Loading...
HomeMy WebLinkAbout20210745 Ver 1_ePCN Application_20221206DWR Division of Water Resources Initial Review Pre -Construction Notification (PCN) Form For Nationwide Permits and Regional General Permits (along with corresponding Water Quality Certifications) April 13, 2022 Ver 4.3 Has this project met the requirements for acceptance in to the review process?* Yes No Is this project a public transportation project?* Yes No Change only if needed. Pre -Filing Meeting Date Request was submitted on: 4/12/2021 BIMS # Assigned* Version#* 20210745 1 Is a payment required for this project?* No payment required Fee received Fee needed - send electronic notification Reviewing Office* Raleigh Regional Office - (919) 791-4200 Information for Initial Review la. Name of project: Hilltop Needmore Elementary School la. Who is the Primary Contact?* Elias Ruhl What amout is owed?* $240.00 $570.00 Select Project Reviewer* Zachary Thomas:eads\ztthomas lb. Primary Contact Email:* lc. Primary Contact Phone:* eruhl@fandr.com (919)719-1973 Date Submitted 12/6/2022 Nearest Body of Water Terrible Creek Basin Neuse Water Classification C;NSW Site Coordinates Latitude: Longitude: 35.6298 -78.7374 A. Processing Information County (or Counties) where the project is located: Wake Is this a NCDMS Project Yes No Is this project a public transportation project? * Yes No la. Type(s) of approval sought from the Corps: Section 404 Permit (wetlands, streams and waters, Clean Water Act) Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) Has this PCN previously been submitted?* Yes No 1 b. What type(s) of permit(s) do you wish to seek authorization? Nationwide Permit (NWP) Regional General Permit (RGP) Standard (IP) lc. Has the NWP or GP number been verified by the Corps? Yes No Nationwide Permit (NWP) Number: 39 - Commercial/Institutional Developments NWP Numbers (for multiple NWPS): ld. Type(s) of approval sought from the DWR: 401 Water Quality Certification - Regular Non-404 Jurisdictional General Permit Individual 401 Water Quality Certification le. Is this notification solely for the record because written approval is not required? For the record only for DWR 401 Certification: For the record only for Corps Permit: 1f. Is this an after -the -fact permit application?* Yes No lg. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? Yes No lg. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? Yes No 1 h. Is the project located in any of NC's twenty coastal counties? Yes No 1j. Is the project located in a designated trout watershed? Yes No B. Applicant Information ld. Who is applying for the permit? Owner Applicant (other than owner) le. Is there an Agent/Consultant for this project?* Yes No 2. Owner Information 2a. Name(s) on recorded deed: Wake County Board of Education 2b. Deed book and page no.: book 17243, page 256 2c. Contact Person: Ronnie Stott 2d. Address Street Address 111 Corning Road, Ste. 190 Address Line 2 City Cary Postal /Zip Code 27518 401 Water Quality Certification - Express Riparian Buffer Authorization State / Province / Region NC Country USA Yes No Yes No 2e. Telephone Number: (919)588-3596 2f. Fax Number: 2g. Email Address: * rstott@wcpss.net 3. Applicant Information (if different from owner) 3a. Name: Ronnie Stott 3b. Business Name: Wake County Public School System 3c. Address Street Address 111 Corning Road, Ste. 190 Address Line 2 City Cary Postal / Zip Code 27518 3d. Telephone Number: (919)588-3596 3f. Email Address: * rstott@wcpss.net 4. Agent/Consultant (if applicable) 4a. Name: Elias Ruhl 4b. Business Name: Froehling & Robertson, Inc. 4c. Address Street Address 310 Hubert Street Address Line 2 City Raleigh Postal / Zip Code 27603 4d. Telephone Number: (919)719-1973 4f. Email Address: * eruhl@fandr.com C. Project Information and Prior Project History State / Province / Region NC Country USA 3e. Fax Number: State / Province / Region NC Country USA 4e. Fax Number: 1. Project Information 1b. Subdivision name: (if appropriate) E-44 lc. Nearest municipality / town: Fuquay-Varina 2. Project Identification 2a. Property Identification Number: 0678749164 and 0678833327 2b. Property size: 40.36 2c. Project Address Street Address 4575 Hilltop Needmore Road Address Line 2 City State / Province / Region Fuquay-Varina NC Postal / Zip Code Country 27562 USA 3. Surface Waters 3a. Name of the nearest body of water to proposed project: * Terrible Creek 3b. Water Resources Classification of nearest receiving water: * C;NSW 3c. What river basin(s) is your project located in?* Neuse 3d. Please provide the 12-digit HUC in which the project is located. 030202010901 4. Project Description and History 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* The review area contains a portion of the former Crooked Creek Golf Course. The site consists of mostly grassy areas, two small wooded areas, and several paved cart paths that transect the site. 4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past? * Yes No Unknown 4f. List the total estimated acreage of all existing wetlands on the property: 0.593 acres (25,872 SF) 4g. List the total estimated linear feet of all existing streams on the property: 483 LF 4h. Explain the purpose of the proposed project: * As the population in Wake County continues to grow exponentially, a new elementary school is needed to support the existing and growing community within the Town of Fuquay Varina. The proposed elementary school is located off Hilltop Needmore Road. It is adjacent to Fuquay Varina's Town Park & Preserve, a former golf course that has been dedicated as park space within the Town. The Town is currently in the design phase of a new Community and Active Adult Center in the park. As part of an interlocal agreement, the Wake County School Board and Town of Fuquay Varina have master planned the proposed school and community center to mutually benefit from shared uses and infrastructure. This request is to approve wetland impacts as a result of the need for an elementary school in this area. 4i. Describe the overall project in detail, including indirect impacts and the type of equipment to be used: * The proposed site use is Public & Civic - Educational Facility, and by nature requires standard program elements such as facility size requirements to accommodate the required student population, ingress/egress requirements, outdoor recreation requirements, service area requirements, program element adjacency and separation requirements, NCDOT MSTA traffic safety requirements, and accessibility requirements. As required by local emergency responders and NCDOT, all schools are required to have two separate points of entry to the school. The project will utilize typical construction equipment and BMPs. 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or proposed impact areas?* Yes No Comments: 5b. If the Corps made a jurisdictional determination, what type of determination was made? * Preliminary Approved Not Verified Unknown N/A Corps AID Number: SAW-2020-01408 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Alex Aycrigg Agency/Consultant Company: Froehling & Robertson, Inc. Other: Elias Ruhl Unknown 5d. List the dates of the Corp jurisdiction determination or State determination if a determination was made by the Corps or DWR Corps provided field visit on September 17, 2020 and provided a preliminary determination letter concurring with the delineation on June 6, 2022 (see letter attached). 6. Future Project Plans 6a. Is this a phased project?* Yes No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? No. D. Proposed Impacts Inventory 1. Impacts Summary la. Where are the impacts associated with your project? (check all that apply): Wetlands Streams -tributaries Open Waters Pond Construction 2. Wetland Impacts Buffers 2a. Site #* (?) 2a1 Reason (?) 2b. Impact type*(?) 2c. Type of W.* 2d. W. name 2e. Forested* 2f. Type of Jurisdicition* (?) 2g. Impact area* Impact 1 Road Grade Fill P Headwater Forest Wetland 2 No Corps 0.092 (acres) Impact 2 Construction of Road T Headwater Forest Wetland 2 No Corps 0.034 (acres) Impact 3 Construction of Road T Headwater Forest Wetland 3 No Corps 0.026 (acres) Impact 4 Road Grade Fill P Headwater Forest Wetland 4 Yes Corps 0.004 (acres) Impact 5 Construction of Road T Headwater Forest Wetland 4 Yes Corps 0.005 (acres) 2g. Total Temporary Wetland Impact 0.065 2g. Total Wetland Impact 0.161 2i. Comments: 2g. Total Permanent Wetland Impact 0.096 Wetland impacts have been minimized to the extent possible and still accomplish the project needs. 3. Stream Impacts 3a. Reason for impact (?) 3b.Impact type* 3c. Type of impact* 3d. S. name* 3e. Stream Type* (?) 3f. Type of Jurisdiction* 3g. S. width 3h. Impact length* S1 Pipe Construction Temporary Culvert Stream 1 Intermittent Both 12 Average (feet) 5 (linear feet) S2 Pipe Installation Permanent Culvert Stream 1 Intermittent Both 12 Average (feet) 5 (linear feet) 3i. Total jurisdictional ditch impact in square feet: 0 3i. Total permanent stream impacts: 5 3i. Total stream and ditch impacts: 10 3i. Total temporary stream impacts: 5 3j. Comments: Impacts occur at the outfall of the current pipe and the stream is approximately 12 feet wide at the impact location. Temporary stream impacts = 5 LF (60 SF/ 0.001 acres) Permanent stream impacts = 5 LF (35 SF/ 0.0001 acres) 6. Buffer Impacts (for DWR) 6a. Project is in which protect basin(s)? Check all that apply. Neuse Tar -Pamlico Catawba Randleman Goose Creek Jordan Lake Other 6b. Impact Type 6c. Per or Temp 6d. Stream name 6e. Buffer mitigation required? 6f. Zone 1 impact 6g. Zone 2 impact Pipe Installation Construction T Stream 1 No 326 197 Pipe Installation P Stream 1 No 297 291 6h. Total buffer impacts: Zone 1 Total Temporary impacts: 326.00 Zone 1 Total Permanent impacts: 297.00 Zone 1 Total combined buffer impacts: 623.00 488.00 Zone 2 197.00 Zone 2 291.00 6i. Comments: Existing pipe is being replaced in the same location. E. Impact Justification and Mitigation Zone 2 1. Avoidance and Minimization la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: Due to the size and orientation of the wetlands in relation to the parcels, a small amount of impact was unavoidable. However, the driveway through the site was intentionally aligned and centered through the existing break in the wetlands to minimize the disturbance. Retaining walls are proposed to minimize grading within the wetlands and allow complete avoidance of any impacts to the stream buffer. Where retaining walls are not proposed, slopes as steep as 2:1 are being utilized in an effort to minimize and avoid impacts to the wetlands where possible. The stream originates near the discharge of an existing 24" HDPE that collects site water from the adjacent Town of Fuquay Varina parcel along with the right of way of Hilltop Needmore Road. As part of the development of this project along with the adjacent Fuquay-Varina parcel, the existing HDPE pipe is being replaced with a new RCP but this new pipe will be discharging near the same location but it will be discharging outside of the buffer. The existing pipe that is between the two stream buffers is also being replaced since it is HDPE with a new RCP but is being placed in the same location of the existing storm drainage. We feel that the proposed design reflects a significant effort to reduce the impacts to the stream, to protect the environment and allow for the functionality of the current and future needs of the campus. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: Retaining walls are proposed to minimize grading within the wetlands and allow complete avoidance of any impacts to the stream buffer. Where retaining walls are not proposed, slopes as steep as 2:1 are being utilized in an effort to minimize and avoid impacts to the wetlands where possible. The existing pipe that is between the two stream buffers is also being replaced since it is HDPE with a new RCP but is being placed in the same location of the existing storm drainage utilizing minimum disturbance techniques. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? Yes No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: Impacts are below the mitigation thresholds for each type of impact. We have also demonstrated a significant effort to avoid and minimize impacts where possible. F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan la. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? Yes No What type of SCM are you providing? Level Spreader Vegetated Conveyance (lower SHWT) Wetland Swale (higher SHWT) Other SCM that removes minimum 30% nitrogen Proposed project will not create concentrated stormwater flow through the buffer 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250? * Yes No 2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)? Yes No Comments: G. Supplementary Information 1. Environmental Documentation la. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?* Yes No 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental Policy Act (NEPA/SEPA)?* Yes No Comments: * This project does not meet the minimum criteria needed to trigger additional environmental documentation under the NCEPA, as defined in state rules at 01 NCAC 25. 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)?* Yes No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project result in additional development, which could impact nearby downstream water quality?* Yes No 3b. If you answered "no," provide a short narrative description. The project is proposed to serve the existing population. It is not anticipated that the school will result in additional development which could impact nearby downstream water quality based on past and reasonably anticipated future impacts. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project?* Yes No N/A 4b. Describe, in detail, the treatment methods and dispositions (non -discharge or discharge) of wastewater generated from the proposed project. If the wastewater will be treated at a treatment plant, list the capacity available at that plant. The project will be connected to the Town of Fuquay-Varina sanitary sewer system. 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat?* Yes No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* Yes No 5c. If yes, indicate the USFWS Field Office you have contacted. Raleigh 5d. Is another Federal agency involved?* Yes 5e. Is this a DOT project located within Division's 1-8? Yes No No Unknown 5f. Will you cut any trees in order to conduct the work in waters of the U.S.? Yes No 5g. Does this project involve bridge maintenance or removal? Yes No 5h. Does this project involve the construction/installation of a wind turbine(s)?* Yes No 5i. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.? Yes No 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? Review of the NC Natural Heritage Program database, obtained an official Species List through the US Fish & Wildlife Service (USFWS) iPac, and on - site review of existing habitat. 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* Yes No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* The NOAA Habitat Conservation/ Habitat Protection: National Marine Fish Service; Essential Fish Habitat Mapper website was referenced. No Essential Fish Habitat was identified near the project. 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?* Yes No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?* The NC State Historic Preservation Office (SHPO) HPOWEB GIS Service interactive map was referenced on August 1, 2022, no historic listings or study list entries or determined eligible listings were identified within the property boundaries. 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain?* Yes No 8c. What source(s) did you use to make the floodplain determination?* NC Flood Risk Information System Floodplain Mapping Program - FIRM 3720067800J dated May 2, 2006 Miscellaneous Please use the space below to attach all required documentation or any additional information you feel is helpful for application review. Documents should be combined into one file when possible, with a Cover Letter, Table of Contents, and a Cover Sheet for each Section preferred. Click the upload button or drag and drop files here to attach document Hiltop Needmore Elementary_PCN Attachements.pdf 86.1 MB File must be PDF or KMZ Comments Signature By checking the box and signing below, I certify that: • The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief'; and • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. • I have given true, accurate, and complete information on this form; I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND I intend to electronically sign and submit the PCN form. Full Name: Elias N. Ruhl Signature Q[ Date 12/6/2022 FROEHLING 4� ROBERTSON December 6, 2022 United States Army Corps of Engineers Raleigh Regulatory Field Office Via Online PCN Form Submittal Assess. Manage. Consult. NC Division of Water Resources 401 and Buffer Permitting Branch Via Online PCN Form Submittal Re: Nationwide Permit 39 Application and WQGC 4263 Hilltop Needmore Elementary School Proposed Public Elementary School 4575 Hilltop Needmore Road Fuquay-Varina, North Carolina 27562 USACE Action ID No. SAW-2020-01408 F&R Project No. 59Y-0243 Please accept this application for a US Army Corps of Engineers (USACE) Nationwide Permit 39 and NC Division of Water Resources (DWR) Water Quality Certification 4263 for the proposed jurisdictional waters impacts associated with the Hilltop Needmore Elementary School project, which currently consists of five contiguous, irregularly -shaped parcels totaling 15.15 acres, including PIN 0678749164. The site currently contains a portion of the former Crooked Creek Golf Course. The site consists of mostly grassy areas, two small wooded areas, and several paved cart paths that transect the site. It is located along the south side of Hilltop Needmore Road. A list of attachments is included below and the documents are attached to this letter. Please let us know if you have any questions or if any additional information is required in order to process this request. Sincerely, Froehling & Robertson, Inc. //71,4 27. Elias N. Ruhl Natural Resources Practice Leader (919)630-1705 ERuhl@FandR.com Attachments: DWR Pre -File Notice Agent Authorization Letters Preliminary Jurisdictional Determination (SAW-2022-02448) Wetland Delineation and Supporting Maps Impact Maps Stormwater Calculations Documentation T&E Documentation Construction Plans and Specification Details A Minority -Owned Business PURPOSE AND NEED As the population in Wake County continues to grow exponentially, a new elementary school is needed to support the existing and growing community within the Town of Fuquay Varina. The proposed elementary school is located off Hilltop Needmore Road. It is adjacent to Fuquay Varina's Town Park & Preserve, a former golf course that has been dedicated as park space within the Town. The Town is currently in the design phase of a new Community and Active Adult Center in the park. As part of an interlocal agreement, the Wake County School Board and Town of Fuquay Varina have master planned the proposed school and community center to mutually benefit from shared uses and infrastructure. This request is to approve wetland impacts as a result of the need for an elementary school in this area. A wetland and stream delineation was performed in June 2020 by Froehling & Robertson, Inc. (F&R). The delineation features were field surveyed by SEPI in September, 2020. A Buffer Determination Letter was provided by NCDEQ on September 25, 2020. Additionally, a field verification site visit was completed by the US Army Corps of Engineers on September 17, 2020 and a confirmation letter was issued by the USACE on June 6, 2022 concurring with F&R's Wetland Delineation findings. The proposed site use is Public & Civic - Educational Facility, and by nature requires standard program elements such as facility size requirements to accommodate the required student population, ingress/egress requirements, outdoor recreation requirements, service area requirements, program element adjacency and separation requirements, NCDOT MSTA traffic safety requirements, and accessibility requirements. As required by local emergency responders and NCDOT, all schools are required to have two separate points of entry to the school. AVOIDANCE AND MINIMIZATION Due to the size and orientation of the wetlands in relation to the parcels, a small amount of impact was unavoidable. However, the driveway through the site was intentionally aligned and centered through the existing break in the wetlands to minimize the disturbance. Retaining walls are proposed to minimize grading within the wetlands and allow complete avoidance of any impacts to the stream buffer. Where retaining walls are not proposed, slopes as steep as 2:1 are being utilized in an effort to minimize and avoid impacts to the wetlands where possible. The stream originates near the discharge of an existing 24" HDPE that collects site water from the adjacent Town of Fuquay Varina parcel along with the right of way of Hilltop Needmore Road. As part of the development of this project along with the adjacent Fuquay-Varina parcel, the existing HDPE pipe is being replaced with a new RCP but this new pipe will be discharging near the same location but it will be discharging outside of the buffer. The existing pipe that is between the two stream buffers is also being replaced since it is HDPE with a new RCP but is being placed in the same location of the existing storm drainage. We feel that the proposed design reflects a significant effort to reduce the impacts to the stream, to protect the environment and allow for the functionality of the current and future needs of the campus. DWR Pre -Filing Meeting Request Form NORTH CAROLINA Environmental Quality ID#* Regional Office * Reviewer List* 20210745 Version* Raleigh Regional Office - (919) 791-4200 Rick Trone Pre -Filing Meeting Request submitted 4/12/2021 Contact Name * Alex Aycrigg Contact Email Address* aaycrigg@fandr.com Project Name * WCPSS - Hilltop Needmore School Site aka E-44 Project Owner* Town of FV Project County* Wake Owner Address: Street Address Wake County Public School System Address Line 2 5625 Dillard Drive City State / Rovince / Region Cary NC Fbstal / Zip Code Country 27518 United States Is this a transportation project?* C Yes (' No Type(s) of approval sought from the DWR: rJ 401 Water Quality Certification - I— 401 Water Quality Certification - Reg ula r Express E Individual Permit E Modification I— Shoreline Stabilization Does this project have an existing project ID#?* r Yes r No Do you know the name of the staff member you would like to request a meeting with? a Goss Please give a brief project description below and include location information.* New school site. No meeting needed. Please give a couple of dates you are available for a meeting. 4/16/2021 Please attach the documentation you would like to have the meeting about. pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • !also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature Submittal Date 4/12/2021 Elias Ruhl From: laserfiche@ncdenr.gov Sent: Thursday, May 13, 2021 12:00 AM To: Alex Aycrigg Cc: rick.trone@ncdenr.gov Subject: Pre -Filing Meeting Review Completed for WCPSS - Hilltop Needmore School Site aka E-44 - 20210745 Ver 1 The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for WCPSS - Hilltop Needmore School Site aka E-44 that you submitted on 4/12/2021 2:50 PM. The ID number for that project is 20210745, Version 1. It has been decided that no meeting is needed for this project. Review Comments (If provided): Project file link: https://edocs.deq.nc.gov/WaterResourcesBrowse.aspx?dbid=0&startid=1714991 When you submit your application please upload a copy of the attached document in this email. This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses are not monitored. i E-44 R EI D: 0495199 PIN: 0678749164 PIN Extension: 000 Land Value: $603900 Total Value Assessed: $603900 Deed Acres: 15.15 City: FUQUAY-VARINA Planning Jurisdiction: FV Township: Middle Creek Owner: WAKE COUNTY BOARD OF EDUCATION Mailing Address 1: BETTY L PARKER RE SVCS SR DIRECT Mailing Address 2: 1551 ROCK QUARRY RD Mailing Address 3: RALEIGH NC 27610-4145 Deed Book: 017243 Deed Page: 00256 Deed Date: 9/17/2018 Land Class: EXEMPT Map Name: 0678 04 Billing Class: Exempt Property Description: TR2 WAKE BOEDU AND TOWN OF FUQUAY - VARINA BM2021 -01729 Site Address: 4575 HILLTOP NEEDMORE RD Street Name: HILLTOP NEEDMORE RD Old Parcel Number: -- Exempt Description: COUNTY Exempt Status: WC1 Total Structures: 1 ZIP: 27526 0 200 400 800 ft 1 1 1 1 1 1 1 1 1 inch equals 400 feet Disclaimer iMaps makes every effort to produce and publish the most current and accurate information possible. However, the maps are produced for information purposes, and are NOT surveys. No warranties, expressed or implied, are provided for the data therein, its use,or its interpretation. SINCE FROEHLING Sc ROBERTSON, INC. Engineering Stability Since 1881 310 Hubert Street Raleigh, North Carolina 27603-2302 T 919.828.34411 F 919.828.5751 NC License #F-0266 July 17, 2020 United States Army Corps of Engineers 3331 Heritage Trade Drive, Suite 105 Wake Forest, NC 27587 Re: USACE Agent Authorization Letter E-44 Elementary School Site 4551 Hilltop Needmore Road Fuquay-Varina, Wake County, NC The undersigned, registered property owner(s) of the above -note property, do hereby authorize Froehling & Robertson, Inc. (F&R) to act on behalf of the current property owner(s) as the agent for all actions necessary for the processing, issuance, and acceptance of permits or certifications pertaining to Waters of the United States at the above referenced project site. This agent authorization letter supersedes all previous agent authorizations. Owner Signature: (required) Printed Name: Date: Organization: 2nd Signature: vtional) D. M. Hay on, Jr. Chief of Facilities and Operations, wcPs Printed Name: July 20, 2020 The Wake County Board of Education Facilities Design and Construction Mailing Address: Date: Organization: 111 Corning Rd., Suite 190 Cary, NC 27518 Phone Number: 919-694-7542 Mailing Address: Phone Number: dhaydon@wcpss.net Corporate HQ: 3015 Dumbarton Road Richmond, Virginia 23228 T 804.264.2701 F 804.264.1202 www.fandr.com VIRGINIA • NORTH CAROLINA • SOUTH CAROLINA • MARYLAND • DISTRICT OF COLUMBIA FROEHLING & ROBERTSON, INC. Engineering Stability Since 1881 310 Hubert Street Raleigh, North Carolina 27603-2302 T 919,828.3441 I F 919.828,5751 NC License #F-0266 July 17, 2020 United States Army Corps of Engineers 3331 Heritage Trade Drive, Suite 105 Wake Forest, NC 27587 Re: USACE Agent Authorization Letter E-44 Elementary School Site 4501 Hilltop Needmore Road Fuquay-Varina, Wake County, NC The undersigned, registered property owner(s) of the above -note property, do hereby authorize Froehling & Robertson, Inc. (F&R) to act on behalf of the current property owner(s) as the agent for all actions necessary for the processing, issuance, and acceptance of permits or certifications pertaining to Waters of the United States at the above referenced project site. This agent authorization letter supersedes all previous agent authorizations. Owner Signature: (required) 2nd ,..i ignature: (optional) Printed Name: A, - Printed Name: Date: 7 /3 i T.220 Date: Organization: . ., . - Organization: Mailing Address: . NI v) , -- Vq6ita, Mailing Address: Phone Number: O .." 0Phone Number: Tro Ccj Corporate HO,: 3015 Dumbarton Road Richmond, Virginia 23228 T 804.264.2701 F 804.264.1202 www.fandr.com VIRGINIA • NORTH CAROLINA • SOUTH CAROLINA • MARYLAND • DISTRICT OF COLUMBIA A AAInnrItii-niAmPri R115111PSC Elias Ruhl From: Phillips, George L CIV USARMY CESAW (USA) <George.L.Phillips@usace.army.mil> Sent: Monday, June 6, 2022 1:20 PM To: Alex Aycrigg Subject: WCSPP E-44 / Fuquay-Varina / Wake County / SAW-2020-01408 / Jurisdictional Determination Request Attachments: Delineation Sketch Map.pdf [EXTERNAL] Mr. Aycrigg, Based on my site visit on 09/17/2020 the Corps concurs with the delineation within the red outlined "E-44 Review Area" depicted on the attached "Delineation Sketch Map" exhibit. Due to workload it may take 90-120 days for the issuance of a formal written jurisdictional determination. The delineation may be used for planning and permitting purposes. Should the need for a Department of the Army permit arise the JD can be issued with the permit verification. The AID for the project is SAW-2020-01408. I have attached the "Delineation Sketch Map" for reference. Let me know if you have any questions or concerns. Lyle Phillips Regulatory Specialist US Army Corps of Engineers CE-SAW-RG-R 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Phone: (919) 554-4884, Ext. 25. Fax: (919) 562-0421 Email: George.L.Phillips@usace.army.mil We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at https://regulatory.ops.usace.army.mil/customer-service-survey/ . Thank you for taking the time to visit this site and complete the survey. 1 DELINEATION SKETCH MAP 1 inch =200 feet DELINEATION SKETCH MAP 1 inch = 50 feet ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Director Tommy Moorman Wake County Board of Education 336 S. Fayetteville Street, Suite 1100 Raleigh, NC 27601 NORTH CAROLINA Environmental Quality September 25, 2020 Subject: Surface Water Determination Letter NBRRO#20-276 Wake County Determination Type: Buffer Call Isolated or EIP Call ❑ Ephemeral/Intermittent/Perennial Determination ❑ Isolated Wetland Determination 1 Neuse (15A NCAC 2B .0714) ❑ Tar Pamlico (15A NCAC 2B .0734) ❑ Jordan (15A NCAC 2B .0267) Project Name: WCPSS E-44 Site Location/Directions: The project area is located at 0 Hilltop Needmore Road, in Fuquay - Varina, Wake County Subject Stream: UT to Terrible Creek Determination Date: 9/17/2020 Staff: Cheng Zhang Stream E/UP Not Subject Subject to Start@ Stop@ Soil USGS * to Buffers Buffers Survey Topo A I X 35.629754, 35.629325, X X -78.736779 -78.736374 A I X 35.628983, Into Pond X X -78.735946 Pond** X *E/I/P = Ephemeral/Intermittent/Perennial ** Pond is not depicted but is part of Feature A Explanation: The feature(s) listed above has or have been located on the Soil Survey of Wake County, North Carolina or the most recent copy of the USGS Topographic map at a 1:24,000 scale. Each feature that is checked "Not Subject" has been determined not to be a stream or is not present on the property. Features that are checked "Subject" have been located on the property and possess characteristics that qualify it to be a stream. There may be other streams located on your property that do not show up on the maps referenced above but, still may be considered jurisdictional according to the US Army Corps of Engineers and/or to the Division of Water Resources (DWR). D_E %i )H i,•C.nHOLiNA Department of Environmentalm.i� North Carolina Department of Environmental Quality I Division of Water Resources Raleigh Regional Office 13800 Barrett Drive I Raleigh, North Carolina 27609 919.791.4200 This on -site determination shall expire five (5) years from the date of this letter. Landowners or affected parties that dispute a determination made by the DWR or Delegated Local Authority may request a determination by the Director. An appeal request must be made within sixty (60) days of date of this letter or from the date the affected party (including downstream and/or adjacent owners) is notified of this letter. A request for a determination by the Director shall be referred to the Director in writing If sending via US Postal Service c/o Paul Wojoski DWR — 401 & Buffer Permitting Unit 1617 Mail Service Center Raleigh, NC 27699-1617. If sending via delivery service (UPS, FedEx, etc.) Paul Wojoski DWR — 401 & Buffer Permitting Unit, 512 N. Salisbury Street Raleigh, NC 27604 This determination is final and binding unless, as detailed above, you ask for a hearing or appeal within sixty (60) days. The owner/future owners should notify the Division of Water Resources (including any other Local, State, and Federal Agencies) of this decision concerning any future correspondences regarding the subject property (stated above). This project may require a Section 404/401 Permit for the proposed activity. Any inquiries should be directed to the Division of Water Resources (Central Office) at (919)-807-6300, and the US Army Corp of Engineers (Raleigh Regulatory Field Office) at (919)-554-4884. If you have questions regarding this determination, please feel free to contact Cheng Zhang at (919) 791-4259. Sincerely, DocuSigned by: Sit /1.449-k, BCDA9D825D4A46D... Scott Vinson, Regional Supervisor Water Quality Regional Operations Section Raleigh Regional Office Division of Water Resources cc: RRO DWR File Copy WCPSS E-44 Site Wake County, NC-DWR Project # 20-276 1 nch = 666-666667 feet WCPSS E-44 Site Wake County, NC-DWR Project # 20-276 1 inch = 333.333333 feet FROEHLING 4 ROBERTSON Assess. Manage. Consuif. 