAN 50' IN LENGTH WITHIN 7 WORKING DAYS. ALL OTHER DISTURBED AREAS SHALL BE PROVIDED PERMANENT
GROUND COVER WITHIN 14 CALENDAR DAYS FROM LAST LAND DISTURBING ACTIVITY.
2. THE CONTRACTOR SHALL TAKE WHATEVER MEASURES NECESSARY TO MINIMIZE SOIL EROSION AND SILTATION. HE SHALL
KEEP FULLY INFORMED OF ALL SUCH REGULATIONS WHICH AFFECT THE CONDUCT OF THE WORK, AND SHALL AT ALL
TIMES OBSERVE AND COMPLY WITH ALL SUCH REGULATIONS.
3. THE CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE REQUIREMENTS AS SPECIFIED IN THE GENERAL PERMIT NO. NCG01.
4. ALL DISTURBED AREAS SHALL BE SEEDED WITH PERMANENT SEED FOR PRIMARY STABILIZATION AND TEMPORARY SEED FOR
IMMEDIATE GROUND STABILIZATION.
5. ALL EROSION AND SEDIMENT CONTROL DEVICES SHALL BE INSPECTED AT LEAST ONCE PER 7 CALENDAR DAYS AND WITHIN
24 HOURS OF A RAIN EVENT GREATER THAN 1.0 INCHES.
6. ANY NEEDED REPAIRS TO EROSION CONTROL DEVICES SHALL BE MADE IMMEDIATELY AND PROPERLY DOCUMENTED WITH AN
INSPECTION REPORT.
7. THE CONTRACTOR SHALL MAINTAIN A RAIN GAUGE AT THE PROJECT SITE AND PROVIDE WEEKLY AND POST RAINFALL
INSPECTION REPORTS IN ACCORDANCE WITH NPDES REQUIREMENTS AND THE REQUIREMENTS OF GENERAL PERMIT NCG01.
8. THE CONTRACTOR, UPON COMPLETION OF THE PROJECT, SHALL LEAVE INTACT THOSE TEMPORARY EROSION CONTROL
DEVICES DEEMED NECESSARY BY THE ENGINEER FOR FUTURE PROTECTION.
9. DISTURBED AREAS DELINEATED BY LIMITS OF CONSTRUCTION IS 5.12 ACRES.
EROSION CONTROL CONSTRUCTION SEQUENCE:
1. INSTALL EROSION CONTROL MEASURES IN ADVANCE OF LAND DISTURBING ACTIVITIES.
2. STOCKPILE MATERIALS.
3. MAINTENANCE OF EROSION CONTROL DEVICES IS THE CONTRACTOR'S RESPONSIBILITY. EROSION CONTROL MEASURES SHALL
BE INSPECTED WEEKLY AND AFTER EACH RAIN EVENT. THE DEVICES SHALL BE INSPECTED FOR DAMAGE AND REPAIRS
SHALL BE COMPLETED IMMEDIATELY.
4. RESEED, MULCH, AND STABILIZE DISTURBED AREAS AS SOON AS PRACTICAL.
5. MAINTAIN ALL EROSION CONTROL MEASURES. FOLLOW THE SPECIFIC MAINTENANCE INSTRUCTIONS LISTED FOR EACH
EROSION CONTROL DEVICE.
6. AFTER PROJECT AREA IS STABILIZED, REMOVE EROSION CONTROL DEVICES.