310 Hubert Street Raleigh, North Carolina 27603-2302 T 919.828.3441 July 16, 2020 Ronnie Stott, LEED, AP Sr. Project Manager - FD&C Wake County Public School System 111 Corning Road, Ste. 190 Cary, North Carolina 27518 Re: Stream and Wetland Delineation Proposed E-44 Elementary School 4551 Hilltop Needmore Road Fuquay-Varina, North Carolina F&R Project No. 59Y-0243 Property Description: Size (acres): 29.1 acres Nearest Town: Fuquay-Varina, NC Nearest Waterway: Terrible Creek River Basin: Neuse USGS HUC: 030202010901 Coordinates: Lat 35.6298/ Long -78.7374 Location: Along the south side of Hilltop Needmore Road, approximately 270 feet east of the intersection with Brushy Meadows Drive near the town of Fuquay-Varina, North Carolina. Mr. Stott, Froehling & Robertson, Inc., (F&R) presents herein the results of the stream and wetland delineation conducted at the Proposed E-44 Elementary School site, which includes one parcel identified as PIN Number 0678749253 (21.0 acres) as well as the northern portion of PIN 0678831336 (8.07 acres). The parcels are located east of the intersection of Hilltop Needmore Road and Brushy Meadows Drive near Fuquay-Varina, Wake County, North Carolina (see Attachments for Site Location Map). The review area contains approximately 29.1 acres and is a portion of the former Crooked Creek Golf Course. The site consists of mostly grassy areas, two small wooded areas, and several paved cart paths that transect the site. EXECUTIVE SUMMARY The following is a summary of our findings and is not intended to replace more detailed information contained elsewhere in this report. Based on F&R's field observations and information review, three likely jurisdictional wetlands (W1, W2/W3, and W4), and two streams (S1 and S2) were identified and delineated within the review area during our assessment. A graphic depiction of the identified feature locations is included in the attachments. SCOPE OF SERVICES This report describes the activities and findings associated with the completion of a stream and wetland assessment for the above -referenced review area. F&R reviewed applicable information sources to identify Corporate HQ: 3015 Dumbarton Road Richmond, Virginia 23228 T 804.264.2701 F 804.264.1202 www.fandr.com VIRGINIA • NORTH CAROLINA • SOUTH CAROLINA • MARYLAND • DISTRICT OF COLUMBIA A Minority -Owned Business areas on the project site that could be considered "Waters of the US" (i.e., wetland, stream, and open water features) and subject to jurisdiction by Environmental Protection Agency (EPA), United States Army Corps of Engineers (USACE) and/or North Carolina Division of Water Resources (NCDWR). On -site identification of wetlands was performed in general accordance with the 1987 Corps of Engineers Wetlands Delineation Manual and subsequent USACE clarification memorandums. On -site identification of streams was performed in general accordance with the NCDWR Identification Methods of the Origins of Intermittent and Perennial Streams. SITE CONDITIONS Information Review F&R reviewed all or some of the following resources prior to visiting the project site: United States Geological Survey (USGS) current 1:24,000-scale topographic map, Natural Resource Conservation Service (NRCS) Soil Survey, National Wetland Inventory (NWI), and aerial photographs. Wetland features were not depicted in reviewed resources, including NWI Maps, NRCS Soil Survey Maps, and USGS Topographical Maps. However, one stream feature (S1), was depicted on the NWI Map, the NRCS Soil Map, and the USGS Topographic Map. Additionally, the NRCS Soil Survey maps indicate four soil series within the project review area: Appling (Ag), Faceville (Fa), Mantachie (Me), and White Store (Wa). Of the four soil series mapped within the project area, Mantachie is the sole type that is considered to be hydric. Hydric soils are defined as "soil that formed under conditions of saturation, flooding, or ponding long enough during the growing season to develop anaerobic conditions in the upper part." The presence of hydric soils is one of three wetland delineation criteria. On -Site Observations The review area currently consists of a grassy former golf course with paved cart paths as well as two small wooded areas. Three likely jurisdictional wetlands (W1, W2/W3, and W4), and two likely jurisdictional streams (S1 and S2) were identified and delineated during our assessment. Based on F&R's on -site observations, each of the above -listed features is likely to be considered jurisdictional "Waters of the US" by the USACE and/or NCDWR; however, on -site determinations by the USACE and NCDWR will be required in order to confirm or deny jurisdiction by these two regulatory agencies. Since the assessment area is located within the Neuse River Basin, mapped streams on the site are also subject to the Neuse River Basin Riparian Buffer Rules. The approximate location of the mapped surface features is shown on the Wetland Identification Map in the Attachments and is described as follows: • Wetland 1— This Palustrine Emergent wetland feature, located in the center eastern portion of the review area, appears to drain to a concrete grated drop -inlet drainage structure and then into a buried black corrugated pipe. The pipe directs the water to the origin point of feature S1, which then flows to the southeast and offsite. • Wetland 2 & 3 — This Palustrine Emergent wetland feature is located along the north and south sides of stream feature S1. The wetland feature drains into S1 and then into a culvert that flows under a former golf fairway out of the review area. • Wetland 4 — This Palustrine Forested wetland feature is located on the eastern edge of the review area and is located along both sides of Streams 1 and 2. It drains directly into S1 and S2, which conjoin at the eastern edge of the review area and S1 continues into a surface water pond just to the east of the property boundary. Wake County Public School System E-44 Elementary School Site — Wetland Delineation F&R Project No. 59Y-0243 2 July 16, 2020 • Stream 1 — An intermittent channel originating in the southeast portion of the review area at the discharge point for a buried 24" black corrugated pipe, this Riverine Unconsolidated feature flows between and drains features W2 and W3, then flows into another 24" black corrugated pipe emerging near W4 and flowing to the east into a small pond that is located approximately 15 feet east of the review area. The western portion of S1 measures approximately 280 linear feet (LF) and the eastern portion is approximately 120 LF. S1 is mapped on the NRCS Soil Survey as well as the USGS Topographic map and is anticipated to be subject to riparian buffer requirements of the Neuse River watershed. • Stream 2 — this intermittent feature begins at a headcut within W4 and is fed by the discharge of a buried culvert that appears to collect groundwater from beneath the former golf course. The channel is ephemeral at the culvert but then becomes intermittent and flows through feature W4 and joins with feature S1 near the eastern property boundary. The feature measures approximately 110 LF within the review area. The feature is not mapped on the NRCS Soil Survey nor the USGS Topographic map and is therefore not anticipated to be subject to Neuse River Basin riparian buffer rules. However, it is anticipated that this feature will be subject to USACE jurisdiction. • Off -Site Pond — a jurisdictional pond was observed approximately 15 feet outside of the review area to the east. This pond receives inflow from Stream 1 identified above. Since this pond was located outside of the review area, it was not evaluated as an on -site feature. However, based on visual observation and geomorphologic position, it appears to be a jurisdictional feature and would be subject to Neuse Buffer Rules. CONCLUSION Based on F&R's assessment, three likely jurisdictional wetlands (W1, W2/W3, and W4), and two likely jurisdictional Streams (S1 and S2) were identified and delineated within the review area during our assessment. It is F&R's opinion that the portions of the features contained within the review area are likely to be considered jurisdictional by the USACE and/or NCDWR based on F&R's on -site observations. Based on this information, the features would be subject to USACE or NCDWR regulations in accordance with the Clean Water Act (CWA); however, on -site determinations by the USACE and NCDWR will be required in order to confirm or deny jurisdiction by these two regulatory agencies. Additionally, since the assessment area is located within the Neuse River Basin, mapped streams on the site are also subject to the Neuse River Basin Riparian Buffer Rules. Please note that the attached Wetlands Identification Map prepared by F&R is meant for use as a reference document only. This map is not designed to satisfy any requirement for a survey plat by a licensed surveyor nor is it intended to be used for construction purposes or relied upon for the jurisdictional limits of the mapped surface features. GENERAL GUIDANCE F&R recommends that plans for development of the subject property consider the USACE and NCDWR procedures for assessing impacts to jurisdictional wetlands and/or streams (i.e., avoid, minimize, and mitigate) to optimize permitting strategies. If proposed development on the project site does not result in impacts to wetland areas, the areas immediately adjacent to wetland boundaries, or the identified Waters of the US, a USACE permit will not be necessary. Typical activities requiring USACE permitting include, but are not limited to, depositing of fill or Wake County Public School System E-44 Elementary School Site — Wetland Delineation F&R Project No. 59Y-0243 3 July 16, 2020 dredged material in wetlands; site development fill; construction of revetments, groins, breakwaters, levees, dams, dikes, and weirs; and placement of riprap and road fill. If impacts to these areas are anticipated, F&R recommends that site plans be developed that optimize permitting strategies to comply with the USACE, NCDWR, and local municipality procedures for assessing impacts to jurisdictional wetlands and/or "Waters of the US" (i.e., avoid, minimize, and mitigate). If future impacts to jurisdictional wetlands and/or streams are anticipated, the appropriate permit applications for regulatory review must be completed prior to any initiation of activities that may require permitting. F&R can provide alternative design measures and make the written request based upon extensive experience and professional relationships with the USACE and NCDWR throughout North Carolina in the event that impacts are unavoidable and written authorization needs to be requested. LIMITATIONS This report has been prepared for the exclusive use of the Wake County Public School System (Client) and others so designated by the Client for this specific project. These services have been provided in accordance with generally accepted environmental practices. No other warranty, expressed or implied, is made. Our observations were based upon conditions readily visible at the site at the time of our visit. If additional information becomes available which may affect our conclusions and recommendations, we request the opportunity to review the information, and reserve the right to modify our report, as warranted. CLOSURE We appreciate the opportunity to serve as your Environmental Consultant. Please do not hesitate to contact us if you have any questions, comments or additional needs. Sincerely, FROEHLING & ROBERTSON, INC. Alex D. Aycrigg, MS, PWS Elias N. Ruhl Wetland Scientist Practice Leader, Natural Resources Attachments: General Terms, Conditions & Limitations Figure 1: Site Location Map Figure 2: Site Location Aerial Figure 3: USGS Topographical Map Figure 4: NRCS Soil Survey Map (Published) Figure 5: National Wetland Inventory Map Figure 6: Wetlands Identification Map Site Photographs USACE Wetland Data Forms NCDWR Stream Determination Forms Wake County Public School System E-44 Elementary School Site — Wetland Delineation F&R Project No. 59Y-0243 4 July 16, 2020 GENERAL TERMS, CONDITIONS, AND LIMITATIONS Froehling & Robertson, Inc. by virtue of providing the services described in this proposal does not assume the responsibility of the person(s) in charge of the site, or otherwise undertake responsibility for reporting to any local, State, or Federal public agencies any conditions at the site that may present a potential danger to public health, safety, or the environment. The CLIENT agrees to notify the appropriate local, State, or Federal public agencies as required by law, or otherwise to disclose, in a timely manner, any information that may be necessary to prevent any danger to public health, safety, or the environment. The scope of work will be limited to what is provided for in this proposal. By engaging F&R, Client warrants that they have full legal authority to provide access to the property to F&R in order to perform our proposed scope of work. This evaluation will not constitute an exhaustive evaluation of the site or extant reports. Our services will be based upon available data and upon current industry standards. Under this scope of services, F&R assumes no responsibility regarding response actions conducted by the Client and/or outside contractors initiated as a result of this study(s). Response actions are the sole responsibility of the Client and should be conducted in accordance with local, state, and/or federal requirements, and should be performed by appropriate trained and licensed -personnel, as warranted. F&R also assumes no responsibility regarding implementation of any recommendations made as a result of this report. The findings, recommendations, or discussions provided as part of our services should not be construed in any way as a recommendation to purchase, sell, or develop the project site. F&R retains the right to revise our opinions or conclusions if new information is later discovered or made available. When hazardous materials are known, assumed or suspected to exist at a site, F&R is required to take appropriate precautions to protect the health and safety of personnel, to comply with applicable laws and regulations, and to follow procedures that an engineer deemed prudent to minimize physical risks to employees and the public. The CLIENT hereby warrants that, if he knows or has any reason to assume or suspect that hazardous materials may exist at the project site, the CLIENT has so informed F&R. If pollutants are discovered that, in our sole opinion, pose unanticipated risks, it is hereby agreed that the scope of services, schedule and the estimated costs will be reconsidered and that this contract shall immediately become subject to renegotiation or, in the sole discretion of Froehling & Robertson, termination. If accepted, these stated prices are subject to a negotiated increase after a one-year period. u' 3 + z i tz y tt 4 4.0. b 7 G X. 11111(ap.Neamn Ore Mp Lr n.•hy Mt Mow' ��' 1 1 1 1 3 FtO3 Hottni CI shad./ Crse,ea O Jqn. fir Legend Q E-44 Review Area RM+n SI :f Wrenn St Lark it (Feet SS, Irtermap, INCREMENT P, NRCan, Esri 1 333 1 63• 3 Z003 2,E00 3,000 •ng), Esri Korea, Esri ;Thailand), NGCC, {c) '_ cenStreetMat: contributors, and the GIS User Community nrr Site Location Map Froehling & Robertson, Inc. 310 Hubert Street Raleigh, North Carolina 27603 T 919.828.3441 Client: Project: Location: Wake County Public Schools E-44 Elementary School Site Fuquay-Varina, Wake County, NC Project Number: 59Y-0243 Data Source: Date: Esri Street Map June 2020 IScale: As Shown FIGURE J. No. •' IA! :y i• •IFEet :TO 503 no Fn =OO:D 250000 3.000 Froehling & Robertson, Inc. 310 Hubert Street Raleigh, North Carolina 27603 T 919.828.3441 Site Location Aerial Client: Project: Location: Project Number: Data Source: Date: Wake County Public Schools E-44 Elementary School Site Fuquay-Varina, Wake County, NC 59Y-0243 Wake County GIS 2017 June 2020 IScale: As Shown SCA,6 FIGURE 2 No. Stream 1 0 185 330 0 1,320 1,650 Froehling & Robertson, Inc. 310 Hubert Street Raleigh, North Carolina 27603 T 919.828.3441 USGS Topographic Map Client: Project: Location: Project Number: Data Source: Wake County Public Schools E-44 Elementary School Site Fuquay-Varina, Wake County, NC 59Y-0243 "Lake Wheeler, NC" dated 1993 June 2020 IScale: As Shown FIGURE No. Froehling & Robertson, Inc. 310 Hubert Street Raleigh, North Carolina 27603 T 919.828.3441 Published Soil Survey Map Client: Project: Location: Project Number: Data Source: Date: Wake County Public Schools E-44 Elementary School Site Fuquay-Varina, Wake County, NC 59Y-0243 Wake County Soil Survey Dated 1971 June 2020 IScale: As Shown F1 FIGURE 4 No. Legend n E-44 Review Area Estuarine and Marine Deepwater Estuarine and Marine Wetland Freshwater Emergent Wetland Freshwater Forested/Shrub Wetland Freshwater Pond Lake Riverine Froehling & Robertson, Inc. 310 Hubert Street Raleigh, North Carolina 27603 T 919.828.3441 National Wetland Inventory Map Client: Project: Location: Project Number: Data Source: Date: Wake County Public Schools E-44 Elementary School Site Fuquay-Varina, Wake County, NC 59Y-0243 USFWS NWI Data June 2020 IScale: As Shown FIGURE No. 5 Froehling & Robertson, Inc. 310 Hubert Street Raleigh, North Carolina 27603 T 919.828.3441 Wetland Identification Map Client: Project: Location: Project Number: Data Source: Date: Wake County Public Schools E-44 Elementary School Site Fuquay-Varina, Wake County, NC 59Y-0243 Field Observations and Wake County GIS 2017 Aerial June 2020 IScale: As Shown FA FIGURE (J No. Legend 0 E-44 Review Area Stream Wetlands Approxirnate`location buried culvert Culvert outlet and stream origin S1 Subject to 50' Buffer Two Culverts flow to W4 and S1 Approximate location of buried culverts Wetland S1 Subject to 50' Buffer S2 Not Subject to 50' Buffer Detail Map • 4%0*, :._ .„ Offsite Pond Froehling & Robertson, Inc. 310 Hubert Street Raleigh, North Carolina 27603 T 919.828.3441 Client: Project: Location: Wake County Public Schools E-44 Elementary School Site Fuquay-Varina, Wake County, NC Project Number: 59Y-0243 Data Source: Date: Field Observations and Wake County GIS 2017 Aerial June 2020 IScale: As Shown FIGURE 7 No. 1. View of wetland feature W1 facing northeast. 2. View of origin of stream feature S1 facing east. The culvert shown appears to function as an underdrain, receiving water from the golf course fairway and discharging into feature S1. Wake County PSS—E-44 Elementary School Site (59Y-0243) 1 Jurisdictional Wetland Delineation 3. View of Si, facing east. 4. View of wetland feature W2, facing south. Wake County PSS—E-44 Elementary School Site (59Y-0243) 2 Jurisdictional Wetland Delineation 5. View of the wetland W2 facing northwest. 6. View of feature W3 facing south. Wake County PSS—E-44 Elementary School Site (59Y-0243) 3 Jurisdictional Wetland Delineation 7. View of feature W3 where it joins stream feature Si, facing west. 8. View of the culvert discharge offsite for feature Si, facing east. Wake County PSS—E-44 Elementary School Site (59Y-0243) 4 Jurisdictional Wetland Delineation 9. View of the culvert outlet of feature S1 just upstream of W4, facing west. 10. View of the feature S2, facing east. Wake County PSS—E-44 Elementary School Site (59Y-0243) 5 Jurisdictional Wetland Delineation 11. View of the stream feature S2, facing west. 12. View of the confluence of S1 and S2, with the offsite pond in the background, facing east. Wake County PSS—E-44 Elementary School Site (59Y-0243) 6 Jurisdictional Wetland Delineation WETLAND DETERMINATION DATA FORM — Atlantic and Gulf Coastal Plain Region Wetlands 1 & 2/3 Project/Site: E-44 Site Applicant/Owner: Wake County Investigator(s): A. Aycrigg City/County: Wake Co Sampling Date: 6/2/20 State: NC Sampling Point: DP1 Wet Section, Township, Range: Landform (hillslope, terrace, etc.): Local relief (concave, convex, none): Slope (%): Subregion (LRR or MLRA): Soil Map Unit Name: NWI classification: Are climatic / hydrologic conditions on the site typical for this time of year? Yes ✓ No (If no, explain in Remarks.) Are Vegetation , Soil , or Hydrology significantly disturbed? Are "Normal Circumstances" present? Yes i No Are Vegetation Soil or Hydrology naturally problematic? (If needed, explain any answers in Remarks.) Lat: 35.629650 Long: -78.736744 Datum: SUMMARY OF FINDINGS — Attach site map showing sampling point locations, transects, important features, etc. Hydrophytic Vegetation Present? Hydric Soil Present? Wetland Hydrology Present? Yes ✓ No Yes ✓ No Yes ✓ No Is the Sampled Area within a Wetland? Yes ✓ No Remarks: HYDROLOGY Wetland Hydrology Indicators: Primary Indicators (minimum of one is required; check all that apply) Secondary Indicators (minimum of two required) Surface Soil Cracks (B6) Concave Surface (B8) (B10) (B16) Table (C2) (C8) on Aerial Imagery (C9) (D2) (D3) (D5) (D8) (LRR T, U) Surface Water (A1) Aquatic Fauna (B13) Sparsely Vegetated High Water Table (A2) Marl Deposits (B15) (LRR U) _ Drainage Patterns ✓ Saturation (A3) Hydrogen Sulfide Odor (C1) Moss Trim Lines Water Marks (B1) 1 Oxidized Rhizospheres along Living Roots (C3) _ Dry -Season Water Sediment Deposits (B2) Presence of Reduced Iron (C4) _ Crayfish Burrows Drift Deposits (B3) _ Recent Iron Reduction in Tilled Soils (C6) _ Saturation Visible Algal Mat or Crust (B4) _ Thin Muck Surface (C7) _ Geomorphic Position Iron Deposits (B5) _ Other (Explain in Remarks) ` Shallow Aquitard Inundation Visible on Aerial Imagery (B7) _ FAC-Neutral Test Water -Stained Leaves (B9) _ Sphagnum moss Field Observations: Surface Water Present? Yes No ✓ Depth (inches): Wetland Hydrology Present? Yes ✓ No Water Table Present? Yes No ✓ Depth (inches): Saturation Present? Yes ✓ No Depth (inches): 6 (includes capillary fringe) Describe Recorded Data (stream gauge, monitoring well, aerial photos, previous inspec ions), if available: Remarks: US Army Corps of Engineers Atlantic and Gulf Coastal Plain Region — Version 2.0 VEGETATION (Five Strata) - Use scientific names of plants. Sampling Point: DP1 Wet Tree Stratum (Plot size: Carya cordiformis 2. 3. 4. 5. 6. 20 ) Absolute Dominant Indicator % Cover Species? Status 25 Yes FACW 25 = Total Cover 50% of total cover: 12 20% of total cover: 4 Sapling Stratum (Plot size: 20 ) 1. 2. 3. 4. 5. 6. n/a 50% of total cover: Shrub Stratum (Plot size: 20 ) 1. 2. 3. 4. 5. 6. n/a 0 50% of total cover: Herb Stratum (Plot size: 10 = Total Cover 20% of total cover: 0 = Total Cover 20% of total cover: 1 Panicum spp. 40 Yes FAC 2. Juncus effusus 10 Yes FACW 3 Sagittaria fasciculata 5 No FACW 4. 5. 6. 7. 8. 9. 10. 11. 55 = Total Cover 50% of total cover: 27 20% of total cover: 11 Woody Vine Stratum (Plot size: 10 ) 1. n/a 2. 3. 4. 5. 0 = Total Cover 50% of total cover: 20% of total cover: 1 Dominance Test worksheet: Number of Dominant Species That Are OBL, FACW, or FAC: 3 (A) Total Number of Dominant Species Across All Strata: 3 (B) Percent of Dominant Species That Are OBL, FACW, or FAC: 100 (A/B) Prevalence Index worksheet: Total % Cover of: Multiply by: OBL species x 1 = FACW species x 2 = FAC species x 3 = FACU species x 4 = UPL species x 5 = Column Totals: 0 (A) 0 Prevalence Index = B/A = (B) Hydrophytic Vegetation Indicators: ❑ 1 - Rapid Test for Hydrophytic Vegetation ❑✓ 2 - Dominance Test is >50% ❑ 3 - Prevalence Index is <_3.0' ❑ Problematic Hydrophytic Vegetation' (Explain) 'Indicators of hydric soil and wetland hydrology must be present, unless disturbed or problematic. Definitions of Five Vegetation Strata: Tree - Woody plants, excluding woody vines, approximately 20 ft (6 m) or more in height and 3 in. (7.6 cm) or larger in diameter at breast height (DBH). Sapling - Woody plants, excluding woody vines, approximately 20 ft (6 m) or more in height and less than 3 in. (7.6 cm) DBH. Shrub - Woody plants, excluding woody vines, approximately 3 to 20 ft (1 to 6 m) in height. Herb - All herbaceous (non -woody) plants, including herbaceous vines, regardless of size, and woody plants, except woody vines, less than approximately 3 ft (1 m) in height. Woody vine - All woody vines, regardless of height. Hydrophytic Vegetation Present? Yes Remarks: (If observed, list morphological adaptations below). US Army Corps of Engineers Atlantic and Gulf Coastal Plain Region - Version 2.0 SOIL Sampling Point: DP1 Wet Profile Description: (Describe to the depth needed to document the indicator or confirm the absence of indicators.) Depth Matrix (inches) Color (moist) 0-3 3-6 10 Y/R 3/2 10 Y/R 3/3 95 6-12 10 Y/R 4/3 95 Redox Features Color (moist) % Type' Loc2 5 Y/R 4/6 5 C M 5 Y/R 4/6 5 C M 'Type: C=Concentration, D=Depletion, RM=Reduced Matrix, MS=Masked Sand Grains. Hydric Soil Indicators: (Applicable to all LRRs, unless otherwise noted.) Histosol (A1) Histic Epipedon (A2) Black Histic (A3) Hydrogen Sulfide (A4) Stratified Layers (A5) Organic Bodies (A6) (LRR P, T, U) ✓ 5 cm Mucky Mineral (A7) (LRR P, T, U) _ Muck Presence (A8) (LRR U) 1 cm Muck (A9) (LRR P, T) Depleted Below Dark Surface (A11) Thick Dark Surface (Al2) Coast Prairie Redox (A16) (MLRA 150A) Sandy Mucky Mineral (S1) (LRR 0, S) Sandy Gleyed Matrix (S4) Sandy Redox (S5) Stripped Matrix (S6) Dark Surface (S7) (LRR P, S, T, U) Texture Remarks SL mucky mineral SL SCL Polyvalue Below Surface (S8) (LRR S, T, U) Thin Dark Surface (S9) (LRR S, T, U) Loamy Mucky Mineral (F1) (LRR O) Loamy Gleyed Matrix (F2) Depleted Matrix (F3) Redox Dark Surface (F6) Depleted Dark Surface (F7) Redox Depressions (F8) Marl (F10) (LRR U) Depleted Ochric (F11) (MLRA 151) Iron -Manganese Masses (F12) (LRR O, P, T) Umbric Surface (F13) (LRR P, T, U) Delta Ochric (F17) (MLRA 151) Reduced Vertic (F18) (MLRA 150A, 150B) Piedmont Floodplain Soils (F19) (MLRA 149A) Anomalous Bright Loamy Soils (F20) (MLRA 149A, 153C, 153D) 2Location: PL=Pore Lining, M=Matrix. Indicators for Problematic Hydric Soils3: _ 1 cm Muck (A9) (LRR 0) _ 2 cm Muck (A10) (LRR S) Reduced Vertic (F18) (outside MLRA 150A,B) Piedmont Floodplain Soils (F19) (LRR P, S, T) _ Anomalous Bright Loamy Soils (F20) (MLRA 153B) Red Parent Material (TF2) Very Shallow Dark Surface (TF12) Other (Explain in Remarks) 3lndicators of hydrophytic vegetation and wetland hydrology must be present, unless disturbed or problematic. Restrictive Layer (if observed): Type: Depth (inches): Hydric Soil Present? Yes No Remarks: Soils are disturbed throughout the site as the location was a golf course. US Army Corps of Engineers Atlantic and Gulf Coastal Plain Region — Version 2.0 WETLAND DETERMINATION DATA FORM — Atlantic and Gulf Coastal Plain Region Project/Site: E-44 Site City/County: Wake Co Sampling Date: 6/2/20 Applicant/Owner: Wake County Investigator(s): A. Aycrigg State: NC Sampling Point: DP1 Up Section, Township, Range: Landform (hillslope, terrace, etc.): Local relief (concave, convex, none): Slope (%): Subregion (LRR or MLRA): Soil Map Unit Name: NWI classification: Are climatic / hydrologic conditions on the site typical for this time of year? Yes ✓ No (If no, explain in Remarks.) Are Vegetation , Soil , or Hydrology significantly disturbed? Are "Normal Circumstances" present? Yes i No Are Vegetation Soil or Hydrology naturally problematic? (If needed, explain any answers in Remarks.) Lat: 35.630031 Long: -78.737228 Datum: SUMMARY OF FINDINGS — Attach site map showing sampling point locations, transects, important features, etc. Hydrophytic Vegetation Present? Yes ✓ No Hydric Soil Present? Yes No ✓ Wetland Hydrology Present? Yes No ✓ Is the Sampled Area within a Wetland? Yes No Remarks: HYDROLOGY Wetland Hydrology Indicators: Primary Indicators (minimum of one is required; check all that apply) Secondary Indicators (minimum of two required) Surface Soil Cracks (B6) Concave Surface (B8) (B10) (B16) Table (C2) (C8) on Aerial Imagery (C9) (D2) (D3) (D5) (D8) (LRR T, U) Surface Water (A1) Aquatic Fauna (B13) Sparsely Vegetated High Water Table (A2) Marl Deposits (B15) (LRR U) _ Drainage Patterns Saturation (A3) Hydrogen Sulfide Odor (C1) Moss Trim Lines Water Marks (B1) Oxidized Rhizospheres along Living Roots (C3) _ Dry -Season Water Sediment Deposits (B2) Presence of Reduced Iron (C4) _ Crayfish Burrows Drift Deposits (B3) _ Recent Iron Reduction in Tilled Soils (C6) _ Saturation Visible Algal Mat or Crust (B4) _ Thin Muck Surface (C7) _ Geomorphic Position Iron Deposits (B5) _ Other (Explain in Remarks) ` Shallow Aquitard Inundation Visible on Aerial Imagery (B7) _ FAC-Neutral Test Water -Stained Leaves (B9) _ Sphagnum moss Field Observations: Surface Water Present? Yes No ✓ Depth (inches): Wetland Hydrology Present? Yes No Water Table Present? Yes No ✓ Depth (inches): Saturation Present? Yes No 1 Depth (inches): (includes capillary fringe) Describe Recorded Data (stream gauge, monitoring well, aerial photos, previous inspec ions), if available: Remarks: US Army Corps of Engineers Atlantic and Gulf Coastal Plain Region — Version 2.0 VEGETATION (Five Strata) - Use scientific names of plants. Sampling Point: DP1 Up Tree Stratum (Plot size: 20 1. 2. 3. 4. 5. 6. Quercus alba Absolute Dominant Indicator % Cover Species? Status 50 Yes FACU 50 = Total Cover 50% of total cover: 25 20% of total cover: 10 Sapling Stratum (Plot size: 20 ) 1. 2. 3. 4. 5. 6. n/a 50% of total cover: Shrub Stratum (Plot size: 20 ) 1. 2. 3. 4. 5. 6. n/a 0 50% of total cover: Herb Stratum (Plot size: 10 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. Panicum spp. = Total Cover 20% of total cover: 0 = Total Cover 20% of total cover: 80 Yes FAC 80 = Total Cover 50% of total cover: 40 20% of total cover: 16 Woody Vine Stratum (Plot size: 10 ) 1. n/a 2. 3. 4. 5. 0 = Total Cover 50% of total cover: 20% of total cover: 1 Dominance Test worksheet: Number of Dominant Species That Are OBL, FACW, or FAC: 1 (A) Total Number of Dominant Species Across All Strata: 2 (B) Percent of Dominant Species That Are OBL, FACW, or FAC: 50 (A/B) Prevalence Index worksheet: Total % Cover of: Multiply by: OBL species x 1 = FACW species x 2 = FAC species x 3 = FACU species x 4 = UPL species x 5 = Column Totals: 0 (A) 0 Prevalence Index = B/A = (B) Hydrophytic Vegetation Indicators: ❑ 1 - Rapid Test for Hydrophytic Vegetation ❑✓ 2 - Dominance Test is >50% ❑ 3 - Prevalence Index is <_3.0' ❑ Problematic Hydrophytic Vegetation' (Explain) 'Indicators of hydric soil and wetland hydrology must be present, unless disturbed or problematic. Definitions of Five Vegetation Strata: Tree - Woody plants, excluding woody vines, approximately 20 ft (6 m) or more in height and 3 in. (7.6 cm) or larger in diameter at breast height (DBH). Sapling - Woody plants, excluding woody vines, approximately 20 ft (6 m) or more in height and less than 3 in. (7.6 cm) DBH. Shrub - Woody plants, excluding woody vines, approximately 3 to 20 ft (1 to 6 m) in height. Herb - All herbaceous (non -woody) plants, including herbaceous vines, regardless of size, and woody plants, except woody vines, less than approximately 3 ft (1 m) in height. Woody vine - All woody vines, regardless of height. Hydrophytic Vegetation Present? Yes Remarks: (If observed, list morphological adaptations below). US Army Corps of Engineers Atlantic and Gulf Coastal Plain Region - Version 2.0 SOIL Sampling Point: DP1 Up Profile Description: (Describe to the depth needed to document the indicator or confirm the absence of indicators.) Depth Matrix (inches) Color (moist) 0-3 10 Y/R 3/3 3-6 10 Y/R 5/4 6-12 10 Y/R 5/6 Redox Features Color (moist) % Type' Loc2 'Type: C=Concentration, D=Depletion, RM=Reduced Matrix, MS=Masked Sand Grains. Hydric Soil Indicators: (Applicable to all LRRs, unless otherwise noted.) Histosol (A1) Histic Epipedon (A2) Black Histic (A3) Hydrogen Sulfide (A4) Stratified Layers (A5) Organic Bodies (A6) (LRR P, T, U) 5 cm Mucky Mineral (A7) (LRR P, T, U) Muck Presence (A8) (LRR U) 1 cm Muck (A9) (LRR P, T) Depleted Below Dark Surface (A11) Thick Dark Surface (Al2) Coast Prairie Redox (A16) (MLRA 150A) Sandy Mucky Mineral (S1) (LRR 0, S) Sandy Gleyed Matrix (S4) Sandy Redox (S5) Stripped Matrix (S6) Dark Surface (S7) (LRR P, S, T, U) Texture Remarks SL SL SCL Polyvalue Below Surface (S8) (LRR S, T, U) Thin Dark Surface (S9) (LRR S, T, U) Loamy Mucky Mineral (F1) (LRR O) Loamy Gleyed Matrix (F2) Depleted Matrix (F3) Redox Dark Surface (F6) Depleted Dark Surface (F7) Redox Depressions (F8) Marl (F10) (LRR U) Depleted Ochric (F11) (MLRA 151) Iron -Manganese Masses (F12) (LRR O, P, T) Umbric Surface (F13) (LRR P, T, U) Delta Ochric (F17) (MLRA 151) Reduced Vertic (F18) (MLRA 150A, 150B) Piedmont Floodplain Soils (F19) (MLRA 149A) Anomalous Bright Loamy Soils (F20) (MLRA 149A, 153C, 153D) 2Location: PL=Pore Lining, M=Matrix. Indicators for Problematic Hydric Soils3: _ 1 cm Muck (A9) (LRR 0) _ 2 cm Muck (A10) (LRR S) Reduced Vertic (F18) (outside MLRA 150A,B) Piedmont Floodplain Soils (F19) (LRR P, S, T) _ Anomalous Bright Loamy Soils (F20) (MLRA 153B) Red Parent Material (TF2) Very Shallow Dark Surface (TF12) Other (Explain in Remarks) 3lndicators of hydrophytic vegetation and wetland hydrology must be present, unless disturbed or problematic. Restrictive Layer (if observed): Type: Depth (inches): Hydric Soil Present? Yes No Remarks: US Army Corps of Engineers Atlantic and Gulf Coastal Plain Region — Version 2.0 WETLAND DETERMINATION DATA FORM — Atlantic and Gulf Coastal Plain Region Wetland 4 Project/Site: E-44 Site Applicant/Owner: Wake County Investigator(s): A. Aycrigg City/County: Wake Co Sampling Date: 6/23/20 State: NC Sampling Point: DP2 Wet Section, Township, Range: Landform (hillslope, terrace, etc.): Local relief (concave, convex, none): Slope (%): Subregion (LRR or MLRA): Soil Map Unit Name: NWI classification: Are climatic / hydrologic conditions on the site typical for this time of year? Yes ✓ No (If no, explain in Remarks.) Are Vegetation , Soil , or Hydrology significantly disturbed? Are "Normal Circumstances" present? Yes i No Are Vegetation Soil or Hydrology naturally problematic? (If needed, explain any answers in Remarks.) Lat: 35.628939 Long: -78.735821 Datum: SUMMARY OF FINDINGS — Attach site map showing sampling point locations, transects, important features, etc. Hydrophytic Vegetation Present? Hydric Soil Present? Wetland Hydrology Present? Yes ✓ No Yes ✓ No Yes ✓ No Is the Sampled Area within a Wetland? Yes ✓ No Remarks: HYDROLOGY Wetland Hydrology Indicators: Primary Indicators (minimum of one is required; check all that apply) Secondary Indicators (minimum of two required) Surface Soil Cracks (B6) Concave Surface (B8) (B10) (B16) Table (C2) (C8) on Aerial Imagery (C9) (D2) (D3) (D5) (D8) (LRR T, U) Surface Water (A1) Aquatic Fauna (B13) Sparsely Vegetated High Water Table (A2) Marl Deposits (B15) (LRR U) _ Drainage Patterns ✓ Saturation (A3) Hydrogen Sulfide Odor (C1) Moss Trim Lines Water Marks (B1) Oxidized Rhizospheres along Living Roots (C3) _ Dry -Season Water Sediment Deposits (B2) Presence of Reduced Iron (C4) _ Crayfish Burrows Drift Deposits (B3) _ Recent Iron Reduction in Tilled Soils (C6) _ Saturation Visible Algal Mat or Crust (B4) _ Thin Muck Surface (C7) _ Geomorphic Position Iron Deposits (B5) _ Other (Explain in Remarks) ` Shallow Aquitard Inundation Visible on Aerial Imagery (B7) _ FAC-Neutral Test Water -Stained Leaves (B9) _ Sphagnum moss Field Observations: Surface Water Present? Yes ✓ No Depth (inches): 0 Wetland Hydrology Present? Yes ✓ No Water Table Present? Yes ✓ No Depth (inches): Saturation Present? Yes ✓ No Depth (inches): (includes capillary fringe) Describe Recorded Data (stream gauge, monitoring well, aerial photos, previous inspec ions), if available: Remarks: US Army Corps of Engineers Atlantic and Gulf Coastal Plain Region — Version 2.0 VEGETATION (Five Strata) - Use scientific names of plants. Sampling Point: DP2 Wet Tree Stratum (Plot size: 20 1. 2. 3. 4. 5. 6. Liquidambar styraciflua Acer rubrum Carya cordiformis Sapling Stratum (Plot size: 20 1. 2. 3. 4. 5. 6. Acer rubrum Absolute Dominant Indicator % Cover Species? Status 50 Yes FAC 30 Yes FAC 10 Yes FAC 90 = Total Cover 50% of total cover: 45 20% of total cover: 18 Carya cordiformis Carpinus caroliniana 10 Yes FAC 10 Yes FACU 5 No FAC 25 = Total Cover 50% of total cover: 12 20% of total cover: 5 Shrub Stratum (Plot size: 20 ) 1. 2. 3. 4. 5. 6. n/a 50% of total cover: Herb Stratum (Plot size: 10 0 = Total Cover 20% of total cover: 1 Saururus cernuus 30 Yes OBL 2. Woodwardia areolata 10 Yes FACW 3. 4. 5. 6. 7. 8. 9. 10. 11. 40 = Total Cover 50% of total cover: 27 20% of total cover: 11 Woody Vine Stratum (Plot size: 10 ) 1. n/a 2. 3. 4. 5. 0 = Total Cover 50% of total cover: 20% of total cover: 1 Dominance Test worksheet: Number of Dominant Species That Are OBL, FACW, or FAC: 7 (A) Total Number of Dominant Species Across All Strata: 6 (B) Percent of Dominant Species That Are OBL, FACW, or FAC: 85 (A/B) Prevalence Index worksheet: Total % Cover of: Multiply by: OBL species x 1 = FACW species x 2 = FAC species x 3 = FACU species x 4 = UPL species x 5 = Column Totals: 0 (A) 0 Prevalence Index = B/A = (B) Hydrophytic Vegetation Indicators: ❑ 1 - Rapid Test for Hydrophytic Vegetation ❑✓ 2 - Dominance Test is >50% ❑ 3 - Prevalence Index is <_3.0' ❑ Problematic Hydrophytic Vegetation' (Explain) 'Indicators of hydric soil and wetland hydrology must be present, unless disturbed or problematic. Definitions of Five Vegetation Strata: Tree - Woody plants, excluding woody vines, approximately 20 ft (6 m) or more in height and 3 in. (7.6 cm) or larger in diameter at breast height (DBH). Sapling - Woody plants, excluding woody vines, approximately 20 ft (6 m) or more in height and less than 3 in. (7.6 cm) DBH. Shrub - Woody plants, excluding woody vines, approximately 3 to 20 ft (1 to 6 m) in height. Herb - All herbaceous (non -woody) plants, including herbaceous vines, regardless of size, and woody plants, except woody vines, less than approximately 3 ft (1 m) in height. Woody vine - All woody vines, regardless of height. Hydrophytic Vegetation Present? Yes Remarks: (If observed, list morphological adaptations below). US Army Corps of Engineers Atlantic and Gulf Coastal Plain Region - Version 2.0 SOIL Sampling Point: DP2 Wet Profile Description: (Describe to the depth needed to document the indicator or confirm the absence of indicators.) Depth Matrix (inches) Color (moist) 0-3 10 Y/R 2/2 3-6 10 Y/R 3/3 95 6-12 10 Y/R 4/3 95 Redox Features Color (moist) % Type' Loc2 5 Y/R 4/6 5 C M 5 Y/R 4/6 5 C M 'Type: C=Concentration, D=Depletion, RM=Reduced Matrix, MS=Masked Sand Grains. Hydric Soil Indicators: (Applicable to all LRRs, unless otherwise noted.) Histosol (A1) Histic Epipedon (A2) Black Histic (A3) Hydrogen Sulfide (A4) Stratified Layers (A5) Organic Bodies (A6) (LRR P, T, U) ✓ 5 cm Mucky Mineral (A7) (LRR P, T, U) _ Muck Presence (A8) (LRR U) 1 cm Muck (A9) (LRR P, T) Depleted Below Dark Surface (A11) Thick Dark Surface (Al2) Coast Prairie Redox (A16) (MLRA 150A) Sandy Mucky Mineral (S1) (LRR 0, S) Sandy Gleyed Matrix (S4) Sandy Redox (S5) Stripped Matrix (S6) Dark Surface (S7) (LRR P, S, T, U) Texture Remarks SL mucky mineral SL SCL Polyvalue Below Surface (S8) (LRR S, T, U) Thin Dark Surface (S9) (LRR S, T, U) Loamy Mucky Mineral (F1) (LRR O) Loamy Gleyed Matrix (F2) Depleted Matrix (F3) Redox Dark Surface (F6) Depleted Dark Surface (F7) Redox Depressions (F8) Marl (F10) (LRR U) Depleted Ochric (F11) (MLRA 151) Iron -Manganese Masses (F12) (LRR O, P, T) Umbric Surface (F13) (LRR P, T, U) Delta Ochric (F17) (MLRA 151) Reduced Vertic (F18) (MLRA 150A, 150B) Piedmont Floodplain Soils (F19) (MLRA 149A) Anomalous Bright Loamy Soils (F20) (MLRA 149A, 153C, 153D) 2Location: PL=Pore Lining, M=Matrix. Indicators for Problematic Hydric Soils3: _ 1 cm Muck (A9) (LRR 0) _ 2 cm Muck (A10) (LRR S) Reduced Vertic (F18) (outside MLRA 150A,B) Piedmont Floodplain Soils (F19) (LRR P, S, T) _ Anomalous Bright Loamy Soils (F20) (MLRA 153B) Red Parent Material (TF2) Very Shallow Dark Surface (TF12) Other (Explain in Remarks) 3lndicators of hydrophytic vegetation and wetland hydrology must be present, unless disturbed or problematic. Restrictive Layer (if observed): Type: Depth (inches): Hydric Soil Present? Yes No Remarks: US Army Corps of Engineers Atlantic and Gulf Coastal Plain Region — Version 2.0 Stream 1 NC DWQ Stream Identification Form Version 4.11 Date: 6/2/20 Project/Site: WCPSS E-44 Latitude: 35.629228 Evaluator: A.Aycrigg County: Wake Longitude: -78.7364441 Total Points: Stream is at least intermittent if 19 or perennial if 30" Stream Determination (circle one) Other e.g. Quad Name: 28 Ephemeral c termittej) Perennial A. Geomorphology (Subtotal = 12 ) Absent Weak Moderate Strong la. Continuity of channel bed and bank 0 1 2 3 2. Sinuosity of channel along thalweg 0 Q 2 3 3. In -channel structure: ex. riffle -pool, step -pool, ripple -pool sequence 0 CD 2 3 4. Particle size of stream substrate 0 10 2 3 5. Active/relict floodplain 0 01 2 3 6. Depositional bars or benches 0 1 02 3 7. Recent alluvial deposits 0 1 ® 3 8. Headcuts 1 2 3 9. Grade control ® 0.5 1 1.5 10. Natural valley 0 0.5 CD 1.5 11. Second or greater order channel (lo = 0) Yes = 3 a artificial ditches are not rated; see dis s in manual B. Hydrology (Subtotal = 8.5 ) 12. Presence of Baseflow 0 1 02 3 13. Iron oxidizing bacteria 0 2 3 14. Leaf litter 1.5 Cr.) 0.5 0 15. Sediment on plants or debris 0 0.5 CT 1.5 16. Organic debris lines or piles 0 C.5 7 1 1.5 17. Soil -based evidence of high water table? No = 0 (7-es = 3.) C. Biology (Subtotal = 7.5 18. Fibrous roots in streambed 3 20 1 0 19. Rooted upland plants in streambed 2 1 0 20. Macrobenthos (note diversity and abundance) 0 0 2 3 21. Aquatic Mollusks 1 2 3 22. Fish 0 1 1.5 23. Crayfish 0CD 1 1.5 24. Amphibians 0 Cs) 1 1.5 25. Algae0 0.5 1 1.5 26. Wetland plants in streambed FACW = 0.75; OBL = 1.5 bier =U) *perennial streams may also be identified using other methods. See p. 35 of manual. Notes: Sketch: Stream 2 NC DWQ Stream Identification Form Version 4.11 Date: 6/23/20 Project/Site: WCPSS E-44 Latitude: 35.629046 Evaluator: A.Aycrigg County: Wake Longitude: Total Points: Stream is at least intermittent if 19 or perennial if 30" Stream Determination (circle one) -78.735912 20.5 Other e.g. Quad Name: Ephemeral ctermittej) Perennial A. Geomorphology (Subtotal = 5.5 ) Absent Weak Moderate Strong la. Continuity of channel bed and bank 0 1 1 3 2. Sinuosity of channel along thalweg 0 Q 2 3 3. In -channel structure: ex. riffle -pool, step -pool, ripple -pool sequence 0 0 2 3 4. Particle size of stream substrate 0 10 2 3 5. Active/relict floodplain 00 1 2 3 6. Depositional bars or benches 0 01 2 3 7. Recent alluvial deposits CD 1 2 3 8. Headcuts 1 2 3 9. Grade control ® 0.5 1 1.5 10. Natural valley 0 © 1 1.5 11. Second or greater order channel (lo = 0) Yes = 3 a artificial ditches are not rated; see dis s in manual B. Hydrology (Subtotal = 7 12. Presence of Baseflow 0 1 02 3 13. Iron oxidizing bacteria CC 1 2 3 14. Leaf litter 1.5 m 0.5 0 15. Sediment on plants or debris 0 ® 1 1.5 16. Organic debris lines or piles 0 ��7 1 1.5 17. Soil -based evidence of high water table? No = 0 Os = 3) C. Biology (Subtotal = 17 L) 18. Fibrous roots in streambed 3 20 1 0 19. Rooted upland plants in streambed 0 2 1 0 20. Macrobenthos (note diversity and abundance) 0 0 2 3 21. Aquatic Mollusks ® 1 2 3 22. Fish 0 0.5 1 1.5 23. Crayfish () 0.5 1 1.5 24. Amphibians 0 0.5 1.5 Q 25. Algae D 0.5 1 1.5 26. Wetland plants in streambed FACW = 0.75; OBL = 1.5 bier =U) *perennial streams may also be identified using other methods. See p. 35 of manual. Notes: Sketch: B(471-AyE DEW DR (soFI., IMPROVED RIG Ii OF -WAY (e111,(8 20177p 44 416) -41 SANITARY MH FORCE MAIN RIM: 385.65' 0 100 200 400 SCALE: 1 "=200' �. �l v _ J / '/ \ _"'\ X� (_' f r �.J r)\II/I)/(\1k�t( �((* 1 ry 4 ( (\•(fir �` Ill �r e. )` ) i . ♦ NORTH ants and calculai.• cuter files, drawn ,:ification prepared by Stewart, Inc. are instruments professional service intended for one -tune use. They are subject to copyright and other property right laws and shall remain the property of Stewart, Inc. They are not to be copied, modified, or - - - • - - - - - permission of Stewart, Inc. WETLAND AND STREAM DISTURBANCE OVERALL SITE PLAN STEWART WAKE COUNTY PUBLIC SCHOOL SYSTEM, HILLTOP NEEDMORE ROAD ELEMENTARY SCHOOL FUQUAY-VARINA, NC Project No: L20040 Scale: 1"=200' Drawn By: JOT Checked By: RGB Ref No: Drawing No: WD 0 9 B• BW: 66 9�W 31.00 BW:36,. B1 - TEMPORARY BUFFER IMPACT, FOR CONSTRUCTION OF FILL SLOPE TO ZONE 2 RIPARIAN BUFFER - 0.178 ACRE BW:3 OR 7,786 SQFT. TW:366.6 W2 - WETLAND 2 I 5° TEMPORARY IMPACT TW FROM GRADING - 0.034 ACRE OR 1,485 SQFT. W1 - WETLAND 2 PERMANENT IMPACT FROM WALL INSTALL AND FILL - 0.092 ACRE OR 4,020 SQFT. 1 07.A - CB • 0 20 SCALE: 1"=40' NORTH -.. r.;ents and calculations including computer files, draw. ification prepared by Stewart, Inc. are instruments professional service intended for one-time use. They are subject to copyright and other property right laws and shall remain the property of Stewart, Inc. They are not to be copied, modified, or - - - - - — permission of Stewart, Inc. W3 - WETLAND 3 TEMPORARY IMPACT FROM GRADING - 0.026 ACRE OR 1,161 SQFT. W1/W2/W3 WETLAND AND B1 BUFFER DISTURBANCE ENLARGEMENT STEWART WAKE COUNTY PUBLIC SCHOOL SYSTEM, HILLTOP NEEDMORE ROAD ELEMENTARY SCHOOL Project No: L20040 Ref No: Scale: 1"=40' Date: 11.21.2022 Drawn By: JOT Drawing No: WD 1 FUQUAY-VARINA, NC Checked By: RGB B2 - TEMPORARY BUFFER IMPACT FOR CONSTRUCTION OF PIPE INSTALLATION ZONE 1= 326 SQFT ZONE 2 = 197 SQFT i 'Mtv B3 - PERMANENT BUFFER IMPACT FROM PIPE INSTALLATION ZONE 1 = 297 SQFT ZONE 2 = 291 SQFT w • 0 20 40 SCALE: 1 =40' W4 - WETLAND 4 PERMANENT IMPACT FROM FILL - 0.004 ACRE OR 187 SQFT. 401 W5 - WETLAND 4 TEMPORARY IMPACT FROM FILL - 0.005 ACRE \_' :355.00 /13W:355.00 NORTH 300 - CB 66`50, .356.11 OR 240 SQFT. 502 - MH) S1 - TEMPORARY STREAM IMPACT FOR CONSTRUCTION OF PIPE INSTALLATION - 0.001 ACRE OR 60 SQFT. S2 - PERMANENT STREAM IMPACT FROM PIPE INSTALLATION - 0.0008 ACRE OR 35 SQFT. i -•n is and calculations including computer files, drawings, and >p_;: c,cauon prepared by Stewart, Inc. are instruments of pioCessional service intended for one-time use. They are subject to copyright and other property right laws and shall remain the property of Stewart, Inc. They are not to be copied, modified, or - - - - - - -- - - - permission of Stewart, Inc. 1') 0 0 MCP 1 ,DPE I :352.55 Structure - (240) J AREA: ACRE DS W4 123 SQ.F1 0. FOLEY, AMANDA ST CLAIR, DAVID IV PIN: 0678836691 DB 16127 PG 237 W4/W5 WETLAND, S1/S2 STREAM AND B2/B3 BUFFER DISTURBANCE ENLARGEMENT STEWART WAKE COUNTY PUBLIC SCHOOL SYSTEM, HILLTOP NEEDMORE ROAD ELEMENTARY SCHOOL Project No: L20040 Ref No: Scale: 1" = 40' Date: 11.21.2022 Drawn By: JOT Drawing No: WD 2 FUQUAY-VARINA, NC Checked By: RGB STEWART STO RM WATE R REPORT For the proposed HILLTOP NEEDMORE ROAD ELEMENTARY SCHOOL Fuquay Varina, North Carolina Prepared For: Wake County Public School System Prepared By: Stewart, Inc. (C-1051) 223 S. WEST STREET, Suite 1100 RALEIGH, NC 27603 T 919.380.8750 HNR Elementary School - Fuquay-Varina Stewart Project No: L20040 TABLE OF CONTENTS Narrative Computations STEWART Storm Pipe Flow Calculations Impervious Area Calculations Wet Pond Design Calculations Post -Construction Stormwater Analysis (HydroCAD) Rip Rap Apron Nomographs Exhibits - Soils Maps - USGS Quad Map - FEMA FIRM Map - Copy of Preliminary Jurisdictional Determination - Pre -Development Drainage Area Map - Post -Development Drainage Area Map - Storm Inlet Drainage Area Map HNR Elementary School - Fuquay-Varina Stewart Project No: L20040 NARRATIVE .42 STEWART This report has been prepared to illustrate how the proposed development will comply with the stormwater design requirements specified in the Fuquay-Varina Stormwater Regulations in the Land Development Ordinance.. Site Information The project site is located at the eastern corner of the Hilltop Needmore Road and Brushy Meadows Drive intersection. The land use associated with the site was previously a golf course with a site area totaling 28.83-acres. The site is currently zoned Office and Institutional Conditional Zoning District (OI-CZD). The site is bordered by mostly single-family residential properties. The north and parts of the west sides of the property front along Hilltop Needmore Road and Brushy Meadows Drive, respectively, with mostly undeveloped or rural residential developments on the other side of Brushy Meadows Drive and a park across the street from Hilltop Needmore Road. Currently, most of the site drains toward a stream to the south-east of the site. The conveyance measures currently installed to drain the site is mostly occurring through an existing underground storm pipe system which outfalls into a stream buffer to the southeast of the site. The site is defined by multiple mounds and pits associated with golf course terrain. The site currently receives some offsite runoff from the west, which flows into the site through overland flow. The site lies within the Neuse River Basin outside of the Falls Lake or any water supply watersheds and contains riparian buffers and wetlands. The site is mostly grassy with some woody vegetation buffering the intermittent stream. The entire property is located in Zone X and is outside of any flood -prone areas according to the latest Flood Insurance Rate Map 37200678003 dated 5/2/2006. A copy of the FEMA FIRMette is included in the appendices for reference. Prominent soil types on the property include Dothan -Urban land complex and Rains Sandy Loam. The different soil types found on site are a combination of Hydrologic Soil Groups B and C according to the Wake County Soil Survey performed by the U.S. Department of Agriculture Natural Resource Conservation Service (NRCS). Soil maps have also been included in the appendices for reference. Development Summary The project includes the development of an approximately 1.96 acre elementary school and supporting site infrastructure including parking, drives, sidewalks, play area, and underground utilities. Provisions have also been made for development of future development. There are public roadway and utilities improvements proposed as part of this development. The total proposed impervious area for the site including the main building, drives, parking areas, and other supporting infrastructure will sum to approximately 8.46 acres. The stormwater design includes an additional 3.62 acres of impervious to accommodate any future impervious area that is anticipated to be developed on the site at a later date. This is labeled as Senior and Community Center on the exhibit SW-1 - Proposed Impervious Area Summary and in the Impervious Area table below. 1 HNR Elementary School - Fuquay-Varina Stewart Project No: L20040 For design purposes, this development was assumed to be high -density. 4 STEWART The project will be developed in two phases. Phase 1, also known as the Early Site Package (ESP) includes mass grading of the site to establish a building pad. Due to high moisture content in the soils, a dewatering system will be installed during Phase 1. Phase 2 will include installation of underground stormwater conveyance pipes and construction of the physical site improvements such as pavement and curbs. Stormwater surface runoff will be conveyed through a combination of curb and gutter, open ditches, and a private on -site storm drainage system. Building roof drains will be tied directly to the storm drainage system to minimize long-term maintenance at downspouts. The storm drainage system will outfall into a single wet detention pond located on the east side of the site. The wet pond will treat runoff from the entire development (including future development) and will outfall through the riparian buffer toward the stream on the east side of the site. Offsite runoff from the north and west sides of the site will be bypassed to the existing drainage infrastructure that outfalls to the wetlands onsite. Offsite runoff will not be collected and routed to the proposed wet detention pond. Some impacts to the wetlands and jurisdictional stream are proposed. A permit for impacts to the riparian buffer, stream buffer, and wetlands will be obtained from the North Carolina Department of Environmental Quality (NCDEQ) and the US Army Corps of Engineers. Design Requirements/Assumptions Prior to analysis, stormwater management requirements were researched in the Fuquay- Varina Stormwater Regulations in the Land Development Ordinance. Per Development Standards for High Density Projects section in the LDO, high density projects, which include those with greater than 24% built upon area, are required to provide stormwater control measures capable of removing 85% of average annual Total Suspended Solids (TSS) and shall control and treat the difference in stormwater runoff volume between the pre- and post -development conditions for the 1-y 24-hr, the 2-yr 24-hr, and the 10-yr 24hr storm with a drawdown time between 48 and 120 hours. In addition to the requirements above, the measures shall provide sufficient storage volume to retain on -site the runoff from the first inch of rainfall between 48 and 120 hours. Stormwater conveyance pipes have been designed to carry the 10-year storm runoff. Run- off calculations have been included in the appendices. 2 HNR Elementary School - Fuquay-Varina Stewart Project No: L20040 Analysis Results/Summary STEWART Impervious Areas A summary of the pre -development and post -development impervious areas for the project site are listed in the table below. Impervious Area Onsite To Pond Future Offsite to Pond Post -Development 8.46 3.62 Based on the proposed impervious areas shown in the table above, the built upon area was calculated as follows: Parcel Area (Outside R/W) Onsite Impervious Area (includes Future development) Built Upon Area Onsite 24.71 acres 8.46 acres 34.24 Offsite (Future) 5.55 acres 3.62 acres 65.23 Post -Construction Stormwater Analysis A wet pond designed in accordance with the NCDEQ Stormwater Design Manual will be used to satisfy the requirements above. The pond has been designed with a forebay depth of 4.5' and permanent pool depth of 5 feet. Infiltration has been assumed to be negligible. To conduct the volume and peak flow analyses, drainage areas were delineated for the project area and times of concentration and curve numbers were calculated in accordance with the County's Stormwater Management Design Manual. One point of analysis was established for the site. The resulting values for the pre -development and post -development conditions are summarized in the table below. Pre -Development Post -Development Area (acres) Weight Curve Number Time of Concentration (minutes) Area (acres) Weight Curve Number Time of Concentration (minutes) Drainage Area #1 (To Pond) 24.02 75 11 17.57 87 5.0 Drainage Area #2 (To Pond) - - - 5.34 89 5.0 Bypass Area #3 - - - 2.43 78 5.0 Bypass Area #4 - - - 1.81 69 5.0 Type II 24-hr storm events were used for the analyses. The table is shown below for reference. Frequency 1-yr 2-yr 10-yr 25-yr 50-yr 100-yr Rainfall (inches) 2.86 3.45 5.02 5.95 6.69 7.44 The conditions described above were then used to develop hydrograph models using HydroCAD software based on the NRCS method. 3 HNR Elementary School - Fuquay-Varina Stewart Project No: L20040 STEWART A summary of the pre -development and post -development peak runoffs is shown in the table below. As shown, the peak flows in the post -development condition are less than the peak flows in the pre -development condition at the point of analysis for the 1-year, 2-year, and 10-year storm events. Project Area Peak Runoffs (cfs) Outfall #1 Storm Event Pre Post 1-year, 24-hour 30.05 24.72 2-year, 24-hour 44.71 44.70 10-year, 24-hour 88.08 56.94 In addition to the peak flow analysis, the runoff volume from the 1-year, 24-hour storm was analyzed for Outfall 1. The total runoff volume and drawdown is summarized in the table below: 1-year, 24-hour Runoff Volume 1.43 ac-ft Pond Storage at 60 hrs (48 hrs after center of rainfall) 0.375 ac-ft (26.2%) Pond Storage at 132 hrs (120 hrs after center of rainfall) 0.036 ac-ft (2.5%) Using the Surface Area / Drainage Area and Average Depth method and based on the tables provided in the NCDEQ Stormwater Design Manual, it was determined that the minimum pond surface area required would be 16,017 sq. ft. to obtain 85% TSS removal for a permanent pool average depth of 4.81 feet. 26,415 sq. ft. has been provided. Conclusion Based on the results of this analysis, the stormwater requirements of the Fuquay-Varina have been satisfied. A wet detention pond will be used to control and treat runoff from the new development. Peak stormwater runoff has been reduced to below or near pre -development levels for the 1-yr, 2-yr, and 10-year 24-hour storm events. Please refer to the attached appendices for detailed calculations and additional information. 4 HNR Elementary School - Fuquay-Varina Stewart Project No: L20040 Storm Pipe Flow Calculations STEWART STEWART Input values in red Project: Project No: Storm: Intensity = WCPSS E-44 L2040 10 Year Date: 12/17/2021 By: RGB Location: Fuquay Varina 7.42 in/hr based on 5 min tc for 10 year LOCATION DRAINAGE AREA IMPERVIOUS PIPE Velocity Flow PIPE SIZE CHECK FROM TO C I n *Req. Dia. DIAMETER MATERIAL SLOPE A/Af V/Vf *Vf Design sub cumm. *Qf Q/Qf Depth sq. ft. acres sq. ft. in/hr inches inches % fps fps cfs cfs cfs ft BMP Storm Line 218 217 3733 0.09 3733 0.95 7.42 0.013 7.0 15 RCP 0.50 0.22 0.57 3.7 2.11 0.60 0.60 4.57 0.13 0.34 OK 215 217 16456 0.38 16456 0.95 7.42 0.013 12.3 15 RCP 0.50 0.64 0.90 3.7 3.36 2.66 2.66 4.57 0.58 0.76 OK 217 216 0 0.00 0 0.00 7.42 0.013 13.2 15 RCP 0.50 0.74 0.97 3.7 3.60 0.00 3.27 4.57 0.72 0.86 OK 214 216 1378 0.03 1378 0.95 7.42 0.013 4.1 15 RCP 1.16 0.08 0.38 5.7 2.17 0.22 0.22 6.95 0.03 0.16 OK 216 211 1298 0.03 1298 0.95 7.42 0.013 13.9 15 RCP 0.50 0.79 1.00 3.7 3.73 0.21 3.70 4.57 0.81 0.93 OK 213 211 6944 0.16 6944 0.95 7.42 0.013 8.9 15 RCP 0.50 0.35 0.69 3.7 2.57 1.12 1.12 4.57 0.25 0.48 OK 212 211 10409 0.24 10409 0.95 7.42 0.013 10.3 15 RCP 0.50 0.46 0.77 3.7 2.88 1.68 1.68 4.57 0.37 0.59 OK 211 210 0 0.00 0 0.00 7.42 0.013 15.0 15 RCP 1.00 0.94 1.07 5.3 5.63 0.00 6.51 6.46 1.01 1.11 OK 210 209 10381 0.24 8500 0.81 7.42 0.013 18.5 24 RCP 0.50 0.58 0.86 5.1 4.37 1.44 7.95 15.99 0.50 1.12 OK 209 207 4725 0.11 2300 0.57 7.42 0.013 18.9 24 RCP 0.50 0.59 0.87 5.1 4.41 0.45 8.40 15.99 0.53 1.14 OK 208 207 25461 0.58 9000 0.47 7.42 0.013 11.0 15 RCP 0.50 0.53 0.82 3.7 3.05 2.02 2.02 4.57 0.44 0.65 OK 207 206 2476 0.06 2476 0.95 7.42 0.013 20.7 24 RCP 0.50 0.70 0.94 5.1 4.80 0.40 10.82 15.99 0.68 1.32 OK 206A 206 3642 0.08 3642 0.95 7.42 0.013 7.0 15 RCP 0.50 0.22 0.57 3.7 2.11 0.59 0.59 4.57 0.13 0.34 OK 206 205 22600 0.52 6500 0.42 7.42 0.013 22.2 24 RCP 0.50 0.80 1.01 5.1 5.13 1.60 13.01 15.99 0.81 1.50 OK 205A 205 4439 0.10 4439 0.95 7.42 0.013 7.5 15 RCP 0.50 0.25 0.60 3.7 2.24 0.72 0.72 4.57 0.16 0.38 OK 205 204 34152 0.78 7500 0.36 7.42 0.013 23.9 24 RCP 0.50 0.92 1.06 5.1 5.42 2.12 15.85 15.99 0.99 1.74 OK 204A 204 4010 0.09 4010 0.95 7.42 0.013 7.2 15 RCP 0.50 0.23 0.58 3.7 2.15 0.65 0.65 4.57 0.14 0.35 OK 204 203 17561 0.40 8000 0.54 7.42 0.013 25.1 30 RCP 0.50 0.66 0.92 5.9 5.43 1.62 18.12 28.99 0.62 1.58 OK 203 202 11030 0.25 10000 0.88 7.42 0.013 26.0 30 RCP 0.50 0.71 0.95 5.9 5.62 1.65 19.77 28.99 0.68 1.68 OK 221A 221 500 0.01 500 0.95 7.42 0.013 2.5 15 RCP 2.00 0.03 0.27 7.4 2.03 0.08 0.08 9.13 0.01 0.09 OK 221 220 32460 0.75 5000 0.32 7.42 0.013 10.6 15 RCP 0.50 0.49 0.79 3.7 2.95 1.74 1.83 4.57 0.40 0.61 OK 220 202 2493 0.06 2493 0.95 7.42 0.013 11.5 15 RCP 0.50 0.56 0.85 3.7 3.16 0.40 2.23 4.57 0.49 0.69 OK 202 201 94 0.00 94 0.95 7.42 0.013 27.1 30 RCP 0.50 0.76 0.98 5.9 5.79 0.02 22.02 28.99 0.76 1.78 OK 201C 201B 7278 0.17 7278 0.95 7.42 0.013 7.9 15 RCP 1.00 0.28 0.63 5.3 3.29 1.18 1.18 6.46 0.18 0.40 OK 201B 201A 3904 0.09 3904 0.95 7.42 0.013 9.3 15 RCP 1.00 0.39 0.72 5.3 3.79 0.63 1.81 6.46 0.28 0.51 OK 201A 201 6454 0.15 6454 0.95 7.42 0.013 11.0 15 RCP 1.00 0.53 0.82 5.3 4.31 1.04 2.85 6.46 0.44 0.65 OK 201 104 785 0.02 785 0.95 7.42 0.013 28.4 30 RCP 0.50 0.84 1.03 5.9 6.06 0.13 25.00 28.99 0.86 1.95 OK 306 305 11717 0.27 11717 0.95 7.42 0.013 10.3 15 RCP 0.65 0.46 0.77 4.2 3.29 1.90 1.90 5.21 0.36 0.59 OK 305 304 8056 0.18 7157 0.87 7.42 0.013 10.5 15 RCP 1.50 0.49 0.79 6.4 5.10 1.19 3.08 7.91 0.39 0.61 OK 304A 304 8263 0.19 8263 0.95 7.42 0.013 9.5 15 RCP 0.50 0.40 0.73 3.7 2.72 1.34 1.34 4.57 0.29 0.53 OK 304 303 4789 0.11 4789 0.95 7.42 0.013 12.1 15 RCP 2.00 0.63 0.89 7.4 6.65 0.77 5.20 9.13 0.57 0.75 OK 316 315 200642 4.61 196408 0.93 7.42 0.013 29.6 30 RCP 0.65 0.91 1.06 6.7 7.13 31.93 31.93 33.06 0.97 2.13 OK 315 314 0 0.00 0 0.00 7.42 0.013 29.6 30 RCP 0.65 0.91 1.06 6.7 7.13 0.00 31.93 33.06 0.97 2.13 OK 314 313 0 0.00 0 0.00 7.42 0.013 29.6 30 RCP 0.65 0.91 1.06 6.7 7.13 0.00 31.93 33.06 0.97 2.13 OK 313 312 0 0.00 0 0.00 7.42 0.013 31.1 36 RCP 0.50 0.70 0.94 6.7 6.29 0.00 31.93 47.15 0.68 1.98 OK 312A 312 27156 0.62 20000 0.75 7.42 0.013 11.9 18 RCP 1.00 0.44 0.76 5.9 4.50 3.48 3.48 10.50 0.33 0.68 OK 312 311 1392 0.03 1392 0.95 7.42 0.013 30.9 30 RCP 0.65 1.00 1.00 6.7 6.73 0.23 35.63 33.06 1.08 2.50 NOT OK 311A 311 5488 0.13 5488 0.95 7.25 0.013 6.2 15 RCP 1.98 0.17 0.52 7.4 3.83 0.87 0.87 9.09 0.10 0.29 OK 311 310 6976 0.16 6976 0.95 7.42 0.013 33.1 36 RCP 0.50 0.79 1.00 6.7 6.68 1.13 37.63 47.15 0.80 2.22 OK 310 303 3254 0.07 3254 0.95 7.42 0.013 33.2 36 RCP 0.50 0.79 1.00 6.7 6.68 0.53 38.16 47.15 0.81 2.22 OK 303 302 12112 0.28 8351 0.72 7.42 0.013 35.3 36 RCP 0.50 0.90 1.05 6.7 7.03 1.48 44.83 47.15 0.95 2.52 OK 302 301 6660 0.15 6660 0.95 7.42 0.013 35.6 36 RCP 0.50 0.91 1.06 6.7 7.08 1.08 45.91 47.15 0.97 2.58 OK 301 300 11609 0.27 11609 0.95 7.42 0.013 36.2 42 RCP 0.50 0.70 0.94 7.4 6.97 1.88 47.79 71.12 0.67 2.31 OK 300B 300A 9703 0.22 9703 0.95 7.42 0.013 8.8 15 RCP 1.00 0.35 0.69 5.3 3.63 1.57 1.57 6.46 0.24 0.48 OK 300A 300 0 0.00 0 0.00 7.42 0.013 8.8 15 RCP 1.00 0.35 0.69 5.3 3.63 0.00 1.57 6.46 0.24 0.48 OK 300 105 0 0.00 0 0.00 7.42 0.013 36.6 42 RCP 0.50 0.71 0.95 7.4 7.03 0.00 49.36 71.12 0.69 2.35 OK 121 120 4669 0.11 4000 0.84 7.25 0.013 7.2 15 RCP 0.50 0.24 0.59 3.7 2.20 0.65 0.65 4.57 0.14 0.36 OK 120 119 4860 0.11 4860 0.95 7.42 0.013 7.7 15 RCP 1.70 0.26 0.61 6.9 4.21 0.79 1.44 8.42 0.17 0.39 OK 119 118 3628 0.08 3628 0.95 7.42 0.013 7.7 15 RCP 3.55 0.26 0.61 9.9 6.08 0.59 2.03 12.17 0.17 0.39 OK 118 117 907 0.02 907 0.95 7.25 0.013 10.2 15 RCP 0.89 0.45 0.77 5.0 3.80 0.14 2.17 6.09 0.36 0.58 OK 117B 117A 13996 0.32 0 0.20 7.42 0.013 5.6 15 RCP 1.00 0.14 0.48 5.3 2.53 0.48 0.48 6.46 0.07 0.25 OK 117A 117 7583 0.17 7583 0.95 7.42 0.013 9.4 15 RCP 0.82 0.40 0.73 4.8 3.48 1.23 1.70 5.85 0.29 0.53 OK 117 116 1294 0.03 1294 0.95 7.25 0.013 12.4 15 RCP 1.09 0.65 0.91 5.5 5.00 0.20 4.08 6.74 0.61 0.78 OK 133 132 3955 0.09 3955 0.95 7.42 0.013 7.2 15 RCP 0.50 0.23 0.58 3.7 2.15 0.64 0.64 4.57 0.14 0.35 OK 132 131 3226 0.07 3226 0.95 7.25 0.013 8.9 15 RCP 0.50 0.35 0.69 3.7 2.57 0.51 1.15 4.57 0.25 0.48 OK 131 130 14872 0.34 14872 0.95 7.25 0.013 13.6 15 RCP 0.50 0.77 0.99 3.7 3.68 2.35 3.50 4.57 0.77 0.90 OK 130 127 4077 0.09 4077 0.95 7.42 0.013 14.5 15 RCP 0.50 0.87 1.04 3.7 3.87 0.66 4.16 4.57 0.91 1.01 OK 128 127 4329 0.10 4329 0.95 7.42 0.013 7.4 15 RCP 0.50 0.25 0.60 3.7 2.24 0.70 0.70 4.57 0.15 0.38 OK 129 127 4228 0.10 4228 0.95 7.25 0.013 7.3 15 RCP 0.50 0.24 0.59 3.7 2.20 0.67 0.67 4.57 0.15 0.36 OK 127 126 4514 0.10 4514 0.95 7.42 0.013 16.9 18 RCP 0.50 0.83 1.02 4.2 4.28 0.73 6.26 7.43 0.84 1.16 OK 126 125 0 0.00 0 0.00 7.42 0.013 16.9 18 RCP 0.50 0.83 1.02 4.2 4.28 0.00 6.26 7.43 0.84 1.16 OK 125 123 14028 0.32 6000 0.52 7.25 0.013 18.0 18 RCP 0.50 0.94 1.07 4.2 4.49 1.22 7.48 7.43 1.01 1.34 OK 124 123 2834 0.07 1500 0.60 7.42 0.013 4.1 15 RCP 2.00 0.08 0.38 7.4 2.84 0.29 0.29 9.13 0.03 0.16 OK 123 122 0 0.00 0 0.00 7.25 0.013 16.2 18 RCP 0.96 0.76 0.98 5.8 5.71 0.00 7.76 10.29 0.75 1.07 OK 122 116 4356 0.10 1366 0.44 7.42 0.013 16.3 18 RCP 1.00 0.77 0.99 5.9 5.87 0.32 8.09 10.50 0.77 1.08 OK 116 115 3412 0.08 2220 0.69 7.25 0.013 21.9 24 RCP 0.50 0.78 0.99 5.1 5.06 0.39 12.56 15.99 0.79 1.46 OK 115B 115 19323 0.44 15323 0.79 7.42 0.013 12.2 15 RCP 0.50 0.63 0.89 3.7 3.33 2.62 2.62 4.57 0.57 0.75 OK 115C 115 4120 0.09 4120 0.95 7.42 0.013 5.6 15 RCP 2.12 0.14 0.48 7.7 3.68 0.67 0.67 9.40 0.07 0.25 OK 115 114 18299 0.42 18299 0.95 7.25 0.013 25.5 30 RCP 0.50 0.69 0.94 5.9 5.53 2.89 18.73 28.99 0.65 1.63 OK 114 113 5866 0.13 5866 0.95 7.25 0.013 25.9 30 RCP 0.50 0.71 0.95 5.9 5.62 0.93 19.66 28.99 0.68 1.68 OK 113A 113 1773 0.04 1773 0.95 7.42 0.013 4.1 15 RCP 2.00 0.08 0.38 7.4 2.84 0.29 0.29 9.13 0.03 0.16 OK 113 112 16281 0.37 11119 0.71 7.42 0.013 27.0 30 RCP 0.50 0.76 0.98 5.9 5.79 1.98 21.92 28.99 0.76 1.78 OK 112 112A 10261 0.24 7283 0.73 7.25 0.013 27.6 30 RCP 0.50 0.79 1.00 5.9 5.91 1.25 23.17 28.99 0.80 1.85 OK 112B 112A 4040 0.09 4040 0.95 7.25 0.013 4.9 15 RCP 3.92 0.11 0.44 10.4 4.61 0.64 0.64 12.79 0.05 0.21 OK 112A 110 4697 0.11 4697 0.95 7.25 0.013 28.2 30 RCP 0.50 0.83 1.02 5.9 6.02 0.74 24.56 28.99 0.85 1.93 OK 111 110 5222 0.12 5222 0.95 7.42 0.013 6.9 15 RCP 1.04 0.22 0.57 5.4 3.04 0.85 0.85 6.59 0.13 0.34 OK 110 109 1000 0.02 1000 0.95 7.42 0.013 28.6 30 RCP 0.50 0.85 1.03 5.9 6.09 0.16 25.56 28.99 0.88 1.98 OK 109 108 0 0.00 0 0.00 7.25 0.013 28.6 30 RCP 0.50 0.85 1.03 5.9 6.09 0.00 25.56 28.99 0.88 1.98 OK 108 107 5192 0.12 5192 0.95 7.25 0.013 29.0 30 RCP 0.50 0.87 1.04 5.9 6.15 0.82 26.38 28.99 0.91 2.03 OK 107C 107B 9351 0.21 9351 0.95 7.42 0.013 9.9 15 RCP 0.50 0.44 0.76 3.7 2.82 1.51 1.51 4.57 0.33 0.56 OK 107B 107A 3581 0.08 3581 0.95 7.25 0.013 8.0 15 RCP 2.92 0.29 0.64 9.0 5.72 0.57 2.08 11.03 0.19 0.41 OK 107A 107 7887 0.18 7887 0.95 7.25 0.013 13.3 15 RCP 0.50 0.75 0.97 3.7 3.62 1.25 3.33 4.57 0.73 0.88 OK 107 106 2400 0.06 2400 0.95 7.25 0.013 30.4 30 RCP 0.50 0.96 1.07 5.9 6.33 0.38 30.09 28.99 1.04 2.30 OK 106A 106 11978 0.27 7200 0.65 7.25 0.013 7.0 15 RCP 2.30 0.22 0.57 8.0 4.53 1.30 1.30 9.79 0.13 0.34 OK 106 105 21638 0.50 10394 0.56 7.25 0.013 24.4 30 RCP 2.00 0.63 0.89 11.8 10.56 2.02 33.41 57.99 0.58 1.50 OK 105 104 5536 0.13 5536 0.95 7.25 0.013 44.6 48 RCP 0.50 0.80 1.01 8.1 8.14 0.88 83.64 101.54 0.82 3.00 OK 104 103 0 0.00 0 0.00 7.42 0.013 46.9 48 RCP 0.65 0.89 1.05 9.2 9.68 0.00 108.64 115.77 0.94 3.32 OK 103 102 0 0.00 0 0.00 7.42 0.013 43.2 48 RCP 1.00 0.76 0.98 11.4 11.21 0.00 108.64 143.59 0.76 2.84 OK 406B 406A 40279 0.92 10000 0.39 7.25 0.013 12.1 15 RCP 0.50 0.63 0.89 3.7 3.33 2.59 2.59 4.57 0.57 0.75 OK 406A 405 0 0.00 0 0.00 7.42 0.013 12.1 15 RCP 0.50 0.63 0.89 3.7 3.33 0.00 2.59 4.57 0.57 0.75 OK 405 405A 66821 1.53 45000 0.71 7.42 0.013 20.6 24 RCP 0.50 0.70 0.94 5.1 4.80 8.03 10.61 15.99 0.66 1.32 OK 405A 404 0 0.00 0 0.00 7.25 0.013 20.6 24 RCP 0.50 0.70 0.94 5.1 4.80 0.00 10.61 15.99 0.66 1.32 OK 404 401 0 0.00 0 0.00 7.42 0.013 20.6 24 RCP 0.50 0.70 0.94 5.1 4.80 0.00 10.61 15.99 0.66 1.32 OK 401 400 0 0.00 0 0.00 7.42 0.013 20.6 24 RCP 0.50 0.70 0.94 5.1 4.80 0.00 10.61 15.99 0.66 1.32 OK 450 450 81550 1.87 10000 0.29 7.42 0.013 17.4 24 RCP 2.36 0.51 0.81 11.1 8.96 4.06 14.67 34.74 0.42 1.02 OK HNR Elementary School - Fuquay-Varina Stewart Project No: L20040 Proposed Impervious Area Map STEWART NOT FOR CONSTWUCTION E D L:\Projects\2020\L20040 - WQRSS E-44\CALCS AND DATA\Stormwater\CAD Files\L20040-SW2_PROP WIPERVIOUS.dwg Dec 21, 2021 - 4:02am 1 • • • • • D R• w PY) N`( MEPDp D R\GNj.OF R�bo 6M r O� PG A15_A l tl,rgq;e N U. • • 24" RCP INV: 345.89' EIP l OPE SANITARY MH FORCE MAIN RIM: 385.65' • • • • / • • El 5" RCP INV: 355.59' 15" RCP INV: 355.04' FTRANS- __ 15" RCP INV: 349.50' ,INV:349.01' IkI\/•'1 A7 ln' 4" PVC 4' PVC INV: 349.37' i 3 • • • • • • • • • • • • • • 4 • 14. ELEMENTARY SCHOOL BOUNDARY • • • NA lc ortzir( 0S, bet IMPERVIOUS AREA CALCULATIONS: ELEMENTARY SCHOOL PROPOSED ROADWAY/PARKING PROPOSED BUILDING PROPOSED SIDEWALK/AMENITY EXISTING IMPERVIOUS TO REMAIN SCHOOL TOTAL IMPERVIOUS SENIOR AND COMMUNITY CENTER PROPOSED ROADWAY/PARKING PROPOSED BUILDING PROPOSED SIDEWALK/AMENITY SC/CC TOTAL IMPERVIOUS TOTAL PROJECT IMPERVIOUS: 4.83 AC 1.96 AC 1.60 AC 0.07 AC 8.46 AC 2.41 AC 1.17 AC 0.04 AC 3.62 AC 12.08 AC DRAINAGE SUMMARY: ELEMENTARY SCHOOL SITE AREA: IMPERVIOUS AREA: PERCENT IMPERVIOUS: CURVE NUMBER: 1-YR FLOW: 2-YR FLOW: 10-YR FLOW: 100-YR FLOW: SENIOR AND COMMUNITY CENTER SITE AREA: IMPERVIOUS AREA: PERCENT IMPERVIOUS: CURVE NUMBER: 1-YR FLOW: 2-YR FLOW: 10-YR FLOW: 100-YR FLOW: TOTAL PROJECT SITE AREA: IMPERVIOUS AREA: PERCENT IMPERVIOUS: CURVE NUMBER: 1-YR FLOW: 2-YR FLOW: 10-YR FLOW: 100-YR FLOW: *FLOWS CALCULATED USING HYDROCAD 24.71 AC 8.46 AC 34.24 % 87 CN 52.15 CFS 66.12 CFS 111.08 CFS 177.03 CFS 5.55 AC 3.62 AC 65.23 % 89 CN 17.18 CFS 22.08 CFS 35.13 CFS 55.05 CFS 29.26 AC 10.37 AC 35.4 % 88 CN 69.33 CFS 90.20 CFS 146.22 CFS 232.08 CFS • 160 NORTH NOT FOR CONSTRUCTION • 40 80 SCALE: 1" = 80' TTLE DIVERSIFIED ARCHITECTURAL CONSULTING This drawing and the design shown are the propero of Little Diversified Architectural Consulting. The reproduction, copying or other use of this drawing without their written consent is prohibited and any infringement will be subject to legal action. RELIM NOT FOR NSTRUCTI NOT FOR CONSTRUCTION Site Plan Issue Date 2021.12.17 NO. REASON DATE PRINCIPAL IN CHARGE PROJECT MANAGER KS, RL DESIGN TEAM HILLTOP NEEDMORE ROAD ELEMENTARY SCHOOL WCPSS# 862-520 RONNE STOTT, SENIOR PM 5141301400 PROPOSED IMPERVIOUS AREA SUMMARY HNR Elementary School - Fuquay-Varina Stewart Project No: L20040 Wet Pond Design Calculations STEWART r-u STEWART Project: Project No: HNRES L20040 Date: By: 11.24.2020 KST Revision: xx.xx.xxxx Wet Detention Pond Sizing Calculations (90% TSS Removal) Drainage Area 1 Input values in red Drainage Area Total Drainage Area (sf) On -site Drainage Area (sf) Off -site Drainage Area (sf) 997,960 997,960 0 Impervious ur ace rea — 526,205 On -site Buildings/Lots (sf) On -site Low Density (sf) On -site Rural (sf) On -site Sidewalk (sf) Future (sf) 0 Off -site (sf) 0 Existing BUA* (sf) 0 Total Impervious Area (sf) 526,205 Required Surface Area Pervious Surface Area Managed Pervious Area (sf) Unmanged Pervious Area (pasture) (sf) Forest (sf) Total Pervious Area (sf) 471,755 * = Report only amount of existing BUA that will remain after development. Do not report any existing BUA that is to be removed and which will be replaced by new BUA Total Drainage Area = Total Impervious Area = Percent Impervious = Design Rainfall Depth = Average Perm. Pool Depth = Max. Perm. Pool Depth = SA/DA Ratio = Surface Area Required = 22.91 ac 12.08 ac 52.73% 1 in 4.81 ft 6ft 1.60 16017 sf 0.37 ac Required Storage for lst inch of runoff Simple Method Rv = 0.05 + 0.009(I) I = % impervious = 53% Rv = 0.52 in Volume = 43624 cf Calculation Methods are taken from DEHNR Stormwater Best Management Practices Manual, Latest Version Surface Area Required at Normal Pool = Surface Area Provided at Normal Pool = Temporary Storage Volume Required = Temporary Storage Volume Provided = 16,017 sf 26,415 sf 43,624 cf 44,375 cf 421 FAYETTEVILLE ST. SUITE 400 RALEIGH, NC 27603T 919.380.8750 F 919.380.8752 n� STEWART Project: Project No: HNRES L20040 Date: By: 11.24.2020 KST Revision: Stage -Storage Analysis Drainage Area 1 Input values in red Contour (ft) Area (ft2) Incr Vol (ft3) Accum Vol (ft3) Stage Z (ft) In S In Z Zest 356 26415 0 0 0 357 30657 28536 28536 1 10.259 0.000 1.009 358 33194 31926 60462 2 11.010 0.693 1.980 359 35789 34492 94953 3 11.461 1.099 2.970 360 38441 37115 132068 4 11.791 1.386 3.995 361 41149 39795 171863 5 12.054 1.609 5.061 362 43913 42531 214394 6 12.276 1.792 6.173 b = 1.11 Ks = 28253 12.200 12.000 11.800 11.600 11.400 11.200 11.000 10.800 10.600 10.400 10.200 10.000 0.000 y= 1 1134x+ 10 249 0.200 0.400 0.600 0.800 1.000 1.200 1.400 1.600 1.800 421 FAYETTEVILLE ST. SUITE 400 RALEIGH, NC 27603 T 919.380.8750 F 919.380.8752 n142 STEWART Project: Project No: Drainage Area 1 Input values in red HNRES L20040 Forebay Bottom Elev = Forebay Berm Elev = Date: By: 11.24.2020 KST Volume Calculations 351 ft 356 ft Main Pond Bottom Elev = 350 ft Bottom Of Veg. Shelf Elev = 355.5 ft Normal Pool Elev = 356 ft Top Of Veg. Shelf Elev = 356.6 ft Top of Dam Elev = 362 ft Forebay Volume Contour (ft) Area (ft2) Incr Vol (ft3) Accum Vol (ft3) 351 2237 0 0 352 2834 2536 2536 353 3486 3160 5696 354 4195 3841 9536 355 4961 4578 14114 356 5783 5372 19486 Pond Volume Contour (ft) Area (ft2) Incr Vol (ft3) Accum Vol (ft3) 350 9281 0 0 351 10947 10114 10114 352 12700 11824 21938 353 14532 13616 35554 354 16423 15478 51031 355 18370 17397 68428 356 20373 19372 87799 Forebay Vol (NP) = 19486 cf Total Vol (NP)= 107285 cf Revision xx.xx.xxx: Volume above Normal Pool Contour (ft) Area (ft2) Incr Vol (ft3) Accum Vol (ft3) 356 26415 0 0 357 30657 28536 28536 358 33194 31926 60462 359 35789 34492 94953 360 38441 37115 132068 361 41149 39795 171863 362 43913 42531 214394 Average Depth of Permanent pool to use in the SA/DA tables (ft) Vperm_pooi = 107285 cf Aperm_pooi = 26415 sf Abot_shelf = 18370 sf Abot_pond = 10947 sf Depth = 5.5 ft Option 1: day = 4.06 ft Option 2: day = 4.81 ft Forebay equals 18.20/0 of total volume. 421 FAYETTEVILLE ST. SUITE 400 RALEIGH, NC 27603 T 919.380.8750 F 919.380.8752 STEWART Project: Project No: HNRES L20040 Date: By: 11.24.2020 KST Revision xx.xx.xxx Water Quality Drawdown Calculations Drainage Area 1 Input values in red Storage Volume Required (Simple Method) Total Drainage Area = Total Impervious Area = Percent Impervious = 22.91 12.08 53% ac ac Rv = 0.05 + 0.009(I) I = % impervious = 53% Rv = 0.52 in Runoff Vol. Req'= 43624 cf Basin Characteristics Pond Invert = Normal Pool Elevation = Next available Outlet = Storage Depth = Driving Head (H/3)= Ks = b= Minimum depth required for storage = 350.00 ft 356.00 ft 357.50 ft 1.50 ft 0.50 ft 28253 1.11 1.48 ft Temporary Storage Volume = 44375 cf Temporary Storage Surface Area = 32938 sf Find orifice size for 2-day drawdown time Flow Rate = Volume (cf) / Time (sec) 0.2568 cfs Q=CD*A*(2*g*h)^(1/2) (Orifice Equation - solve for A (area)) A= 0.07542 ft2 10.86111 in2 Orifice Size (2 day) = 3.72 in (dia) Find orifice size for 5-day drawdown time Flow Rate = Volume (cf) / Time (sec) 0.1010 cfs Q=CD*A*(2*g*h)^(1/2) (Orifice Equation - solve for A (area)) A= 0.02966 ft2 4.27091 in2 Orifice Size (5 day) = 2.33 in (dia) Select orifice size between 2 and 5 day size Size selected = _ 3 " dia Actual Drawdown Time Volume = 44375 cf Pipe Size = 3 "dia Area = 0.049087385 ft2 Flow Rate = 0.16712795 cfs me = STRONGER BY DESIGN 421 FAYETTEVILLE ST. SUITE 400 RALEIGH, NC 27603 T 919.380.8750 F 919.380.8752 HNR Elementary School - Fuquay-Varina Stewart Project No: L20040 Post -Construction Stormwater Analysis r m642 STEWART <PIA> Pre DA1 <Subca> Reach DA1 DA1 <DA2> (BA3 JA2 /;N BMP #� A Outfall 1 Routing Diagram for HNR Prepared by Stewart, Printed 12/21/2021 HydroCAD® 10.00-20 s/n 09358 © 2017 HydroCAD Software Solutions LLC HNR Prepared by Stewart HydroCAD® 10.00-20 s/n 09358 © 2017 HydroCAD Software Solutions LLC Printed 12/21/2021 Page 2 Area Listing (selected nodes) Area CN Description (acres) (subcatchment-numbers) 15.960 69 50-75% Grass cover, Fair, HSG B (BA4, DA1, DA2, P1A) 19.660 79 50-75% Grass cover, Fair, HSG C (DA1, DA2, P1A) 2.050 74 >75% Grass cover, Good, HSG C (BA3) 13.500 98 Paved parking, HSG B (BA3, DA1, DA2, P1A) HNR Prepared by Stewart HydroCAD® 10.00-20 s/n 09358 © 2017 HydroCAD Software Solutions LLC Printed 12/21/2021 Page 3 Soil Listing (selected nodes) Area Soil Subcatchment (acres) Group Numbers 0.000 HSG A 29.460 HSG B BA3, BA4, DA1, DA2, P1A 21.710 HSG C BA3, DA1, DA2, P1A 0.000 HSG D 0.000 Other HNR Prepared by Stewart Printed 12/21/2021 HydroCAD® 10.00-20 s/n 09358 © 2017 HydroCAD Software Solutions LLC Page 4 Ground Covers (selected nodes) HSG-A HSG-B HSG-C HSG-D Other Total Ground Subcatchment (acres) (acres) (acres) (acres) (acres) (acres) Cover Numbers 0.000 15.960 19.660 0.000 0.000 35.620 50-75% Grass cover, Fair BA4, DA1, DA2, P1A 0.000 0.000 2.050 0.000 0.000 2.050 >75% Grass cover, Good BA3 0.000 13.500 0.000 0.000 0.000 13.500 Paved parking BA3, DA1, DA2, P1A H N R Type 11 24-hr 1-yr Rainfall =2.86" Prepared by Stewart Printed 12/21/2021 HydroCAD® 10.00-20 s/n 09358 © 2017 HydroCAD Software Solutions LLC Page 5 Summary for Subcatchment BA3: BA3 Runoff = 4.65 cfs @ 11.97 hrs, Volume= 0.209 af, Depth= 1.03" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-144.00 hrs, dt= 0.01 hrs Type II 24-hr 1-yr Rainfall=2.86" Area (ac) CN Description 0.380 98 Paved parking, HSG B 2.050 74 >75% Grass cover, Good, HSG C 2.430 78 Weighted Average 2.050 84.36% Pervious Area 0.380 15.64% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 5 4 Direct Entry, Subcatchment BA3: BA3 Hydrograph 1 J L L L L 1 J L 1 L Type 0 24. hr =yr Rain-fait:2.86' Runoff Area=2.430 ac Runoff Vo(u e=0:20-9�a1- RunoffDupthT1.03'1 Tc=540 mlin' T Z8 J J 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 Time (hours) • Runoff H N R Type 11 24-hr 1-yr Rainfall =2.86" Prepared by Stewart Printed 12/21/2021 HydroCAD® 10.00-20 s/n 09358 © 2017 HydroCAD Software Solutions LLC Page 6 Hydrograph for Subcatchment BA3: BA3 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 3.00 0.10 0.00 0.00 6.00 0.23 0.00 0.00 9.00 0.42 0.00 0.00 12.00 1.90 0.43 4.11 15.00 2.44 0.75 0.14 18.00 2.63 0.88 0.09 21.00 2.76 0.96 0.06 24.00 2.86 1.03 0.05 27.00 2.86 1.03 0.00 30.00 2.86 1.03 0.00 33.00 2.86 1.03 0.00 36.00 2.86 1.03 0.00 39.00 2.86 1.03 0.00 42.00 2.86 1.03 0.00 45.00 2.86 1.03 0.00 48.00 2.86 1.03 0.00 51.00 2.86 1.03 0.00 54.00 2.86 1.03 0.00 57.00 2.86 1.03 0.00 60.00 2.86 1.03 0.00 63.00 2.86 1.03 0.00 66.00 2.86 1.03 0.00 69.00 2.86 1.03 0.00 72.00 2.86 1.03 0.00 75.00 2.86 1.03 0.00 78.00 2.86 1.03 0.00 81.00 2.86 1.03 0.00 84.00 2.86 1.03 0.00 87.00 2.86 1.03 0.00 90.00 2.86 1.03 0.00 93.00 2.86 1.03 0.00 96.00 2.86 1.03 0.00 99.00 2.86 1.03 0.00 102.00 2.86 1.03 0.00 105.00 2.86 1.03 0.00 108.00 2.86 1.03 0.00 111.00 2.86 1.03 0.00 114.00 2.86 1.03 0.00 117.00 2.86 1.03 0.00 120.00 2.86 1.03 0.00 123.00 2.86 1.03 0.00 126.00 2.86 1.03 0.00 129.00 2.86 1.03 0.00 132.00 2.86 1.03 0.00 135.00 2.86 1.03 0.00 138.00 2.86 1.03 0.00 141.00 2.86 1.03 0.00 144.00 2.86 1.03 0.00 H N R Type 11 24-hr 1-yr Rainfall =2.86" Prepared by Stewart Printed 12/21/2021 HydroCAD® 10.00-20 s/n 09358 © 2017 HydroCAD Software Solutions LLC Page 7 Summary for Subcatchment BA4: DA 3A Runoff = 1.87 cfs @ 11.97 hrs, Volume= 0.090 af, Depth= 0.60" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-144.00 hrs, dt= 0.01 hrs Type II 24-hr 1-yr Rainfall=2.86" Area (ac) CN Description 1.810 69 50-75% Grass cover, Fair, HSG B 1.810 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 N 0 LL 0 5 10 15 20 25 30 35 40 45 Direct Entry, Subcatchment BA4: DA 3A Hydrograph Type 0 24-hrr 1-yr RairifaIIr2.86" Runoff Areal=1.810 ac Runoff urne=0.090'af Runoff _6epth 0.60111 TcT5nl0 i n /y_ T N=69 50 55 60 65 70 75 80 85 Time (hours) 90 95 100 105 110 115 120 125 130 135 140 H N R Type 11 24-hr 1-yr Rainfall =2.86" Prepared by Stewart Printed 12/21/2021 HydroCAD® 10.00-20 s/n 09358 © 2017 HydroCAD Software Solutions LLC Page 8 Hydrograph for Subcatchment BA4: DA 3A Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 3.00 0.10 0.00 0.00 6.00 0.23 0.00 0.00 9.00 0.42 0.00 0.00 12.00 1.90 0.18 1.73 15.00 2.44 0.39 0.07 18.00 2.63 0.48 0.05 21.00 2.76 0.54 0.03 24.00 2.86 0.60 0.03 27.00 2.86 0.60 0.00 30.00 2.86 0.60 0.00 33.00 2.86 0.60 0.00 36.00 2.86 0.60 0.00 39.00 2.86 0.60 0.00 42.00 2.86 0.60 0.00 45.00 2.86 0.60 0.00 48.00 2.86 0.60 0.00 51.00 2.86 0.60 0.00 54.00 2.86 0.60 0.00 57.00 2.86 0.60 0.00 60.00 2.86 0.60 0.00 63.00 2.86 0.60 0.00 66.00 2.86 0.60 0.00 69.00 2.86 0.60 0.00 72.00 2.86 0.60 0.00 75.00 2.86 0.60 0.00 78.00 2.86 0.60 0.00 81.00 2.86 0.60 0.00 84.00 2.86 0.60 0.00 87.00 2.86 0.60 0.00 90.00 2.86 0.60 0.00 93.00 2.86 0.60 0.00 96.00 2.86 0.60 0.00 99.00 2.86 0.60 0.00 102.00 2.86 0.60 0.00 105.00 2.86 0.60 0.00 108.00 2.86 0.60 0.00 111.00 2.86 0.60 0.00 114.00 2.86 0.60 0.00 117.00 2.86 0.60 0.00 120.00 2.86 0.60 0.00 123.00 2.86 0.60 0.00 126.00 2.86 0.60 0.00 129.00 2.86 0.60 0.00 132.00 2.86 0.60 0.00 135.00 2.86 0.60 0.00 138.00 2.86 0.60 0.00 141.00 2.86 0.60 0.00 144.00 2.86 0.60 0.00 H N R Type 11 24-hr 1-yr Rainfall =2.86" Prepared by Stewart Printed 12/21/2021 HydroCAD® 10.00-20 s/n 09358 © 2017 HydroCAD Software Solutions LLC Page 9 Summary for Subcatchment DA1: DA1 Runoff = 52.15 cfs @ 11.96 hrs, Volume= 2.368 af, Depth= 1.62" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-144.00 hrs, dt= 0.01 hrs Type II 24-hr 1-yr Rainfall=2.86" Area (ac) CN Description 8.460 98 Paved parking, HSG B 7.740 79 50-75% Grass cover, Fair, HSG C 1.370 69 50-75% Grass cover, Fair, HSG B 17.570 87 Weighted Average 9.110 51.85% Pervious Area 8.460 48.15% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DA1: DA1 Hydrograph I I 55-+ 152.15 cf I 5O— 45- 40�< 30-- 3 0 LL 25-- _ _ 1 20-- 151 - 4 - 4-4 H4 ✓ ▪ --I-4 L Ty,pe24-hrr • 1-yrr Ramfalrr2.86'- Ru fi offl A reIIaT 17.57Q F unt * \to urriO 2.II13 8 IIIa iRuno1f bepth;m .-62' - 4 rcT5-0 nhin4- 4-- 4-4 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 Time (hours) 4 0 Runoff H N R Type 11 24-hr 1-yr Rainfall =2.86" Prepared by Stewart Printed 12/21/2021 HydroCAD® 10.00-20 s/n 09358 © 2017 HydroCAD Software Solutions LLC Page 10 Hydrograph for Subcatchment DA1: DA1 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 3.00 0.10 0.00 0.00 6.00 0.23 0.00 0.00 9.00 0.42 0.01 0.22 12.00 1.90 0.83 44.61 15.00 2.44 1.26 1.29 18.00 2.63 1.42 0.78 21.00 2.76 1.53 0.54 24.00 2.86 1.62 0.48 27.00 2.86 1.62 0.00 30.00 2.86 1.62 0.00 33.00 2.86 1.62 0.00 36.00 2.86 1.62 0.00 39.00 2.86 1.62 0.00 42.00 2.86 1.62 0.00 45.00 2.86 1.62 0.00 48.00 2.86 1.62 0.00 51.00 2.86 1.62 0.00 54.00 2.86 1.62 0.00 57.00 2.86 1.62 0.00 60.00 2.86 1.62 0.00 63.00 2.86 1.62 0.00 66.00 2.86 1.62 0.00 69.00 2.86 1.62 0.00 72.00 2.86 1.62 0.00 75.00 2.86 1.62 0.00 78.00 2.86 1.62 0.00 81.00 2.86 1.62 0.00 84.00 2.86 1.62 0.00 87.00 2.86 1.62 0.00 90.00 2.86 1.62 0.00 93.00 2.86 1.62 0.00 96.00 2.86 1.62 0.00 99.00 2.86 1.62 0.00 102.00 2.86 1.62 0.00 105.00 2.86 1.62 0.00 108.00 2.86 1.62 0.00 111.00 2.86 1.62 0.00 114.00 2.86 1.62 0.00 117.00 2.86 1.62 0.00 120.00 2.86 1.62 0.00 123.00 2.86 1.62 0.00 126.00 2.86 1.62 0.00 129.00 2.86 1.62 0.00 132.00 2.86 1.62 0.00 135.00 2.86 1.62 0.00 138.00 2.86 1.62 0.00 141.00 2.86 1.62 0.00 144.00 2.86 1.62 0.00 H N R Type 11 24-hr 1-yr Rainfall =2.86" Prepared by Stewart Printed 12/21/2021 HydroCAD® 10.00-20 s/n 09358 © 2017 HydroCAD Software Solutions LLC Page 11 Summary for Subcatchment DA2: DA2 Runoff = 17.18 cfs @ 11.96 hrs, Volume= 0.789 af, Depth= 1.77" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-144.00 hrs, dt= 0.01 hrs Type II 24-hr 1-yr Rainfall=2.86" Area (ac) CN Description 3.620 98 Paved parking, HSG B 1.290 69 50-75% Grass cover, Fair, HSG B 0.430 79 50-75% Grass cover, Fair, HSG C 5.340 89 Weighted Average 1.720 32.21% Pervious Area 3.620 67.79% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 -I 197." 1 ' 18� 17 _L 16 15� 13 12= w 11:- .9 10L- 0 9. LL 8� 7. 6 5 4 3 2 0 L_L Direct Entry, Subcatchment DA2: DA2 L L 1 L_L L Hydrograph L_L__L L L L L- L-1_-' -L_L -L 1yI'po-1�-24hi - 1-yrL II1RainIfaL e llr2.8 Fiat o#f r'I e4_=L5.-3400 d L L I L I I L noff-Volune=9:1739-a - iRwnotb6 th 1�I.77' Tc 60'nhifl-- N - O 9 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105110 115 120 125 130 135 140 Time (hours) H N R Type 11 24-hr 1-yr Rainfall =2.86" Prepared by Stewart Printed 12/21/2021 HydroCAD® 10.00-20 s/n 09358 © 2017 HydroCAD Software Solutions LLC Page 12 Hydrograph for Subcatchment DA2: DA2 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 3.00 0.10 0.00 0.00 6.00 0.23 0.00 0.00 9.00 0.42 0.02 0.11 12.00 1.90 0.94 14.59 15.00 2.44 1.40 0.41 18.00 2.63 1.57 0.25 21.00 2.76 1.68 0.17 24.00 2.86 1.77 0.15 27.00 2.86 1.77 0.00 30.00 2.86 1.77 0.00 33.00 2.86 1.77 0.00 36.00 2.86 1.77 0.00 39.00 2.86 1.77 0.00 42.00 2.86 1.77 0.00 45.00 2.86 1.77 0.00 48.00 2.86 1.77 0.00 51.00 2.86 1.77 0.00 54.00 2.86 1.77 0.00 57.00 2.86 1.77 0.00 60.00 2.86 1.77 0.00 63.00 2.86 1.77 0.00 66.00 2.86 1.77 0.00 69.00 2.86 1.77 0.00 72.00 2.86 1.77 0.00 75.00 2.86 1.77 0.00 78.00 2.86 1.77 0.00 81.00 2.86 1.77 0.00 84.00 2.86 1.77 0.00 87.00 2.86 1.77 0.00 90.00 2.86 1.77 0.00 93.00 2.86 1.77 0.00 96.00 2.86 1.77 0.00 99.00 2.86 1.77 0.00 102.00 2.86 1.77 0.00 105.00 2.86 1.77 0.00 108.00 2.86 1.77 0.00 111.00 2.86 1.77 0.00 114.00 2.86 1.77 0.00 117.00 2.86 1.77 0.00 120.00 2.86 1.77 0.00 123.00 2.86 1.77 0.00 126.00 2.86 1.77 0.00 129.00 2.86 1.77 0.00 132.00 2.86 1.77 0.00 135.00 2.86 1.77 0.00 138.00 2.86 1.77 0.00 141.00 2.86 1.77 0.00 144.00 2.86 1.77 0.00 H N R Type 11 24-hr 1-yr Rainfall =2.86" Prepared by Stewart Printed 12/21/2021 HydroCAD® 10.00-20 s/n 09358 © 2017 HydroCAD Software Solutions LLC Page 13 Summary for Subcatchment PIA: Pre DA1 Runoff = 30.05 cfs @ 12.04 hrs, Volume= 1.742 af, Depth= 0.87" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-144.00 hrs, dt= 0.01 hrs Type II 24-hr 1-yr Rainfall=2.86" Area (ac) CN Description 1.040 98 Paved parking, HSG B 11.490 69 50-75% Grass cover, Fair, HSG B 11.490 79 50-75% Grass cover, Fair, HSG C 24.020 75 Weighted Average 22.980 95.67% Pervious Area 1.040 4.33% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 4.9 100 0.1000 0.34 Sheet Flow, Grass: Short n= 0.150 P2= 3.60" 5.2 304 0.0197 0.98 Shallow Concentrated Flow, Short Grass Pasture Kv= 7.0 fps 0.5 140 0.1100 4.97 Shallow Concentrated Flow, Grassed Waterway Kv= 15.0 fps 0.1 12 0.0200 2.12 Shallow Concentrated Flow, Grassed Waterway Kv= 15.0 fps 0.3 Direct Entry, 11.0 556 Total H N R Type 11 24-hr 1-yr Rainfall =2.86" Prepared by Stewart Printed 12/21/2021 HydroCAD® 10.00-20 s/n 09358 ©2017 HydroCAD Software Solutions LLC Page 14 Subcatchment PIA: Pre DA1 Hydrograph --7--1--r---r7 32: --I 30.05 cf I 1 1 1 /I 30= 28:: - 11 26 244- 4 _ 22-" 20 - - N 18' 4_ 0 16- • 14- 12= 10= 8= 6: 4= 2= -r- - 1 r- T1 r I I L I I 1 r 7 r Runoff_ bepthrO.87" f lb* Length=5 6' - r 1 r 1 1 r 1 I 1 r 1-y'pe 24-fir Rainfa1I 2.86'r ry Ir + r + 1 + 1 r + 1 + r Bu ff' ew-`24A20 Ik'ultiPff V6l urng=1. 2 '� a r i r + 7 i i 7 1 1 Gar= 11.OrrinH r1 r 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105110 115 120 125 130 135 140 Time (hours) 0 Runoff H N R Type 11 24-hr 1-yr Rainfall =2.86" Prepared by Stewart Printed 12/21/2021 HydroCAD® 10.00-20 s/n 09358 © 2017 HydroCAD Software Solutions LLC Page 15 Hydrograph for Subcatchment PIA: Pre DA1 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 3.00 0.10 0.00 0.00 6.00 0.23 0.00 0.00 9.00 0.42 0.00 0.00 12.00 1.90 0.33 27.59 15.00 2.44 0.62 1.24 18.00 2.63 0.73 0.77 21.00 2.76 0.81 0.54 24.00 2.86 0.87 0.49 27.00 2.86 0.87 0.00 30.00 2.86 0.87 0.00 33.00 2.86 0.87 0.00 36.00 2.86 0.87 0.00 39.00 2.86 0.87 0.00 42.00 2.86 0.87 0.00 45.00 2.86 0.87 0.00 48.00 2.86 0.87 0.00 51.00 2.86 0.87 0.00 54.00 2.86 0.87 0.00 57.00 2.86 0.87 0.00 60.00 2.86 0.87 0.00 63.00 2.86 0.87 0.00 66.00 2.86 0.87 0.00 69.00 2.86 0.87 0.00 72.00 2.86 0.87 0.00 75.00 2.86 0.87 0.00 78.00 2.86 0.87 0.00 81.00 2.86 0.87 0.00 84.00 2.86 0.87 0.00 87.00 2.86 0.87 0.00 90.00 2.86 0.87 0.00 93.00 2.86 0.87 0.00 96.00 2.86 0.87 0.00 99.00 2.86 0.87 0.00 102.00 2.86 0.87 0.00 105.00 2.86 0.87 0.00 108.00 2.86 0.87 0.00 111.00 2.86 0.87 0.00 114.00 2.86 0.87 0.00 117.00 2.86 0.87 0.00 120.00 2.86 0.87 0.00 123.00 2.86 0.87 0.00 126.00 2.86 0.87 0.00 129.00 2.86 0.87 0.00 132.00 2.86 0.87 0.00 135.00 2.86 0.87 0.00 138.00 2.86 0.87 0.00 141.00 2.86 0.87 0.00 144.00 2.86 0.87 0.00 H N R Type 11 24-hr 1-yr Rainfall =2.86" Prepared by Stewart Printed 12/21/2021 HydroCAD® 10.00-20 sin 09358 © 2017 HydroCAD Software Solutions LLC Page 16 Inflow Area = Inflow = Outflow = Primary = Secondary = Summary for Pond 2P: BMP #1 22.910 ac, 52.73% Impervious, Inflow Depth = 1.65" for 1-yr event 69.33 cfs @ 11.96 hrs, Volume= 3.158 of 22.09 cfs @ 12.07 hrs, Volume= 3.127 af, Atten= 68%, Lag= 6.6 min 22.09 cfs @ 12.07 hrs, Volume= 3.127 af 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-144.00 hrs, dt= 0.01 hrs Peak Elev= 358.06' @ 12.07 hrs Surf.Area= 33,343 sf Storage= 62,366 cf Plug -Flow detention time= 838.3 min calculated for 3.127 af (99% of inflow) Center -of -Mass det. time= 832.9 min (1,650.5 - 817.7 ) Volume Invert Avail.Storage Storage Description #1 Elevation (feet) 356.00 357.00 358.00 359.00 360.00 361.00 362.00 356.00' 213,040 cf Custom Stage Data (Prismatic)Listed below (Recalc) Surf.Area (sq-ft) 26,415 30,657 33,194 35,789 38,441 39,795 43,913 Device Routing Invert Inc.Store (cubic -feet) 0 28,536 31,926 34,492 37,115 39,118 41,854 Outlet Devices Cum.Store (cubic -feet) 0 28,536 60,462 94,953 132,068 171,186 213,040 #1 Primary 351.92' #2 Device 1 #3 Device 1 356.00' 357.50' #4 Secondary 361.00' 24.000" Round RCP_Round 24 L= 100.0' RCP, sq.cut end projecting, Ke= 0.500 Inlet / Outlet Invert= 351.92' / 351.00' S= 0.0092 '/' Cc= 0.900 n= 0.013 Concrete pipe, bends & connections, Flow Area= 3.14 sf 3.000" Vert. Orifice/Grate C= 0.600 48.000" x 48.000" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads 26.000' long x 10.000' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=22.08 cfs @ 12.07 hrs HW=358.06' TW=0.00' (Dynamic Tailwater) t1=RCP_Round 24 (Passes 22.08 cfs of 34.21 cfs potential flow) 12=Orifice/Grate (Orifice Controls 0.33 cfs @ 6.69 fps) 3=Orifice/Grate (Weir Controls 21.75 cfs @ 2.44 fps) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=356.00' TW=0.00' (Dynamic Tailwater) t4=Broad-Crested Rectangular Weir( Controls 0.00 cfs) H N R Type 11 24-hr 1-yr Rainfall =2.86" Prepared by Stewart Printed 12/21/2021 HydroCAD® 10.00-20 s/n 09358 ©2017 HydroCAD Software Solutions LLC Page 17 75'' 70 654" 60 55� 50 457' 40'' 0 35J, u_ 30'' 25'' 20'' 15='' 10='' 0.00 cfs 0 Pond 2P: BMP #1 Hyd rog raph 69.33 cfs 22.09 cfs / + + L 1 + i rrfkiw Ares'=22.91-0-ac - r + L L 1 pearl( Elev=358.06 SforatgE =6Z,36& of - L 1 L 1 r + 1 7 10 20 30 40 50 60 70 80 Time (hours) r 90 100 110 120 130 140 1 T p Inflow Outflow ❑ Primary Secondary HNR Prepared by Stewart HydroCAD® 10.00-20 s/n 09358 © 2017 HydroCAD Software Solutions LLC Type 11 24-hr 1-yr Rainfall =2.86" Printed 12/21/2021 Page 18 Time Inflow (hours) (cfs) 0.00 0.00 3.00 0.00 6.00 0.00 9.00 0.32 12.00 59.20 15.00 1.69 18.00 1.03 21.00 0.72 24.00 0.64 27.00 0.00 30.00 0.00 33.00 0.00 36.00 0.00 39.00 0.00 42.00 0.00 45.00 0.00 48.00 0.00 51.00 0.00 54.00 0.00 57.00 0.00 60.00 0.00 63.00 0.00 66.00 0.00 69.00 0.00 72.00 0.00 75.00 0.00 78.00 0.00 81.00 0.00 84.00 0.00 87.00 0.00 90.00 0.00 93.00 0.00 96.00 0.00 99.00 0.00 102.00 0.00 105.00 0.00 108.00 0.00 111.00 0.00 114.00 0.00 117.00 0.00 120.00 0.00 123.00 0.00 126.00 0.00 129.00 0.00 132.00 0.00 135.00 0.00 138.00 0.00 141.00 0.00 144.00 0.00 Hydrograph for Pond 2P: BMP #1 Storage Elevation (cubic -feet) (feet) 0 356.00 0 356.00 0 356.00 900 356.03 57,152 357.90 47,259 357.60 46,164 357.56 45,542 357.54 45,361 357.54 42,108 357.43 39,238 357.34 36,472 357.26 33,809 357.17 31,251 357.09 28,799 357.01 26,452 356.93 24,214 356.86 22,083 356.79 20,062 356.72 18,152 356.65 16,353 356.59 14,667 356.53 13,094 356.48 11,637 356.43 10,294 356.38 9,068 356.33 7,959 356.29 6,967 356.26 6,090 356.23 5,338 356.20 4,712 356.18 4,193 356.16 3,762 356.14 3,402 356.13 3,097 356.12 2,838 356.11 2,616 356.10 2,424 356.09 2,256 356.08 2,108 356.08 1,978 356.07 1,861 356.07 1,758 356.07 1,664 356.06 1,580 356.06 1,503 356.06 1,433 356.05 1,369 356.05 1,311 356.05 Outflow (cfs) 0.00 0.00 0.00 0.00 13.55 1.84 1.09 0.74 0.65 0.27 0.26 0.25 0.24 0.23 0.22 0.21 0.20 0.19 0.18 0.17 0.16 0.15 0.14 0.13 0.12 0.11 0.10 0.09 0.08 0.06 0.05 0.04 0.04 0.03 0.03 0.02 0.02 0.02 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 Primary (cfs) 0.00 0.00 0.00 0.00 13.55 1.84 1.09 0.74 0.65 0.27 0.26 0.25 0.24 0.23 0.22 0.21 0.20 0.19 0.18 0.17 0.16 0.15 0.14 0.13 0.12 0.11 0.10 0.09 0.08 0.06 0.05 0.04 0.04 0.03 0.03 0.02 0.02 0.02 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 Secondary (cfs) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 H N R Type 11 24-hr 1-yr Rainfall =2.86" Prepared by Stewart Printed 12/21/2021 HydroCAD® 10.00-20 s/n 09358 © 2017 HydroCAD Software Solutions LLC Page 19 Summary for Pond 0-1: Outfall 1 Inflow Area = 27.150 ac, 45.89% Impervious, Inflow Depth > 1.51" for 1-yr event Inflow = 24.72 cfs @ 12.05 hrs, Volume= 3.426 af Primary = 24.72 cfs @ 12.05 hrs, Volume= 3.426 af, Atten= 0%, Lag= 0.0 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-144.00 hrs, dt= 0.01 hrs 26" 24� 22� 20� 181" H 16* i 12� 101" 8? 6- r 2- 124.72 cfs 24.72 cfs r r T + Pond 0-1: Outfall 1 Hyd rog raph r L L -1 r r r 10 20 30 40 50 60 70 80 Time (hours) Iriflo�nr Area=277,15O ac, 90 r r L L -1 r —I 100 110 120 130 r L 140 7 Inflow ❑ Primary H N R Type 11 24-hr 1-yr Rainfall =2.86" Prepared by Stewart Printed 12/21/2021 HydroCAD® 10.00-20 s/n 09358 © 2017 HydroCAD Software Solutions LLC Page 20 Hydrograph for Pond 0-1: Outfall 1 Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) 0.00 0.00 0.00 3.00 0.00 0.00 6.00 0.00 0.00 9.00 0.00 0.00 12.00 19.39 19.39 15.00 2.05 2.05 18.00 1.22 1.22 21.00 0.83 0.83 24.00 0.74 0.74 27.00 0.27 0.27 30.00 0.26 0.26 33.00 0.25 0.25 36.00 0.24 0.24 39.00 0.23 0.23 42.00 0.22 0.22 45.00 0.21 0.21 48.00 0.20 0.20 51.00 0.19 0.19 54.00 0.18 0.18 57.00 0.17 0.17 60.00 0.16 0.16 63.00 0.15 0.15 66.00 0.14 0.14 69.00 0.13 0.13 72.00 0.12 0.12 75.00 0.11 0.11 78.00 0.10 0.10 81.00 0.09 0.09 84.00 0.08 0.08 87.00 0.06 0.06 90.00 0.05 0.05 93.00 0.04 0.04 96.00 0.04 0.04 99.00 0.03 0.03 102.00 0.03 0.03 105.00 0.02 0.02 108.00 0.02 0.02 111.00 0.02 0.02 114.00 0.01 0.01 117.00 0.01 0.01 120.00 0.01 0.01 123.00 0.01 0.01 126.00 0.01 0.01 129.00 0.01 0.01 132.00 0.01 0.01 135.00 0.01 0.01 138.00 0.01 0.01 141.00 0.01 0.01 144.00 0.01 0.01 HNR Type 11 24-hr 2-yr Rainfall=3.45" Prepared by Stewart Printed 12/21/2021 HydroCAD® 10.00-20 s/n 09358 © 2017 HydroCAD Software Solutions LLC Page 21 Summary for Subcatchment BA3: BA3 Runoff = 6.61 cfs @ 11.96 hrs, Volume= 0.296 af, Depth= 1.46" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-144.00 hrs, dt= 0.01 hrs Type II 24-hr 2-yr Rainfall=3.45" Area (ac) CN Description 0.380 98 Paved parking, HSG B 2.050 74 >75% Grass cover, Good, HSG C 2.430 78 Weighted Average 2.050 84.36% Pervious Area 0.380 15.64% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment BA3: BA3 Hydrograph Type 11 24-h r- 2-yr Rainfallr3.4�5" Runiff Areal=2.430- c Fkungff VtOurne=0.296'af 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105110115120 125130135140 Time (hours) • Runoff HNR Type 11 24-hr 2-yr Rainfall=3.45" Prepared by Stewart Printed 12/21/2021 HydroCAD® 10.00-20 s/n 09358 © 2017 HydroCAD Software Solutions LLC Page 22 Hydrograph for Subcatchment BA3: BA3 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 3.00 0.12 0.00 0.00 6.00 0.28 0.00 0.00 9.00 0.51 0.00 0.00 12.00 2.29 0.65 5.77 15.00 2.94 1.09 0.18 18.00 3.18 1.26 0.11 21.00 3.33 1.37 0.08 24.00 3.45 1.46 0.07 27.00 3.45 1.46 0.00 30.00 3.45 1.46 0.00 33.00 3.45 1.46 0.00 36.00 3.45 1.46 0.00 39.00 3.45 1.46 0.00 42.00 3.45 1.46 0.00 45.00 3.45 1.46 0.00 48.00 3.45 1.46 0.00 51.00 3.45 1.46 0.00 54.00 3.45 1.46 0.00 57.00 3.45 1.46 0.00 60.00 3.45 1.46 0.00 63.00 3.45 1.46 0.00 66.00 3.45 1.46 0.00 69.00 3.45 1.46 0.00 72.00 3.45 1.46 0.00 75.00 3.45 1.46 0.00 78.00 3.45 1.46 0.00 81.00 3.45 1.46 0.00 84.00 3.45 1.46 0.00 87.00 3.45 1.46 0.00 90.00 3.45 1.46 0.00 93.00 3.45 1.46 0.00 96.00 3.45 1.46 0.00 99.00 3.45 1.46 0.00 102.00 3.45 1.46 0.00 105.00 3.45 1.46 0.00 108.00 3.45 1.46 0.00 111.00 3.45 1.46 0.00 114.00 3.45 1.46 0.00 117.00 3.45 1.46 0.00 120.00 3.45 1.46 0.00 123.00 3.45 1.46 0.00 126.00 3.45 1.46 0.00 129.00 3.45 1.46 0.00 132.00 3.45 1.46 0.00 135.00 3.45 1.46 0.00 138.00 3.45 1.46 0.00 141.00 3.45 1.46 0.00 144.00 3.45 1.46 0.00 HNR Type 11 24-hr 2-yr Rainfall=3.45" Prepared by Stewart Printed 12/21/2021 HydroCAD® 10.00-20 s/n 09358 © 2017 HydroCAD Software Solutions LLC Page 23 Summary for Subcatchment BA4: DA 3A Runoff = 3.03 cfs @ 11.97 hrs, Volume= 0.139 af, Depth= 0.92" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-144.00 hrs, dt= 0.01 hrs Type II 24-hr 2-yr Rainfall=3.45" Area (ac) CN Description 1.810 69 50-75% Grass cover, Fair, HSG B 1.810 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 0 LL 0 5 10 15 20 25 30 35 40 45 Direct Entry, Subcatchment BA4: DA 3A Hydrograph Type 0 24-hr 2-yr RaiiifaIIr3.45" Runoff Areal=1.810 ea Runoff Vo=0.Tat- Runoff bepthT0.92'1 Tc=-`&0 n1in' S- 69__ 50 55 60 65 70 75 80 85 Time (hours) 90 95 100 105 110 115 120 125 130 135 140 HNR Type 11 24-hr 2-yr Rainfall=3.45" Prepared by Stewart Printed 12/21/2021 HydroCAD® 10.00-20 s/n 09358 © 2017 HydroCAD Software Solutions LLC Page 24 Hydrograph for Subcatchment BA4: DA 3A Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 3.00 0.12 0.00 0.00 6.00 0.28 0.00 0.00 9.00 0.51 0.00 0.00 12.00 2.29 0.33 2.74 15.00 2.94 0.64 0.10 18.00 3.18 0.77 0.06 21.00 3.33 0.85 0.05 24.00 3.45 0.92 0.04 27.00 3.45 0.92 0.00 30.00 3.45 0.92 0.00 33.00 3.45 0.92 0.00 36.00 3.45 0.92 0.00 39.00 3.45 0.92 0.00 42.00 3.45 0.92 0.00 45.00 3.45 0.92 0.00 48.00 3.45 0.92 0.00 51.00 3.45 0.92 0.00 54.00 3.45 0.92 0.00 57.00 3.45 0.92 0.00 60.00 3.45 0.92 0.00 63.00 3.45 0.92 0.00 66.00 3.45 0.92 0.00 69.00 3.45 0.92 0.00 72.00 3.45 0.92 0.00 75.00 3.45 0.92 0.00 78.00 3.45 0.92 0.00 81.00 3.45 0.92 0.00 84.00 3.45 0.92 0.00 87.00 3.45 0.92 0.00 90.00 3.45 0.92 0.00 93.00 3.45 0.92 0.00 96.00 3.45 0.92 0.00 99.00 3.45 0.92 0.00 102.00 3.45 0.92 0.00 105.00 3.45 0.92 0.00 108.00 3.45 0.92 0.00 111.00 3.45 0.92 0.00 114.00 3.45 0.92 0.00 117.00 3.45 0.92 0.00 120.00 3.45 0.92 0.00 123.00 3.45 0.92 0.00 126.00 3.45 0.92 0.00 129.00 3.45 0.92 0.00 132.00 3.45 0.92 0.00 135.00 3.45 0.92 0.00 138.00 3.45 0.92 0.00 141.00 3.45 0.92 0.00 144.00 3.45 0.92 0.00 HNR Type 11 24-hr 2-yr Rainfall=3.45" Prepared by Stewart Printed 12/21/2021 HydroCAD® 10.00-20 s/n 09358 © 2017 HydroCAD Software Solutions LLC Page 25 Summary for Subcatchment DA1: DA1 Runoff = 68.12 cfs @ 11.96 hrs, Volume= 3.130 af, Depth= 2.14" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-144.00 hrs, dt= 0.01 hrs Type II 24-hr 2-yr Rainfall=3.45" Area (ac) CN Description 8.460 98 Paved parking, HSG B 7.740 79 50-75% Grass cover, Fair, HSG C 1.370 69 50-75% Grass cover, Fair, HSG B 17.570 87 Weighted Average 9.110 51.85% Pervious Area 8.460 48.15% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DA1: DA1 Hydrograph — 1 1 1 1 1 1 1 1 1 1 1 75 70- 168.12 cf I I I I I 65� 1:(:',/,1 1 1 1 1 1 1 1 60�'J / II 55_ AI 50� . 1 / 71 1 1 -II1 45.-' 40 1 1 1 1 3 ---r / i _II r , 0 35J; E _ 1 / 1 1 1 1 30-. 1 1 1 1 --i-/ 1 r r- 25� 1 1 1 207 1 1 1 1 157'' 1 1 1 1 10='� 1 - 4 - 4 11 - - I4 - 4. 54" + 1 r 4 1 + r Type H 24-hrr 2-yr Rainfall3.45" Ru ffAiream-17.570 Runpff Voluup=3:'11130 at - Runoff bepthr2.14'1 1-r r r r TcT&1.O Ia1lrn -r -+ 7 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 Time (hours) • Runoff HNR Type 11 24-hr 2-yr Rainfall=3.45" Prepared by Stewart Printed 12/21/2021 HydroCAD® 10.00-20 s/n 09358 © 2017 HydroCAD Software Solutions LLC Page 26 Hydrograph for Subcatchment DA1: DA1 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 3.00 0.12 0.00 0.00 6.00 0.28 0.00 0.00 9.00 0.51 0.03 0.42 12.00 2.29 1.14 57.87 15.00 2.94 1.69 1.62 18.00 3.18 1.89 0.98 21.00 3.33 2.03 0.68 24.00 3.45 2.14 0.60 27.00 3.45 2.14 0.00 30.00 3.45 2.14 0.00 33.00 3.45 2.14 0.00 36.00 3.45 2.14 0.00 39.00 3.45 2.14 0.00 42.00 3.45 2.14 0.00 45.00 3.45 2.14 0.00 48.00 3.45 2.14 0.00 51.00 3.45 2.14 0.00 54.00 3.45 2.14 0.00 57.00 3.45 2.14 0.00 60.00 3.45 2.14 0.00 63.00 3.45 2.14 0.00 66.00 3.45 2.14 0.00 69.00 3.45 2.14 0.00 72.00 3.45 2.14 0.00 75.00 3.45 2.14 0.00 78.00 3.45 2.14 0.00 81.00 3.45 2.14 0.00 84.00 3.45 2.14 0.00 87.00 3.45 2.14 0.00 90.00 3.45 2.14 0.00 93.00 3.45 2.14 0.00 96.00 3.45 2.14 0.00 99.00 3.45 2.14 0.00 102.00 3.45 2.14 0.00 105.00 3.45 2.14 0.00 108.00 3.45 2.14 0.00 111.00 3.45 2.14 0.00 114.00 3.45 2.14 0.00 117.00 3.45 2.14 0.00 120.00 3.45 2.14 0.00 123.00 3.45 2.14 0.00 126.00 3.45 2.14 0.00 129.00 3.45 2.14 0.00 132.00 3.45 2.14 0.00 135.00 3.45 2.14 0.00 138.00 3.45 2.14 0.00 141.00 3.45 2.14 0.00 144.00 3.45 2.14 0.00 HNR Type 11 24-hr 2-yr Rainfall=3.45" Prepared by Stewart Printed 12/21/2021 HydroCAD® 10.00-20 s/n 09358 © 2017 HydroCAD Software Solutions LLC Page 27 Summary for Subcatchment DA2: DA2 Runoff = 22.08 cfs @ 11.96 hrs, Volume= 1.028 af, Depth= 2.31" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-144.00 hrs, dt= 0.01 hrs Type II 24-hr 2-yr Rainfall=3.45" Area (ac) CN Description 3.620 98 Paved parking, HSG B 1.290 69 50-75% Grass cover, Fair, HSG B 0.430 79 50-75% Grass cover, Fair, HSG C 5.340 89 Weighted Average 1.720 32.21% Pervious Area 3.620 67.79% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, 24- Subcatchment DA2: DA2 Hydrograph t r 1 r r r t r r r t r r r t r t t 1 r t I t 1 r 21 2.08cf I+ + + + + + 1- + + + 1- + + + + 11r1-41 1+ 1+ 23= Ize�} 22 % 1 L'4�h1'r 1YPe-1111 1 20_ /- F r-1 r; F T r 2 r R inf lrr .4'15i- 19' /- I I I I I I I 1 1 1 1 .. i 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 17. 1 1 1 1 , 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 16 15,;, /,-III III 4-11-4 1111 rll ll` nnY-- �� - III rtrr 1111 12' ° 11 : --+- LL 101 94 / + + 11111 +111 4-11 1 +1 + + 8, 64 _1 77 5- II 1 1 1 I I I I I I I I 1 1 1 1 1 1 1 1 4_' 1 1 1 + + 1 1 1 1 1 3_ 1 1 1 1 1 1 1 1 1 1 1 2 -A +1 + +1 +1 1 + + + I I + + 1 + -1 I- L 1 1 L 1 1 1 1 L L 1 1 1 L L 1 1 C rt r rt r y + r y + T :*60mnil - 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1-4 11- 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105110 115 120 125 130 135 140 Time (hours) • Runoff HNR Type 11 24-hr 2-yr Rainfall=3.45" Prepared by Stewart Printed 12/21/2021 HydroCAD® 10.00-20 s/n 09358 © 2017 HydroCAD Software Solutions LLC Page 28 Hydrograph for Subcatchment DA2: DA2 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 3.00 0.12 0.00 0.00 6.00 0.28 0.00 0.01 9.00 0.51 0.05 0.18 12.00 2.29 1.27 18.64 15.00 2.94 1.85 0.51 18.00 3.18 2.06 0.31 21.00 3.33 2.20 0.21 24.00 3.45 2.31 0.19 27.00 3.45 2.31 0.00 30.00 3.45 2.31 0.00 33.00 3.45 2.31 0.00 36.00 3.45 2.31 0.00 39.00 3.45 2.31 0.00 42.00 3.45 2.31 0.00 45.00 3.45 2.31 0.00 48.00 3.45 2.31 0.00 51.00 3.45 2.31 0.00 54.00 3.45 2.31 0.00 57.00 3.45 2.31 0.00 60.00 3.45 2.31 0.00 63.00 3.45 2.31 0.00 66.00 3.45 2.31 0.00 69.00 3.45 2.31 0.00 72.00 3.45 2.31 0.00 75.00 3.45 2.31 0.00 78.00 3.45 2.31 0.00 81.00 3.45 2.31 0.00 84.00 3.45 2.31 0.00 87.00 3.45 2.31 0.00 90.00 3.45 2.31 0.00 93.00 3.45 2.31 0.00 96.00 3.45 2.31 0.00 99.00 3.45 2.31 0.00 102.00 3.45 2.31 0.00 105.00 3.45 2.31 0.00 108.00 3.45 2.31 0.00 111.00 3.45 2.31 0.00 114.00 3.45 2.31 0.00 117.00 3.45 2.31 0.00 120.00 3.45 2.31 0.00 123.00 3.45 2.31 0.00 126.00 3.45 2.31 0.00 129.00 3.45 2.31 0.00 132.00 3.45 2.31 0.00 135.00 3.45 2.31 0.00 138.00 3.45 2.31 0.00 141.00 3.45 2.31 0.00 144.00 3.45 2.31 0.00 HNR Type 11 24-hr 2-yr Rainfall=3.45" Prepared by Stewart Printed 12/21/2021 HydroCAD® 10.00-20 s/n 09358 © 2017 HydroCAD Software Solutions LLC Page 29 Summary for Subcatchment PIA: Pre DA1 Runoff = 44.71 cfs @ 12.04 hrs, Volume= 2.535 af, Depth= 1.27" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-144.00 hrs, dt= 0.01 hrs Type II 24-hr 2-yr Rainfall=3.45" Area (ac) CN Description 1.040 98 Paved parking, HSG B 11.490 69 50-75% Grass cover, Fair, HSG B 11.490 79 50-75% Grass cover, Fair, HSG C 24.020 75 Weighted Average 22.980 95.67% Pervious Area 1.040 4.33% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 4.9 100 0.1000 0.34 Sheet Flow, Grass: Short n= 0.150 P2= 3.60" 5.2 304 0.0197 0.98 Shallow Concentrated Flow, Short Grass Pasture Kv= 7.0 fps 0.5 140 0.1100 4.97 Shallow Concentrated Flow, Grassed Waterway Kv= 15.0 fps 0.1 12 0.0200 2.12 Shallow Concentrated Flow, Grassed Waterway Kv= 15.0 fps 0.3 Direct Entry, 11.0 556 Total HNR Type 11 24-hr 2-yr Rainfall=3.45" Prepared by Stewart Printed 12/21/2021 HydroCAD® 10.00-20 s/n 09358 © 2017 HydroCAD Software Solutions LLC Page 30 T -T -T-T- T-T-T-T-,-T-T-,-T-,-T-T-,-T-, --T 32_ / tInT f- Q)u10#2,505-a r- 30= - -r- / r r r r r r tt 26i --4- 24 +-T + [1w�aliQ, DepthT1.0 ,�ir- _ �H gl = 75 � 18. -,- 16 12= Subcatchment PIA: Pre DA1 Hydrograph ,T r t +r 42= / ' 40/_t+ 4 -4 =yr Ri1fa1 3.5'' 38= --T-/ T TT r T TT r T TT r T 1 T 1 T T 1 1 1 T 36 Ruhdff�Aie�a�2 -020-a 344 7 / r T 17 1 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 Time (hours) 0 Runoff HNR Type 11 24-hr 2-yr Rainfall=3.45" Prepared by Stewart Printed 12/21/2021 HydroCAD® 10.00-20 s/n 09358 © 2017 HydroCAD Software Solutions LLC Page 31 Hydrograph for Subcatchment PIA: Pre DA1 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 3.00 0.12 0.00 0.00 6.00 0.28 0.00 0.00 9.00 0.51 0.00 0.00 12.00 2.29 0.53 41.77 15.00 2.94 0.92 1.68 18.00 3.18 1.08 1.04 21.00 3.33 1.18 0.73 24.00 3.45 1.27 0.65 27.00 3.45 1.27 0.00 30.00 3.45 1.27 0.00 33.00 3.45 1.27 0.00 36.00 3.45 1.27 0.00 39.00 3.45 1.27 0.00 42.00 3.45 1.27 0.00 45.00 3.45 1.27 0.00 48.00 3.45 1.27 0.00 51.00 3.45 1.27 0.00 54.00 3.45 1.27 0.00 57.00 3.45 1.27 0.00 60.00 3.45 1.27 0.00 63.00 3.45 1.27 0.00 66.00 3.45 1.27 0.00 69.00 3.45 1.27 0.00 72.00 3.45 1.27 0.00 75.00 3.45 1.27 0.00 78.00 3.45 1.27 0.00 81.00 3.45 1.27 0.00 84.00 3.45 1.27 0.00 87.00 3.45 1.27 0.00 90.00 3.45 1.27 0.00 93.00 3.45 1.27 0.00 96.00 3.45 1.27 0.00 99.00 3.45 1.27 0.00 102.00 3.45 1.27 0.00 105.00 3.45 1.27 0.00 108.00 3.45 1.27 0.00 111.00 3.45 1.27 0.00 114.00 3.45 1.27 0.00 117.00 3.45 1.27 0.00 120.00 3.45 1.27 0.00 123.00 3.45 1.27 0.00 126.00 3.45 1.27 0.00 129.00 3.45 1.27 0.00 132.00 3.45 1.27 0.00 135.00 3.45 1.27 0.00 138.00 3.45 1.27 0.00 141.00 3.45 1.27 0.00 144.00 3.45 1.27 0.00 HNR Type 11 24-hr 2-yr Rainfall=3.45" Prepared by Stewart Printed 12/21/2021 HydroCAD® 10.00-20 s/n 09358 © 2017 HydroCAD Software Solutions LLC Page 32 Inflow Area = Inflow = Outflow = Primary = Secondary = Summary for Pond 2P: BMP #1 22.910 ac, 52.73% Impervious, Inflow Depth = 2.18" for 2-yr event 90.20 cfs @ 11.96 hrs, Volume= 4.158 of 35.62 cfs @ 12.06 hrs, Volume= 4.128 af, Atten= 61%, Lag= 5.8 min 35.62 cfs @ 12.06 hrs, Volume= 4.128 af 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-144.00 hrs, dt= 0.01 hrs Peak Elev= 358.48' @ 12.06 hrs Surf.Area= 34,446 sf Storage= 76,784 cf Plug -Flow detention time= 644.8 min calculated for 4.128 af (99% of inflow) Center -of -Mass det. time= 640.8 min (1,450.6 - 809.8 ) Volume Invert Avail.Storage Storage Description #1 Elevation (feet) 356.00 357.00 358.00 359.00 360.00 361.00 362.00 356.00' 213,040 cf Custom Stage Data (Prismatic)Listed below (Recalc) Surf.Area (sq-ft) 26,415 30,657 33,194 35,789 38,441 39,795 43,913 Device Routing Invert Inc.Store (cubic -feet) 0 28,536 31,926 34,492 37,115 39,118 41,854 Outlet Devices Cum.Store (cubic -feet) 0 28,536 60,462 94,953 132,068 171,186 213,040 #1 Primary 351.92' #2 Device 1 #3 Device 1 356.00' 357.50' #4 Secondary 361.00' 24.000" Round RCP_Round 24 L= 100.0' RCP, sq.cut end projecting, Ke= 0.500 Inlet / Outlet Invert= 351.92' / 351.00' S= 0.0092 '/' Cc= 0.900 n= 0.013 Concrete pipe, bends & connections, Flow Area= 3.14 sf 3.000" Vert. Orifice/Grate C= 0.600 48.000" x 48.000" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads 26.000' long x 10.000' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=35.62 cfs @ 12.06 hrs HW=358.48' TW=0.00' (Dynamic Tailwater) t1=RCP_Round 24 (Barrel Controls 35.62 cfs @ 11.34 fps) 12=Orifice/Grate (Passes < 0.36 cfs potential flow) 3=Orifice/Grate (Passes < 50.92 cfs potential flow) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=356.00' TW=0.00' (Dynamic Tailwater) t4=Broad-Crested Rectangular Weir( Controls 0.00 cfs) HNR Type 11 24-hr 2-yr Rainfall=3.45" Prepared by Stewart Printed 12/21/2021 HydroCAD® 10.00-20 s/n 09358 © 2017 HydroCAD Software Solutions LLC Page 33 100 95� 90 85 80 75' 70" 65- 60- 55-' 50i' 40 35= 30' 25- 20 15 10'' 0.00 cfs 0 Pond 2P: BMP #1 Hyd rog raph 1 T T 1 1 1 T T 90.20 cfs / j J1 1 T r T i !Inflow Area=22:910 TI IT T I T T Peak- Elev= 3 58.48''I 35.62 cfs T Storag=7-0,784 cf 1 L L L L IL L L HI ----1----1----r---t---1II 1 4- r t 1 II HI I tl HI II II IH HI tl HI T 1 1 T T T 1 I T T T T II r—— - 'T T 1 I I T r T r T T -- 10 20 30 40 50 60 70 80 Time (hours) 90 100 110 120 130 140 ■ Inflow 13 Outflow ❑ Primary 7. Secondary HNR Type 11 24-hr 2-yr Rainfall=3.45" Prepared by Stewart Printed 12/21/2021 HydroCAD® 10.00-20 s/n 09358 © 2017 HydroCAD Software Solutions LLC Page 34 Hydrograph for Pond 2P: BMP #1 Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic -feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 0 356.00 0.00 0.00 0.00 3.00 0.00 0 356.00 0.00 0.00 0.00 6.00 0.01 9 356.00 0.00 0.00 0.00 9.00 0.60 2,302 356.09 0.02 0.02 0.00 12.00 76.51 72,577 358.36 35.22 35.22 0.00 15.00 2.13 47,840 357.61 2.30 2.30 0.00 18.00 1.29 46,585 357.58 1.36 1.36 0.00 21.00 0.90 45,880 357.55 0.92 0.92 0.00 24.00 0.79 45,679 357.55 0.81 0.81 0.00 27.00 0.00 42,227 357.44 0.27 0.27 0.00 30.00 0.00 39,353 357.35 0.26 0.26 0.00 33.00 0.00 36,582 357.26 0.25 0.25 0.00 36.00 0.00 33,915 357.17 0.24 0.24 0.00 39.00 0.00 31,353 357.09 0.23 0.23 0.00 42.00 0.00 28,896 357.01 0.22 0.22 0.00 45.00 0.00 26,546 356.93 0.21 0.21 0.00 48.00 0.00 24,302 356.86 0.20 0.20 0.00 51.00 0.00 22,168 356.79 0.19 0.19 0.00 54.00 0.00 20,142 356.72 0.18 0.18 0.00 57.00 0.00 18,227 356.66 0.17 0.17 0.00 60.00 0.00 16,424 356.59 0.16 0.16 0.00 63.00 0.00 14,733 356.53 0.15 0.15 0.00 66.00 0.00 13,156 356.48 0.14 0.14 0.00 69.00 0.00 11,693 356.43 0.13 0.13 0.00 72.00 0.00 10,346 356.38 0.12 0.12 0.00 75.00 0.00 9,115 356.34 0.11 0.11 0.00 78.00 0.00 8,001 356.30 0.10 0.10 0.00 81.00 0.00 7,005 356.26 0.09 0.09 0.00 84.00 0.00 6,124 356.23 0.08 0.08 0.00 87.00 0.00 5,366 356.20 0.06 0.06 0.00 90.00 0.00 4,735 356.18 0.05 0.05 0.00 93.00 0.00 4,212 356.16 0.04 0.04 0.00 96.00 0.00 3,778 356.14 0.04 0.04 0.00 99.00 0.00 3,415 356.13 0.03 0.03 0.00 102.00 0.00 3,109 356.12 0.03 0.03 0.00 105.00 0.00 2,848 356.11 0.02 0.02 0.00 108.00 0.00 2,624 356.10 0.02 0.02 0.00 111.00 0.00 2,431 356.09 0.02 0.02 0.00 114.00 0.00 2,262 356.09 0.01 0.01 0.00 117.00 0.00 2,114 356.08 0.01 0.01 0.00 120.00 0.00 1,983 356.07 0.01 0.01 0.00 123.00 0.00 1,866 356.07 0.01 0.01 0.00 126.00 0.00 1,762 356.07 0.01 0.01 0.00 129.00 0.00 1,668 356.06 0.01 0.01 0.00 132.00 0.00 1,583 356.06 0.01 0.01 0.00 135.00 0.00 1,506 356.06 0.01 0.01 0.00 138.00 0.00 1,436 356.05 0.01 0.01 0.00 141.00 0.00 1,372 356.05 0.01 0.01 0.00 144.00 0.00 1,313 356.05 0.01 0.01 0.00 HNR Type 11 24-hr 2-yr Rainfall=3.45" Prepared by Stewart Printed 12/21/2021 HydroCAD® 10.00-20 s/n 09358 © 2017 HydroCAD Software Solutions LLC Page 35 Summary for Pond 0-1: Outfall 1 Inflow Area = 27.150 ac, 45.89% Impervious, Inflow Depth > 2.02" for 2-yr event Inflow = 44.70 cfs @ 11.98 hrs, Volume= 4.563 af Primary = 44.70 cfs @ 11.98 hrs, Volume= 4.563 af, Atten= 0%, Lag= 0.0 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-144.00 hrs, dt= 0.01 hrs Pond 0-1: Outfall 1 Hyd rog raph II II II II II II 5© T r r r r -1r r 48 = 44.70ors 46 ' ' �4a.70 c 44` ' 42` 40 ' / 38` 36`' 34= 32= 30= I w 28= 1 _1 r 1 _ _ _ 26 I 1 I I 1 24= - � 1 I 1 r I 1 I 1 r I 1 I -I LT 224/ -- I I I I I I 20= 1 1 1 1 1 1 1 18= I I I I I I 164 1 _1 r 1 _ 14= I I I I I I 124- k r 1 -I r 1 -I 107: I I I I I I 8 4 6` 4` 2= T 1 1 1 1 1 lnflvgv Area=27s9-50-aC 1 1 I 1 I I 4 I 1 1 I 1 1 I r T -I r I T -I 1- 10 20 30 40 50 60 70 80 90 100 110 120 130 140 Time (hours) • Inflow ❑ Primary HNR Type 11 24-hr 2-yr Rainfall=3.45" Prepared by Stewart Printed 12/21/2021 HydroCAD® 10.00-20 s/n 09358 © 2017 HydroCAD Software Solutions LLC Page 36 Hydrograph for Pond 0-1: Outfall 1 Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) 0.00 0.00 0.00 3.00 0.00 0.00 6.00 0.00 0.00 9.00 0.02 0.02 12.00 43.74 43.74 15.00 2.59 2.59 18.00 1.54 1.54 21.00 1.05 1.05 24.00 0.92 0.92 27.00 0.27 0.27 30.00 0.26 0.26 33.00 0.25 0.25 36.00 0.24 0.24 39.00 0.23 0.23 42.00 0.22 0.22 45.00 0.21 0.21 48.00 0.20 0.20 51.00 0.19 0.19 54.00 0.18 0.18 57.00 0.17 0.17 60.00 0.16 0.16 63.00 0.15 0.15 66.00 0.14 0.14 69.00 0.13 0.13 72.00 0.12 0.12 75.00 0.11 0.11 78.00 0.10 0.10 81.00 0.09 0.09 84.00 0.08 0.08 87.00 0.06 0.06 90.00 0.05 0.05 93.00 0.04 0.04 96.00 0.04 0.04 99.00 0.03 0.03 102.00 0.03 0.03 105.00 0.02 0.02 108.00 0.02 0.02 111.00 0.02 0.02 114.00 0.01 0.01 117.00 0.01 0.01 120.00 0.01 0.01 123.00 0.01 0.01 126.00 0.01 0.01 129.00 0.01 0.01 132.00 0.01 0.01 135.00 0.01 0.01 138.00 0.01 0.01 141.00 0.01 0.01 144.00 0.01 0.01 HNR Type 11 24-hr 10-yr Rainfall=5.02" Prepared by Stewart Printed 12/21/2021 HydroCAD® 10.00-20 s/n 09358 © 2017 HydroCAD Software Solutions LLC Page 37 Summary for Subcatchment BA3: BA3 Runoff = 12.21 cfs @ 11.96 hrs, Volume= 0.553 af, Depth= 2.73" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-144.00 hrs, dt= 0.01 hrs Type II 24-hr 10-yr Rainfall=5.02" Area (ac) CN Description 0.380 98 Paved parking, HSG B 2.050 74 >75% Grass cover, Good, HSG C 2.430 78 Weighted Average 2.050 84.36% Pervious Area 0.380 15.64% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0 LL 5.0 Direct Entry, Subcatchment BA3: BA3 Hydrograph 7 I 13— 12.21 cfs 12 11� 10 9J, 8- 7� 5� 4- 3- r L r L 1-- r r Type 11 24- h r L_1____L10-yr_R ir0II S.O2u _ Runoff Aie =2.430 Od,- unr ff Volu ne*Oa'S53 a- - Rcrno* iapthr2. 3'-- Tc*560'nlin' —t r L 1 r N J78 it 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100105110115120125130135140 Time (hours) HNR Type 11 24-hr 10-yr Rainfall=5.02" Prepared by Stewart Printed 12/21/2021 HydroCAD® 10.00-20 s/n 09358 © 2017 HydroCAD Software Solutions LLC Page 38 Hydrograph for Subcatchment BA3: BA3 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 3.00 0.17 0.00 0.00 6.00 0.40 0.00 0.00 9.00 0.74 0.01 0.04 12.00 3.33 1.37 10.48 15.00 4.28 2.12 0.31 18.00 4.62 2.40 0.19 21.00 4.84 2.58 0.13 24.00 5.02 2.73 0.12 27.00 5.02 2.73 0.00 30.00 5.02 2.73 0.00 33.00 5.02 2.73 0.00 36.00 5.02 2.73 0.00 39.00 5.02 2.73 0.00 42.00 5.02 2.73 0.00 45.00 5.02 2.73 0.00 48.00 5.02 2.73 0.00 51.00 5.02 2.73 0.00 54.00 5.02 2.73 0.00 57.00 5.02 2.73 0.00 60.00 5.02 2.73 0.00 63.00 5.02 2.73 0.00 66.00 5.02 2.73 0.00 69.00 5.02 2.73 0.00 72.00 5.02 2.73 0.00 75.00 5.02 2.73 0.00 78.00 5.02 2.73 0.00 81.00 5.02 2.73 0.00 84.00 5.02 2.73 0.00 87.00 5.02 2.73 0.00 90.00 5.02 2.73 0.00 93.00 5.02 2.73 0.00 96.00 5.02 2.73 0.00 99.00 5.02 2.73 0.00 102.00 5.02 2.73 0.00 105.00 5.02 2.73 0.00 108.00 5.02 2.73 0.00 111.00 5.02 2.73 0.00 114.00 5.02 2.73 0.00 117.00 5.02 2.73 0.00 120.00 5.02 2.73 0.00 123.00 5.02 2.73 0.00 126.00 5.02 2.73 0.00 129.00 5.02 2.73 0.00 132.00 5.02 2.73 0.00 135.00 5.02 2.73 0.00 138.00 5.02 2.73 0.00 141.00 5.02 2.73 0.00 144.00 5.02 2.73 0.00 HNR Type 11 24-hr 10-yr Rainfall=5.02" Prepared by Stewart Printed 12/21/2021 HydroCAD® 10.00-20 s/n 09358 © 2017 HydroCAD Software Solutions LLC Page 39 Summary for Subcatchment BA4: DA 3A Runoff = 6.65 cfs @ 11.97 hrs, Volume= 0.297 af, Depth= 1.97" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-144.00 hrs, dt= 0.01 hrs Type II 24-hr 10-yr Rainfall=5.02" Area (ac) CN Description 1.810 69 50-75% Grass cover, Fair, HSG B 1.810 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 c4� 2-- 1— Direct Entry, Subcatchment BA4: DA 3A Hydrograph 16.65 cfs I — —4 —+-4 -4 0 5 10 15 20 25 30 35 40 7-7 -4 4 4 1 41I . 4 J Type 11 24-hr 10-yr Rainfallr5.02'' Runoff A-ea=1.81 Fku n of f Vo u0100.97 ' a1 Runoff bupthT1.97r-'11 01=r6g 45 50 55 60 65 70 75 80 85 Time (hours) 4--.4 4 4 90 95 100 105 110 115 120 125 130 135 140 • Runoff HNR Type 11 24-hr 10-yr Rainfall=5.02" Prepared by Stewart Printed 12/21/2021 HydroCAD® 10.00-20 s/n 09358 © 2017 HydroCAD Software Solutions LLC Page 40 Hydrograph for Subcatchment BA4: DA 3A Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 3.00 0.17 0.00 0.00 6.00 0.40 0.00 0.00 9.00 0.74 0.00 0.00 12.00 3.33 0.85 5.84 15.00 4.28 1.46 0.19 18.00 4.62 1.69 0.12 21.00 4.84 1.84 0.08 24.00 5.02 1.97 0.07 27.00 5.02 1.97 0.00 30.00 5.02 1.97 0.00 33.00 5.02 1.97 0.00 36.00 5.02 1.97 0.00 39.00 5.02 1.97 0.00 42.00 5.02 1.97 0.00 45.00 5.02 1.97 0.00 48.00 5.02 1.97 0.00 51.00 5.02 1.97 0.00 54.00 5.02 1.97 0.00 57.00 5.02 1.97 0.00 60.00 5.02 1.97 0.00 63.00 5.02 1.97 0.00 66.00 5.02 1.97 0.00 69.00 5.02 1.97 0.00 72.00 5.02 1.97 0.00 75.00 5.02 1.97 0.00 78.00 5.02 1.97 0.00 81.00 5.02 1.97 0.00 84.00 5.02 1.97 0.00 87.00 5.02 1.97 0.00 90.00 5.02 1.97 0.00 93.00 5.02 1.97 0.00 96.00 5.02 1.97 0.00 99.00 5.02 1.97 0.00 102.00 5.02 1.97 0.00 105.00 5.02 1.97 0.00 108.00 5.02 1.97 0.00 111.00 5.02 1.97 0.00 114.00 5.02 1.97 0.00 117.00 5.02 1.97 0.00 120.00 5.02 1.97 0.00 123.00 5.02 1.97 0.00 126.00 5.02 1.97 0.00 129.00 5.02 1.97 0.00 132.00 5.02 1.97 0.00 135.00 5.02 1.97 0.00 138.00 5.02 1.97 0.00 141.00 5.02 1.97 0.00 144.00 5.02 1.97 0.00 HNR Type 11 24-hr 10-yr Rainfall=5.02" Prepared by Stewart Printed 12/21/2021 HydroCAD® 10.00-20 s/n 09358 © 2017 HydroCAD Software Solutions LLC Page 41 Summary for Subcatchment DA1: DA1 Runoff = 111.08 cfs @ 11.96 hrs, Volume= 5.251 af, Depth= 3.59" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-144.00 hrs, dt= 0.01 hrs Type II 24-hr 10-yr Rainfall=5.02" Area (ac) CN Description 8.460 98 Paved parking, HSG B 7.740 79 50-75% Grass cover, Fair, HSG C 1.370 69 50-75% Grass cover, Fair, HSG B 17.570 87 Weighted Average 9.110 51.85% Pervious Area 8.460 48.15% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) LL0 5.0 Direct Entry, Subcatchment DA1: DA1 Hydrograph /- - 7 I 14 41 120=h77 r I 7 r T too— + 95 =' . 4 85 - I I I I I I TI I'IT I'I II I I'I r I I'I 1 65= 60i- 50 40= 7 r 7 i T 7 i T i r 7 1 r 7 i T i i T i r 7 I r T r 35= 1_ L L I 1 L I i I L 1 I L 1 I L I I L I L 1 I 1 L I L 30 = r - + - - 1-7 - - - r T - - - r - - - - T - T - - - - 1-7 - - - T - 1 - - T T - -I - - 1-7 - - - - r T - - - - r 25 20=' ---h r H + H r + r + + I I + r + I r + = 15---- I I I I I I I I I I I 5= I1 - T T T T T T T I T 1 J 1 I L 1 I I I I 1 r4 r7 1111 I r T I 1111 ype-I1244r - + + + + + + - + 'FQ= ri ir�ifaill a i�2'� ui-o'ff Awed=11.570 ad I I I I I I I I I I I I I I I I I I I r T T r 7 r T Ku l¢f Oiume=o.-41 'ar L J 1 J 1 L 1 1 1 r 7 t nunoffve;pth:F3. SI9', 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100105110115120125130135140 Time (hours) ■ Runoff HNR Type 11 24-hr 10-yr Rainfall=5.02" Prepared by Stewart Printed 12/21/2021 HydroCAD® 10.00-20 s/n 09358 © 2017 HydroCAD Software Solutions LLC Page 42 Hydrograph for Subcatchment DA1: DA1 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 3.00 0.17 0.00 0.00 6.00 0.40 0.01 0.19 9.00 0.74 0.10 1.10 12.00 3.33 2.03 93.35 15.00 4.28 2.90 2.51 18.00 4.62 3.21 1.51 21.00 4.84 3.42 1.05 24.00 5.02 3.59 0.92 27.00 5.02 3.59 0.00 30.00 5.02 3.59 0.00 33.00 5.02 3.59 0.00 36.00 5.02 3.59 0.00 39.00 5.02 3.59 0.00 42.00 5.02 3.59 0.00 45.00 5.02 3.59 0.00 48.00 5.02 3.59 0.00 51.00 5.02 3.59 0.00 54.00 5.02 3.59 0.00 57.00 5.02 3.59 0.00 60.00 5.02 3.59 0.00 63.00 5.02 3.59 0.00 66.00 5.02 3.59 0.00 69.00 5.02 3.59 0.00 72.00 5.02 3.59 0.00 75.00 5.02 3.59 0.00 78.00 5.02 3.59 0.00 81.00 5.02 3.59 0.00 84.00 5.02 3.59 0.00 87.00 5.02 3.59 0.00 90.00 5.02 3.59 0.00 93.00 5.02 3.59 0.00 96.00 5.02 3.59 0.00 99.00 5.02 3.59 0.00 102.00 5.02 3.59 0.00 105.00 5.02 3.59 0.00 108.00 5.02 3.59 0.00 111.00 5.02 3.59 0.00 114.00 5.02 3.59 0.00 117.00 5.02 3.59 0.00 120.00 5.02 3.59 0.00 123.00 5.02 3.59 0.00 126.00 5.02 3.59 0.00 129.00 5.02 3.59 0.00 132.00 5.02 3.59 0.00 135.00 5.02 3.59 0.00 138.00 5.02 3.59 0.00 141.00 5.02 3.59 0.00 144.00 5.02 3.59 0.00 HNR Type 11 24-hr 10-yr Rainfall=5.02" Prepared by Stewart Printed 12/21/2021 HydroCAD® 10.00-20 s/n 09358 © 2017 HydroCAD Software Solutions LLC Page 43 Summary for Subcatchment DA2: DA2 Runoff = 35.13 cfs @ 11.96 hrs, Volume= 1.687 af, Depth= 3.79" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-144.00 hrs, dt= 0.01 hrs Type II 24-hr 10-yr Rainfall=5.02" Area (ac) CN Description 3.620 98 Paved parking, HSG B 1.290 69 50-75% Grass cover, Fair, HSG B 0.430 79 50-75% Grass cover, Fair, HSG C 5.340 89 Weighted Average 1.720 32.21% Pervious Area 3.620 67.79% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, 34 -4- 32-� 30: 28= ,_ 264- rt 24_ rt H 22 . 3 20= ,--T- 0 184 16: T 144- --T- 12 1 10= --T r -1- 8= 6' 4' 24 r 1 r Subcatchment DA2: DA2 r 1 7T Hydrograph 1- 1 1- 1 r 1 1 1 1 1 1 41 1- + + F + 1- + + 1 11 11 + 1 + 11 11 1 y12+ 1 4-1hr 4- -1 4- 4- -4 • H + 11-0=yrrRainfa1h 5.fl2'' • r± r ✓ ' H + -� 4ffre - • r r r ungff Vo)u e=1,116 7-la iR r� oft bepthra. 9' - �''1_ 1 C T -Ir r T - -T-- 1ci�&O n1irl- � r T r- r T + ✓ T Tl ✓ 7T 1 T1 11 11 1 T 1 111 r 1 T T-T--r- 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100105110115120125130135140 Time (hours) • Runoff HNR Type 11 24-hr 10-yr Rainfall=5.02" Prepared by Stewart Printed 12/21/2021 HydroCAD® 10.00-20 s/n 09358 © 2017 HydroCAD Software Solutions LLC Page 44 Hydrograph for Subcatchment DA2: DA2 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 3.00 0.17 0.00 0.00 6.00 0.40 0.02 0.10 9.00 0.74 0.14 0.41 12.00 3.33 2.20 29.40 15.00 4.28 3.09 0.78 18.00 4.62 3.41 0.47 21.00 4.84 3.62 0.32 24.00 5.02 3.79 0.29 27.00 5.02 3.79 0.00 30.00 5.02 3.79 0.00 33.00 5.02 3.79 0.00 36.00 5.02 3.79 0.00 39.00 5.02 3.79 0.00 42.00 5.02 3.79 0.00 45.00 5.02 3.79 0.00 48.00 5.02 3.79 0.00 51.00 5.02 3.79 0.00 54.00 5.02 3.79 0.00 57.00 5.02 3.79 0.00 60.00 5.02 3.79 0.00 63.00 5.02 3.79 0.00 66.00 5.02 3.79 0.00 69.00 5.02 3.79 0.00 72.00 5.02 3.79 0.00 75.00 5.02 3.79 0.00 78.00 5.02 3.79 0.00 81.00 5.02 3.79 0.00 84.00 5.02 3.79 0.00 87.00 5.02 3.79 0.00 90.00 5.02 3.79 0.00 93.00 5.02 3.79 0.00 96.00 5.02 3.79 0.00 99.00 5.02 3.79 0.00 102.00 5.02 3.79 0.00 105.00 5.02 3.79 0.00 108.00 5.02 3.79 0.00 111.00 5.02 3.79 0.00 114.00 5.02 3.79 0.00 117.00 5.02 3.79 0.00 120.00 5.02 3.79 0.00 123.00 5.02 3.79 0.00 126.00 5.02 3.79 0.00 129.00 5.02 3.79 0.00 132.00 5.02 3.79 0.00 135.00 5.02 3.79 0.00 138.00 5.02 3.79 0.00 141.00 5.02 3.79 0.00 144.00 5.02 3.79 0.00 HNR Type 11 24-hr 10-yr Rainfall=5.02" Prepared by Stewart Printed 12/21/2021 HydroCAD® 10.00-20 s/n 09358 © 2017 HydroCAD Software Solutions LLC Page 45 Summary for Subcatchment PIA: Pre DA1 Runoff = 88.08 cfs @ 12.03 hrs, Volume= 4.935 af, Depth= 2.47" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-144.00 hrs, dt= 0.01 hrs Type II 24-hr 10-yr Rainfall=5.02" Area (ac) CN Description 1.040 98 Paved parking, HSG B 11.490 69 50-75% Grass cover, Fair, HSG B 11.490 79 50-75% Grass cover, Fair, HSG C 24.020 75 Weighted Average 22.980 95.67% Pervious Area 1.040 4.33% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 4.9 100 0.1000 0.34 Sheet Flow, Grass: Short n= 0.150 P2= 3.60" 5.2 304 0.0197 0.98 Shallow Concentrated Flow, Short Grass Pasture Kv= 7.0 fps 0.5 140 0.1100 4.97 Shallow Concentrated Flow, Grassed Waterway Kv= 15.0 fps 0.1 12 0.0200 2.12 Shallow Concentrated Flow, Grassed Waterway Kv= 15.0 fps 0.3 Direct Entry, 11.0 556 Total 90a' 85- 4_ 80= ' - 75=' - T 65 60 _ _ 55= -, 3 50 0 45 LT_ 404 - - 35 T_j 30- 25= --T- 20 r r 15= 10_ 4 5= HNR Prepared by Stewart HydroCAD® 10.00-20 s/n 09358 © 2017 HydroCAD Software Solutions LLC Type 11 24-hr 10-yr Rainfall=5.02" Printed 12/21/2021 Page 46 Subcatchment PIA: Pre DA1 Hydrograph 1-- 1 111111 95= L—L 4 4 88.08 cfs ✓ r r r ▪ - r- -r-r ✓ r 7 r L— L—L—L--1--L--1-- L— 4 --1__ L_ L-- L— L-4--L—L--1--L-4--1--L--1—V-L-4--1--4-4 — I— ir 1-0=yrr Railnfal[ .fl3'� Ruh-Off'1 Are11a 24 .020 -ad - Fku n Qfflrolu ne=4.9$5-11af r r r T Rr no' f Depthr2.47' - r r r r r F Length=S56'r Ir 4 T Tc 1111. Tnil T T T I— r IT 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 Time (hours) 0 Runoff HNR Type 11 24-hr 10-yr Rainfall=5.02" Prepared by Stewart Printed 12/21/2021 HydroCAD® 10.00-20 s/n 09358 © 2017 HydroCAD Software Solutions LLC Page 47 Hydrograph for Subcatchment PIA: Pre DA1 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 3.00 0.17 0.00 0.00 6.00 0.40 0.00 0.00 9.00 0.74 0.00 0.10 12.00 3.33 1.18 84.03 15.00 4.28 1.88 2.91 18.00 4.62 2.15 1.77 21.00 4.84 2.32 1.23 24.00 5.02 2.47 1.09 27.00 5.02 2.47 0.00 30.00 5.02 2.47 0.00 33.00 5.02 2.47 0.00 36.00 5.02 2.47 0.00 39.00 5.02 2.47 0.00 42.00 5.02 2.47 0.00 45.00 5.02 2.47 0.00 48.00 5.02 2.47 0.00 51.00 5.02 2.47 0.00 54.00 5.02 2.47 0.00 57.00 5.02 2.47 0.00 60.00 5.02 2.47 0.00 63.00 5.02 2.47 0.00 66.00 5.02 2.47 0.00 69.00 5.02 2.47 0.00 72.00 5.02 2.47 0.00 75.00 5.02 2.47 0.00 78.00 5.02 2.47 0.00 81.00 5.02 2.47 0.00 84.00 5.02 2.47 0.00 87.00 5.02 2.47 0.00 90.00 5.02 2.47 0.00 93.00 5.02 2.47 0.00 96.00 5.02 2.47 0.00 99.00 5.02 2.47 0.00 102.00 5.02 2.47 0.00 105.00 5.02 2.47 0.00 108.00 5.02 2.47 0.00 111.00 5.02 2.47 0.00 114.00 5.02 2.47 0.00 117.00 5.02 2.47 0.00 120.00 5.02 2.47 0.00 123.00 5.02 2.47 0.00 126.00 5.02 2.47 0.00 129.00 5.02 2.47 0.00 132.00 5.02 2.47 0.00 135.00 5.02 2.47 0.00 138.00 5.02 2.47 0.00 141.00 5.02 2.47 0.00 144.00 5.02 2.47 0.00 HNR Prepared by Stewart HydroCAD® 10.00-20 s/n 09358 © 2017 HydroCAD Software Solutions LLC Type 11 24-hr 10-yr Rainfall=5.02" Printed 12/21/2021 Page 48 Inflow Area = Inflow = Outflow = Primary = Secondary = Summary for Pond 2P: BMP #1 22.910 ac, 52.73% Impervious, Inflow Depth = 3.63" 146.22 cfs @ 11.96 hrs, Volume= 39.87 cfs @ 12.08 hrs, Volume= 39.87 cfs @ 12.08 hrs, Volume= 0.00 cfs @ 0.00 hrs, Volume= for 10-yr event 6.938 af 6.907 af, Atten= 73%, Lag= 7.3 min 6.907 af 0.000 af Routing by Dyn-Stor-Ind method, Time Span= 0.00-144.00 hrs, dt= 0.01 hrs Peak Elev= 359.87' @ 12.08 hrs Surf.Area= 38,095 sf Storage= 127,081 cf Plug -Flow detention time= 406.3 min calculated for 6.907 af (100% of inflow) Center -of -Mass det. time= 403.9 min (1,199.3 - 795.4 ) Volume Invert Avail.Storage Storage Description #1 Elevation (feet) 356.00 357.00 358.00 359.00 360.00 361.00 362.00 356.00' 213,040 cf Custom Stage Data (Prismatic)Listed below (Recalc) Surf.Area (sq-ft) 26,415 30,657 33,194 35,789 38,441 39,795 43,913 Device Routing Invert Inc.Store (cubic -feet) 0 28,536 31,926 34,492 37,115 39,118 41,854 Outlet Devices Cum.Store (cubic -feet) 0 28,536 60,462 94,953 132,068 171,186 213,040 #1 Primary 351.92' #2 Device 1 #3 Device 1 356.00' 357.50' #4 Secondary 361.00' 24.000" Round RCP_Round 24 L= 100.0' RCP, sq.cut end projecting, Ke= 0.500 Inlet / Outlet Invert= 351.92' / 351.00' S= 0.0092 '/' Cc= 0.900 n= 0.013 Concrete pipe, bends & connections, Flow Area= 3.14 sf 3.000" Vert. Orifice/Grate C= 0.600 48.000" x 48.000" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads 26.000' long x 10.000' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=39.87 cfs @ 12.08 hrs HW=359.87' TW=0.00' (Dynamic Tailwater) t1=RCP_Round 24 (Barrel Controls 39.87 cfs @ 12.69 fps) 12=Orifice/Grate (Passes < 0.46 cfs potential flow) 3=Orifice/Grate (Passes < 118.59 cfs potential flow) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=356.00' TW=0.00' (Dynamic Tailwater) t4=Broad-Crested Rectangular Weir( Controls 0.00 cfs) HNR Prepared by Stewart HydroCAD® 10.00-20 s/n 09358 © 2017 HydroCAD Software Solutions LLC Type 11 24-hr 10-yr Rainfall=5.02" Printed 12/21/2021 Page 49 160 150 140 130 120 110 100 E 90 80 0 LT 70 60 50 40 30 20 0.00 cfs 0 Ih#Caw Area=22.910 ac r 7 Peak ev-359.87 Storage=122,O8T cf i 4 i L L L L L L Pond 2P: BMP #1 Hyd rog raph 146.22 cf L 39.87 cfs / r 151 10 20 30 40 50 60 70 80 Time (hours) T T 90 100 110 120 130 140 T T ■ Inflow 13 Outflow ❑ Primary 7. Secondary HNR Type 11 24-hr 10-yr Rainfall=5.02" Prepared by Stewart Printed 12/21/2021 HydroCAD® 10.00-20 s/n 09358 © 2017 HydroCAD Software Solutions LLC Page 50 Time Inflow (hours) (cfs) 0.00 0.00 3.00 0.00 6.00 0.28 9.00 1.50 12.00 122.75 15.00 3.29 18.00 1.98 21.00 1.37 24.00 1.21 27.00 0.00 30.00 0.00 33.00 0.00 36.00 0.00 39.00 0.00 42.00 0.00 45.00 0.00 48.00 0.00 51.00 0.00 54.00 0.00 57.00 0.00 60.00 0.00 63.00 0.00 66.00 0.00 69.00 0.00 72.00 0.00 75.00 0.00 78.00 0.00 81.00 0.00 84.00 0.00 87.00 0.00 90.00 0.00 93.00 0.00 96.00 0.00 99.00 0.00 102.00 0.00 105.00 0.00 108.00 0.00 111.00 0.00 114.00 0.00 117.00 0.00 120.00 0.00 123.00 0.00 126.00 0.00 129.00 0.00 132.00 0.00 135.00 0.00 138.00 0.00 141.00 0.00 144.00 0.00 Hydrograph for Pond 2P: BMP #1 Storage Elevation (cubic -feet) (feet) 0 356.00 0 356.00 672 8,247 116,209 49,194 47,552 46,644 46,392 42,421 39,540 36,762 34,088 31,519 29,055 26,698 24,448 22,305 20,273 18,350 16,540 14,842 13,257 11,787 10,432 9,193 8,071 7,067 6,178 5,412 4,773 4,244 3,804 3,437 3,127 2,864 2,638 2,443 2,272 2,123 1,991 1,873 1,768 1,674 1,588 1,511 1,440 1,376 1,317 356.03 356.30 359.58 357.66 357.61 357.58 357.57 357.44 357.35 357.27 357.18 357.10 357.02 356.94 356.87 356.79 356.73 356.66 356.60 356.54 356.48 356.43 356.38 356.34 356.30 356.26 356.23 356.20 356.18 356.16 356.14 356.13 356.12 356.11 356.10 356.09 356.09 356.08 356.07 356.07 356.07 356.06 356.06 356.06 356.05 356.05 356.05 Outflow (cfs) 0.00 0.00 0.00 0.10 39.03 3.52 2.07 1.40 1.23 0.27 0.26 0.25 0.24 0.23 0.22 0.21 0.20 0.19 0.18 0.17 0.16 0.15 0.14 0.13 0.12 0.11 0.10 0.09 0.08 0.06 0.05 0.04 0.04 0.03 0.03 0.02 0.02 0.02 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 Primary (cfs) 0.00 0.00 0.00 0.10 39.03 3.52 2.07 1.40 1.23 0.27 0.26 0.25 0.24 0.23 0.22 0.21 0.20 0.19 0.18 0.17 0.16 0.15 0.14 0.13 0.12 0.11 0.10 0.09 0.08 0.06 0.05 0.04 0.04 0.03 0.03 0.02 0.02 0.02 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 Secondary (cfs) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 HNR Type 11 24-hr 10-yr Rainfall=5.02" Prepared by Stewart Printed 12/21/2021 HydroCAD® 10.00-20 s/n 09358 © 2017 HydroCAD Software Solutions LLC Page 51 Summary for Pond 0-1: Outfall 1 Inflow Area = 27.150 ac, 45.89% Impervious, Inflow Depth = 3.43" for 10-yr event Inflow = 56.94 cfs @ 11.97 hrs, Volume= 7.757 af Primary = 56.94 cfs @ 11.97 hrs, Volume= 7.757 af, Atten= 0%, Lag= 0.0 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-144.00 hrs, dt= 0.01 hrs + 607- 156.94 cfs 551 50 401' 35: 30 LT_ 25� 20- 15- 10� Pond 0-1: Outfall 1 Hyd rog raph 1 1 J L J L L L Ifs lo�nr Area=2715O ac L J J 1 L L J 10 20 30 40 50 60 70 80 90 100 110 120 130 140 Time (hours) Inflow ❑ Primary HNR Type 11 24-hr 10-yr Rainfall=5.02" Prepared by Stewart Printed 12/21/2021 HydroCAD® 10.00-20 s/n 09358 © 2017 HydroCAD Software Solutions LLC Page 52 Hydrograph for Pond 0-1: Outfall 1 Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) 0.00 0.00 0.00 3.00 0.00 0.00 6.00 0.00 0.00 9.00 0.14 0.14 12.00 55.35 55.35 15.00 4.01 4.01 18.00 2.37 2.37 21.00 1.61 1.61 24.00 1.42 1.42 27.00 0.27 0.27 30.00 0.26 0.26 33.00 0.25 0.25 36.00 0.24 0.24 39.00 0.23 0.23 42.00 0.22 0.22 45.00 0.21 0.21 48.00 0.20 0.20 51.00 0.19 0.19 54.00 0.18 0.18 57.00 0.17 0.17 60.00 0.16 0.16 63.00 0.15 0.15 66.00 0.14 0.14 69.00 0.13 0.13 72.00 0.12 0.12 75.00 0.11 0.11 78.00 0.10 0.10 81.00 0.09 0.09 84.00 0.08 0.08 87.00 0.06 0.06 90.00 0.05 0.05 93.00 0.04 0.04 96.00 0.04 0.04 99.00 0.03 0.03 102.00 0.03 0.03 105.00 0.02 0.02 108.00 0.02 0.02 111.00 0.02 0.02 114.00 0.01 0.01 117.00 0.01 0.01 120.00 0.01 0.01 123.00 0.01 0.01 126.00 0.01 0.01 129.00 0.01 0.01 132.00 0.01 0.01 135.00 0.01 0.01 138.00 0.01 0.01 141.00 0.01 0.01 144.00 0.01 0.01 HNR Type 11 24-hr 50-yr Rainfall=6.69" Prepared by Stewart Printed 12/21/2021 HydroCAD® 10.00-20 s/n 09358 © 2017 HydroCAD Software Solutions LLC Page 53 Summary for Subcatchment BA3: BA3 Runoff = 18.45 cfs @ 11.96 hrs, Volume= 0.849 af, Depth= 4.19" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-144.00 hrs, dt= 0.01 hrs Type II 24-hr 50-yr Rainfall=6.69" Area (ac) CN Description 0.380 98 Paved parking, HSG B 2.050 74 >75% Grass cover, Good, HSG C 2.430 78 Weighted Average 2.050 84.36% Pervious Area 0.380 15.64% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 20 rt r 19 118.45 cf I I r T 17= 7= Direct Entry, Subcatchment BA3: BA3 +-+- -+ ✓ t t ✓ T r Hydrograph H HI + I + + + I + I + r- t-- t t t I t I t t I t I t hl hi Ty pH eh Z 4_k�r a0-err Rinflrr19' - L L — L-J--L-1----L-L--L r - t - - r - t - - - - r - t - - I- r—r--r—T----r —r--r 4 - 4 t - + r-� Rinio#f AttA=2 -4310 L L L I L I L L I 1 I L F agncff VO4 0=0.8 9II af- Runoff D 'fit F449"! T t r Trc-311:0 Trriinr 4-4 4 - 4 t-t r — r 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105110 115 120 125 130 135 140 Time (hours) HNR Type 11 24-hr 50-yr Rainfall=6.69" Prepared by Stewart Printed 12/21/2021 HydroCAD® 10.00-20 s/n 09358 © 2017 HydroCAD Software Solutions LLC Page 54 Hydrograph for Subcatchment BA3: BA3 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 3.00 0.23 0.00 0.00 6.00 0.54 0.00 0.00 9.00 0.98 0.05 0.12 12.00 4.44 2.24 15.66 15.00 5.71 3.32 0.44 18.00 6.16 3.72 0.26 21.00 6.45 3.98 0.18 24.00 6.69 4.19 0.16 27.00 6.69 4.19 0.00 30.00 6.69 4.19 0.00 33.00 6.69 4.19 0.00 36.00 6.69 4.19 0.00 39.00 6.69 4.19 0.00 42.00 6.69 4.19 0.00 45.00 6.69 4.19 0.00 48.00 6.69 4.19 0.00 51.00 6.69 4.19 0.00 54.00 6.69 4.19 0.00 57.00 6.69 4.19 0.00 60.00 6.69 4.19 0.00 63.00 6.69 4.19 0.00 66.00 6.69 4.19 0.00 69.00 6.69 4.19 0.00 72.00 6.69 4.19 0.00 75.00 6.69 4.19 0.00 78.00 6.69 4.19 0.00 81.00 6.69 4.19 0.00 84.00 6.69 4.19 0.00 87.00 6.69 4.19 0.00 90.00 6.69 4.19 0.00 93.00 6.69 4.19 0.00 96.00 6.69 4.19 0.00 99.00 6.69 4.19 0.00 102.00 6.69 4.19 0.00 105.00 6.69 4.19 0.00 108.00 6.69 4.19 0.00 111.00 6.69 4.19 0.00 114.00 6.69 4.19 0.00 117.00 6.69 4.19 0.00 120.00 6.69 4.19 0.00 123.00 6.69 4.19 0.00 126.00 6.69 4.19 0.00 129.00 6.69 4.19 0.00 132.00 6.69 4.19 0.00 135.00 6.69 4.19 0.00 138.00 6.69 4.19 0.00 141.00 6.69 4.19 0.00 144.00 6.69 4.19 0.00 HNR Type 11 24-hr 50-yr Rainfall=6.69" Prepared by Stewart Printed 12/21/2021 HydroCAD® 10.00-20 s/n 09358 © 2017 HydroCAD Software Solutions LLC Page 55 Summary for Subcatchment BA4: DA 3A Runoff = 10.96 cfs @ 11.96 hrs, Volume= 0.492 af, Depth= 3.26" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-144.00 hrs, dt= 0.01 hrs Type II 24-hr 50-yr Rainfall=6.69" Area (ac) CN Description 1.810 69 50-75% Grass cover, Fair, HSG B 1.810 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 12 096cf Ir7 11� 101 9J / lL 5_ / � 4- / 2� 11 Direct Entry, Subcatchment BA4: DA 3A Hydrograph r-t 44 H H t r-ter-� Type 24-hi 50-yr- Rainfal l6.S9'' 1 Runoff Area=1.81fl ac RU110 '%Iulne=0.�1492 af -- r-T 11 111111 T T r 7 I T T Tr Fu-raa1f b pthra.26 Tc -Tali- L-1-- i L--L 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105110 115 120 125 130 135 140 Time (hours) • Runoff HNR Type 11 24-hr 50-yr Rainfall=6.69" Prepared by Stewart Printed 12/21/2021 HydroCAD® 10.00-20 s/n 09358 © 2017 HydroCAD Software Solutions LLC Page 56 Hydrograph for Subcatchment BA4: DA 3A Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 3.00 0.23 0.00 0.00 6.00 0.54 0.00 0.00 9.00 0.98 0.00 0.01 12.00 4.44 1.56 9.48 15.00 5.71 2.49 0.29 18.00 6.16 2.84 0.17 21.00 6.45 3.07 0.12 24.00 6.69 3.26 0.11 27.00 6.69 3.26 0.00 30.00 6.69 3.26 0.00 33.00 6.69 3.26 0.00 36.00 6.69 3.26 0.00 39.00 6.69 3.26 0.00 42.00 6.69 3.26 0.00 45.00 6.69 3.26 0.00 48.00 6.69 3.26 0.00 51.00 6.69 3.26 0.00 54.00 6.69 3.26 0.00 57.00 6.69 3.26 0.00 60.00 6.69 3.26 0.00 63.00 6.69 3.26 0.00 66.00 6.69 3.26 0.00 69.00 6.69 3.26 0.00 72.00 6.69 3.26 0.00 75.00 6.69 3.26 0.00 78.00 6.69 3.26 0.00 81.00 6.69 3.26 0.00 84.00 6.69 3.26 0.00 87.00 6.69 3.26 0.00 90.00 6.69 3.26 0.00 93.00 6.69 3.26 0.00 96.00 6.69 3.26 0.00 99.00 6.69 3.26 0.00 102.00 6.69 3.26 0.00 105.00 6.69 3.26 0.00 108.00 6.69 3.26 0.00 111.00 6.69 3.26 0.00 114.00 6.69 3.26 0.00 117.00 6.69 3.26 0.00 120.00 6.69 3.26 0.00 123.00 6.69 3.26 0.00 126.00 6.69 3.26 0.00 129.00 6.69 3.26 0.00 132.00 6.69 3.26 0.00 135.00 6.69 3.26 0.00 138.00 6.69 3.26 0.00 141.00 6.69 3.26 0.00 144.00 6.69 3.26 0.00 HNR Type 11 24-hr 50-yr Rainfall=6.69" Prepared by Stewart Printed 12/21/2021 HydroCAD® 10.00-20 s/n 09358 © 2017 HydroCAD Software Solutions LLC Page 57 Summary for Subcatchment DA1: DA1 Runoff = 156.67 cfs @ 11.96 hrs, Volume= 7.584 af, Depth= 5.18" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-144.00 hrs, dt= 0.01 hrs Type II 24-hr 50-yr Rainfall=6.69" Area (ac) CN Description 8.460 98 Paved parking, HSG B 7.740 79 50-75% Grass cover, Fair, HSG C 1.370 69 50-75% Grass cover, Fair, HSG B 17.570 87 Weighted Average 9.110 51.85% Pervious Area 8.460 48.15% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, 170 160 150 140 130 120 110 H 100 90 s 80 LL 70 60 50 40 30 20 10 0 Subcatchment DA1: DA1 Hydrograph II -T 1 T T II T II T i i 1 i + 4 +-+----+l II --I----+--I--+-+--I--+-+----+- LI 1 I I'II I'II I 'll , y p �� i.IT. i --! II II 1illfai-III-6a"11 - 1uria'ff Awea:1-7.570 ad 1 1 I I 1 I L 1 I L 1 L Rupspif Volume=`7,584af- 4 i r-+ 1 1 un'off 4-1 T L-L 1 T T L I icT-,O4 a I1- L 1 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 Time (hours) 85 90 95 100 105 110 115 120 125 130 135 140 • Runo HNR Type 11 24-hr 50-yr Rainfall=6.69" Prepared by Stewart Printed 12/21/2021 HydroCAD® 10.00-20 s/n 09358 © 2017 HydroCAD Software Solutions LLC Page 58 Hydrograph for Subcatchment DA1: DA1 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 3.00 0.23 0.00 0.00 6.00 0.54 0.03 0.52 9.00 0.98 0.22 1.93 12.00 4.44 3.04 130.87 15.00 5.71 4.24 3.45 18.00 6.16 4.67 2.07 21.00 6.45 4.95 1.43 24.00 6.69 5.18 1.26 27.00 6.69 5.18 0.00 30.00 6.69 5.18 0.00 33.00 6.69 5.18 0.00 36.00 6.69 5.18 0.00 39.00 6.69 5.18 0.00 42.00 6.69 5.18 0.00 45.00 6.69 5.18 0.00 48.00 6.69 5.18 0.00 51.00 6.69 5.18 0.00 54.00 6.69 5.18 0.00 57.00 6.69 5.18 0.00 60.00 6.69 5.18 0.00 63.00 6.69 5.18 0.00 66.00 6.69 5.18 0.00 69.00 6.69 5.18 0.00 72.00 6.69 5.18 0.00 75.00 6.69 5.18 0.00 78.00 6.69 5.18 0.00 81.00 6.69 5.18 0.00 84.00 6.69 5.18 0.00 87.00 6.69 5.18 0.00 90.00 6.69 5.18 0.00 93.00 6.69 5.18 0.00 96.00 6.69 5.18 0.00 99.00 6.69 5.18 0.00 102.00 6.69 5.18 0.00 105.00 6.69 5.18 0.00 108.00 6.69 5.18 0.00 111.00 6.69 5.18 0.00 114.00 6.69 5.18 0.00 117.00 6.69 5.18 0.00 120.00 6.69 5.18 0.00 123.00 6.69 5.18 0.00 126.00 6.69 5.18 0.00 129.00 6.69 5.18 0.00 132.00 6.69 5.18 0.00 135.00 6.69 5.18 0.00 138.00 6.69 5.18 0.00 141.00 6.69 5.18 0.00 144.00 6.69 5.18 0.00 HNR Type 11 24-hr 50-yr Rainfall=6.69" Prepared by Stewart Printed 12/21/2021 HydroCAD® 10.00-20 s/n 09358 © 2017 HydroCAD Software Solutions LLC Page 59 Summary for Subcatchment DA2: DA2 Runoff = 48.91 cfs @ 11.96 hrs, Volume= 2.406 af, Depth= 5.41" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-144.00 hrs, dt= 0.01 hrs Type II 24-hr 50-yr Rainfall=6.69" Area (ac) CN Description 3.620 98 Paved parking, HSG B 1.290 69 50-75% Grass cover, Fair, HSG B 0.430 79 50-75% Grass cover, Fair, HSG C 5.340 89 Weighted Average 1.720 32.21% Pervious Area 3.620 67.79% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 50- 45: 40: 35- ,3 307 3 0 25 LL 20= 15� 10. r-T L r-r rr - - 4 - - 4 - 4- - 4 - - r Direct Entry, Subcatchment DA2: DA2 Hydrograph 4- L_1_ L ▪ rr L 4 4 -1__L r r r r 4I t 1 4- L- Type 24-hi 50-yr_ Rainfal lr6.S9" Runoff AreI=5.340 ad r r i r i r Runoff Volume=2.406'aL unotf bepthr5�'.41'1 1-- r - -I- - t - - Tc=51.0'Min' 4-4 4_4 4 4_4 GN=89 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 Time (hours) 4- HNR Type 11 24-hr 50-yr Rainfall=6.69" Prepared by Stewart Printed 12/21/2021 HydroCAD® 10.00-20 s/n 09358 © 2017 HydroCAD Software Solutions LLC Page 60 Hydrograph for Subcatchment DA2: DA2 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 3.00 0.23 0.00 0.00 6.00 0.54 0.05 0.21 9.00 0.98 0.27 0.68 12.00 4.44 3.23 40.73 15.00 5.71 4.45 1.06 18.00 6.16 4.89 0.64 21.00 6.45 5.18 0.44 24.00 6.69 5.41 0.39 27.00 6.69 5.41 0.00 30.00 6.69 5.41 0.00 33.00 6.69 5.41 0.00 36.00 6.69 5.41 0.00 39.00 6.69 5.41 0.00 42.00 6.69 5.41 0.00 45.00 6.69 5.41 0.00 48.00 6.69 5.41 0.00 51.00 6.69 5.41 0.00 54.00 6.69 5.41 0.00 57.00 6.69 5.41 0.00 60.00 6.69 5.41 0.00 63.00 6.69 5.41 0.00 66.00 6.69 5.41 0.00 69.00 6.69 5.41 0.00 72.00 6.69 5.41 0.00 75.00 6.69 5.41 0.00 78.00 6.69 5.41 0.00 81.00 6.69 5.41 0.00 84.00 6.69 5.41 0.00 87.00 6.69 5.41 0.00 90.00 6.69 5.41 0.00 93.00 6.69 5.41 0.00 96.00 6.69 5.41 0.00 99.00 6.69 5.41 0.00 102.00 6.69 5.41 0.00 105.00 6.69 5.41 0.00 108.00 6.69 5.41 0.00 111.00 6.69 5.41 0.00 114.00 6.69 5.41 0.00 117.00 6.69 5.41 0.00 120.00 6.69 5.41 0.00 123.00 6.69 5.41 0.00 126.00 6.69 5.41 0.00 129.00 6.69 5.41 0.00 132.00 6.69 5.41 0.00 135.00 6.69 5.41 0.00 138.00 6.69 5.41 0.00 141.00 6.69 5.41 0.00 144.00 6.69 5.41 0.00 HNR Type 11 24-hr 50-yr Rainfall=6.69" Prepared by Stewart Printed 12/21/2021 HydroCAD® 10.00-20 s/n 09358 © 2017 HydroCAD Software Solutions LLC Page 61 Summary for Subcatchment PIA: Pre DA1 Runoff = 137.74 cfs @ 12.03 hrs, Volume= 7.761 af, Depth= 3.88" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-144.00 hrs, dt= 0.01 hrs Type II 24-hr 50-yr Rainfall=6.69" Area (ac) CN Description 1.040 98 Paved parking, HSG B 11.490 69 50-75% Grass cover, Fair, HSG B 11.490 79 50-75% Grass cover, Fair, HSG C 24.020 75 Weighted Average 22.980 95.67% Pervious Area 1.040 4.33% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 4.9 100 0.1000 0.34 Sheet Flow, Grass: Short n= 0.150 P2= 3.60" 5.2 304 0.0197 0.98 Shallow Concentrated Flow, Short Grass Pasture Kv= 7.0 fps 0.5 140 0.1100 4.97 Shallow Concentrated Flow, Grassed Waterway Kv= 15.0 fps 0.1 12 0.0200 2.12 Shallow Concentrated Flow, Grassed Waterway Kv= 15.0 fps 0.3 Direct Entry, 11.0 556 Total HNR Type 11 24-hr 50-yr Rainfall=6.69" Prepared by Stewart Printed 12/21/2021 HydroCAD® 10.00-20 s/n 09358 © 2017 HydroCAD Software Solutions LLC Page 62 150 140 130 120 110 100 90 80= 70 60 50 40 30. 20 10_ 0 Subcatchment PIA: Pre DA1 Hydrograph 137.74 cf IIII T ti t tl H t T 1 1—T r + Type 1I 24-hr 50-yr Rainfa►11r6.69" r rt + I + r + I r + Ru tioff 1Akea=24FO20_� I+ I + I I tl 71 II II Runoff DeipthT3.S8 - FlOwteiigth=,556' i i II II 4II I-4 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 Time (hours) ❑ Runoff HNR Type 11 24-hr 50-yr Rainfall=6.69" Prepared by Stewart Printed 12/21/2021 HydroCAD® 10.00-20 s/n 09358 © 2017 HydroCAD Software Solutions LLC Page 63 Hydrograph for Subcatchment PIA: Pre DA1 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 3.00 0.23 0.00 0.00 6.00 0.54 0.00 0.00 9.00 0.98 0.03 0.74 12.00 4.44 2.00 132.63 15.00 5.71 3.04 4.25 18.00 6.16 3.42 2.56 21.00 6.45 3.67 1.77 24.00 6.69 3.88 1.57 27.00 6.69 3.88 0.00 30.00 6.69 3.88 0.00 33.00 6.69 3.88 0.00 36.00 6.69 3.88 0.00 39.00 6.69 3.88 0.00 42.00 6.69 3.88 0.00 45.00 6.69 3.88 0.00 48.00 6.69 3.88 0.00 51.00 6.69 3.88 0.00 54.00 6.69 3.88 0.00 57.00 6.69 3.88 0.00 60.00 6.69 3.88 0.00 63.00 6.69 3.88 0.00 66.00 6.69 3.88 0.00 69.00 6.69 3.88 0.00 72.00 6.69 3.88 0.00 75.00 6.69 3.88 0.00 78.00 6.69 3.88 0.00 81.00 6.69 3.88 0.00 84.00 6.69 3.88 0.00 87.00 6.69 3.88 0.00 90.00 6.69 3.88 0.00 93.00 6.69 3.88 0.00 96.00 6.69 3.88 0.00 99.00 6.69 3.88 0.00 102.00 6.69 3.88 0.00 105.00 6.69 3.88 0.00 108.00 6.69 3.88 0.00 111.00 6.69 3.88 0.00 114.00 6.69 3.88 0.00 117.00 6.69 3.88 0.00 120.00 6.69 3.88 0.00 123.00 6.69 3.88 0.00 126.00 6.69 3.88 0.00 129.00 6.69 3.88 0.00 132.00 6.69 3.88 0.00 135.00 6.69 3.88 0.00 138.00 6.69 3.88 0.00 141.00 6.69 3.88 0.00 144.00 6.69 3.88 0.00 HNR Prepared by Stewart HydroCAD® 10.00-20 s/n 09358 © 2017 HydroCAD Software Solutions LLC Type 11 24-hr 50-yr Rainfall=6.69" Printed 12/21/2021 Page 64 Inflow Area = Inflow = Outflow = Primary = Secondary = Summary for Pond 2P: BMP #1 22.910 ac, 52.73% Impervious, Inflow Depth = 5.23" 205.58 cfs @ 11.96 hrs, Volume= 49.06 cfs @ 12.09 hrs, Volume= 43.51 cfs @ 12.09 hrs, Volume= 5.55 cfs @ 12.09 hrs, Volume= for 50-yr event 9.990 af 9.960 af, Atten= 76%, Lag= 7.8 min 9.910 af 0.050 af Routing by Dyn-Stor-Ind method, Time Span= 0.00-144.00 hrs, dt= 0.01 hrs Peak Elev= 361.19' @ 12.09 hrs Surf.Area= 40,596 sf Storage= 179,001 cf Plug -Flow detention time= 301.4 min calculated for 9.959 af (100% of inflow) Center -of -Mass det. time= 299.9 min (1,085.1 - 785.2 ) Volume Invert Avail.Storage Storage Description #1 Elevation (feet) 356.00 357.00 358.00 359.00 360.00 361.00 362.00 356.00' 213,040 cf Custom Stage Data (Prismatic)Listed below (Recalc) Surf.Area (sq-ft) 26,415 30,657 33,194 35,789 38,441 39,795 43,913 Device Routing Invert Inc.Store (cubic -feet) 0 28,536 31,926 34,492 37,115 39,118 41,854 Outlet Devices Cum.Store (cubic -feet) 0 28,536 60,462 94,953 132,068 171,186 213,040 #1 Primary 351.92' #2 Device 1 #3 Device 1 356.00' 357.50' #4 Secondary 361.00' 24.000" Round RCP_Round 24 L= 100.0' RCP, sq.cut end projecting, Ke= 0.500 Inlet / Outlet Invert= 351.92' / 351.00' S= 0.0092 '/' Cc= 0.900 n= 0.013 Concrete pipe, bends & connections, Flow Area= 3.14 sf 3.000" Vert. Orifice/Grate C= 0.600 48.000" x 48.000" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads 26.000' long x 10.000' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=43.51 cfs @ 12.09 hrs HW=361.19' TW=0.00' (Dynamic Tailwater) t1=RCP_Round 24 (Inlet Controls 43.51 cfs @ 13.85 fps) 12=Orifice/Grate (Passes < 0.53 cfs potential flow) 3=Orifice/Grate (Passes < 148.07 cfs potential flow) Secondary OutFlow Max=5.53 cfs @ 12.09 hrs HW=361.19' TW=0.00' (Dynamic Tailwater) t4=Broad-Crested Rectangular Weir(Weir Controls 5.53 cfs @ 1.10 fps) HNR Prepared by Stewart HydroCAD® 10.00-20 s/n 09358 © 2017 HydroCAD Software Solutions LLC Type 11 24-hr 50-yr Rainfall=6.69" Printed 12/21/2021 Page 65 230, 220, 210. 200= 190 =' 180`z 170= 160 150= 140 N 1304 • 120 3 110` • 100= a 90_ 80= 70= 60 50' 40` 30= = z 20 10- 0` Pond 2P: BMP #1 Hyd rog raph T T 1 1 T T r T T L 1 L 1 1 1 1 L L 1 L � T 1 1 T T 1 1 I— T T T 205.58 cf - 1 1 1 1 1 1 1 L 1 L Ii1fk w ATea=22�.94©-ac' P e-a k- EIov 3 6- 1-9' 4 —1 1 - 4 -4 1 1 - L 4 -4 ▪ Sto rOge=17 -00+ - _cf t -------1----1----+---T---1----1----1-------r---t---� T ✓ T r r T r T ✓ r 1 1 1 r r t 1 L 1 L 1 1 L 1 1 L 10 20 30 40 50 60 70 80 90 100 110 120 130 140 Time (hours) ■ Inflow In Outflow ❑ Primary 7. Secondary HNR Type 11 24-hr 50-yr Rainfall=6.69" Prepared by Stewart Printed 12/21/2021 HydroCAD® 10.00-20 s/n 09358 © 2017 HydroCAD Software Solutions LLC Page 66 Time Inflow (hours) (cfs) 0.00 0.00 3.00 0.00 6.00 0.74 9.00 2.61 12.00 171.60 15.00 4.51 18.00 2.70 21.00 1.87 24.00 1.65 27.00 0.00 30.00 0.00 33.00 0.00 36.00 0.00 39.00 0.00 42.00 0.00 45.00 0.00 48.00 0.00 51.00 0.00 54.00 0.00 57.00 0.00 60.00 0.00 63.00 0.00 66.00 0.00 69.00 0.00 72.00 0.00 75.00 0.00 78.00 0.00 81.00 0.00 84.00 0.00 87.00 0.00 90.00 0.00 93.00 0.00 96.00 0.00 99.00 0.00 102.00 0.00 105.00 0.00 108.00 0.00 111.00 0.00 114.00 0.00 117.00 0.00 120.00 0.00 123.00 0.00 126.00 0.00 129.00 0.00 132.00 0.00 135.00 0.00 138.00 0.00 141.00 0.00 144.00 0.00 Hydrograph for Pond 2P: BMP #1 Storage Elevation (cubic -feet) (feet) 0 356.00 0 356.00 2,867 17,235 160,896 50,447 48,437 47,336 47,035 42,543 39,657 36,875 34,197 31,624 29,155 26,793 24,539 22,392 20,355 18,428 16,613 14,910 13,320 11,845 10,486 9,242 8,116 7,107 6,213 5,441 4,797 4,264 3,821 3,451 3,139 2,874 2,647 2,450 2,279 2,129 1,996 1,878 1,772 1,677 1,592 1,514 1,443 1,378 1,319 356.11 356.62 360.74 357.69 357.63 357.60 357.59 357.45 357.36 357.27 357.18 357.10 357.02 356.94 356.87 356.80 356.73 356.66 356.60 356.54 356.49 356.43 356.39 356.34 356.30 356.26 356.23 356.20 356.18 356.16 356.14 356.13 356.12 356.11 356.10 356.09 356.09 356.08 356.08 356.07 356.07 356.06 356.06 356.06 356.05 356.05 356.05 Outflow (cfs) 0.00 0.00 0.02 0.17 42.30 4.79 2.82 1.90 1.68 0.27 0.26 0.25 0.24 0.23 0.22 0.21 0.20 0.19 0.18 0.17 0.16 0.15 0.14 0.13 0.12 0.11 0.10 0.09 0.08 0.07 0.05 0.04 0.04 0.03 0.03 0.02 0.02 0.02 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 Primary (cfs) 0.00 0.00 0.02 0.17 42.30 4.79 2.82 1.90 1.68 0.27 0.26 0.25 0.24 0.23 0.22 0.21 0.20 0.19 0.18 0.17 0.16 0.15 0.14 0.13 0.12 0.11 0.10 0.09 0.08 0.07 0.05 0.04 0.04 0.03 0.03 0.02 0.02 0.02 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 Secondary (cfs) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 HNR Type 11 24-hr 50-yr Rainfall=6.69" Prepared by Stewart Printed 12/21/2021 HydroCAD® 10.00-20 s/n 09358 © 2017 HydroCAD Software Solutions LLC Page 67 Summary for Pond 0-1: Outfall 1 Inflow Area = 27.150 ac, 45.89% Impervious, Inflow Depth = 4.99" for 50-yr event Inflow = 70.36 cfs @ 11.97 hrs, Volume= 11.301 af Primary = 70.36 cfs @ 11.97 hrs, Volume= 11.301 af, Atten= 0%, Lag= 0.0 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-144.00 hrs, dt= 0.01 hrs Pond 0-1: Outfall 1 Hyd rog raph - 1 70.36 cfs 75?' _' I 0.36 cfs 70 l 65� 60 55 50=' 445:- 3 40 a 35 30� 25:' 20 15 10� 5= I faow-Area=27 1-50 -ac H L — 1- 1 J H 10 20 30 40 50 60 70 80 Time (hours) 90 7 100 it 110 120 7 7 130 140 Inflow ❑ Primary HNR Type 11 24-hr 50-yr Rainfall=6.69" Prepared by Stewart Printed 12/21/2021 HydroCAD® 10.00-20 s/n 09358 © 2017 HydroCAD Software Solutions LLC Page 68 Hydrograph for Pond 0-1: Outfall 1 Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) 0.00 0.00 0.00 3.00 0.00 0.00 6.00 0.02 0.02 9.00 0.30 0.30 12.00 67.44 67.44 15.00 5.52 5.52 18.00 3.26 3.26 21.00 2.21 2.21 24.00 1.95 1.95 27.00 0.27 0.27 30.00 0.26 0.26 33.00 0.25 0.25 36.00 0.24 0.24 39.00 0.23 0.23 42.00 0.22 0.22 45.00 0.21 0.21 48.00 0.20 0.20 51.00 0.19 0.19 54.00 0.18 0.18 57.00 0.17 0.17 60.00 0.16 0.16 63.00 0.15 0.15 66.00 0.14 0.14 69.00 0.13 0.13 72.00 0.12 0.12 75.00 0.11 0.11 78.00 0.10 0.10 81.00 0.09 0.09 84.00 0.08 0.08 87.00 0.07 0.07 90.00 0.05 0.05 93.00 0.04 0.04 96.00 0.04 0.04 99.00 0.03 0.03 102.00 0.03 0.03 105.00 0.02 0.02 108.00 0.02 0.02 111.00 0.02 0.02 114.00 0.01 0.01 117.00 0.01 0.01 120.00 0.01 0.01 123.00 0.01 0.01 126.00 0.01 0.01 129.00 0.01 0.01 132.00 0.01 0.01 135.00 0.01 0.01 138.00 0.01 0.01 141.00 0.01 0.01 144.00 0.01 0.01 HNR Elementary School - Fuquay-Varina Stewart Project No: L20040 Riprap Apron Nomographs .42 STEWART i STEWART Project Project No. RIPRAP OUTLET PROTECTION WORKSHEET WCPSS E-44 L20040 - Greenway Crossing RR-1 Outlet flowrate 29.41 cfs Pipe diameter 24 inches EQUIVALENT PIPE AREA Outlet pipe slope 2.2 percent Full flow velocity 9.4 ft/sec Date 5-Oct-21 Designer RGB Velocity (ft/sec) 25 Figure 8.06.b.1 20 15 10 2 3 one 4 5 Pipe diameter (ft) 6 7 e2 Zone 7 Zon Zon e5 e4 Zone 3 10 Zone from graph above = 2 Outlet pipe diameter 24 in. Outlet flowrate 29.4 cfs Outlet velocity 9.4 ft/sec Material = Class B Length = 12.0 ft. Width = 6.0 ft. Stone diameter = 6 in. Thickness = 22 in. Zone Material Diameter Thickness Length Width 1 Class A 3 9 4 x D(o) 3 x D(o) 2 Class B 6 22 6 x D(o) 3 x D(o) 3 Class I 13 22 8 x D(o) 3 x D(o) 4 Class I 13 22 8 x D(o) 3 x D(o) 5 Class II 23 27 10 x D(o) 3 x D(o) 6 Class II 23 27 10 x D(o) 3 x D(o) 7 Special study required Calculations based on NY DOT method - Pages 8.06.05 through 8.06.06 in NC Erosion Control Manual 421 Fayetteville Street, Suite 400, Raleigh, NC 27601 Tel 919.380.8750 Fax 919.380.8752 www.stewart-eng.com i STEWART Project Project No. Outlet ID Outlet flowrate Pipe diameter Outlet pipe slope Full flow velocity RIPRAP OUTLET PROTECTION WORKSHEET WCPSS E-44 L20040 RR-2 RR-2 35.66 24 33,3 11.4 cfs inches EQUIVALENT PIPE AREA percent ft/sec Date 10.05.2021 Designer RGB Zone from graph above = 2 Outlet pipe diameter 24 in. Outlet flowrate 35.7 cfs Outlet velocity 11.4 ft/sec Material = Class B Length = 12.0 ft. Width = 6.0 ft. Stone diameter = 6 in. Thickness = 22 in. Zone Material Diameter Thickness Length Width 1 Class A 3 9 4 x D(o) 3 x D(o) 2 Class B 6 22 6 x D(o) 3 x D(o) 3 Class I 13 22 8 x D(o) 3 x D(o) 4 Class I 13 22 8 x D(o) 3 x D(o) 5 Class II 23 27 10 x D(o) 3 x D(o) 6 Class II 23 27 10 x D(o) 3 x D(o) 7 Special study required Calculations based on NY DOT method - Pages 8.06.05 through 8.06.06 in NC Erosion Control Manual 421 Fayetteville Street, Suite 400, Raleigh, NC 27601 Tel 919.380.8750 Fax 919.380.8752 www.stewart-eng.com i STEWART Project Project No. Outlet ID RIPRAP OUTLET PROTECTION WORKSHEET WCPSS E-44 L20040 RR-3 RR-3 Outlet flowrate 0.08 cfs Pipe diameter 4 inches EQUIVALENT PIPE AREA Outlet pipe slope 2 percent Full flow velocity 0.9 ft/sec Date 14-Dec-20 Designer HMH Zone from graph above = 1 Outlet pipe diameter 4 in. Outlet flowrate 0.1 cfs Outlet velocity 0.9 ft/sec Material = Class A Length = 1.3 ft. Width = 1.0 ft. Stone diameter = 3 in. Thickness = 9 in. Zone Material Diameter Thickness Length Width 1 Class A 3 9 4 x D(o) 3 x D(o) 2 Class B 6 22 6 x D(o) 3 x D(o) 3 Class I 13 22 8 x D(o) 3 x D(o) 4 Class I 13 22 8 x D(o) 3 x D(o) 5 Class II 23 27 10 x D(o) 3 x D(o) 6 Class II 23 27 10 x D(o) 3 x D(o) 7 Special study required Calculations based on NY DOT method - Pages 8.06.05 through 8.06.06 in NC Erosion Control Manual 421 Fayetteville Street, Suite 400, Raleigh, NC 27601 Tel 919.380.8750 Fax 919.380.8752 www.stewart-eng.com i STEWART Project Project No. Outlet ID RIPRAP OUTLET PROTECTION WORKSHEET Hilltop Needmore L20040 Temp. Const. Entrance Pipe Crossing - RR4 Outlet flowrate 1.93 cfs Pipe diameter 15 inches EQUIVALENT PIPE AREA Outlet pipe slope 0.5 percent Full flow velocity 1.6 ft/sec Date 14-Dec-20 Designer HMH Zone from graph above = 1 Outlet pipe diameter 15 in. Outlet flowrate 1.9 cfs Outlet velocity 1.6 ft/sec Material = Class A Length = 5.0 ft. Width = 3.8 ft. Stone diameter = 3 in. Thickness = 9 in. Zone Material Diameter Thickness Length Width 1 Class A 3 9 4 x D(o) 3 x D(o) 2 Class B 6 22 6 x D(o) 3 x D(o) 3 Class I 13 22 8 x D(o) 3 x D(o) 4 Class I 13 22 8 x D(o) 3 x D(o) 5 Class II 23 27 10 x D(o) 3 x D(o) 6 Class II 23 27 10 x D(o) 3 x D(o) 7 Special study required Calculations based on NY DOT method - Pages 8.06.05 through 8.06.06 in NC Erosion Control Manual 421 Fayetteville Street, Suite 400, Raleigh, NC 27601 Tel 919.380.8750 Fax 919.380.8752 www.stewart-eng.com HNR Elementary School - Fuquay-Varina Stewart Project No: L20040 Soils Maps STEWART Soil Map —Wake County, North Carolina 35° 37' 59" N 35° 37' 34" N 705110 704570 704660 704750 704840 704930 706020 706110 Map Scale: 1:3,830 if printed on A portrait (8.5" x 11") sheet. N N( 0 100 ■\ 0 1y0 31J 600 900 Mapprojedion: Web Mercator Conerwordinates: WGS84 Edge tics: UTM Zone 17N WGS84 200 Meters 330 Feet 35° 37' 59" N 35° 37'34"N Uslr,\ Natural Resources Web Soil Survey 44. Conservation Service National Cooperative Soil Survey 12/20/2021 Page 1 of 3 Soil Map —Wake County, North Carolina MAP LEGEND Area of Interest (AOI) p Area of Interest (AOI) Soils 0 Soil Map Unit Polygons Soil Map Unit Lines © Soil Map Unit Points Special Point Features Blowout Borrow Pit Clay Spot Closed Depression Gravel Pit Gravelly Spot Landfill Lava Flow Marsh or swamp Mine or Quarry Miscellaneous Water Perennial Water Rock Outcrop Saline Spot Sandy Spot Severely Eroded Spot Sinkhole Slide or Slip Sodic Spot x 0 A_ 0 Spoil Area Stony Spot Very Stony Spot Wet Spot Other Special Line Features Water Features Streams and Canals Transportation - Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography MAP INFORMATION The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Wake County, North Carolina Survey Area Data: Version 21, Sep 10, 2021 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Oct 19, 2019—Oct 28, 2019 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. usim Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 12/20/2021 Page 2 of 3 Soil Map —Wake County, North Carolina Map Unit Legend Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI CfC Cecil -Urban land complex, 2 to 10 percent slopes 0.7 1.1 % DuB Dothan -Urban land complex, 0 to 6 percent slopes 49.9 77.7% RaA Rains sandy loam, 0 to 2 percent slopes 12.0 18.7% W Water 0.6 1.0% WeD Wedowee sandy loam, 10 to 15 percent slopes 1.0 1.5% Totals for Area of Interest 64.2 100.0% son Natural Resources Web Soil Survey 0104 Conservation Service National Cooperative Soil Survey 12/20/2021 Page 3 of 3 HNR Elementary School - Fuquay-Varina Stewart Project No: L20040 USGS Quad Map STEWART ■ 1000 NORTH HNR Elementary School - Fuquay-Varina Stewart Project No: L20040 FEMA FIRM Map r m642 STEWART STATE OF NORTH CAROLINA FIRM PANEL LOCATOR DIAGRAM Town of Cary 8'a5'00" LEGEND DATUM INFORMATION The projection used in the preparation of this map was the North Carolina State Plane IFIPSZONE 3200). The horizontal datum was the North American Datum of 1983, GRS80 ellipsoid. Differences in datum, ellipsoid. projection, or Universal Transverse Mercator zones used In the production of FIRMS for adjacent jurisdictions may result in slight positional differences in map features across jurisdictional boundaries. These differences do not affect the accuracy of this FIRM. All coordinates on this map are n U.S. Survey Feet. where 1 U.S. Survey Foot = 1200/3937 Meters. Flood elevations on this map are referenced to the North American Vertical Datum of 1988 (NAVD BB). These flood elevations must be compared to structure and ground elevations referenced to the same vertical datum. An average offset between NAVD 88 and the National Geodetic Vertical Datum of 1929 (NGVD 29)hes been computed for each North Carolina county. This offset was then applied to the NGVD 29 flood elevations that were not revised during the creation of this statewide format FIRM. The offsets for each county shown on this FIRM panel are shown in the vertical datum offset table below. Where a county boundary and a flooding source with unrevised NGVD 29 flood elevations are incident, an individual offset has been calculated and applied during the creation of this statewide format FIRM. See Section 6.1 of the accompanying Flood Insurance Study report to obtain further information on the conversion of elevations between NAVD 88 and NGVD 29. To obtain current elevation. description, and/or location information for bench marks shown on this map. please contact the North Carolina Geodetic Survey at the address shown below. You may also contact the Information Services Branch of the National Geodetic. Survey at (301) 713.3242, or visit its website m www.ngs.noaa.gay. North Carolina Geodetic Survey County Average Vertical Datum Offset Table 121 West Jones Street Raleigh, NC 27601 (919)) 733-3836 www.nces.state.nc.us County Vertical Datum Of fast Ift) Example: NAVD 9a - NGVD 29 • 1-0Ra) All streams listed in the Flood hazard Otto Table below were studied by detailed methods using field survey. Other flood hazard data shown on this map may have been derived using either a coastal analysis or limited detailed analysis. More information on the flooding sources studied by these analyses is. contained In the Flood Insurance Study report. FLOOD HAZARD DATA TABLE Flood Olsolharge Wel Nnvl10can wa liedu o BSI Elevation Floodm WNN )feed the Cantor o15ttetim to lE=c0hZtne%1 em o Tobl E.t.a Wide! BASIN 22.STREAM 6 008 760 NA 2711 160 MIDDLE CREEK (BASIN 22.STREAM 1) 2001 200.140 NA 265.6 1000 2016 201,500 NA 266.3 020 2035 203,540 NA 270.0 670 2041 204,130 NA 271.1 610 2060 205,000 NA 274.1 700 2070 207.000 NA 278.0 90D 2094 209,360 NA 280.1 840 2116 211.450 NA 282.7 700 Feat aeove m oat JOINS PANEL 3945 682 500 FEET NO CW FEET 2 070 000 FEET 370238 \ JOINS PANEL 0679 17. TB eel 30 500 FEET /2Eus LAKE RD ZONE XN ZONE X ZONE AE Wake County Unincorporated Areas 370368 ZONE X Town of Varina Extraterritorial jurisdiction 270'_39 Town of Fuquay-Varina Extraterritorial Jurisdiction 370239 4' ZONE AE ZONE X. ZONE AE ZONE AE ZONE 4 Town of Fuquay-Varina' Extraterritorial Jurisdiction 370239 ZONE 5 fown of F,uquav- Vatina. 370239 2 072 500 FEET 1700 JOINS PANEL 061777 687 500 FEET 3648= sr 8 2 680 0w FEET 2 000 000 FEET SPECIAL FLOOD HAZARD AREAS (SFHAs) SUBJECT TO INUNDATION BY THE 1% ANNUAL CHANCE FLOOD The 1 % annual chance flood (100-ye flood), also known as Me base flood, is Me flood that has a % dance of being equaled or exceeded i n any given year. The Special Flood Hazard Area is the area subject to flooding by the1% annual chance Flood. Areas of special Flood Hazard Include Zones A, AE, AH, AO, AR, A99, V, and VE. The Base Flood Elevation its the water -surface elevation of the 1% annual chance flood. NE A No Base Flood Elevations determined. ZONE AE Base Flood Elevations determined. ZONE NI Flood depths of 1 to 3 feet (usually areas of ponding); Base Hood Elevations determined. ZONE AO Flood depths of 1 to 3 feet (usually sheet flow on sloping terrain); average depths determined. For areof alluvial fan flzading, velarRes also determined. ZONE 02 Special Flood Hazard Area formerly protected from the 1% annual dance flood by a flood control system that was subsequently decertified. Zone AR indicates that the former flood c0ntr0) system Is being restored to provide pro0ection from the 1% annual chance or greater flood. ZONE Age Area to be protected from 1% annual dame flood by a Federal flood prm0Oion system under corebuolon, no Base Flood Elevations determined. ZONE YE Coastal flood zone with velocity hazard (wave action); Base Flood Elevations determined. FLOODWAY AREAS IN ZONE AE The Floodway is the channel of a stream plus a1y ad1'aam floodplaain areas that must be kept freed encoachmem that the 1% anti 1 dance flood n be carried wi0001 substantial lnoeases in flood heights. OTHER FLOOD AREAS ZONE X Areas of 0.2% annual dance flood; areas el bture conditions 1% annual chance Howl; areas of 1% annual dance flood wiM average depths of les than 1 foot or with drainage areas less than 1 square mile; and areas protected by levees from 1% annual dance Rood. OTHER AREAS ZONE X Areas determined to be outside the 0.2% annual dance and future conditions 1% annual chance floodplain. ZONE 0 Areas In which flood hazards are undetermined, but possible. 1\\N COASTAL BARRIER RESOURCES SYSTEM (CBRS) AREAS OTHERWISE PROTECTED AREAS (OPAs) MPS areas end OPAs are normally located Wolin or adjacent to Soaclal Rood Hazard Areas. 1% an nual dance floodplain boundary 0.2%annual chance floodplain boundary and future conditions 1% annual chance floodplain boundary Floodway boundary Zone D Boundary GB. and OPA boundary Boundary dividing Special Flood Hazard Area Zones and boundary dividing Special Flood Hazard Areas of different Base Fbod Elevations, flood depths or flood ve1ntl0es. 513^-•— Base Flood Elevation line and value; elevation in feet" Base (EL 8B]1 Hood Elevation value where uniform within zoo , elevation In feet' 'Referenced to the North Amerlon Vertical Datum of 198E Q I 8- 9l of 4zi6ea N32 30 1477 600 FEET BM5510 % BM5510 e M1.5 Curs section line Tamest line Da0aeof 1893d(NAD raenced to the North American 1000meter Universal Transverse Mercator grid ticks, zone 17 2500-faot aRnrd values: Z,^ Carolina Stare H0;e inordinate sya[an IFIPSZONf 3200, Smte Plane NAD feet) North Carolina Geodetic Survey bend mark(seeexplanation In the Datum Infonmagon section of thisFIRM paean. National Geodetic Survey bench mark (see explaation In the Datum Information section of this FIRM panel). River Mil: GRID NORTH MAP SCALE 1. a 500' (1 : 6,000) cofEET METERS 1. NOTES TO USERS This digital Flood Insurance Rate Map (FIRM) was produced through a unique coopEmergency paManagemershipent t between (FEMA). Theorth Statearf )na North and CaroltnaFederal has gene ngment A the costs as o long term approach T of floodplain management 160 0 decrease the arils associated with Flooding. This 0 100005As demonstrated by the Scale's the mimeo 04 map Carolina areas a1 the local level. As a part of 1Sthis ettorL the State of North Carolina has joinedin i a CoopgitaliFI Technical Slate agreement with FEMA to produce and maintain this digital FIRM. www.ncfloodmaps.com This map is for use in administering the National Flood Insurance Program. It does not nacessariN Identify all areas subject to flooding, particularly from local drainage sources of small size. The unity map repository should be consulted for possible updated or additional flood hazard information. To obtain more detailed information in where Base Flood Elevations (BFEs) and/or fl5odways have been determined, 0sers arencouraged to consult the Flood Profiles. Floodway Data. Limited Detailed Flood Hazard Data, and/or Summary of Stillwater Elevations tables contained within the Hood Insurance Study (EIS) report that accompanies this FIRM. Users should be aware that BFEs shown on the FIRM represent rounded whole -foot elevations. These BFEs are intended for flood insurance rating purposes only and should not be used as the sole source of flood eevation information. Accordingly. flood elevation data presented in the FIS report should be utilized in conjunction with the FIRM for purposes of construction and/or floodplain management - Boundaries of regulatory iloodways shown on the FIRM for flooding sources studied by detailed methods were computed at cross sections and interpolated between cross sections. The floodways were based on hydraulic considerations with regard to requirements of the National Flood Insurance Program. Floodway widths and other pertinent Floodway data for flooding sources studied by detailed methods as well as non-00droechssnt widths for flooding sources studied by limited detailed methods are provided in the FIS report for this jurisdiction. The FIS report also provides instructions for determining a iloodway using non -encroachment widths for flooding sources studied by limbed detailed methods. Certain areas not in Special Flood Hazard Areas may be protected by Thad control etructurae. Refer to Section 4.4 "Flood Protection Measures" of the Flood Insurance Study report for information on flood control structures in this jurisdiction. Base map information and geospetial data used to develop this FIRM were Obtained from various organizations, including the participating local communiMiesl, state and federal agencies. and/or other sources. The primary base for this FIRM is aerial imagery acquired by Wake County. The time period of collection for the imagery is 1999. Information and geospatial data supplied by the localcommunitytiesl that met FEMA base map specifications were considered the preferred source for development of the base map. See geospatial metadata for the associated digital FIRM for additional information about base map preparation. Base map features shown on this map, such as corporate 1Lita. are based on the most up-to-date data available at the time of publication. Changes in the corporate limits sty have occurred since this map was published. Map users should consult the appropriate co unity official or website to verify current conditions of jurisdictional boundaries and base map features. This map may contain roads that were not considered in the hydraulic analysis of streams where no new hydraulic model was created during the production of this statewide format FIRM. This map reflects more detailed and up-to-date etreaa channel configurations than those shown on the previous FIRM for this jurisdiction. The floodpleins and floodways that were transferred from the previous FIRM may have been adjusted to conform to these new stream channel configurations. Asa result, the Flood Profiles and Floodway Data tables In the Flood Insurance Study report (which contains authoritative hydraulic data) may reflect stream channel distances that differ from what is shown on this map. Please refer to the separately primed Nap Index for an overview map of the county showing the layout of map panels, community map repository addresses, and a Usting of Communities table containing National Rood Insurance Program dates for each community as well as a listing of the panels on which each community Is located. If you have questions about this map, or questions concerning the National Flood Insurance Program In general, please call l-B77-FFJA IMPD-877336-2627) or visit vie FEMA website at www.feme.gov. An accompanying Flood Insurance Study report, Letter of Map Revision (LOMR) or Letter of Map Amendment (LOMA) revising portions of this panel, and digital versions of this RRM may be available. Visit the North Carolina Floadplain Napping Progrn website et www.ncfloodmaps com or contact the FEMA Nap Service Center et 1-800358-9616 for information on all related products associated with this FIRM. The FEMA Map Service Center may also be reached by Fax at1-800358-9620 and its website et wwuv,msc.fema.gov. REPOSITORYMAP Reform hadnp of Map Repositories on Map Ind a orwhit www.ncfloodmaps.com. EFFECT. DATE OF FLOOD INSURANCE RATE MAP PANEL MAY 2.2005 EFFECTNE DATE1510F REM51ONI5(TO THIS PANEL For community map revision history priort0 sMteuide mapping refer to the Community Map History table located in the Flood Insurance Study report for this jurisdiction. To determine if flood insurance is available In this community, contact your insurance agent, the North Carolina DWeion of Emergency Management or the National Flood Insurance Program atthe following phone numbers or we6Mtes: NC Division of Ememgeocy Management National Flood Ira Program (9191715-0000 .nccnmewrNd.org/nfip 1-000.638-6620 wvnv.fema.M,dnfip NlrFd�][ pA o CD a wor Buda. 0 PI CD I1 InEE 50 PANEL 0678d FIRM FLOOD INSURANCE RATE MAP NORTH CAROLINA PANEL 0678 (SEE LOCATOR DIAGRAM 0R MAP INDEX FOR RR PANEL IATOUD CONTAINS: COMMUNITY .1e0 TOWN OF NOUAY-VARINATONN OF WAKE COUNTY CID No. PANEL SUFFIX should ee wu tin 0002, ep50m30,vi an6rtil2W EFFECTIVE DATE MAY 2, 2006 MAP NUMBER 37200678001 State of North Carolina Federal Emergency Management Agency) HNR Elementary School - Fuquay-Varina Stewart Project No: L20040 Copy of Preliminary Jurisdictional Determination .42 STEWART WETLAND DETERMINATION DATA FORM — Atlantic and Gulf Coastal Plain Region Project/Site: E-44 Site City/County: Wake Co Sampling Date: 9/17/20 Applicant/Owner: Wake County Investigator(s): A. Aycrigg State: NC Sampling Point: DP2 Up Section, Township, Range: Landform (hillslope, terrace, etc.): Local relief (concave, convex, none): Slope (%): Subregion (LRR or MLRA): Soil Map Unit Name: NWI classification: Are climatic / hydrologic conditions on the site typical for this time of year? Yes ✓ No (If no, explain in Remarks.) Are Vegetation , Soil , or Hydrology significantly disturbed? Are "Normal Circumstances" present? Yes i No Are Vegetation Soil or Hydrology naturally problematic? (If needed, explain any answers in Remarks.) Lat: 35.630405 Long: -78.737044 Datum: SUMMARY OF FINDINGS — Attach site map showing sampling point locations, transects, important features, etc. Hydrophytic Vegetation Present? Yes ✓ No Hydric Soil Present? Yes No ✓ Wetland Hydrology Present? Yes No ✓ Is the Sampled Area within a Wetland? Yes No Remarks: HYDROLOGY Wetland Hydrology Indicators: Primary Indicators (minimum of one is required; check all that apply) Secondary Indicators (minimum of two required) Surface Soil Cracks (B6) Concave Surface (B8) (B10) (B16) Table (C2) (C8) on Aerial Imagery (C9) (D2) (D3) (D5) (D8) (LRR T, U) Surface Water (A1) Aquatic Fauna (B13) Sparsely Vegetated High Water Table (A2) Marl Deposits (B15) (LRR U) _ Drainage Patterns Saturation (A3) Hydrogen Sulfide Odor (C1) Moss Trim Lines Water Marks (B1) Oxidized Rhizospheres along Living Roots (C3) _ Dry -Season Water Sediment Deposits (B2) Presence of Reduced Iron (C4) _ Crayfish Burrows Drift Deposits (B3) _ Recent Iron Reduction in Tilled Soils (C6) _ Saturation Visible Algal Mat or Crust (B4) _ Thin Muck Surface (C7) _ Geomorphic Position Iron Deposits (B5) _ Other (Explain in Remarks) ` Shallow Aquitard Inundation Visible on Aerial Imagery (B7) _ FAC-Neutral Test Water -Stained Leaves (B9) _ Sphagnum moss Field Observations: Surface Water Present? Yes No ✓ Depth (inches): Wetland Hydrology Present? Yes No Water Table Present? Yes No ✓ Depth (inches): Saturation Present? Yes No 1 Depth (inches): (includes capillary fringe) Describe Recorded Data (stream gauge, monitoring well, aerial photos, previous inspec ions), if available: Remarks: US Army Corps of Engineers Atlantic and Gulf Coastal Plain Region — Version 2.0 VEGETATION (Five Strata) - Use scientific names of plants. Sampling Point: DP2 Up Tree Stratum (Plot size: 1. 2. 3. 4. 5. 6. n/a Sapling Stratum (Plot size: 1. 2. 3. 4. 5. 6. n/a 50% of total cover: Absolute Dominant Indicator % Cover Species? Status 0 Shrub Stratum (Plot size: 1. 2. 3. 4. 5. 6. n/a 50% of total cover: = Total Cover 20% of total cover: 10 0 50% of total cover: Herb Stratum (Plot size: 10 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. Panicum spp. = Total Cover 20% of total cover: 0 Polygonum hydropiperoides Juncus spp. Woody Vine Stratum (Plot size: 1. n/a 2. 3. 4. 5. 80 = Total Cover 20% of total cover: 20 20 120 Yes No No FAC OBL FAC = Total Cover 50% of total cover: 60 20% of total cover: 24 50% of total cover: 0 = Total Cover 20% of total cover: 1 Dominance Test worksheet: Number of Dominant Species That Are OBL, FACW, or FAC: 1 (A) Total Number of Dominant Species Across All Strata: 1 (B) Percent of Dominant Species That Are OBL, FACW, or FAC: 100 (A/B) Prevalence Index worksheet: Total % Cover of: Multiply by: OBL species x 1 = FACW species x 2 = FAC species x 3 = FACU species x 4 = UPL species x 5 = Column Totals: 0 (A) 0 Prevalence Index = B/A = (B) Hydrophytic Vegetation Indicators: ❑ 1 - Rapid Test for Hydrophytic Vegetation ❑✓ 2 - Dominance Test is >50% ❑ 3 - Prevalence Index is <_3.0' ❑ Problematic Hydrophytic Vegetation' (Explain) 'Indicators of hydric soil and wetland hydrology must be present, unless disturbed or problematic. Definitions of Five Vegetation Strata: Tree - Woody plants, excluding woody vines, approximately 20 ft (6 m) or more in height and 3 in. (7.6 cm) or larger in diameter at breast height (DBH). Sapling - Woody plants, excluding woody vines, approximately 20 ft (6 m) or more in height and less than 3 in. (7.6 cm) DBH. Shrub - Woody plants, excluding woody vines, approximately 3 to 20 ft (1 to 6 m) in height. Herb - All herbaceous (non -woody) plants, including herbaceous vines, regardless of size, and woody plants, except woody vines, less than approximately 3 ft (1 m) in height. Woody vine - All woody vines, regardless of height. Hydrophytic Vegetation Present? Yes Remarks: (If observed, list morphological adaptations below). US Army Corps of Engineers Atlantic and Gulf Coastal Plain Region - Version 2.0 SOIL Sampling Point: DP2 Up Profile Description: (Describe to the depth needed to document the indicator or confirm the absence of indicators.) Depth Matrix (inches) Color (moist) 0-6 10 Y/R 5/6 6-8 10 Y/R 6/4 8-12 10 Y/R 7/3 0,6 Redox Features Color (moist) % Type' Loc2 'Type: C=Concentration, D=Depletion, RM=Reduced Matrix, MS=Masked Sand Grains. Hydric Soil Indicators: (Applicable to all LRRs, unless otherwise noted.) Histosol (A1) Histic Epipedon (A2) Black Histic (A3) Hydrogen Sulfide (A4) Stratified Layers (A5) Organic Bodies (A6) (LRR P, T, U) 5 cm Mucky Mineral (A7) (LRR P, T, U) Muck Presence (A8) (LRR U) 1 cm Muck (A9) (LRR P, T) Depleted Below Dark Surface (A11) Thick Dark Surface (Al2) Coast Prairie Redox (A16) (MLRA 150A) Sandy Mucky Mineral (S1) (LRR 0, S) Sandy Gleyed Matrix (S4) Sandy Redox (S5) Stripped Matrix (S6) Dark Surface (S7) (LRR P, S, T, U) Texture Remarks SL SL SCL Polyvalue Below Surface (S8) (LRR S, T, U) Thin Dark Surface (S9) (LRR S, T, U) Loamy Mucky Mineral (F1) (LRR O) Loamy Gleyed Matrix (F2) Depleted Matrix (F3) Redox Dark Surface (F6) Depleted Dark Surface (F7) Redox Depressions (F8) Marl (F10) (LRR U) Depleted Ochric (F11) (MLRA 151) Iron -Manganese Masses (F12) (LRR O, P, T) Umbric Surface (F13) (LRR P, T, U) Delta Ochric (F17) (MLRA 151) Reduced Vertic (F18) (MLRA 150A, 150B) Piedmont Floodplain Soils (F19) (MLRA 149A) Anomalous Bright Loamy Soils (F20) (MLRA 149A, 153C, 153D) low chroma mottles appear to be due to parent matenal 2Location: PL=Pore Lining, M=Matrix. Indicators for Problematic Hydric Soils3: _ 1 cm Muck (A9) (LRR 0) _ 2 cm Muck (A10) (LRR S) Reduced Vertic (F18) (outside MLRA 150A,B) Piedmont Floodplain Soils (F19) (LRR P, S, T) _ Anomalous Bright Loamy Soils (F20) (MLRA 153B) Red Parent Material (TF2) Very Shallow Dark Surface (TF12) Other (Explain in Remarks) 3lndicators of hydrophytic vegetation and wetland hydrology must be present, unless disturbed or problematic. Restrictive Layer (if observed): Type: Depth (inches): Hydric Soil Present? Yes No Remarks: US Army Corps of Engineers Atlantic and Gulf Coastal Plain Region — Version 2.0 �~~~� E-44 Rev iewArea ~~~~~Stroann I Wetlands 1 inch =200feet Legend �~~~� E-44 Rev iewArea -----Stroann 1 inch = 6O feet HNR Elementary School - Fuquay-Varina Stewart Project No: L20040 PRE DEVELOPMENT DRAINAGE AREA MAP STEWART NOT FOR CONSTRUCTION • • co 0 CL iles\L20040-SCM D 0 CO CO CO \2020\L20040 • • • • 24" RCP 100' SHEET FLOW 10% SLOPE GRASS SURFACE , • • • • • ,00 El 15" RCP 15" RCP 15" RCP 4" PVC 4" PVC .---__-- - N\I / / : ----------,-____. / i // ---- 4.--// tall' i / 7 __ — — -- ; \ \ )7 zt.:--/ 7- :::,:5" --------/— —7-1- --- .."-- .. --N‘ \ \ \ \ \ \ - 4/( / ( / /r (—\\---:::-N \\ ‘I \N __\ \\\ \ ) i / I I / / /I \..... ..\ N \ \ \I 1 \ --- \ \ \ \ --i ri \ 1 ( ,.....\ , \\\ ,,,, e, i, i, , , \ , \, 11 \ x..... ',\ ( iN - \ \.- ..-/ i ..„, ......,,,,-----__..„, ..r03 , . . tr) CN \ \ ,.....0 \\.\\\\\ \ :\ 1........._.„..--.....7:, ...., ."•1\\ \ \\ \J__: li ____// //:///:NZI: '......" I I ( j \ \ \\ \\ \\ \ \N \\ \ \\ --\ -I\ I ( ((f.*\\\I i /\ \\ C2---- \\\\ \ \ \ S \ \ A'i\i I \ ) \ 1//t, 1 \) \ L - =---. ---=_ _= =7-=-•••-'----:----------- AL1 Ik-r°/-)-/I -I .7--1- -_-_-:-\ \ \-'...._. \C! d' \ \ t 7./ ---7—• —__, 9'‘ SHALLOW CONCENTRATED FLOW GRASS SURFACE I `'K''\ NN \\ \\k" \\\\\\:\ ic' \:‘1.1.-‘ \,),I1 \A\\\\\\ /\\\AI"` \\\.\\1\3't //'/A‘ \\,\,\\It\pr\- --‘r'?1/4/1\i"(111\\\\\ 11/4 DRAINAGE AREA #1 (DA1) = 24.02 Ac TIME OF CONC. = 11 MIN IMPERVIOUS AREA = 1.04 Ac SHALLOW CONCENTRATED FLOW < 11% SLOPE GRASS SURFACE 24 1-11S)Pk Ef / > .7: = 11\:\. ) 7 1 \ yolt\L, r ,-- 3 • • / • • • • • • • • • • • • ' .,--c-'-69 4 SHALLOW CONCENTRATED FLOW 2% SLOPE GRASS WETLAND • • • • 161.62' PIPE FLOW 2.21% SLOPE WETTED PERIMETER = 6.28 FT HDPE PIPE SURFACE ::\>):\N\-\\:\NII\\)11:11111111111:1111111(\11111:::\\\-\\ \\\\ \\VA \\ '‘.11:\\\\.\\\\,\0\. II) 1111 ov \:01 \\\t TI:11 \\\\ \\\\ \\\\ \\\ \\\% \1\k 1//1 .111.\\"\ \0\ \\\\\ \\\\\\\ VII // I ; vOlt EROSION CONTROL LEGEND: SYMBOL TP DD IP 0 IP DESCRIPTION LIMITS OF DISTURBANCE SILT FENCE TREE PROTECTION DIVERSION DITCH 100 YR FLOOD ELEV. DETAIL REFERENCE N/A N/A BLOCK & GRAVEL INLET PROTECTION 1/C9.12 SILT FENCE AND WIRE INLET PROTECTION 8/C9.11 HORSE SHOE INLET PROTECTION 7/C9.11 SILT FENCE OUTLET CHECK DAM RIPRAP DISSIPATER N/A TEMPORARY CONSTRUCTION ENTRANCE 1/C9.10 ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH NORTH CAROLINA EROSION CONTROL SPECIFICATIONS • 40 80 SCALE: 1" = 80' • 160 NORTH NOT FOR CONSTRUCTION LITTLE DIVERSIFIED ARCHITECTURAL CONSULTING This draw* and the design shown are the propeay of Little Diversified Architectural Consulting. The reproduction, copying or other use of this drawing without their written consent is prohibited and any zOingement will be subject to legal action. RELIMINAI NOT FOR NSTRUCTI NOT FOR CONSTRUCTION Site Plan Issue Date 2021.12.17 NO. REASON DATE PRINCIPAL IN CHARGE Jerry Guerrier PROJECT MANAGER KS, RL DESIGN TEAM ML, EM, RB, HH HILLTOP NEEDMORE ROAD ELEMENTARY SCHOOL WCPSS# 862-520 RONNE STOTT, SENIOR PM 5141301400 PRE -DEVELOPMENT SCM DRAINAGE AREA MAP SW2 HNR Elementary School - Fuquay-Varina Stewart Project No: L20040 POST DEVELOPMENT DRAINAGE AREA MAP STEWART NOT FOR CONSTRUCTION E • • • D C E M N O N L:\Projects\2020\L20040 - WQBSS E-44\CALCS AND DATA\Stormwater\CAD Files\L20040-SCM DrainagZDArea Map.dwg Dec 21 TRAV 14704 N: 685,093.2224 2,077,498.2034 E 400.580 (TN) STOP ,,.:6;\12., 2017 ? • • • • • • • \igq),\S '\\\\3\'\\'''s*\A \AA 1/4\ilA v\\' V\k\\\\ 1(// // BYPASS AREA 3 (BA3) = 2.43 Ac IMPERVIOUS AREA = 0.38 Ac 24" RCP SANITARY M FORCE MAIN RIM: 385.65' 15" RCP • • • • 15" RCP 49' LE N: 684, EL. 18" RCP El 15" RCP 15" RCP 15" RCP 4" PVC 4" PVC 3 LDINIG- FE: 376.50 BYPASS AREA 4 DRAINAGE AREA 1 (DA1) = 17.57 Ac IMPERVIOUS AREA = 8.46 Ac • • • • • • Ea 'En • WM WM MN NM OM MN Nil IN • • • • • • • • 4 WETLAN: • • • • 00 • 90\1°\:,1•N 40 80 160 oo NOT FOR CONSTRUCTION LITTLE DIVERSIFIED ARCHITECTURAL CONSULTING This drawing and the design shown are the propegy of Little Diversfied Architectural Consulting. The reproduction, copying or other use of this drawing without their written consent is prohibited and agy infringement will be subject to legal action. RELIMINR NOT FOR NSTRUCTI NOT FOR CONSTRUCTION Site Plan Issue Date 2021.12.17 NO. REASON DATE PRINCIPAL IN CHARGE Jerry Guerrier PROJECT MANAGER KS, RL DESIGN TEAM ML, EM, RB, HH HILLTOP NEEDMORE ROAD ELEMENTARY SCHOOL WCPSS# 862-520 RONNE STOTT, SENIOR PM 5141301400 POST -DEVELOPMENT SCM DRAINAGE AREA MAP HNR Elementary School - Fuquay-Varina Stewart Project No: L20040 STORM DRAINAGE INLET AREA MAP STEWART LOCATION DRAINAGE AREA FROM TO IMPERVIOUS C sq. ft. acres sq. ft. ,. NO OR CONS RO-6 ION z£` BMP Storm Line L I T T L E // . - / �I 218 217 3733 a.a9 3733 0.95 DIVERSIFIED ARCHITECTURAL CONSULTING -� - / ( s /,� =- �` 215 217 16456 0.38 16456 0.95 ��t� / 217 216 0 0.00 0 0.00 \/�///�/�� �' 214 216 1378 0.03 1378 0.95 1\I - \\ 121621112980.031298a.95 «_� 21321169440.1669440.95 ,�„ I eon Ine.com ��°�� S'i2112100 E _212211104090.24104090.95 0000 000www. :)//t )//i =210209103810.2485000.81 draunng and the design shoavn are the property of Little Diversified Architectural Consulting. The reproduction, copying or other use o this drawing without their 'platen consent 1 d g is prohibited and an infringement will be sub ect p y to legal action. Little 2019 // _.,, ,,Thzs / /r-- - +' iR ®-�-2092074725D.1123000.57 _ _�� ��- / - / 5�� � /�J - ,�� ^_ :' :�� - y' 208 207 25461 0.58 9000 0.47 \ /�// / ► ,1 + \� \ / \\ll t.7. - / ,//� / / / _ \ // / // M �'�� �� \ Lh� 207 206 2476 0.06 2476 0.95 1/� � - 1 % 421 �, ��_ EX DI �i- � � -- � �� / -�/ , / // �� � i \ - i � \� � t / ,- �►) / /l�,I '%� �'I ���� / a - \ \ /�� // /,/ C / it;;� ��a1 w _ ' Ro�\ \ _ `�� • R : 206A 206 3642 0.08 3642 0.95 \ �� /// / �' / i --� \`� \ �� �/ lit , 393 lll \�_,lib' .�\". ��'�� r/ //// / � � \`�% ( �� ,,.-,.405-MH / �� \ e` / I \ �11 206 205 22600 0.52 650D 0.42 /.'. b'n .I � rl/�� ri' �`�• � 205A 205 4439 0.10 4439 0.95 ; �f /� .-. / � � � / / A (/fr.- A\ 1�� � � �, 205 204 34152 DJ8 7500 0.36 RELIMINAR NOT FOR NSTRUCTI �/� %-- I( \``\ \ 1 ‘\1 420 EXMH " V� - ! / // j _ - \ \ \ \ I 1 1 \• i \ \\1 �� .� / �� �•, •,; 204A 204 4010 0.09 4010 0.95 �"' \ �� , `: ? �, � - \ `' _ `�� � 204 203 17561 a.40 8000 0.54 ". : /� �'// - - -, \ ► �//, % y ` ,.a`� 203 202 11030 0.25 10000 0.88 lkulk\�i /A �,� - FUT► \� / / � 1 \ \ 3D5 cg I 4®*ice .- ...,�„�� ' 1 - _ �- \� , \ \ P �. �� F a �I i �► , � / / III I� � ` \ \ \ � 1 I � / 221A 221 500 0.01 500 0.95 !/,� � � , �1 1,�/ \ "'� �` 221 220 32460 0.75 5000 0.32 / E FUTURE \ I \ \\ \ / \ 111 -� o / / l �� �\ 220 202 2493 DA6 2493 0.95 � � �- _ \ 1 ,sTalli_� 'F.I r �, \ \ II ,,,_, ,,__, - �'; `` `� cARo /� ```,.�IIIII►► ii„ 0.,. ...............,,,, �9 t Q - SEAL - = 15834 :::7-- • %gyp FN -Q;•'•�2� //,'9C/L LC� \\`• ��►►►►Illn����� NOT FOR CONSTRUCTION II ��- / _ / \ / / ' \\ _ - J ` \� R�� 202 201 94 0.00 94 0.95 121 CB �►� 120 CB 1 \\ \ / / \ T \ \\\ ` \\ - - _ ��\;�� �� 1 �] 1 \�\-L / - \\ �I II \ / �� I } 201C 201B 7278 0.17 7278 0.95 5 y I �� \ ��; �\ `7 n II Alt � CHTIE IN 18' PL ��• \ \ -/ - \ , I \ I / \ 201B 201A 3904 0.09 3904 0.95 . ' \ `- N:6$4,743.8 316 DI / 3oa-c6 `� 201A 201 6454 0.15 6454 0.95 - \ D E: • D77,77i" o VA �) \ \ \ - -\ , 201 104 785 0.02 785 0.95 \\\ \\ p�\I \ \\<' IN .... .1lii \ ti ( _ alum,iAi 114 306 305 11717 0.27 11717 0.95 _� \� 305 304 8056 0.18 7157 0.87 V. \` � �i _ ��� •�' ` �..�L,.��� � ,- , WWI , �� Y _ \ 304A 304 8263 0.19 8263 0.95 \ wI , ��rV'� 312 DI \ \ � ' ♦� \ ��, �• - ` T �aotA�� 303 CB - 304 303 4789 0.11 4789 0.95 fr, I ♦ -. I� �I L 311A-DI Lam:►. /i /� 316 315 200642 4.61 196408 0.93 ,, e 117.B DI ��\, A� 115.0 CB �.'�I r 11Ir.2 CB/�� �' .� 501 MH ��� 117-c6 ► _ .. !; .. 315 314 0 O.DO 0 0.00 \! �) Cll\'V �� *� 1 p�� \ I 401-MH�i--1 �1�� 314 313 0 0.00 0 0.00 � � � �� y � �� J/ 4A. r '1 302 c 313 312 0 0.00 0 0.00 Mil" �,�. %. ''��\\, 310 c6 �I MIR MAW' �� 312A 312 27156 0.62 20000 0.75 ���``��:-rI1 ��. 112.B-DID- �, v �,312 3111392D.03 1392a.95 '_�' OttII- 400 HW �t a /// ��rfj� � `"'� ®:,11� _�- ���,�� �r�t<a--.r�Gr-,� elf' / cr ��. / • 1 114 CB ��.. 109-MH ~e ' \ \� �� ,' ' 311A 311 5488 0.13 5488 0.95 �� .• �� '--� • �;, 502 MH � �� �-----1- � � - � � � ��� 311 310 6976 0.16 6976 0.95 / � , • i �� I (� ����`/��� �� �� _ 11�`01 wE��,4�. •/ •Ill/ 310 303 3254 0.07 3254 0.95 �� �/ . ■ PACTS: 6,573 � �. • � ��• ®��� � / .• r • SF i'SEGMENALBLO / / �/��/JJ/�'���� �/ 115B - TD nri ® FF�:aaaew. j• { - LOCK GEENT B . A/ 124 - CB i I /„ ea \ ' I � _ SEGMENTALB BLOCK 303 302 12112 0.28 8351 0.72 h is JILDING� J v _ w� RPw • � \\ � 301 CB , � °I;;�`► ', i'MID i � r 1 ♦ F=E:376.50 _ 3oo6-c6 ' � 302 301 6660 0.15 6660 0.95 �-, `, v�� 128-DI c, � � 300.A - • `�c�y �1 \ I ,•. �`\��. 13o-DI 131-DI �.�, 301 300 11609 0.27 11609 0.95 ` � ,���-0 1. /�� �c ��� • .a. � -'_ "SEGMENTAL 300B300A 9703 o.22 9703 o.95 / \ S� it\\� VS BLOCK . �A"`300A \ ,A s 107-CB �' WE 300 0 0.00 0 0.00 12s-c6 �f! - _ tl `� �� . ACTS:� 300 105 0 0.00 0 0.00 ail �A.� \ `• ' 121 120 4669 0.11 4000 0.84 Site Plan . �r II( �, • \\ \\\ '�� I:, \\\\ •v�!\ \\\1 I 120 119 4860 0.11 4860 0.95 ��5 \VA b, / �� 1 hG • , o� LC BUILDING �\ N 1os-c6, l ,' 119 118 3628 0.08 3628 0.95 FFF 176 9f - AlII z. 1' 100 - HW v `` ' r I I� `\11 I I\( ` �\ 1t.`- ' i 201.A CB \������+ � ;R'\ 118 117 907 0.02 907 0.95 Issue Date 2021.12.17 '''I1�lI I \ 214 DI 215-DI � /F/ 1178 117A 13996 0.32 0 D.2D \V�213-DI \\ ,• ��..,�. 106ACB �; 117A 117 7583 0.17 7583 0.95 NO. REASON DATE • z10-DI �� r ti�lr'� QJ.,A I „ 4. 116 1294 a.03 1294 0.95 AA����;�'ra} .� �� �� ��-ilerig1� \117 \_` 1� � �� � J � , 21s-DI �� �'t� s•�1!/' \ //� 133 132 3955 0.09 3955 a.95 ` ,2�- Jrt:�,,,.,`,l/._ _,: r�. l' \ 132 131 3226 0.07 3226 D.95 `Y' .%►�► I \19I :\\\ L�x M/�1 11 1� / I \ / \ 131 130 14872 0.34 14872 0.95 a , - ►�.P 'y1 \ / I,►ter`�DI BUILDING I�\ /ci \ 130 127 4077 0.09 4077 0.95 OFFE: I�\ � 376.50 II \/"' r � % � � A �- �� . 128 127 4329 0.10 4329 0.95 AV .y I \ \ r ,n 'ti-�__I®n TT,x�, v ��I � II�i r�,�`,r� - n' � -�- Qj - � ll � � � � 1 129 127 4228 0.10 4228 0.95 lb# ' `/ �. 205.A .r/'209c6 `\ 127 126 4514 0.10 4514 0.95 0 AWE y I 204.A-DI I ,�11 126 125 a a.Qa a a.aa +� fp. 0 1 I i 1�' r� rim l� �r%' r► - 125 123 14028 0.32 6000 0.52 Q 1►y�, ;�,,,..X �` _ _ _ L�%h-� r - 11� \� 124 123 2834 0.07 1500 0.60 \ 123 122 0 0.00 0 0.00 ay��_►;� PRINCIPAL Jerry IN CHARGE Guerrier '-�cl 206-DI _ 2os-DI )',4f-tr \ 122 116 4356 0.10 1366 0.44 �, ` �,, �, "`�� \ ����� `{i. ��Q __� ►� 1�„� �ifi \\ \\\ /(l� 208-DI �� \ N ��'�� D 8r •i / 202 DI \ 1 102 HW / `'�� \\\ a, z07-D1�� -- .:A�j �� \\ a \116 115 3412 0.08 2220 0.69 MANAGER KS RL ' �/d�\-'"1\ ,,, A1\ \\ 115B115193230.44153230.79PROJECT L � 1 1 \`\ I Y11 \\1 1 � I 115C 115 4120 0A9 412o a.95 DESIGN TEAM ML, EM, RB, HH 0 E 1 I I I \\\�\ 1 I11111 I 1 \ 115 114 18299 0.42 18299 0.95 o I / ( ♦9 /i' I \\\ \ I /1 I I 114 113 5866 0.13 5866 0.95 \ ` \ /���t� / //III HILLTOP NEEDMORE ROAD ELEMENTARY SCHOOL N� i c� \\\ / 113A 113 1773 0.04 1773 0.95 �, S_,,/ C \ \ / III 113 112 16281 0.37 11119 0.71 \' I / iL "y\� 103-nnH\ \\\ I I I 112 112A 10261 0.24 7283 0.73 \ \ ', \\ ,c / I 112B 112A 4040 0.09 4040 0.95 o I \\`\I11 1 v l `1 \ 112A 110 4697 0.11 4697 0.95 ` \/\ \ �` =/�,%► \ 1\ 11 �, \ \ \ 111 110 5222 D.12 5222 a.95 23o-DI ` 11 \ \` 1 I i \' \ 1 \ \ \ I I 110 109 1000 0.02 1000 a.95 � \\\\l II I11 \ r \\ \\ 1I 11I I \ 109 108 0 D.00 D 0.00 \ u� I I II I11 1 \ / ... \\\\�\I11 1 108 107 5192 a.12 5192 0.95 WCPSS# 862 520 ii( I I 1 \ 1 \ `. \ I 1 1 C \ \ \\\\` \ 107C 107B 9351 0.21 9351 0.95 o 1 1 \ j 1\11 z� I 1 I1 I \ I \ 1078 107A 3581 0.08 3581 D.95 RONNE STOTT, SENIOR PM - I 1 � I I I I I I 107A 107 7887 a.18 7887 a.95 cn I 11 I Q I 1 221.A DI � 1 /� 5141301400 � �����- I 107 106 2400 0.06 2400 0.95 � I11 ► -- -� yi / ►� 106A 106 11978 a.v 7200 0.65 w \ \ \ �- '! 106 105 21638 0.50 10394 0.56 ����� \ v/ \ - STORM INLET DRAINAGE AREA MAP (n�i� :1114 f1- ��I4h'I �, TRANS__ __1 \ \ \ j\ -�`,IUP _ \ ` -� ` `,105 104 5536D.13 55360.95 �11 N �- ). ' 104 103 0 0.00 0 0.00 sp 4° t° , % 103 102 0 0.00 0 0.00 r'+�`\ J /� 406E 406A 40279 0.92 10000 0.39 o 11 / \ 406A 405 0 0.000 0.00 /./ 405 405A 66821 1.53 45000 0.71 EIR loREr �' I 405A 404 0 0.00 0 0.00 a `, \ � ', 404 401 0 0.00 0 a.ao 'i " " \ I 401 400 0 0.00 0 0.00 1 2 3 4 5 450 450 81550 1.87 10000 0.29 United States Department of the Interior FISH AND WILDLIFE SERVICE Raleigh Ecological Services Field Office Post Office Box 33726 Raleigh, NC 27636-3726 Phone: (919) 856-4520 Fax: (919) 856-4556 In Reply Refer To: Project Code: 2023-0022074 Project Name: Hilltop Needmore Road Elementary School December 06, 2022 Subject: List of threatened and endangered species that may occur in your proposed project location or may be affected by your proposed project To Whom It May Concern: The enclosed species list identifies threatened, endangered, proposed and candidate species, as well as proposed and final designated critical habitat, that may occur within the boundary of your proposed project and/or may be affected by your proposed project. The species list fulfills the requirements of the U.S. Fish and Wildlife Service (Service) under section 7(c) of the Endangered Species Act (Act) of 1973, as amended (16 U.S.C. 1531 et seq.). If your project area contains suitable habitat for any of the federally -listed species on this species list, the proposed action has the potential to adversely affect those species. If suitable habitat is present, surveys should be conducted to determine the species' presence or absence within the project area. The use of this species list and/or North Carolina Natural Heritage program data should not be substituted for actual field surveys. New information based on updated surveys, changes in the abundance and distribution of species, changed habitat conditions, or other factors could change this list. Please feel free to contact us if you need more current information or assistance regarding the potential impacts to federally proposed, listed, and candidate species and federally designated and proposed critical habitat. Please note that under 50 CFR 402.12(e) of the regulations implementing section 7 of the Act, the accuracy of this species list should be verified after 90 days. This verification can be completed formally or informally as desired. The Service recommends that verification be completed by visiting the ECOS-IPaC website at regular intervals during project planning and implementation for updates to species lists and information. An updated list may be requested through the ECOS-IPaC system by completing the same process used to receive the enclosed list. The purpose of the Act is to provide a means whereby threatened and endangered species and the ecosystems upon which they depend may be conserved. Under sections 7(a)(1) and 7(a)(2) of the Act and its implementing regulations (50 CFR 402 et seq.), Federal agencies are required to utilize their authorities to carry out programs for the conservation of threatened and endangered 12/06/2022 2 species and to determine whether projects may affect threatened and endangered species and/or designated critical habitat. A Biological Assessment is required for construction projects (or other undertakings having similar physical impacts) that are major Federal actions significantly affecting the quality of the human environment as defined in the National Environmental Policy Act (42 U.S.C. 4332(2) (c)). For projects other than major construction activities, the Service suggests that a biological evaluation similar to a Biological Assessment be prepared to determine whether the project may affect listed or proposed species and/or designated or proposed critical habitat. Recommended contents of a Biological Assessment are described at 50 CFR 402.12. If a Federal agency determines, based on the Biological Assessment or biological evaluation, that listed species and/or designated critical habitat may be affected by the proposed project, the agency is required to consult with the Service pursuant to 50 CFR 402. In addition, the Service recommends that candidate species, proposed species and proposed critical habitat be addressed within the consultation. More information on the regulations and procedures for section 7 consultation, including the role of permit or license applicants, can be found in the "Endangered Species Consultation Handbook" at: http://www.fws.gov/endangered/esa-library/pdf/TOC-GLOS.PDF Migratory Birds: In addition to responsibilities to protect threatened and endangered species under the Endangered Species Act (ESA), there are additional responsibilities under the Migratory Bird Treaty Act (MBTA) and the Bald and Golden Eagle Protection Act (BGEPA) to protect native birds from project -related impacts. Any activity, intentional or unintentional, resulting in take of migratory birds, including eagles, is prohibited unless otherwise permitted by the U.S. Fish and Wildlife Service (50 C.F.R. Sec. 10.12 and 16 U.S.C. Sec. 668(a)). For more information regarding these Acts see https://www.fws.gov/birds/policies-and-regulations.php. The MBTA has no provision for allowing take of migratory birds that may be unintentionally killed or injured by otherwise lawful activities. It is the responsibility of the project proponent to comply with these Acts by identifying potential impacts to migratory birds and eagles within applicable NEPA documents (when there is a federal nexus) or a Bird/Eagle Conservation Plan (when there is no federal nexus). Proponents should implement conservation measures to avoid or minimize the production of project -related stressors or minimize the exposure of birds and their resources to the project -related stressors. For more information on avian stressors and recommended conservation measures see https://www.fws.gov/birds/bird-enthusiasts/threats-to- birds.php. In addition to MBTA and BGEPA, Executive Order 13186: Responsibilities of Federal Agencies to Protect Migratory Birds, obligates all Federal agencies that engage in or authorize activities that might affect migratory birds, to minimize those effects and encourage conservation measures that will improve bird populations. Executive Order 13186 provides for the protection of both migratory birds and migratory bird habitat. For information regarding the implementation of Executive Order 13186, please visit https://www.fws.gov/birds/policies-and-regulations/ executive-orders/e0-13186.php. 12/06/2022 3 We appreciate your concern for threatened and endangered species. The Service encourages Federal agencies to include conservation of threatened and endangered species into their project planning to further the purposes of the Act. Please include the Consultation Code in the header of this letter with any request for consultation or correspondence about your project that you submit to our office. Attachment(s): • Official Species List • Migratory Birds 12/06/2022 1 Official Species List This list is provided pursuant to Section 7 of the Endangered Species Act, and fulfills the requirement for Federal agencies to "request of the Secretary of the Interior information whether any species which is listed or proposed to be listed may be present in the area of a proposed action". This species list is provided by: Raleigh Ecological Services Field Office Post Office Box 33726 Raleigh, NC 27636-3726 (919) 856-4520 12/06/2022 Project Summary Project Code: 2023-0022074 Project Name: Hilltop Needmore Road Elementary School Project Type: Commercial Development Project Description: The project includes the development of an approximately 1.96 acre elementary school and supporting site infrastructure including parking, drives, sidewalks, play area, and underground utilities. Project Location: Approximate location of the project can be viewed in Google Maps: https:// www.google.com/maps/@35.62960505,-78.73764530884358,14z Counties: Wake County, North Carolina 12/06/2022 Endangered Species Act Species There is a total of 9 threatened, endangered, or candidate species on this species list. Species on this list should be considered in an effects analysis for your project and could include species that exist in another geographic area. For example, certain fish may appear on the species list because a project could affect downstream species. IPaC does not display listed species or critical habitats under the sole jurisdiction of NOAA Fisheriesl, as USFWS does not have the authority to speak on behalf of NOAA and the Department of Commerce. See the "Critical habitats" section below for those critical habitats that lie wholly or partially within your project area under this office's jurisdiction. Please contact the designated FWS office if you have questions. 1. NOAA Fisheries, also known as the National Marine Fisheries Service (NMFS), is an office of the National Oceanic and Atmospheric Administration within the Department of Commerce. Mammals NAME STATUS Tricolored Bat Perimyotis subflavus Proposed No critical habitat has been designated for this species. Endangered Species profile: https://ecos.fws.gov/ecp/species/10515 Birds NAME Red -cockaded Woodpecker Picoides borealis No critical habitat has been designated for this species. Species profile: https://ecos.fws.gov/ecp/species/7614 Amphibians NAME STATUS Neuse River Waterdog Necturus lewisi There is final critical habitat for this species. Your location does not overlap the critical habitat. Species profile: https://ecos.fws.gov/ecp/species/6772 Fishes NAME Endangered STATUS Threatened STATUS Carolina Madtom Noturus furiosus There is final critical habitat for this species. Your location does not overlap the critical habitat. Species profile: https://ecos.fws.gov/ecp/species/528 Endangered 12/06/2022 4 Clams NAME STATUS Atlantic Pigtoe Fusconaia masoni There is final critical habitat for this species. Your location does not overlap the critical habitat. Species profile: https://ecos.fws.gov/ecp/species/5164 Dwarf Wedgemussel Alasmidonta heterodon No critical habitat has been designated for this species. Species profile: https://ecos.fws.gov/ecp/species/784 Yellow Lance Elliptio lanceolata There is final critical habitat for this species. Your location does not overlap the critical habitat. Species profile: https://ecos.fws.gov/ecp/species/4511 Threatened Endangered Threatened Insects NAME STATUS Monarch Butterfly Danaus plexippus Candidate No critical habitat has been designated for this species. Species profile: https://ecos.fws.gov/ecp/species/9743 Flowering Plants NAME STATUS Michaux's Sumac Rhus michauxii Endangered No critical habitat has been designated for this species. Species profile: https://ecos.fws.gov/ecp/species/5217 Critical habitats THERE ARE NO CRITICAL HABITATS WITHIN YOUR PROJECT AREA UNDER THIS OFFICE'S JURISDICTION. 12/06/2022 1 Migratory Birds Certain birds are protected under the Migratory Bird Treaty Actl and the Bald and Golden Eagle Protection Act2. Any person or organization who plans or conducts activities that may result in impacts to migratory birds, eagles, and their habitats should follow appropriate regulations and consider implementing appropriate conservation measures, as described below. 1. The Migratory Birds Treaty Act of 1918. 2. The Bald and Golden Eagle Protection Act of 1940. 3. 50 C.F.R. Sec. 10.12 and 16 U.S.C. Sec. 668(a) The birds listed below are birds of particular concern either because they occur on the USFWS Birds of Conservation Concern (BCC) list or warrant special attention in your project location. To learn more about the levels of concern for birds on your list and how this list is generated, see the FAQ below. This is not a list of every bird you may find in this location, nor a guarantee that every bird on this list will be found in your project area. To see exact locations of where birders and the general public have sighted birds in and around your project area, visit the E-bird data mapping tool (Tip: enter your location, desired date range and a species on your list). For projects that occur off the Atlantic Coast, additional maps and models detailing the relative occurrence and abundance of bird species on your list are available. Links to additional information about Atlantic Coast birds, and other important information about your migratory bird list, including how to properly interpret and use your migratory bird report, can be found below. For guidance on when to schedule activities or implement avoidance and minimization measures to reduce impacts to migratory birds on your list, click on the PROBABILITY OF PRESENCE SUMMARY at the top of your list to see when these birds are most likely to be present and breeding in your project area. NAME American Kestrel Falco sparverius paulus This is a Bird of Conservation Concern (BCC) only in particular Bird Conservation Regions (BCRs) in the continental USA https://ecos.fws.gov/ecp/species/9587 Bald Eagle Haliaeetus leucocephalus This is not a Bird of Conservation Concern (BCC) in this area, but warrants attention because of the Eagle Act or for potential susceptibilities in offshore areas from certain types of development or activities. BREEDING SEASON Breeds Apr 1 to Aug 31 Breeds Sep 1 to Jul 31 12/06/2022 2 NAME Brown -headed Nuthatch Sitta pusilla This is a Bird of Conservation Concern (BCC) only in particular Bird Conservation Regions (BCRs) in the continental USA Chimney Swift Chaetura pelagica This is a Bird of Conservation Concern (BCC) throughout its range in the continental USA and Alaska. Kentucky Warbler Oporornis formosus This is a Bird of Conservation Concern (BCC) throughout its range in the continental USA and Alaska. Prairie Warbler Dendroica discolor This is a Bird of Conservation Concern (BCC) throughout its range in the continental USA and Alaska. Prothonotary Warbler Protonotaria citrea This is a Bird of Conservation Concern (BCC) throughout its range in the continental USA and Alaska. Red-headed Woodpecker Melanerpes erythrocephalus This is a Bird of Conservation Concern (BCC) throughout its range in the continental USA and Alaska. Rusty Blackbird Euphagus carolinus This is a Bird of Conservation Concern (BCC) only in particular Bird Conservation Regions (BCRs) in the continental USA Wood Thrush Hylocichla mustelina This is a Bird of Conservation Concern (BCC) throughout its range in the continental USA and Alaska. BREEDING SEASON Breeds Mar 1 to Jul 15 Breeds Mar 15 to Aug 25 Breeds Apr 20 to Aug 20 Breeds May 1 to Jul 31 Breeds Apr 1 to Jul 31 Breeds May 10 to Sep 10 Breeds elsewhere Breeds May 10 to Aug 31 Probability Of Presence Summary The graphs below provide our best understanding of when birds of concern are most likely to be present in your project area. This information can be used to tailor and schedule your project activities to avoid or minimize impacts to birds. Please make sure you read and understand the FAQ "Proper Interpretation and Use of Your Migratory Bird Report" before using or attempting to interpret this report. Probability of Presence (■) Each green bar represents the bird's relative probability of presence in the 10km grid cell(s) your project overlaps during a particular week of the year. (A year is represented as 12 4-week months.) A taller bar indicates a higher probability of species presence. The survey effort (see below) can be used to establish a level of confidence in the presence score. One can have higher confidence in the presence score if the corresponding survey effort is also high. 12/06/2022 3 How is the probability of presence score calculated? The calculation is done in three steps: 1. The probability of presence for each week is calculated as the number of survey events in the week where the species was detected divided by the total number of survey events for that week. For example, if in week 12 there were 20 survey events and the Spotted Towhee was found in 5 of them, the probability of presence of the Spotted Towhee in week 12 is 0.25. 2. To properly present the pattern of presence across the year, the relative probability of presence is calculated. This is the probability of presence divided by the maximum probability of presence across all weeks. For example, imagine the probability of presence in week 20 for the Spotted Towhee is 0.05, and that the probability of presence at week 12 (0.25) is the maximum of any week of the year. The relative probability of presence on week 12 is 0.25/0.25 = 1; at week 20 it is 0.05/0.25 = 0.2. 3. The relative probability of presence calculated in the previous step undergoes a statistical conversion so that all possible values fall between 0 and 10, inclusive. This is the probability of presence score. Breeding Season ( ) Yellow bars denote a very liberal estimate of the time -frame inside which the bird breeds across its entire range. If there are no yellow bars shown for a bird, it does not breed in your project area. Survey Effort (I) Vertical black lines superimposed on probability of presence bars indicate the number of surveys performed for that species in the 10km grid cell(s) your project area overlaps. The number of surveys is expressed as a range, for example, 33 to 64 surveys. No Data (—) A week is marked as having no data if there were no survey events for that week. Survey Timeframe Surveys from only the last 10 years are used in order to ensure delivery of currently relevant information. The exception to this is areas off the Atlantic coast, where bird returns are based on all years of available data, since data in these areas is currently much more sparse. probability of presence breeding season 1 survey effort — no data SPECIES JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC American Kestrel BCC - BCR Bald Eagle Non -BCC Vulnerable ++++1111111114111111111111 1 1 1 1 1 1 1 1 I -I-++ +,++ ++ I I I 1 ++ 1111 1111 1111 1111 1I11 1111 III IIII 1111 IIII III 1111 12/06/2022 4 Brown -headed Nuthatch BCC - BCR Chimney Swift BCC Rangewide (CON) Kentucky Warbler BCC Rangewide (CON) Prairie Warbler BCC Rangewide (CON) Prothonotary Warbler BCC Rangewide (CON) Red-headed Woodpecker BCC Rangewide (CON) Rusty Blackbird BCC - BCR Wood Thrush BCC Rangewide (CON) ■■ ■i ll11 III III III ■m■o nn mi n■um IIII 1III iiii iIIi IIii iiii 1 H 1_�i ++++ ++++ ++++ -I I I 1 I I I I I I I I 1 1 1 1 I I I I 11 1+++++ ++++ ++++ ++++ ++++ ++++ +++I 1 1 1 1 1 1 1 1 1 1 11 I+++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ I I I I I I I 1 1 ++ ++++ ++++ ++++ ++++ ++++ +I++ ++++ +A+ -1 I + ++++ ++++ ++_H_ ++++ ++++ ++1+ ++++ ++++ ++++ ++++ ++1 1 I I 1-+++ ++++ ++++ ++++ Additional information can be found using the following links: • Birds of Conservation Concern https://www.fws.gov/program/migratory-birds/species • Measures for avoiding and minimizing impacts to birds https://www.fws.gov/library/ collections/avoiding-and-minimizing-incidental-take-migratory-birds • Nationwide conservation measures for birds https://www.fws.gov/sites/default/files/ documents/nationwide-standard-conservation-measures.pdf Migratory Birds FAQ Tell me more about conservation measures I can implement to avoid or minimize impacts to migratory birds. Nationwide Conservation Measures describes measures that can help avoid and minimize impacts to all birds at any location year round. Implementation of these measures is particularly important when birds are most likely to occur in the project area. When birds may be breeding in the area, identifying the locations of any active nests and avoiding their destruction is a very helpful impact minimization measure. To see when birds are most likely to occur and be breeding in your project area, view the Probability of Presence Summary. Additional measures or permits may be advisable depending on the type of activity you are conducting and the type of infrastructure or bird species present on your project site. 12/06/2022 What does IPaC use to generate the list of migratory birds that potentially occur in my specified location? The Migratory Bird Resource List is comprised of USFWS Birds of Conservation Concern (BCC) and other species that may warrant special attention in your project location. The migratory bird list generated for your project is derived from data provided by the Avian Knowledge Network (AKN). The AKN data is based on a growing collection of survey, banding, and citizen science datasets and is queried and filtered to return a list of those birds reported as occurring in the 10km grid cell(s) which your project intersects, and that have been identified as warranting special attention because they are a BCC species in that area, an eagle (Eagle Act requirements may apply), or a species that has a particular vulnerability to offshore activities or development. Again, the Migratory Bird Resource list includes only a subset of birds that may occur in your project area. It is not representative of all birds that may occur in your project area. To get a list of all birds potentially present in your project area, please visit the Rapid Avian Information Locator (RAIL) Tool. What does IPaC use to generate the probability of presence graphs for the migratory birds potentially occurring in my specified location? The probability of presence graphs associated with your migratory bird list are based on data provided by the Avian Knowledge Network (AKN). This data is derived from a growing collection of survey, banding, and citizen science datasets. Probability of presence data is continuously being updated as new and better information becomes available. To learn more about how the probability of presence graphs are produced and how to interpret them, go the Probability of Presence Summary and then click on the "Tell me about these graphs" link. How do I know if a bird is breeding, wintering or migrating in my area? To see what part of a particular bird's range your project area falls within (i.e. breeding, wintering, migrating or year-round), you may query your location using the RAIL Tool and look at the range maps provided for birds in your area at the bottom of the profiles provided for each bird in your results. If a bird on your migratory bird species list has a breeding season associated with it, if that bird does occur in your project area, there may be nests present at some point within the timeframe specified. If "Breeds elsewhere" is indicated, then the bird likely does not breed in your project area. What are the levels of concern for migratory birds? Migratory birds delivered through IPaC fall into the following distinct categories of concern: 1. "BCC Rangewide" birds are Birds of Conservation Concern (BCC) that are of concern throughout their range anywhere within the USA (including Hawaii, the Pacific Islands, Puerto Rico, and the Virgin Islands); 2. "BCC - BCR" birds are BCCs that are of concern only in particular Bird Conservation Regions (BCRs) in the continental USA; and 12/06/2022 6 3. "Non -BCC - Vulnerable" birds are not BCC species in your project area, but appear on your list either because of the Eagle Act requirements (for eagles) or (for non -eagles) potential susceptibilities in offshore areas from certain types of development or activities (e.g. offshore energy development or longline fishing). Although it is important to try to avoid and minimize impacts to all birds, efforts should be made, in particular, to avoid and minimize impacts to the birds on this list, especially eagles and BCC species of rangewide concern. For more information on conservation measures you can implement to help avoid and minimize migratory bird impacts and requirements for eagles, please see the FAQs for these topics. Details about birds that are potentially affected by offshore projects For additional details about the relative occurrence and abundance of both individual bird species and groups of bird species within your project area off the Atlantic Coast, please visit the Northeast Ocean Data Portal. The Portal also offers data and information about other taxa besides birds that may be helpful to you in your project review. Alternately, you may download the bird model results files underlying the portal maps through the NOAA NCCOS Integrative Statistical Modeling and Predictive Mapping of Marine Bird Distributions and Abundance on the Atlantic Outer Continental Shelf project webpage. Bird tracking data can also provide additional details about occurrence and habitat use throughout the year, including migration. Models relying on survey data may not include this information. For additional information on marine bird tracking data, see the Diving Bird Study and the nanotag studies or contact Caleb Spiegel or Pam Loring. What if I have eagles on my list? If your project has the potential to disturb or kill eagles, you may need to obtain a permit to avoid violating the Eagle Act should such impacts occur. Proper Interpretation and Use of Your Migratory Bird Report The migratory bird list generated is not a list of all birds in your project area, only a subset of birds of priority concern. To learn more about how your list is generated, and see options for identifying what other birds may be in your project area, please see the FAQ "What does IPaC use to generate the migratory birds potentially occurring in my specified location". Please be aware this report provides the "probability of presence" of birds within the 10 km grid cell(s) that overlap your project; not your exact project footprint. On the graphs provided, please also look carefully at the survey effort (indicated by the black vertical bar) and for the existence of the "no data" indicator (a red horizontal bar). A high survey effort is the key component. If the survey effort is high, then the probability of presence score can be viewed as more dependable. In contrast, a low survey effort bar or no data bar means a lack of data and, therefore, a lack of certainty about presence of the species. This list is not perfect; it is simply a starting point for identifying what birds of concern have the potential to be in your project area, when they might be there, and if they might be breeding (which means nests might be present). The list helps you know what to look for to confirm presence, and helps guide you in knowing when to implement conservation measures to avoid or minimize potential impacts from your project activities, should presence be confirmed. To learn more about conservation measures, visit the FAQ "Tell 12/06/2022 7 me about conservation measures I can implement to avoid or minimize impacts to migratory birds" at the bottom of your migratory bird trust resources page. 12/06/2022 IPaC User Contact Information Agency: County of Wake Name: Elias Ruhl Address: 310 Hubert Street City: Raleigh State: NC Zip: 27603 Email eruhl@fandr.com Phone: 9198283441 Lead Agency Contact Information Lead Agency: Army Corps of Engineers ■ ■■■■ ■ :I • NC DEPARTMENT OF ■ om NATURAL AND CULTURAL RESOURCES snows December 6, 2022 Elias Ruhl F&R 310 Hubert Street Raleigh, NC 27603 RE: Hilltop Needmore Road Elementary School; 59Y-0243 Dear Elias Ruhl: Roy Cooper, Governor D_ Reid Wilson, Secretary Misty Buchanan Deputy Director, Natural Heritage Program NCNHDE-20212 The North Carolina Natural Heritage Program (NCNHP) appreciates the opportunity to provide information about natural heritage resources for the project referenced above. Based on the project area mapped with your request, a query of the NCNHP database indicates that there are no records for rare species, important natural communities, natural areas, and/or conservation/managed areas within the proposed project boundary. Please note that although there may be no documentation of natural heritage elements within the project boundary, it does not imply or confirm their absence; the area may not have been surveyed. The results of this query should not be substituted for field surveys where suitable habitat exists. In the event that rare species are found within the project area, please contact the NCNHP so that we may update our records. The attached `Potential Occurrences' table summarizes rare species and natural communities that have been documented within a one -mile radius of the property boundary. The proximity of these records suggests that these natural heritage elements may potentially be present in the project area if suitable habitat exists. Tables of natural areas and conservation/managed areas within a one -mile radius of the project area, if any, are also included in this report. If a Federally -listed species is found within the project area or is indicated within a one -mile radius of the project area, the NCNHP recommends contacting the US Fish and Wildlife Service (USFWS) for guidance. Contact information for USFWS offices in North Carolina is found here: https://www.fws.gov/offices/Di rectory/ListOffices.cfm?statecode=37. Please note that natural heritage element data are maintained for the purposes of conservation planning, project review, and scientific research, and are not intended for use as the primary criteria for regulatory decisions. Information provided by the NCNHP database may not be published without prior written notification to the NCNHP, and the NCNHP must be credited as an information source in these publications. Maps of NCNHP data may not be redistributed without permission. The NC Natural Heritage Program may follow this letter with additional correspondence if a Dedicated Nature Preserve, Registered Heritage Area, Land and Water Fund easement, or Federally - listed species are documented near the project area. If you have questions regarding the information provided in this letter or need additional assistance, please contact Rodney A. Butler at rodney.butler@ncdcr.gov or 919-707-8603. Sincerely, NC Natural Heritage Program DEPARTMENT OF NATURAL AND CULTURAL RESOURCES 121 W. JONES STREET. RALEIGH. NC 27603 • 1651 MAIL SERVICE CENTER. RALEIGH. NC 27699 OFC 919.707.9120 • FAX 919.707.9121 Natural Heritage Element Occurrences, Natural Areas, and Managed Areas Within a One -mile Radius of the Project Area Hilltop Needmore Road Elementary School Project No. 59Y-0243 December 6, 2022 NCNHDE-20212 Element Occurrences Documented Within a One -mile Radius of the Project Area Taxonomic Group Amphibian Crustacean Dragonfly or Damselfly Freshwater Bivalve Freshwater Bivalve Freshwater Bivalve Freshwater Bivalve Freshwater Bivalve Natural Community Natural Community Natural Community Natural Community Natural Community EO ID Scientific Name Common Name Last Observation Date 40727 Necturus lewisi Neuse River Waterdog 2021-02-04 19215 Faxonius carolinensis North Carolina Spiny Crayfish 32043 Coryphaeschna ingens Regal Darner 18654 Alasmidonta undulata Triangle Floater 34956 Fusconaia masoni Atlantic Pigtoe 2952 Lampsilis radiata Eastern Lampmussel 8924 Strophitus undulatus Creeper 16205 Villosa constricts Notched Rainbow 13302 Dry-Mesic Oak --Hickory Forest (Piedmont Subtype) 37185 Floodplain Pool 8840 Mesic Mixed Hardwood --- Forest (Piedmont Subtype) 30513 Piedmont Bottomland --- Forest (High Subtype) 37184 Piedmont/Mountain --- Semipermanent Impoundment (Open Water Subtype) 2022-02-22 2004-Pre 2016-11-04 2004-07-07 2018-06-07 2018-06-07 1992-05-18 2013 2017-04-13 2013 2009-03-07 2017-04-13 Element Occurrence Rank E E H? C Accuracy Federal Status 6-Unkno Threatened wn 3-Medium 5-Very Low 3-Medium State Global State Status Rank Rank Special G2 S2 Concern Special G3 S3 Concern Significantly G5 S2? Rare Threatened G4 S3 E 3-Medium Threatened Endangered G1 S3 E 3-Medium Threatened G5 S3 E 3-Medium Threatened G5 S3 H? 3-Medium Threatened G3 S3 C 3-Medium G4G5 S4 B B A E 2-High 2-High 2-High 2-High G3 S2 G3G4 S4 G3G4 S2 G4G5 S4 Page 2 of 4 Element Occurrences Documented Within a One -mile Radius of the Project Area Taxonomic EO ID Scientific Name Common Name Last Element Accuracy Federal State Global State Group Observation Occurrence Status Status Rank Rank Date Rank Natural 5094 Piedmont/Mountain Community Semipermanent Impoundment (Shrub Subtype) 2013 E 3-Medium G4 S4 Vascular Plant 10838 Thermopsis mollis Appalachian Golden- 2002-09-19 B 3-Medium Significantly G3G4 52 banner Rare Throughout Natural Areas Documented Within a One -mile Radius of the Project Area Site Name W Representational Rating Collective Rating NEU/Middle Creek Aquatic Habitat R2 (Very High) C3 (High) Middle Creek Bluffs and Floodplain R2 (Very High) C4 (Moderate) Managed Areas Documented Within a One -mile Radius of the Project Area Managed Area Name Triangle Greenways Council Preserve Wake County Open Space Owner Owner Type Private Local Government Triangle Greenways Council Wake County NC Hazard Mitigation Buyout Property - Wake NC DPS, Division of Emergency State County Management NC Hazard Mitigation Buyout Property - Wake NC DPS, Division of Emergency State County Management NC Hazard Mitigation Buyout Property - Wake NC DPS, Division of Emergency State County Management NC Hazard Mitigation Buyout Property - Wake NC DPS, Division of Emergency State County Management NC Hazard Mitigation Buyout Property - Wake NC DPS, Division of Emergency State County Management NC Hazard Mitigation Buyout Property - Wake NC DPS, Division of Emergency State County Management Definitions and an explanation of status designations and codes can be found at https://ncnhde.natureserve.ora/help. Data query generated on December 6, 2022; source: NCNHP, Q3, October 2022. Please resubmit your information request if more than one year elapses before project initiation as new information is continually added to the NCNHP database. Page 3 of 4 December 6, 2022 rA NCNHDE-20212: Hilltop Needmore Road Elementary School NHP Natural Area (NHNA) Managed Area (MAREA) Buffered Project Boundary Project Boundary Sources: Esri, Airbus DS. USGS, NGA NASA, CG-AR. N Robinson, NCEAS, NLS, OS. NMA, Geodatastyrelsen, Rpkswaterstaat, GSA, Geoland, FEMA, Intermap and :he GIS user community Sources: Esri. HERE, Garmin, FAO, NOAA, USGS. © OpenS:ree©ap contributors, and the GIS User Community Page 4 of 4 LITTLE DIVER/WED ARCHITECTURAL CONSULTING L:\Projects\2020\L20040 - WCPSS E-44\DWGS\2-Design\3-Sheets\L20040-C4.00 Erosion Control Plan.dwg Nov 29, 2022 - 10:02am EROSION CONTROL MAINTENANCE NOTES 1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE INSTALLATION AND MAINTENANCE OF ALL EROSION CONTROL MEASURES THROUGHOUT THE DURATION OF CONSTRUCTION. 2. CONSTRUCTION AND MAINTENANCE OF ALL EROSION CONTROL DEVICES SHALL CONFORM TO THE STANDARDS SET FORTH IN THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENT, HEALTH AND NATURAL RESOURCES LAND QUALITY SECTION EROSION AND SEDIMENT CONTROL PLANNING LAND DESIGN MANUAL. 3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE INSTALLATION OF CONSTRUCTION ENTRANCES AS NECESSARY TO PREVENT THE TRACKING OF SEDIMENT OFF -SITE. THE OWNER IS RESPONSIBLE FOR MAINTENANCE OF ALL PERMANENT EROSION CONTROL METHODS AFTER CONSTRUCTION IS COMPLETE, IF ANY PERMANENT METHODS ARE REQUIRED. 4. THE CONTRACTOR IS ALSO REQUIRED TO MET THE BELOW REQUIREMENTS FOR EACH EROSION CONTROL MEASURE, AS NOTED IN THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY - EROSION CONTROL MANUAL. THESE REQUIREMENTS ARE NOT LIMITED TO BUT INCLUDE: 4.1. CONSTRUCTION ENTRANCE - MAINTAIN THE GRAVEL PAD IN A CONDITION TO PREVENT MUD OR SEDIMENT FROM LEAVING THE CONSTRUCTION SITE. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH 2-INCH STONE. AFTER EACH RAINFALL EVENT, INSPECT ANY STRUCTURE USED TO TRAP SEDIMENT AND CLEAN IT OUT AS NECESSARY. IMMEDIATELY REMOVE ALL MATERIALS SPILLED, WASHED, OR TRACKED OFF THE CONSTRUCTION SITE OR ONTO PUBLIC ROADWAYS. 4.2. SILT FENCE - INSPECT TEMPORARY SEDIMENT TRAPS AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (1 INCH OR GREATER) RAINFALL EVENT AND REPAIR IMMEDIATELY. REMOVE SEDIMENT, AND RESTORE THE TRAP TO ITS ORIGINAL DIMENSIONS WHEN THE SEDIMENT HAS ACCUMULATED TO ONE-HALF THE DESIGN DEPTH OF THE TRAP. PLACE THE SEDIMENT THAT IS REMOVED IN THE DESIGNATED DISPOSAL AREA, AND REPLACE THE PART OF THE GRAVEL FACING THAT IS IMPAIRED BY SEDIMENT. CHECK THE STRUCTURE FOR DAMAGE FROM EROSION OR PIPING. PERIODICALLY CHECK THE DEPTH OF THE SPILLWAY TO ENSURE IT IS A MINIMUM OF 1.5 FT BELOW THE LOW POINT OF THE EMBANKMENT. IMMEDIATELY FILL AN SETTLEMENT OF THE EMBANKMENT TO SLIGHTLY ABOVE DESIGN GRADE. ANY RIPRAP DISPLACED FROM THE SPILLWAY MUST BE REPLACED IMMEDIATELY. AFTER ALL SEDIMENT -PRODUCING AREAS HAVE BEEN PERMANENTLY STABILIZED, REMOVE THE STRUCTURE AND ALL UNSTABLE SEDIMENT. SMOOTH THE AREA TO BLEND WITH THE ADJOINING AREAS, AND STABILIZE PROPERLY. 4.3. SILT FENCE STONE OUTLET - INSPECT OUTLETS AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (1 INCH OR GREATER) RAINFALL EVENT. CLEAR THE MESH WIRE OF ANY DEBRIS OR OTHER OBJECTS TO PROVIDE ADEQUATE FLOW FOR SUBSEQUENT RAINS. TAKE CARE NOT TO DAMAGE OR UNDERCUT THE WIRE MESH DURING SEDIMENT REMOVAL. REPLACE NO. 57 WASHED STONE AS NEEDED. 4.4. DROP INLET PROTECTION - INSPECT THE BARRIER AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (1 INCH OR GREATER) RAINFALL AND MAKE REPAIRS AS NEEDED. REMOVE SEDIMENT AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR SUBSEQUENT RAINS. WHEN THE CONTRIBUTING DRAINAGE AREA HAS BEEN ADEQUATELY STABILIZED, REMOVE ALL MATERIALS AND ANY UNSTABLE SOIL, AND EITHER SALVAGE OR DISPOSE OF IT PROPERLY. BRING THE DISTURBED AREA TO PROPER GRADE, THEN SMOOTH AND COMPACT IT. APPROPRIATELY STABILIZE ALL BARE AREAS AROUND THE INLET. 4.5. CONCRETE WASHOUT PIT -MAXIMUM WATER AND SEDIMENT DEPTH IS 12". PIT MUST BE EXCAVATED AND RE -LINED WHEN DEPTH OF SEDIMENT REACHES 12" OR COMBINED WATER/SEDIMENT DEPTH EXCEEDS 12" FOLLOWING WASHOUT OF CONCRETE TRUCK. ALLOW WATER TO EVAPORATE COMPLETELY PRIOR TO EXCAVATING PIT. WASHOUT PIT MAY BE LOCATED NO CLOSER THAN 50' TO DRAINS, INLETS, OR SURFACE WATERS. AT COMPLETION OF PROJECT, WASHOUT AREA TO BE BACKFILLED AND GRADED TO BE LEVEL WITH EXISTING GRADE. 4.6. TEMPORARY BERM/DIVERSION DITCH DETAIL- INSPECT TEMPORARY DIVERSIONS ONCE A WEEK AND AFTER EVERY RAINFALL. IMMEDIATELY REMOVE SEDIMENT FROM THE FLOW AREA AND REPAIR THE DIVERSION RIDGE. CAREFULLY CHECK OUTLETS AND MAKE TIMELY REPAIRS AS NEEDED. WHEN THE AREA PROTECTED IS PERMANENTLY STABILIZED, REMOVED THE RIDGE AND THE CHANNEL TO BLEND WITH THE NATURAL GROUND LEVEL AND APPROPRIATELY STABILIZE IT. MACHINE COMPACTION OF ALL FILL IS REQUIRED. ALLOW AT LEAST 10% SETTLEMENT FOR THE TOTAL FILL HEIGHT. DIVERSIONS SUFFICIENT TO DIRECT ALL SEDIMENT- LADEN STORMWATER SEDIMENT CONTROL DEVICE MUST BE INSTALLED PRIOR TO INTO A CLEARING AND GRUBBING OF THE AREA. DIVERSIONS SHOULD BE LOCATED TO MINIMIZE DAMAGE DURING CONSTRUCTION OPERATIONS. DIVERSIONS SHALL BE SEEDED AND MULCHED IF THEY ARE REMAIN TO IN PLACED OVER 30 DAYS.CHECK DEVICE AFTER EACH RAIN, BUT ONCE A WEEK REGARDLESS. REPAIR AS NECESSARY. 4.7. INSPECT ROCK PIPE INLET PROTECTION AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (1 INCH OR GREATER) RAINFALL EVENT AND REPAIR IMMEDIATELY. REMOVE SEDIMENT AND RESTORE THE SEDIMENT STORAGE AREA TO ITS ORIGINAL DIMENSIONS WHEN THE SEDIMENT HAS ACCUMULATED TO ONE-HALF THE DESIGN DEPTH OF THE TRAP. PLACE THE SEDIMENT THAT IS REMOVED IN THE DESIGNATED DISPOSAL AREA AND REPLACE THE CONTAMINATED PART OF THE GRAVEL FACING. CHECK THE STRUCTURE FOR DAMAGE. ANY RIPRAP DISPLACED FROM THE STONE HORSESHOE MUST BE REPLACED IMMEDIATELY. AFTER ALL THE SEDIMENT -PRODUCING ARES HAVE BEEN PERMANENTLY STABILIZED, REMOVE THE STRUCTURE AND ALL THE UNSTABLE SEDIMENT. SMOOTH THE AREA TO BLEND WITH THE ADJOINING AREAS AND PROVIDE PERMANENT GROUND COVER. 4.8. SEDIMENT STORAGE BASINS - INSPECT TEMPORARY SEDIMENT TRAPS AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (1 INCH OR GREATER) RAINFALL EVENT AND REPAIR IMMEDIATELY. REMOVE SEDIMENT, AND RESTORE THE TRAP TO ITS ORIGINAL DIMENSIONS WHEN THE SEDIMENT HAS ACCUMULATED TO ONE-HALF THE DESIGN DEPTH OF THE TRAP. PLACE THE SEDIMENT THAT IS REMOVED IN THE DESIGNATED DISPOSAL AREA, AND REPLACE THE PART OF THE GRAVEL FACING THAT IS IMPAIRED BY SEDIMENT. CHECK THE STRUCTURE FOR DAMAGE FROM EROSION OR PIPING. PERIODICALLY CHECK THE DEPTH OF THE SPILLWAY TO ENSURE IT IS A MINIMUM OF 1.5 FEET BELOW THE LOW POINT OF THE EMBANKMENT. SPILLWAYS ARE TO BE INSTALLED IN UNDISTURBED GROUND. IMMEDIATELY FILL ANY SEDIMENT OF THE EMBANKMENT TO SLIGHTLY ABOVE DESIGN GRADE. ANY RIP RAP DISPLACED FROM THE SPILLWAY MUST BE REMOVED IMMEDIATELY. AFTER ALL SEDIMENT -PRODUCING AREAS HAVE BEEN PERMANENTLY STABILIZED, REMOVE THE STRUCTURE AND ALL UNSTABLE SEDIMENT. SMOOTH THE AREA TO BLEND WITH THE ADJOINING AREAS, AND STABILIZE PROPERLY. 4.9. SOIL STOCKPILES - SEEDING OR COVERING STOCKPILES WITH TARP OR MULCH IS REQUIRED AND WILL REDUCE EROSION PROBLEMS. TARPS SHOULD BE KEYED IN AT THE TOP OF THE SLOPES TO KEEP WATER FROM RUNNING UNDERNEATH THE PLASTIC. IF A STOCKPILE IS TO REMAIN FOR FUTURE USE AFTER THE PROJECT IS COMPLETE, THE FINANCIAL RESPONSIBILITY MUST NOTIFY WAKE COUNTY OF A NEW RESPONSIBLE PARTY FOR THE STOCKPILE. ESTABLISH AND MAINTAIN A VEGETATIVE BUFFER AT THE TOE OF THE SLOPE (WHERE PRACTICAL) EROSION CONTROL NOTES: 1. REFER TO C3.00 FOR GENERAL NOTES. 2. ALL EROSION CONTROL MEASURES SHALL BE INSTALLED IN BEST LOCATION BASED ON FIELD CONDITIONS. 3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE INSTALLATION AND MAINTENANCE OF ALL EROSION CONTROL MEASURES THROUGHOUT THE DURATION OF CONSTRUCTION. 4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE INSTALLATION OF CONSTRUCTION ENTRANCES AS NECESSARY TO PREVENT THE TRACKING OF SEDIMENT OFF -SITE. THE OWNER IS RESPONSIBLE FOR MAINTENANCE OF ALL PERMANENT EROSION CONTROL METHODS AFTER CONSTRUCTION IS COMPLETE, IF ANY PERMANENT METHODS ARE REQUIRED. 5. APPROVAL OF THIS EROSION AND SEDIMENTATION CONTROL (ESC) PLAN DOES NOT CONSTITUTE AN APPROVAL OF DRAINAGE DESIGN (E.G., SIZE AND LOCATION OF ROADS, PIPES, RESTRICTORS, CHANNELS, RETENTION FACILITIES, UTILITIES, ETC.). 6. THE IMPLEMENTATION OF THESE ESC PLANS AND THE CONSTRUCTION, MAINTENANCE, REPLACEMENT, AND UPGRADING OF THESE ESC FACILITIES IS THE RESPONSIBILITY OF THE CONTRACTOR AND ESC SUPERVISOR UNTIL ALL CONSTRUCTION IS APPROVED. 7. DURING THE CONSTRUCTION PERIOD, NO DISTURBANCE BEYOND THE LIMITS OF DISTURBANCE (L.O.D.) SHALL BE PERMITTED. THE L.O.D. SHALL BE MAINTAINED BY THE ESC SUPERVISOR FOR THE DURATION OF CONSTRUCTION. 8. THE ESC FACILITIES SHOWN ON THIS PLAN MUST BE CONSTRUCTED PRIOR TO OR IN CONJUNCTION WITH ALL CLEARING AND GRADING SO AS TO ENSURE THAT THE TRANSPORT OF SEDIMENT TO DRAINAGE SYSTEMS, AND ADJACENT PROPERTIES IS MINIMIZED. 9. THE ESC FACILITIES SHOWN ON THIS PLAN ARE THE MINIMUM REQUIREMENTS FOR ANTICIPATED SITE CONDITIONS. DURING THE CONSTRUCTION PERIOD, THESE ESC FACILITIES SHALL BE UPGRADED AS NEEDED FOR UNEXPECTED STORM EVENTS AND MODIFIED TO ACCOUNT FOR CHANGING SITE CONDITIONS (E.G., ADDITIONAL SUMP PUMPS, RELOCATION OF DITCHES AND SILT FENCES, ETC.). 10. THE ESC FACILITIES SHALL BE INSPECTED DAILY BY THE ESC SUPERVISOR AND MAINTAINED TO ENSURE CONTINUED PROPER FUNCTIONING. WRITTEN RECORDS SHALL BE MAINTAINED BY THE CONTRACTOR THROUGHOUT THE DURATION OF THE PROJECT. COPIES OF THE WRITTEN INSPECTION REPORTS SHALL BE PROVIDED TO THE OWNER'S REPRESENTATIVE TWICE PER WEEK AND AFTER RAINS OF GREATER THAN 1". RAIN GAUGE REQUIRED ON SITE. 11. ANY AREAS OF EXPOSED SOILS THAT WILL NOT BE DISTURBED FOR FOURTEEN DAYS SHALL BE IMMEDIATELY STABILIZED WITH THE APPROVED ESC METHODS (E.G., SEEDING, MULCHING, PLASTIC COVERING, ETC.). 12. THE ESC FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED A MINIMUM OF ONCE A MONTH OR WITHIN FORTY EIGHT (48) HOURS FOLLOWING A STORM EVENT. 13. AT NO TIME SHALL MORE THAN ONE (1) FOOT OF SEDIMENT BE ALLOWED TO ACCUMULATE WITHIN A CATCH BASIN. ALL CATCH BASINS AND CONVEYANCE LINES SHALL BE CLEANED PRIOR TO PAVING. THE CLEANING OPERATION SHALL NOT FLUSH SEDIMENT LADEN WATER INTO THE DOWNSTREAM SYSTEM. 14. STABILIZED CONSTRUCTION ENTRANCES AND ROADS SHALL BE INSTALLED AT THE BEGINNING OF CONSTRUCTION AND MAINTAINED FOR THE DURATION OF THE PROJECT. ADDITIONAL MEASURES, SUCH AS WASH PADS, MAY BE REQUIRED TO ENSURE THAT ALL PAVED AREAS ARE KEPT CLEAN FOR THE DURATION OF THE PROJECT. 15. WHERE STRAW MULCH FOR TEMPORARY EROSION CONTROL IS REQUIRED, IT SHALL BE A MINIMUM THICKNESS OF 2 TO 3 INCHES. 16. INTERIM SLOPES MAY BE GRADED TO A MAXIMUM SLOPE OF 2:1 (HORIZONTAL: VERTICAL); CUT SLOPES SHALL BE LIMITED TO A MAXIMUM SLOPE OF 1.5:1. 17. THE SURFACE OF AREAS SLOPES STEEPER THAN 1 VERTICAL TO 4 HORIZONTAL THAT ARE TO RECEIVE INTERIM FILL SHALL BE PLOWED, FURROWED, TILLED OR BROKEN UP PRIOR TO PLACING FILL SO THAT FILL MATERIAL WILL BOND WITH EXISTING . " SURFACE. INTERIM FILL SHALL BE PLACED AS SPECIFIED FOR PERMANENT FILLS AND IN LIFTS NOT GREATER THAN 6". 18. PROVIDE DUST CONTROL MEASURES INCLUDING, BUT NOT LIMITED TO, WETTING DOWN TO CONTROL DUST ON SITE, IN ORDER TO PREVENT ANNOYANCE/AND OR DAMAGE TO ADJACENT SITES. CALCIUM CHLORIDE OR ANY OTHER CHEMICAL MATERIAL MAY NOT BE USED ON SUBGRADES OF AREAS TO BE SEEDED OR PLANTED. 19. SEDIMENT LADEN RUNOFF FROM EXCAVATIONS SHALL NOT BE PUMPED DIRECTLY TO STORM DRAINAGE. 20. INSPECTOR REFERS TO LOCAL JURISDICTIONAL (NCDENR OR LOCAL) LAND QUALITY INSPECTOR OR HIS REPRESENTATIVE. FIELD INSPECTIONS MAY REQUIRE ADDITIONAL SEDIMENTATION AND EROSION CONTROL MEASURES AS DEEMED NECESSARY BY THE INSPECTOR. 21. CONSTRUCTION AND MAINTENANCE OF ALL EROSION CONTROL DEVICES SHALL CONFORM TO THE STANDARDS SET FORTH IN THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENT, HEALTH AND NATURAL RESOURCES LAND QUALITY SECTION EROSION AND SEDIMENT CONTROL PLANNING LAND DESIGN MANUAL. 22. NOTIFICATION OF LAND RESOURCES SEDIMENT AND EROSION CONTROL SELF -INSPECTION PROGRAM: THE PERSON RESPONSIBLE FOR LAND -DISTURBING ACTIVITIES IS REQUIRED TO INSPECT THE PROJECT AFTER EACH PHASE OF THE PROJECT AND CONTINUED UNTIL PERMANENT GROUND COVER IS ESTABLISHED IN ACCORDANCE WITH NCGS 113A-54.1 AND 15A NCAC 4B.0131 TO MAKE SURE THAT THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN IS BEING FOLLOWED. THE SELF -INSPECTION REPORT FORM IS AVAILABLE AS AN EXCEL SPREADSHEET FORM HTTP://VWVW.DLR.ENR.STATE.NC.US/PAGES/SEDIMENTATION NEW.HTML 23. SEED, MULCH, AND TACK SHALL BE INSTALLED BETWEEN THE PERIMETER MEASURES AND THE DIVERSION DITCHES AND THE SEDIMENT BASIN. SEEDING PREPARATION: 1. CHISEL COMPACTED AREAS AND SPREAD TOPSOIL 3 INCHES DEEP OVER ADVERSE SOIL CONDITIONED, IF AVAILABLE. 2. RIP THE ENTIRE AREA TO 6 INCHES DEPTH. 3. REMOVE ALL LOOSE ROCK, ROOTS, AND OTHER OBSTRUCTIONS LEAVING SURFACE REASONABLY SMOOTH AND UNIFORM. 4. APPLY ALL AGRICULTURAL LIME, FERTILIZER, AND SUPERPHOSPHATE UNIFORMLY AND MIX WITH SOIL (SEE BELOW). 5. CONTINUE TILLAGE UNTIL A WELL PULVERIZED, FIRM, REASONABLY UNIFORM 4 TO 6 INCHES DEEP SEEDBED IS PREPARED. 6. SEED ON A FRESHLY PREPARED SEED BED AND COVER SEED LIGHTLY WITH SEEDING EQUIPMENT OR CULTIPACK AFTER SEEDING. 7. MULCH IMMEDIATELY AFTER SEEDING AND ANCHOR MULCH. 8. INSPECT ALL SEEDED AREAS AND MAKE NECESSARY REPAIRS OR RESENDING WITHIN THE PLANTING SEASON, IF POSSIBLE. IF STAND SHOULD BE OVER 60% DAMAGED , REESTABLISH FOLLOWING ORIGINAL LIME, FERTILIZER AND SEEDING RATES. 9. INSPECT ALL SEEDED AREAS AND MAKE NECESSARY REPAIRS OR RESENDING WITHIN THE PLANTING SEASON, IF POSSIBLE. IF STAND SHOULD BE OVER 50% DAMAGED , REESTABLISH FOLLOWING ORIGINAL LIME, FERTILIZER AND SEEDING RATES AND LANDSCAPING PLANS. 10. SEE LANDSCAPING PLANS FOR PERMANENT SEEDING, MULCHING, AND FERTILIZING RATES. ALL AREAS NOT DESIGNATED TO RECEIVE PLANTS SHALL BE SEEDED PER THE LANDSCAPING PLANS. CHISEL COMPACTED AREAS AND SPREAD TOPSOIL THREE INCHES DEEP OVER ADVERSE SOIL CONDITIONS, IF AVAILABLE. 2. RIP THE ENTIRE AREA TO SIX INCHES DEEP. 3. REMOVE ALL LOOSE ROCK, ROOTS AND OTHER OBSTRUCTIONS, LEAVING SURFACE REASONABLY SMOOTH AND UNIFORM. 4. APPLY AGRICULTURAL LIME, FERTILIZER AND SUPER PHOSPHATE UNIFORMLY AND MIX WITH SOIL (SEE ADMIXTURE BELOW). 5. CONTINUE TILLAGE UNTIL A WELL -PULVERIZED, FIRM, REASONABLY UNIFORM SEEDBED IS PREPARED FOUR TO SIX INCHES DEEP. 6. SEED ON A FRESHLY PREPARED SEEDBED AND COVER SEED LIGHTLY WITH SEEDING EQUIPMENT OR CULTIPACK AFTER SEEDING. 7. MULCH IMMEDIATELY AFTER SEEDING AND ANCHOR MULCH. 8. INSPECT ALL SEEDED AREAS AND MAKE NECESSARY REPAIRS OR RE-SEEDINGS WITHIN THE PLANTING SEASON, IF POSSIBLE. IF STAND SHOULD BE MORE THAN 60% DAMAGED, RE-ESTABLISH FOLLOWING THE ORIGINAL LIME, FERTILIZER AND SEEDING RATES. 9. CONSULT S&EC ENVIRONMENTAL ENGINEERS ON MAINTENANCE TREATMENT AND FERTILIZATION AFTER PERMANENT COVER IS ESTABLISHED. SHOULDERS, SIDE DITCHES, SLOPES (MAX 3:1) DATE AUG 15 - NOV 1 NOV 1 - MAR 1 MAR 1 - APR 15 APR 15 - JUN 30 JUL 1 - AUG 15 SLOPES (3:1 TO 2:1) DATE MAR 1 - JUN 1 (MAR 1 - APR 15) TYPE TALL FESCUE TALL FESCUE & ABRUZZI RYE TALL FESCUE HULLED COMMON BERMUDAGRASS TALL FESCUE **"BROWNTOP MILLET ***OR SORGHUM-SUDAN HYBRIDS TYPE PLANTING RATE 300 LBS/ACRE 300 LBS/ACRE 25 LBS/ACRE 300 LBS/ACRE 25 LBS/ACRE 120 LBS/ACRE 35 LBS/ACRE 30 LBS/ACRE ***BROWNTOP MILLET 50 LBS/ACRE PLANTING RATE ADD TALL FESCUE 120 LBS/ACRE (MAR 1 - JUN 30) OR ADD HULLED COMMON BERMUDAGRASS 25 LBS/ACRE ***TALL FESCUE AND JUN 1 - SEP 1 ***BROWNTOP MILLET ***OR SORGHUM-SUDAN HYBRIDS SEP 1 - MAR 1 ANNUAL RYE AND TALL FESCUE ADD ABRUZZI RYE 120 LBS/ACRE 35 LBS/ACRE 30 LBS/ACRE 70 LBS/ACRE 120 LBS/ACRE (NOV 1 - MAR 1) 25 LBS/ACRE CONSULT CONSERVATION ENGINEER OR SOIL CONSERVATION SERVICE FOR ADDITIONAL INFORMATION CONCERNING OTHER ALTERNATIVES FOR VEGETATION OF DENUDED AREAS. THE ABOVE VEGETATION RATES ARE THOSE WHICH DO WELL UNDER LOCAL CONDITIONS; OTHER SEEDING RATE COMBINATIONS ARE POSSIBLE. ***TEMPORARY - RESEED ACCORDING TO OPTIMUM SEASON FOR DESIRED PERMANENT VEGETATION. DO NOT ALLOW TEMPORARY COVER TO GROW OVER 12" IN HEIGHT BEFORE MOWING, OTHERWISE FESCUE MAY BE SHADED OUT. AGRICULTURAL LIMESTONE: 2 TONS/ACRE WITH 3 TONS/ACRE IN CLAY SOILS OR PER SOILS TEST AND AN ASPHALT EMULSION RATE OF 400 GALLONS/ACRE. FERTILIZER: 1,000 LBS/ACRE - 10-10-10 SUPERPHOSPHATE: 500 LBS/ACRE - 20% ANALYSIS MULCH: 2 TONS/ACRE - SMALL GRAIN STRAW ANCHOR: ASPHALT EMULSION AT 400 GALS/ACRE TOTAL AREA OF DISTURBANCE 19.45 AC/ 847,462 SF TREE PROTECTION NOTES: 1. TREE PROTECTION FENCING MUST BE IN PLACE PRIOR TO ANY DEMOLITION, LAND DISTURBANCE OR ISSUANCE OF A GRADING PERMIT. OR OBTAIN A GRADING PERMIT THEN TREE PROTECTION FENCING MUST BE IN PLACE PRIOR TO ANY DEMOLITION, LAND DISTURBANCE 2. TREE PROTECTION FENCING SHALL INCLUDE WARNING SIGNS POSTED IN BOTH ENGLISH AND SPANISH, AS FOLLOWS: "NO TRESPASSING/TREE PROTECTION AREA/PROHIBIDO ENTRAR / ZONA PROTECTORA PARA LOS ARBOLES." 3. PROTECTION OF EXISTING VEGETATION: AT THE START OF GRADING INVOLVING THE LOWERING OF EXISTING GRADE AROUND A TREE OR STRIPPING OF TOPSOIL, A CLEAN, SHARP, VERTICAL CUT SHALL BE MADE AT THE EDGE ON THE TREE ROOTS OUTSIDE OF THE TREE SAVE AREA. THIS SHALL OCCUR AT THE SAME TIME THAT OTHER EROSION CONTROL MEASURES ARE INSTALLED. THE TREE PROTECTION FENCING SHALL BE INSTALLED ON THE SIDE OF THE CUT FARTHEST AWAY FROM THE TREE TRUNK AND SHALL REMAIN IN PLACE UNTIL ALL CONSTRUCTION IN THE VICINITY OF THE TREES IS COMPLETE. 4. NO STORAGE OF MATERIALS, FILL, OR EQUIPMENT AND NO TRESPASSING SHALL BE ALLOWED WITHIN THE BOUNDARY OF THE PROTECTED TREE AREA. 5. TREE PROTECTION AREA: EQUALS ONE FOOT OF RADIUS FOR EVERY INCH OF DIAMETER OF EXISTING TREES, OR SIX FOOT RADIUS, WHICHEVER IS GREATER. NO DISTURBANCE ALLOWED WITHIN THIS AREA. EROSION CONTROL NOTES: 1. INSPECTOR REFERS TO LOCAL JURISDICTIONAL (NCDENR OR LOCAL) LAND QUALITY INSPECTOR OR HIS REPRESENTATIVE. FIELD INSPECTIONS MAY REQUIRE ADDITIONAL SEDIMENTATION AND EROSION CONTROL MEASURES AS DEEMED NECESSARY BY THE INSPECTOR. 2. CONSTRUCTION AND MAINTENANCE OF ALL EROSION CONTROL DEVICES SHALL CONFORM TO THE STANDARDS SET FORTH IN THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENT, HEALTH AND NATURAL RESOURCES LAND QUALITY SECTION EROSION AND SEDIMENT CONTROL PLANNING LAND DESIGN MANUAL. 3. NOTIFICATION OF LAND RESOURCES SEDIMENT AND EROSION CONTROL SELF -INSPECTION PROGRAM: THE PERSON RESPONSIBLE FOR LAND -DISTURBING ACTIVITIES IS REQUIRED TO INSPECT THE PROJECT AFTER EACH PHASE OF THE PROJECT AND CONTINUED UNTIL PERMANENT GROUND COVER IS ESTABLISHED IN ACCORDANCE WITH NCGS 113A-54.1 AND 15A NCAC 4B.0131 TO MAKE SURE THAT THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN IS BEING FOLLOWED. THE SELF -INSPECTION REPORT FORM IS AVAILABLE AS AN EXCEL SPREADSHEET FORM HTTP://VWVW.DLR.ENR.STATE.NC.US/PAGES/SEDIMENTATION NEW.HTML 4. EROSION AND SEDIMENT CONTROL (E&SC) PERMIT AND A CERTIFICATE OF COVERAGE (COC) MUST BE OBTAINED BEFORE ANY LAND DISTURBING ACTIVITIES (INCLUDING TIMBERING AND DEMOLITION) OCCUR. 5. WHEN THE PROJECT IS COMPLETE, THE PERMITTEE SHALL CONTACT DEMLR TO CLOSE OUT THE E&SC PLAN. 6. CONTACT THE DEMLR RALEIGH REGIONAL OFFICE AT LEAST 48 HOURS PRIOR TO COMMENCING THE LAND -DISTURBING ACTIVITY. THE CONTACT NUMBER IS (919)791-4200. 7. ALL PERIMETER SILT FENCE WILL REMAIN IN OPERATING CONDITION DURING ALL PHASES OF CONSTRUCTION. 8. PERIMETER MEASURES MUST BE LEFT IN PLACE UNTIL ALL UPLAND AREAS ARE PERMANENTLY STABILIZED. AFTER SITE IS PERMANENTLY STABILIZED, REMOVE ALL TEMPORARY EROSION CONTROL MEASURES AND PROVIDE PERMANENT SEEDING WHERE TEMPORARY MEASURES HAVE BEEN REMOVED AND GROUND COVER IS NOT ADEQUATE. SEDIMENT BASINS MAY NOT BE REMOVED OR CONVERTED TO PERMANENT SCMS UNTIL ALL UPLAND AREAS ARE PERMANENTLY STABILIZED. 9. PER NPDES REQUIREMENTS, A RAIN GAUGE, SELF -INSPECTIONS RECORDS, PERMIT, CERTIFICATE OF COVERAGE, AND S&E PLAN ARE REQUIRED TO BE MAINTAINED ON SITE AND ACCESSIBLE DURING INSPECTION. IT IS RECOMMENDED THAT THESE ITEMS BE PLACE IN A PERMITS BOX AT THE BEGINNING OR ENTRANCE OF PROJECT. 10. ALL SEDIMENT CONTAINMENT DEVICES SHALL BE DEWATERED THROUGH A SILT BAG WITH A FLOATING INTAKE THAT IS CONSTANTLY MONITORED WHILE IN USE. 11. A LAYER OF SAND, SCREENINGS OR FINES WILL BE PLACED ON PAVED SURFACES PRIOR TO DEPOSITION OF ANY EXCAVATED MATERIALS. 12. ALL DITCHES ALONG THE FORCEMAIN CORRIDOR WILL BE STABILIZED AT THE END OF THE DAY. SEQUENCE OF CONSTRUCTION ACTIVITIES: (PHASE 1) 1. OBTAIN GRADING PERMIT. 2. DETERMINE AND MARK LIMITS OF DISTURBANCE. 3. A PRE -CONSTRUCTION CONFERENCE MUST BE HELD 48 HOURS PRIOR TO THE START OF ANY CONSTRUCTION ACTIVITIES. THE EROSION CONTROL INSPECTOR, ARCHITECT, ENGINEER, AND CONTRACTOR SHALL BE PRESENT TO SATISFY REQUIREMENTS. (SEE NOTE #4 UNDER "SEQUENCE OF CONSTRUCTION ACTIVITIES") 4. INSTALL CONSTRUCTION ENTRANCE, TREE PROTECTION FENCING, SILT FENCE, PERIMETER EROSION CONTROL DEVICES AND ALL REQUIRED BASINS AND TRAPS. BASINS B-02 AND B-03 SHALL HAVE LEVEL SPREADERS AT OUTFALL LOCATIONS TO PROVIDE NON EROSION CONVEYANCE FROM EACH BASINS RESPECTIVE OUTFALLS. 5. SCHEDULE SITE INSPECTION. 6. CONSTRUCT REMAINING EROSION CONTROL MEASURES AS REQUIRED. 7. REMOVE AND/OR STORE TOPSOIL. 8. UPON APPROVAL TO PROCEED BY THE EROSION CONTROL INSPECTOR, HARVEST ANY TIMBER. (SEE NOTE #4 UNDER "SEQUENCE OF CONSTRUCTION ACTIVITIES"). EROSION AND SEDIMENT CONTROL PERMIT (E&SC) AS WELL AS APPROVAL FROM THE EROSION CONTROL INSPECTOR MUST BE OBTAINED BEFORE AND GRADING OR TIMBERING OPERATIONS CAN BEGIN. ONCE PERMIT AND APPROVAL OBTAINED PROCEED TO PHASE2 SEQUENCING. 0 z O z O z 0 0 4\c ' SHADY GREENS DR HILLTOP NEEDMORE RD a� SITE JS VICINITY MAP: (NOT TO SCALE) COPYRIGHT © 2020 SEPI ENGINEERING & CONSTRUCTION SEQUENCE OF CONSTRUCTION ACTIVITIES: (PHASE 2) 9. BEGIN GRADING OPERATIONS. 10. CLEAN SEDIMENT BASINS/TRAPS WHEN ONE-HALF FULL. ALL DEVICES SHALL BE DE -WATERED THROUGH A SILT BAG WITH A FLOATING INTAKE THAT IS CONSTANTLY MONITORED WHILE IN USE. 11. ALL STREETS SURROUNDING THE PROJECT SHALL BE KEPT CLEAN AT ALL TIMES. 12. PLACE TEMPORARY SEEDING ON ALL DISTURBED AREAS THAT WILL BE IDLE 14 DAYS OR LONGER. 13. ALL UPSTREAM AND DOWNSTREAM BASIN SLOPES SHALL BE COVERED WITH SUITABLE ROLLED EROSION CONTROL PRODUCT (RECP) AFTER SEEDING. 14. ALL CHANNELS, DITCHES, AND SWALES SHALL BE LINED TO THE TOP OF THE BANK. 15. ANY BARE SOILS BETWEEN DOWNSTREAM TOE OF BASIN SLOPES OR DIVERSIONS TO THE LIMITS OF DISTURBANCE (L.O.D.) AND PERIMETER EROSION AND SEDIMENT CONTROL MEASURES WILL BE SEEDED, MULCHED AND TACKED. 16. PERMANENT SURFACE STABILIZATION SHALL BE INSTALLED FOR ALL AREAS WITHIN 14 DAYS AFTER FINAL GRADE HAS BEEN REACHED. AS NECESSARY, FERTILIZE, WATER AND RESEED AS REQUIRED TO ESTABLISH AND MAINTAIN A VIGOROUS STAND OF GRASS. 17. AFTER COMPLETION OF CONSTRUCTION AND THE SITE IS STABILIZED, REMOVE ALL ACCUMULATED SEDIMENT FROM SEDIMENT TRAPPING MEASURES AND DISPOSE BY MEANS DEEMED ACCEPTABLE BY THE ENGINEER. SCHEDULE SITE INSPECTION. UPON APPROVAL BY THE EROSION CONTROL INSPECTOR, REMOVE TEMPORARY EROSION CONTROL MEASURES, SMOOTH AREA AND APPLY APPROPRIATE STABILIZATION. 18. SEDIMENT BASINS B-02 AND B-03 SHALL BE DEWATERED AND DILIGENTLY MONITORED UNTIL SITE IS FULLY STABILIZED AND APPROVAL IS GRANTED BY THE EROSION CONTROL INSPECTOR TO CLOSE OUT BASINS B-02, B-03, AND ALL RELATIVE EROSION CONTROL MEASURES. SEDIMENT BASIN B-01 SHALL BE DEWATERED UNTIL THE SITE IS FULLY STABILIZED AND APPROVAL FROM THE EROSION CONTROL INSPECTOR IS GRANTED, ONLY THEN CAN THE BASIN BE CONVERTED TO THE PERMANENT SCM DEVICE. 19. STORMWATER PERMIT INSPECTION REPORTS SHALL BE PERFORMED BY THE CONTRACTOR UNTIL NOTIFIED OTHERWISE BY THE EROSION CONTROL INSPECTOR. 20. SELF -INSPECTIONS FOR EROSION AND SEDIMENTATION CONTROL MEASURES ARE TO BE PERFORMED AT LEAST ONCE EVERY SEVEN CALENDAR DAYS AND WITHIN 24 HOURS OF EVERY RAIN EVENT OF GREATER THAN 1 INCH. ANY NEEDED REPAIRS SHALL BE MADE IMMEDIATELY TO MAINTAIN MEASURES AS DESIGNED. ALL ESC MEASURES SHALL BE MAINTAINED AS SPECIFIED IN THE CONSTRUCTION DETAILS ON THIS PLAN. A RAIN GAUGE SHALL BE INSTALLED AT THE PROJECT SITE FOR MONITORING. www.Iittleonline.com This drawing and the design shown are the property of Little Diversified Architectural Consulting. The reproduction, copying or other use of this drawing without their written consent is prohibited and any infringement will be subject to legal action. 0 Little 2021 15834 09.06.2Q22: .,,a4(i......... �� ,,, „lllj illi111tt " BID SET 09.06.2022 NO. REASON DATE PRINCIPAL IN CHARGE Jerry Guerrier, AIA PROJECT MANAGER Mary Beth Russo DESIGN TEAM STEWART WAKE COUNTY PUBLIC SCHOOL SYSTEM HILLTOP NEEDMORE ROAD ELEMENTARY SCHOOL 4575 Hilltop Needmore Road Fuquay-Varina, NC 27526 WCPSS# 862-520 SHANE WEBSTER, PM 514.13014.00 EROSION CONTROL PLAN (NOTES) C4.00 1 2 3 4 5 6 7 LITTLE DIVERRtED ARCHITECTURAL CONSULTING F L:\Projects\2020\L20040 - WCPSS E-44\DWGS\2-Design\3-Sheets\L20040-C4.00 Erosion Control Plan.dwg Nov 29, 2022 - 10:03am RIB • ♦ )v1UNITY WATCH SIRttI STOP ♦ • • PROPOSED CHECK DAM RIP RAP APRON (RR-4) 5.0'L X 3.8' W X 9" THICK 3" 0 CLASS A STONE TEMPORARY 15" HDPE PIPE CROSSING UNDER CONSTRUCTION ENTRANCE AT 0.50% SLOPE INVERT IN: 384.83 INVERT OUT: 384.66 FG AT CONST. ENTRANCE: 387.04 RIP -RAP INLET PROTECTION • 24" RCP INV: 345.89' EIP LOPE ♦ • ♦ GREENWAY RULE A El 15" RCP INV: 355.59' 15" RCP INV: 355.04' TRANS- - _ _ 15" RCP INV: 349.50' ,INV: 349.01' I.I\/I A7 in. 4" PVC 4' PVC INV: 349.37' PROPOSED CONCRETE WASHOUT SEE DETAIL NCG01/C4.20 PROPOSED TIRE WASH SEE DETAIL 4/C9.12 r PERMIT BOX AND RAIN GAUGE LOCATION HILLTOP NEE PROVIDE PEDESTRIAN BARRICADE \ \\ \\� \ OF \ \ \ Ice) �\ CE: 10.30 AC \\ \ HARDWARE CLOTH AND GRAVEL T1 // ^ I \ II \\ \ INLET PROTECTION �1 / / \ \ l I INITIAL LIMITS DISTURBANCE: TEMPORARY ASPHALT PEDESTRIAN PATH i Ii11111I111111111111111 1111 IItJ�\ 1 Min Mi. 1.1 X AS X °\� \\\� /� 24 HD) 3 6" THICK ABC LAYDOWN AREA FOR STORAGE AND CONSTRUCTION TRAILER LOCATION 6" THICK ABC LAYDOWN AREA FOR EMPLOYEE PARKING GRE EXISTING ENWAY PATH 111 16 I / DIVERSION / RY LINING: STRAW MAT (TYP) STOCKPILE TEMPORARY SEDIMENT BASIN #1: TOP BASIN ELEVATION = 356.00' ' BOTTOM BASIN ELEVATION = 353.00' SURFACE AREA: 18,370 SF ' 1 DEWATERING TIME: 3.99 DAYS SEE DETAIL 1/C9.11 TEMPORARY ASPHALT PEDESTRIAN PATH / TEMPORARY DIVERSION DITCH #2 DRAINAGE AREA #1 •N° 1 0• PFt�s PG�E , 00-14N Pg�NP GSM �0�pS oo�p���Zg���6 O� RE;:36I QG :p2 'IC MP a21 kgo Go Ovv G6l 9G y,$ PAN• o$ PG 09M 90� 24' WIDE DOUBLE GATES TO PROVIDE PEDESTRIANS WITH SAFE TRAIL • ACCESS, TO REMAIN CLOSED AFTER BMP INSTALLATION TEMPORARY ASPHALT PATH u RIP -RAP APRON (RR-1) 12'LX6'WX22"T CLASS B 6" 0 STONE TEMPORARY 24" HDPE SLOPE DRAIN INTO SEDIMENT BASIN RIP -RAP APRON (RR-2) 12'LX6'WX22"T 6" 0 CLASS B STONE RIP -RAP APRON (RR-3) 12'LX6'WX9"T 3" 0 CLASS A STONE INVERT ELEVATION = 352.50 32' EMERGENCY SPILLWAY a • 3" SKIMMER W/ 2.5" ORIFICE 0 • PORTION OF PPJ TO BE RE MOVED• N ti 7.. \ TEMPORARY 24" HDPE PIPE AT PATH CROSSING. PROTECT OUTFALL WITH ROLLED EROSION CONTROL PROTECTION DRAINAGE AREA #1 8.87 AC • • ♦ EROSION CONTROL LEGEND: SYMBOL SF TP DD DIP °IP DESCRIPTION LIMITS OF DISTURBANCE SILT FENCE TREE PROTECTION DIVERSION DITCH 100 YR FLOOD ELEV. DETAIL REFERENCE N/A 3/C9.10 2/C9.10 4/C9.10 N/A BLOCK & GRAVEL INLET PROTECTION 1/C9.12 SILT FENCE AND WIRE INLET PROTECTION 8/C9.11 HORSE SHOE INLET PROTECTION 7/C9.11 6/C9.11 6/C9.10 SILT FENCE OUTLET CHECK DAM RIPRAP DISSIPATER N/A TEMPORARY CONSTRUCTION ENTRANCE 1/C9.10 ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH NORTH CAROLINA EROSION CONTROL SPECIFICATIONS FOR REFERENCE ONLY AND IS SHOWN TO IDENTIFY MAINTENANCE REQUIREMENTS UNTIL NEXT PHASE OF EROSION ADDED TO THE PROJECT. • 0 40 80 SCALE: 1" = 80' 160 NORTH www.Iittleonline.com This drawing and the design shown are the property of Little Diversified Architectural Consulting. The reproduction, copying or other use of this drawing without their written consent is prohibited and any infringement will be subject to legal action. 0 Little 2021 SE 15834 9; 09.06.2222: „ t_01(�` `1111 111,11“1'tt BID SET 09.06.2022 NO. REASON DATE PRINCIPAL IN CHARGE Jerry Guerrier, AIA PROJECT MANAGER Mary Beth Russo DESIGN TEAM STEWART WAKE COUNTY PUBLIC SCHOOL SYSTEM HILLTOP NEEDMORE ROAD ELEMENTARY SCHOOL 4575 Hilltop Needmore Road Fuquay-Varina, NC 27526 WCPSS# 862-520 SHANE WEBSTER, PM 514.13014.00 EROSION CONTROL PLAN (PHASE 1) C4.01 LITTLE DIVERRtED ARCHITECTURAL CONSULTING F L:\Projects\2020\L20040 - WCPSS E-44\DWGS\2-Design\3-Sheets\L20040-C4.00 Erosion Control Plan.dwg Nov 29, 2022 - 10:03am 1 2 • • • • ee WATCH • • PROPOSED CHECK DAM RIP -RAP OUTLET PROTECTION TEMPORARY 15" HDPE PIPE CROSSING UNDER CONSTRUCTION ENTRANCE AT 0.50% SLOPE INVERT IN: 384.83 INVERT OUT: 384.66 FG AT CONST. ENTRANCE: 387.04 RIP -RAP INLET PROTECTION • • PROPOSED CONCRETE WASHOUT SEE DETAIL NCG01/C4.20 PROPOSED TIRE WASH . PERMIT BOX AND RAIN GAUGE LOCATION FRENCH DRAIN: 6" PERFORATED HDPE PIPE WITH POLYESTER WOVEN SOCK WRAPPED IN WASHED #57 STONE AND GEOTECHNICAL FITLER FABIRC, SEE DETAIL THIS SHEET. ALL FRENCH DRAINS TO SLOPE AT 1°/0 AND DAYLIGHT TO DISCHARGE TO THE EDGE OF THE GRADING AND THEN TRANSITION TO SOLID WALL PIPE AND EXTEND TO BOTTOM OF DITCH OR SEDIMENT BASIN AS INDICATED. • • • • 24" RCP • • • • GREENWAY RULE 15" RCP 15" RCP 15" RCP 4" PVC 4" PVC 3 • • INV ELEV. = 372.50 INV ELEV. = 372.50 INITIAL LIMITS OF DISTURBANCE: 10.30 AC 24' WIDE DOUBLE ACCESS GATES 20' WIDE ACCESS HILLTOP NE \ r\\ \\\ ( .. \\\ 7 HARDWARE CILNOLTEHT pARN0DTGERcATVI0ENL 7/-j\--j:r2j,// 1.1)1. P ) ( "\\\ 6" THICK ABC LAYDOWN AREA FOR STORAGE AND CONSTRUCTION TRAILER LOCATION 6" THICK ABC LAYDOWN AREA FOR EMPLOYEE PARKING A.TE_McF:ORTY A,S\ PITIALT ...\\•no FUTURE BUILDING SHOWN FOR REFERENCE INV ELEV. = 369.25 FUTURE BU LDING SHOWN FOR REFERENCE TEMPORARY DIVERSION DITCH FUTURE BUILDING SHOWN FOR REFERENCE DRAINAGE AREA #2 9.60 AC 4 TEMPORARY 15" 54. HDPE SLOPE DRAIN ‘.1 • • • TEMPORARY ASPHALT PATH 55, oc CDC3\ C)Ica\-; \-6101;11\115;9-b,bb.:5, \\\,56c • TEMPOR R DIVERSION DITCH #1 TEMPCRARY LINING: STRAW NET WI TF MAT (TYP) TEMPORARY 24" PIPE AT PATH 66 WO CROSSING. USE ROLLED EROSION — . . 24' WIDE DOUBLE GATES TO PROVIDE PEDESTRIANS WITH SAFE TRAIL ACCESS, TO REMAIN CLOSED AFTER BMP INSTALLATION l',..I.NV ELEV. = 357.37 ! \ STOCKPILE TEMPORARY SEDIMENT BASIN #1: TOP BASIN ELEVATION = 358.00' BOTTOM BASIN ELEVATION = 354.00' SURFACE AREA: 18,370 SF ; SEE DETAIL 1/C9.11 TEMPORARY ASPHALT PEDESTRIAN PATH • • • • TEMPORARY DIVERSION DITCH #2 REPLACE EXISTING JUTE NET BAFFLE WITH COIR FIBER MESH BAFFLE 16 • 5 11\ 32' EMERGENCY SPILLWAY SKIMMER AND TEMPORARY OUTLET PIPE RIP -RAP APRON (RR-1) CLASS B 6" 0 STONE TEMPORARY 24" HDPE SLOPE DRAIN INTO SEDIMENT BASIN RIP -RAP APRON (RR-2) RIP -RAP APRON (RR-3) INVERT ELEVATION = 352.5C DEWATERING SUMP A PUMP AND FILTER BAG EROSION CONTROL LEGEND: SYMBOL TP DD IP 01P DESCRIPTION LIMITS OF DISTURBANCE SILT FENCE TREE PROTECTION DIVERSION DITCH 100 YR FLOOD ELEV. BLOCK & GRAVEL INLET PROTECTION DETAIL REFERENCE N/A 3/C9.10 2/C9.10 4/C9.10 N/A 1/C9.12 SILT FENCE AND WIRE INLET PROTECTION 8/C9.11 HORSE SHOE INLET PROTECTION SILT FENCE OUTLET CHECK DAM RIPRAP DISSIPATER N/A TEMPORARY CONSTRUCTION ENTRANCE 1/C9.10 ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH NORTH CAROLINA EROSION CONTROL SPECIFICATIONS FOR REFERENCE ONLY AND IS SHOWN TO IDENTIFY MAINTENANCE REQUIREMENTS UNTIL NEXT PHASE OF EROSION ADDED TO THE PROJECT. PERFORMED PIPE OLYEATEA WOVEN EXISTING SOIL FRENCH DRAIN DETAIL: SECTION VIEW, NTS SHOULDER CLEAN BACKFILL (SEED OR MULCH PER SPEC) 20.-0" EASEMENT 1.5" BITUMINOUS CONCRETE S9.513 SURFACE COURSE SIDE SLOPES SHALL BE LESS THAN 3:1 (TYP.) UNLESS OTHERWISE INDICATED ON LAYOUT PLANS. CUT AND FILL SLOPES SHALL TT INTO EXISTING SLOPES TO CREATE AN EVEN TRANSMON. 2% MAX. CROSS SLOPE 1. CROSS SLOPE DIRECTION VARIES. SEE LAYOUT PLANS FOR DIRECTtON OF SLOPE. 2. CONTRACTOR IS RESPONSIBLE FOR RE—ESTABLISHING ALL SLOPES DISTURBED BY 3. SEE DETAIL 080.13 FOR AREAS WHERE GROUNDWATER IS PRESENT. 4. IF NATURAL DRAINAGE CROSSES TRAIL IN AN EROSIVE MANNER. ADDMONAL MEASURES SHALL BE REQUIRED TO PASS WATER ACROSS GREENWAY. 5. 20 FT EASEMENT SHALL BE CLEARED OF ALL VEGETATION AND SEEDED APPROPRIATELY. 6. VERTICAL CLEARANCE OF a' FROM GREENWAY SURFACE TO LOWEST VEGETATION SHALL BE REQUIRED. SELECT REMOVAL OF VEGETATION THAT POSES MAINTENANCE ISSUES MAY BE REQUIRED. SHOULDER COMPACTED SUBGRADE 6" ABC STONE DRAWING NOT TO SCALE porch corona TOWN OF FUQUAY-VARINA 10 FT ASPHALT s sHEE- of , 6 • 0 40 80 SCALE: 1" = 80' 7 • 160 NORTH This drawing and the design shown are the propero of Little Diversified Architectural Consulting. The reproduction, copying or other use of this drawing without their written consent is prohibited and any infringement will be subject to legal action. SE 15834 BID SET 09.06.2022 NO. REASON DATE PRINCIPAL IN CHARGE Jerry Guerrier, AIA PROJECT MANAGER Mary Beth Russo DESIGN TEAM STEWART WAKE COUNTY PUBLIC SCHOOL SYSTEM HILLTOP NEEDMORE ROAD ELEMENTARY SCHOOL 4575 Hilltop Needmore Road Fuquay-Varina, NC 27526 WCPSS# 862-520 SHANE WEBSTER, PM 514.13014.00 EROSION CONTROL PLAN (PHASE 2) LITTLE DIVERSIFIED ARCHITECTURAL CONSULTING L:\Projects\2020\L20040 - WCPSS E-44\DWGS\2-Design\3-Sheets\L20040-C4.00 Erosion Control Plan_Building Package.dwg Nov 29, 2022 - 10:05am 1 r ( 2 Otis Raq • / • • • • • • • PROPOSED CHECK DAM EXISTING 5.0'L X 3.8' W X 9" THICK 3" P CLASS A RIP -RAP OUTLET PROTECTION TEMPORARY 15" HDPE PIPE CROSSING UNDER CONSTRUCTION ENTRANCE AT 0.50% SLOPE INVERT IN: 384.83 INVERT OUT: 384.66 FG AT CONST. ENTRANCE: 387.04 EXISTING RIP -RAP INLET PROTECTION • • '/ • Q\P \ • / NG' OPT G� QL 34! O\IE� `NG'� PERG0�1)N®SC ,101 OP SEA,• sTcpczie,0 sox its ,6.T es' ste GO"' FRENCH DRAIN: 6" PERFORATED HDPE PIPE WITH POLYESTER WOVEN SOCK , WRAPPED IN WASHED #57 STONE AND GEOTECHNICAL FITLER FABIRC, SEE DETAIL THIS SHEET. ALL FRENCH DRAINS TO SLOPE AT 1 % AND DAYLIGHT TO DISCHARGE TO THE EDGE OF THE GRADING AND THEN TRANSITION TO SOLID WALL PIPE AND EXTEND TO BOTTOM OF DITCH OR SEDIMENT BASIN AS INDICATED. r • • • EMERGENCY SPILLWAY B-03 (Skimmer Sediment Basin) DISTURBED DA : 1.98 AC TOP OF BERM : 377.00 FT BOTTOM OF POND : 372.00 FT SURFACE AREA : 3,999 SF 6' SPILLWAY CREST ELEV : 375.50 FT SKIMMER PIPE INVERT : 371.00 FT ,a NP .\\\\ \ fix+ ; %dam f PROPOSED CONCRETE \ INLET PROTECTION WASHOUT SEE DETAIL NCG01/C4.20 __. - EXISTING TIRE WASH \ 1 •40'/ / /03/ / HILLTOP NEEDMORE RD ISRTS997 \ P' F5P GcZ.ce, /\r HARDWARE CLOTH AND GRAVEL s) N I EXISTING PERMIT BOX AND / G�\\ \ i . ) INV ELEV. = 371.80 'Ii! h/A ��. . = 372.500 INV ELEV. = 372.50 4 'INV ELEV. = 371.80 INV ELEV. = 372.50 114? INV ELEV. = 371.80 ,1 \\\\ 2.5" FAIRCLOTH SKIMMER W/ 1.75" ORIFICE & TEMPORARY OUTLET PIP rf11I� 1 i.a 10' LEVEL SPREADER (B03-LS) e � SEE DETAIL 9 SHEET C9.11 DEWATERING SUMP PUMP AND FILTER BAG 3 RR-SD-B03 (SEE CALCS) 18" HDPE SLOPE DRAIN, SEE CALCS (SD-B03), Q10= 5.60 cfs DRAINAGE AREA: 1.37 AC / I// TEMPORARY DIVERSION DITCH (TD-B03-2) AREA: 1.08 AC, 1 I / IIV Q10= 4.41 cfs, I I 1 \\\\N Q2: 3.45 cfs 1 1 1 ` \ \ _ \ 1 \\ 1 ` \ \ \\ ,` \ e` -GP N. � � JO N�RSMpTE•\'� Po p�0* PP / \�1 18" HDPE SLOPE DRAIN \ \ \ \ \ \ (SD-B02-1) PER TABLE 6.32a \ \ \ \ \ \ \ \ I I I DA: 0.96 AC, Q 10: 3.92 cfs \ AV A AV [1." ) J 1 \ )�%/ V' RR-SD-B02-1\ /, J /// / // ` (SEE CALCS) 046 RR SD B02 2 \~ 1 1 (SEE CALCS) • • • 6" THICK ABC LAYDOWN AREA FOR EMPLOYEE PARKING TEMPORARY DIVERSION DITCH (TD-B02-1) DA: 0.95 AC, Q2= 3.04 cfs 18" HDPE SLOPE DRAIN 1 (SD-B02-2) PER TABLE 6.32a r, DA: 0.95 AC, Q10: 3.88 cfs ‘,\ EMERGENCY SPILLWAY 0)? •362� STREAM BUFFER r -4J f _ •..4 EXISTING CHECK DAM, TYP. PSP N\Np( \�\\ \\\ \N • \s \\\VC\ INV ELEV. = 362.61 �`��,\\ . EXISTING TEMPORARY \ \\ \� . DIVERSION DITCH \\\ r� EXISTING LINING: STRAW NET WITH MAT (TYP) • INV ELEV. = 367.13 TEMPORARY DIVERSION DITCH (TD-B03-1) AREA: 0.29 AC Q 10= 1.19 cfs Q2= 0.93 cfs • • 4 L ce INV ELEV1` 369.00 f DRAINAGE AREA #1 10.33 AC • • • TA 04 \\ \ \\\\ \ TEMPORARY SEDIMENT BASIN #1: TOP BASIN ELEVATION = 358.00' BOTTOM BASIN ELEVATION = 354.00' SURFACE AREA: 18,370 SF SEE DETAIL 1/C9.11 10' LEVEL ISPREADER ON SHEET • EX TEMPORARY DIVERSION DITCH #2 BLOCK & GRAVEL INLET PROTECTION • • • DRAINAGE AREA #1 REPLACE EXISTING JUTE NET BAFFLE WITH COIR FIBER BAFFLE MATERIAL • • • • • • • • • 5 elet 45\ • co- sc- TEMPORARY DIVERSION DITCH (TD-602-2) DA: 0.96 AC, Q2= 3.07 cfs POROUS BAFFLES (TYP.) DEWATERING SUMP PUMP AND FILTER BAG B-02 (Skimmer Sediment Basin) DISTURBED DA : 2.83 AC TOP OF BERM : 364.00 FT BOTTOM OF POND : 359.00 FT SURFACE AREA : 5,614 SF 10' SPILLWAY CREST ELEV : 362.50 FT SKIMMER PIPE INVERT : 359.00 FT • "\\\"‘ • • 6" FAIRCLOTH SKIMMER & TEMPORARY OUTLET PIPE DOUBLE ROW HIGH HAZARD SILT FENCE • PROP. HORSE -SHOE INLET PROTECTION • aft INN 4*4 EX TEMPORARY 24" PIPE AT PATH CROSSING. USE ROLLED EROSION CONTROL PROTECTION AT OUTFALL. INV ELEV. = 357.37 EX RIP -RAP APRON (RR-1) CLASS B 6" 0 STONE EX TEMPORARY 24" HDPE SLOPE DRAIN INTO SEDIMENT BASIN EX RIP -RAP APRON (RR-2) 6" 0 CLASS B STONE EX RIP -RAP APRON (RR-3) 3" 0 CLASS A STONE INVERT ELEVATION = 352.50 EX DEWATERING SUMP PUMP AND FILTER BAG 32' EMERGENCY SPILLWAY 4. EX 3" SKIMMER W/ 2.5" ORIFICE 0 EX SKIMMER AND TEMPORARY OUTLET PIPE 6 EROSION CONTROL LEGEND: SYMBOL SF TP DD DIP 4VIP DESCRIPTION LIMITS OF DISTURBANCE SILT FENCE DOUBLE ROW HIGH HAZARD SILT FENCE TREE PROTECTION DIVERSION DITCH BAFFLES 100 YR FLOOD ELEV HARDWARE CLOTH AND GRAVEL INLET PROTECTION BLOCK AND GRAVEL INLET PROTECTION HORSE SHOE INLET PROTECTION SILT FENCE OUTLET CHECK DAM RIPRAP DISSIPATER DETAIL REFERENCE N/A 3/C9.10 8/C9.10 2/C9.10 4/C9.10 5/C9.11 N/A 8/C9.11 1/C9.12 7/C9.11 6/C9.11 6/C9.10 N/A TEMPORARY CONSTRUCTION ENTRANCE 1/C9.10 ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH NORTH CAROLINA EROSION CONTROL SPECIFICATIONS • 0 40 80 SCALE: 1" = 80' 7 • 160 NORTH This drawing and the design shown are the propero of Little Diversified Architectural Consulting. The reproduction, copying or other use of this drawing without their written consent is prohibited and any infringement will be subject to legal action. SE BID SET 09.06.2022 NO. REASON DATE 2 EPP ADDENDUM 08.23.22 NCDEQ 2ND SUBMITTAL 11.28.22 PRINCIPAL IN CHARGE Jerry Guerrier, AIA PROJECT MANAGER Mary Beth Russo DESIGN TEAM STEWART WAKE COUNTY PUBLIC SCHOOL SYSTEM HILLTOP NEEDMORE ROAD ELEMENTARY SCHOOL 4575 Hilltop Needmore Road Fuquay-Varina, NC 27526 WCPSS# 862-520 SHANE WEBSTER, PM 514.13014.00 EROSION CONTROL PLAN (BUILDING PHASE 1) LITTLE DIVERSIFIED ARCHITECTURAL CONSULTING L:\Projects\2020\L20040 - WCPSS E-44\DWGS\2-Design\3-Sheets\L20040-C4.00 Erosion Control Plan_Building Package.dwg Nov 29, 2022 - 10:05am 1 2 014 ', r\\.y I • 1 )1/ O` vt' ot 04 etl' se evo sto 3 str- / • \ \\\\\ \ • >�`\\ ONCE GRADING IS COMPLETE AND THE SITE IS STABILIZED, CALL THE STORMWATER INSPECTIONS REGIONAL COORDINATOR AT (919) 279-6459 TO REQUEST AN INSPECTION AND OBTAIN APPROVAL TO REMOVE TEMPORARY MEASURES. DO NOT REMOVE TEMPORARY MEASURES WITHOUT PRIOR STORMWATER INSPECTOR APPROVAL. / \ 1 I ' v /1 I/ I I\I II/I I 1 \ `\�- \I \ \ \ 1 \ \ — \ �'` 1 \`372` \ ---� ` �— \'ATP `ce f--vcc evalifiks4-dir (Y604- agPiiiaf-011- 0' mil Y� \ —/ i _ _, s\ \ N —\ I — — \ \ r / ► \I I ')` o\\ �/ / ti \ \\\ 1 1 /• \,i �'\\\�w`\` / / �. 1 1.1 \ \o �\ \ / �� N.---,:. ' i HARDWARE CLOTH AND GRAVEL INLET PROTECTION ' •v — \ 6" THICK ABC LAYDOWN AREA FOR EMPLOYEE PARKING #57 WASHED STONE PROTECTION. SEE DETAIL 9 ON SHEET C9.11 • 4 LEVEL SPREADER G (BY-PASS-LS) `. SEE DETAIL 9 SHEET C9.11 36(: c 0-94 / //a BLOCK & GRAVEL INLET PROTECTION \ • \ 5 I —376 — \ i 001;11 \I \ .610 • V O Pr OP NubMOR '° SR ONCE GRADING IS COMPLETE AND THE SITE IS STABILIZED, CALL THE STORMWATER INSPECTIONS REGIONAL COORDINATOR AT (919) 279-6459 TO REQUEST AN INSPECTION AND OBTAIN APPROVAL TO REMOVE TEMPORARY MEASURES. DO NOT REMOVE TEMPORARY MEASURES WITHOUT PRIOR STORMWATER INSPECTOR APPROVAL. elk etik 0 6 EROSION CONTROL LEGEND: SYMBOL DESCRIPTION DETAIL REFERENCE SF SF TP DD BAF DIP riNe LIMITS OF DISTURBANCE SILT FENCE DOUBLE ROW HIGH HAZARD SILT FENCE TREE PROTECTION DIVERSION DITCH BAFFLES 100 YR FLOOD ELEV. HARDWARE CLOTH AND GRAVEL INLET PROTECTION BLOCK AND GRAVEL INLET PROTECTION HORSE SHOE INLET PROTECTION SILT FENCE OUTLET CHECK DAM RIPRAP DISSIPATER N/A 3/C9.10 8/C9.10 2/C9.10 4/C9.10 5/C9.11 N/A 8/C9.11 1 /C9.12 7/C9.11 6/C9.11 6/C9.10 N/A TEMPORARY CONSTRUCTION ENTRANCE 1/C9.10 ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH NORTH CAROLINA EROSION CONTROL SPECIFICATIONS ■ 0 40 80 SCALE: 1" = 80' 7 ■ 160 NORTH This drawing and the design shown are the propero of Little Diversified Architectural Consulting. The reproduction, copying or other use of this drawing without their written consent is prohibited and any infringement will be subject to legal action. BID SET 09.06.2022 NO. REASON 2 DATE EPP ADDENDUM NCDEQ 2ND SUBMITTAL 08.23.22 11.28.22 PRINCIPAL IN CHARGE Jerry Guerrier, AIA PROJECT MANAGER Mary Beth Russo DESIGN TEAM STEWART WAKE COUNTY PUBLIC SCHOOL SYSTEM HILLTOP NEEDMORE ROAD ELEMENTARY SCHOOL 4575 Hilltop Needmore Road Fuquay-Varina, NC 27526 WCPSS# 862-520 SHANE WEBSTER, PM 514.13014.00 EROSION CONTROL PLAN (BUILDING PHASE 2) LITTLE DIVERSIFIED ARCHITECTURAL CONSULTING L:\Projects\2020\L20040 - WCPSS E-44\DWGS\2-Design\3-Sheets\L20040-C4.00 Erosion Control Plan.dwg Nov 29, 2022 - 10:06am Doe3 Raq . • • . STOP- • PROPOSED CHECK DAM RIP RAP APRON (RR-4) 5.0'L X 3.8' W X 9" THICK 3" 0 CLASS A STONE TEMPORARY 15" HDPE PIPE CROSSING UNDER CONSTRUCTION ENTRANCE AT 0.50% SLOPE INVERT IN: 384.83 INVERT OUT: 384.66 FG AT CONST. ENTRANCE: 387.04 RIP -RAP INLET PROTECTION i‘ • • 24" RCP INV:345.89' EIP l OPE • • • • GREENWAY RULE El 04. 5" RCP INV: 355.59' 15" RCP INV: 355.04' TRANS— ____ 15" RCP INV: 349.50' ,INV:349.01' IKI\/ QA7 1 (V 4" PVC 4' PVC INV: 349.37' PROPOSED CONCRETE WASHOUT SEE DETAIL NCG01/C4.20 PROPOSED TIRE WASH SEE DETAIL4/C9.12 % PERMIT BOX AND RAIN GAUGE LOCATION INITIAL LIMITS OF DISTURBANCE: 10.30 AC \ PROVIDE PEDESTRIAN BARRICADE AND WAYFINDING SIGN HARDWARE CLOTH AND GRAVEL INLET PROTECTION / :C.:11.)111.1;C 1�II 1 llllll ill III\1►i; 6" THICK ABC LAYDOWN AREA FOR STORAGE AND CONSTRUCTION TRAILER LOCATION LAYDOWN AREA • 0 00. ,fit TEMPORARY ASPHALT PEDESTRIAN PATH PROPOSED CHECK DAM, TYP. - PORTION OF PAT TO BE REMOVED • IN PHASE 2 TEMPORARY 24" HDPE PIPE ATPATH CROSSING. PROTECT OUTFALL WITH ROLLED EROSION CONTROL PROTECTION Il i • • TEMPORARY SEDIMENT BASIN #1: TOP BASIN ELEVATION = 356.00' BOTTOM BASIN ELEVATION = 353.00' SURFACE AREA: 18,370 SF DEWATERING TIME: 3.99 DAYS SEE DETAIL 1/C9.11 TEMPORARY ir �, ASPHALT PEDESTRIAN PATH Jll TEMPORARY DIVERSION DITCH #2 \ DRAINAGE AREA #1 • • • • / of - F i �P- oS NIv QVP'1 51\ N` O y` D5$k 6 G 2 �'"1p IC, �,v Qq PG EROSION CONTROL LEGEND: SYMBOL SF TP DD DIP °IP tittg DESCRIPTION LIMITS OF DISTURBANCE SILT FENCE TREE PROTECTION DIVERSION DITCH 100 YR FLOOD ELEV. BLOCK & GRAVEL INLET PROTECTION SILT FENCE AND WIRE INLET PROTECTION HORSE SHOE INLET PROTECTION SILT FENCE OUTLET CHECK DAM RIPRAP DISSIPATER TEMPORARY CONSTRUCTION ENTRANCE ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH NORTH CAROLINA EROSION CONTROL SPECIFICATIONS DETAIL REFERENCE N/A 3/C9.10 2/C9.10 4/C9.10 N/A 1 /C9.12 8/C9.11 7/C9.11 6/C9.11 6/C9.10 N/A 1 /C9.10 FOR REFERENCE ONLY AND IS SHOWN TO IDENTIFY MAINTENANCE REQUIREMENTS UNTIL NEXT PHASE OF EROSION ADDED TO THE PROJECT. NPDES SLOPE STABILIZATION CHART SITE AREA DESCRIIPTION PERIMETER DIKES, SWALES, DITCHES AND SLOPES SLOPES STEEPER THAN 3:1 SLOPES 3:1 OR FLATTER ALL OTHER AREAS WITH SLOPES FLATTER THAN 4:1 STABILIZATION TIME FRAME 7 DAYS 7 DAYS 14 DAYS 14 DAYS STABILIZATION TIME FRAME EXCEPTION NONE IF SLOPES ARE 10' OR LESS IN LENGTH AND ARE NOT STEEPER THAN 2:1, 14 DAYS ARE ALLOWED 7 DAYS FOR SLOPES GREATER THAN 50' IN LENGTH NONE (EXCEPT AS SHOWN IN CHART) NOTE: CONTRACTOR MUST PERFORM NPDES EROSION AND SEDIMENT CONTROL INSPECTIONS AT LEAST ONCE PER 7 CALENDAR DAYS AND WITHIN 24 HOURS OF A RAINFALL EVENT GREATER THAN 0.5 INCHES PER 24HR PERIOD. 24' WIDE DOUBLE GATES TO PROVIDE PEDESTRIANS WITH SAFE TRAIL ACCESS, TO REMAIN CLOSED AFTER BMP INSTALLATION TEMPORARY ASPHALT PATH RIP -RAP APRON (RR-1) 12'LX6'WX22"T CLASS B 6" 0 STONE TEMPORARY 24" HDPE SLOPE DRAIN INTO SEDIMENT BASIN RIP -RAP APRON (RR-2) 12'LX6'WX22"T 6" 0 CLASS B STONE RIP -RAP APRON (RR-3) 12'LX6'WX9"T 3" ei CLASS A STONE INVERT ELEVATION = 352.50 �FE 32' EMERGENCY SPILLWAY \\V4.11 3" SKIMMER W/ 2.5" ORIFICE 0 1�\\ ,,. \\\ )11111' "` \(,\ (I 1 10 06\ \\;\\ h)\\\1\\ ( 1\4 II W 1 • 0 40 80 SCALE: 1" = 80' • 160 NORTH www.Iittleonline.com This drawing and the design shown are the property of Little Diversified Architectural Consulting. The reproduction, copying or other use of this drawing without their written consent is prohibited and any infringement will be subject to legal action. 0 Little 2021 BID SET 09.06.2022 NO. REASON DATE PRINCIPAL IN CHARGE Jerry Guerrier, AIA PROJECT MANAGER Mary Beth Russo DESIGN TEAM STEWART WAKE COUNTY PUBLIC SCHOOL SYSTEM HILLTOP NEEDMORE ROAD ELEMENTARY SCHOOL 4575 Hilltop Needmore Road Fuquay-Varina, NC 27526 WCPSS# 862-520 SHANE WEBSTER, PM 514.13014.00 EROSION CONTROL PLAN (PHASE 1) - NPDES C4.10 1 2 3 4 5 6 7 LITTLE DIVERSIFIED ARCHITECTURAL CONSULTING L:\Projects\2020\L20040 - WCPSS E-44\DWGS\2-Design\3-Sheets\L20040-C4.00 Erosion Control Plan.dwg Nov 29, 2022 - 10:07am 1 2 • • ,(\'" • • • PROPOSED CHECK DAM RIP -RAP OUTLET PROTECTION TEMPORARY 15" HDPE PIPE CROSSING UNDER CONSTRUCTION ENTRANCE AT 0.50% SLOPE INVERT IN: 384.83 INVERT OUT: 384.66 FG AT CONST. ENTRANCE: 387.04 RIP -RAP INLET PROTECTION • • FRENCH DRAIN: 6" PERFORATED HDPE PIPE WITH POLYESTER WOVEN SOCK WRAPPED IN WASHED #57 STONE AND GEOTECHNICAL FITLER FABIRC, SEE DETAIL THIS SHEET. ALL FRENCH DRAINS TO SLOPE AT 1°/0 AND DAYLIGHT TO DISCHARGE TO THE EDGE OF THE GRADING AND THEN TRANSITION TO SOLID WALL PIPE AND EXTEND TO BOTTOM OF DITCH OR SEDIMENT BASIN AS INDICATED. 24" RCP • • • 5" RCP 15" RCP 15" RCP 4" PVC 4" PVC 3 PROPOSED CONCRETE WASHOUT SEE DETAIL NCG01/C4.20 PROPOSED TIRE WASH SEE DETAIL 4/C9.12 PERMIT BOX AND RAIN / GAUGE LOCATION INITIAL LIMITS OF DISTURBANCE: 10.30 AC 24' WIDE DOUBLE ACCESS GATES 20' WIDE ACCESS 111 vi 1111 if WOO 11116110 Mll HILLTOP NEE PROVIDE PEDESTRIAN BARRICADE r \ N \• ---\\ \ ' , \ (••.r\\-7 , -A\\\ 2.7\_-___-_., (\.-.,-1, \\ \\:\„,_________7, _____:,____,\‘ \,., \ \;. /,, .• \• ‘, :HARDWARE CLOTH AND GRAVL I \ --°)/ 2 ). . ) 0 \ INLET PROTECTION 7 \ ,r---, /A V / "li.d in* \ Lf I 6" THICK ABC LAYDOWN AREA FOR STORAGE AND CONSTRUCTION TRAILER LOCATION 6" THICK ABC LAYDOWN AREA FOR EMPLOYEE PARKING 4.1 TEMPORARY ASPHALT PEDESTRIAN PATH • • • • • • • FUTURE BUILDING SHOWN FOR REFERENCE FUTURE BU LDING SHOWN FOR REFERENCE / INV ELEV. = 369.00 --LL:fis:''.'iill: ; litilltil SIS,•r1r &1,,t-11144kIjivaTa \i'N PROPOSED CHECK DAM, TYP. TEMPORARY 15" HDPE SLOPE DRAIN \ Tk:\ k 11 TEMPORARY DIVERSION DITCH 0\jigtj).,1 \, HDPE SLOPE DRAIN TEmPoRARY 15" \ '‘‘ \\I:n‘k;;‘‘‘'‘‘tkl At AtV \\,':1/4",\1/4 FUTURE BUILDING SHOWN FOR REFERENCE DRAINAGE AREA #2 9.60 AC 4 INV ELEV. = 357.94 TEMPORARY ASPHAL bai cje'..\1 61:1 ?C''' .\\C-..0 • C),' (25)°55q1 9G AIL r DITCH #1 TEMPOR DIVERSION / TEMPCRARY LINING: STRAW NET WI TH MAT (TYP) TEMPORARY 24" PIPE AT PATH CROSSING. USE ROLLED EROSION CONTROL PROTECTION AT OUTFALL. STOCKPILE TEMPORARY SEDIMENT BASIN #1: TOP BASIN ELEVATION = 358.00' BOTTOM BASIN ELEVATION = 354.00' SURFACE AREA: 18,370 SF SEE DETAIL 1/C9.11 TEMPORARY DIVERSION TEMPORARY ASPHALT DITCH #2 PEDESTRIAN PATH REPLACE EXISTING JUTE NET BAFFLE 11' WITH COIR FIBER MESH BAFFLE • • • • • • • • • 5 • • • 24' WIDE DOUBLE GATES TO PROVIDE PEDESTRIANS WITH SAFE TRAIL ACCESS, TO REMAIN CLOSED AFTER BMP INSTALLATION \\N\ 1\\\\\ ')\A i(W) RIP -RAP APRON (RR-1) CLASS B 6" 0 STONE TEMPORARY 24" HDPE SLOPE DRAIN INTO SEDIMENT BASIN 6" 0 CLASS B STONE 604 -91 EROSION CONTROL LEGEND: SYMBOL TP DD DIP DESCRIPTION LIMITS OF DISTURBANCE SILT FENCE TREE PROTECTION DIVERSION DITCH 100 YR FLOOD ELEV. BLOCK & GRAVEL INLET PROTECTION SILT FENCE AND WIRE INLET PROTECTION HORSE SHOE INLET PROTECTION SILT FENCE OUTLET CHECK DAM RIPRAP DISSIPATER TEMPORARY CONSTRUCTION ENTRANCE ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH NORTH CAROLINA EROSION CONTROL SPECIFICATIONS DETAIL REFERENCE N/A N/A 8/C9.11 6/C9.11 6/C9.10 N/A 1/C9.10 FOR REFERENCE ONLY AND IS SHOWN TO IDENTIFY MAINTENANCE REQUIREMENTS UNTIL NEXT PHASE OF EROSION ADDED TO THE PROJECT. NPDES SLOPE STABILIZATION CHART SITE AREA DESCRIIPTION PERIMETER DIKES, SWALES, DITCHES AND SLOPES SLOPES STEEPER THAN 3:1 STABILIZATION TIME FRAME 7 DAYS 7 DAYS STABILIZATION TIME FRAME EXCEPTION NONE IF SLOPES ARE 10' OR LESS IN LENGTH AND ARE NOT STEEPER THAN 2:1, 14 DAYS ARE ALLOWED SLOPES 3:1 OR FLATTER 14 DAYS 7 DAYS FOR SLOPES GREATER THAN 50' IN LENGTH ALL OTHER AREAS WITH SLOPES FLATTER THAN 4:1 14 DAYS NONE (EXCEPT AS SHOWN IN CHART) NOTE: CONTRACTOR MUST PERFORM NPDES EROSION AND SEDIMENT CONTROL INSPECTIONS AT LEAST ONCE PER 7 CALENDAR DAYS AND WITHIN 24 HOURS OF A RAINFALL EVENT GREATER THAN 0.5 INCHES PER 24HR PERIOD. RIP -RAP APRON (RR-3) INVERT ELEVATION = 352.50 DEWATERING SUMP (1\,. PUMP AND FILTER BAG . 32' EMERGENCY SPILLWAY SKIMMER AND TEMPORARY OUTLET PIPE 6 • 0 40 80 SCALE: 1" = 80' 7 • 160 NORTH This drawing and the design shown are the propero of Little Diversified Architectural Consulting. The reproduction, copying or other use of this drawing without their written consent is prohibited and any infringement will be subject to legal action. SE BID SET 09.06.2022 NO. REASON DATE PRINCIPAL IN CHARGE Jerry Guerrier, AIA PROJECT MANAGER Mary Beth Russo DESIGN TEAM STEWART WAKE COUNTY PUBLIC SCHOOL SYSTEM HILLTOP NEEDMORE ROAD ELEMENTARY SCHOOL 4575 Hilltop Needmore Road Fuquay-Varina, NC 27526 WCPSS# 862-520 SHANE WEBSTER, PM 514.13014.00 EROSION CONTROL PLAN (PHASE 2) - NPDES LITTLE DIVERSIFIED ARCHITECTURAL CONSULTING L:\Projects\2020\L20040 - WCPSS E-44\DWGS\2-Design\3-Sheets\L20040-C4.00 Erosion Control Plan_Building Package.dwg Nov 29, 2022 - 10:08am 1 2 PROPOSED CHECK DAM EXISTING 5.0'L X 3.8' W X 9" THICK 3" 0 CLASS A RIP -RAP OUTLET PROTECTION TEMPORARY 15" HDPE PIPE CROSSING UNDER CONSTRUCTION ENTRANCE AT 0.50% SLOPE INVERT IN: 384.83 INVERT OUT: 384.66 FG AT CONST. ENTRANCE: 387.04 EXISTING RIP -RAP INLET PROTECTION CA JI Oa / ON 0 OvOsSO N ito sot sit 06' �h�11 A ati• FRENCH DRAIN: 6" PERFORATED HDPE PIPE WITH POLYESTER WRAPPED IN WASHED #57 STONE AND GEOTECHNICAL FITLER DETAIL ALL FRENCH DRAINS TO SLOPE AT 1 % AND DAYLIGHT TO DI THE EDGE OF THE GRADING AND THEN TRANSITION TO SOLID WALL PIPE AND EXTEND TO BOTTOM OF DITCH OR SEDIMENT BASIN AS INDICATED. / f PROPOSED CONCRETE I) i WASHOUT SEE DETAIL NCG01/C4.20 EXISTING TIRE WASH / SEE DETAIL 4/C9.12 INV ,, 1d y`III I/ \\411111i kkI ��INV ELEV. = 371.80' \�\ y 10�.�,:, illl 1 i WOVEN SOCK ' \\ \ \ FABIRC, SEE'. \\\\ THIS SHEET. \\\ 1 \ S \III I SCHARGE TO EMERGENCY SPILLWAY B-03 (Skimmer Sediment Basin) DISTURBED DA : 1.98 AC TOP OF BERM : 377.00 FT BOTTOM OF POND : 372.00 FT SURFACE AREA : 3,999 SF 6' SPILLWAY CREST ELEV : 375.50 FT' SKIMMER PIPE INVERT : 371.00 FT • v"' INV ELEV. = 372.501 N. Aki1 \ i , , .\\eel''" INV ELEV. = 371.80 INV ELEV. = 372.50 , INV ELEV. = 371.80 2.5" FAIRCLOTH SKIMMER W/ 1.75" ORIFICE & TEMPORARY OUTLET PIPE 10' LEVEL SPREADER (B03-LS) SEE DETAIL 9 SHEET C9.11 \ DEWATERING SUMP PUMP AND FILTER BAG 3 -SD-B03 (SEE CALCS) 18" HDPE SLOPE DRAIN, SEE CALCS (SD-B03), Q10= 5.60 cfs DRAINAGE AREA: 1.37 AC ' I P TEMPORARY DIVERSION DITCH (TD-B03-2) AREA: 1.08 AC, Q 10= 4.41 cfs, Q2: 3.45 cfs i \\ \ ,`° 11 Yl Cr• rit) p�*p` /�` ' zee 11113-11L1 U // A2-4 III J qi‘ kif(thrzy HILLTOP NEEDMORE RD (S03751 .... VARIES]-�•__ - DI �R�N EEC' 1 / tI \l\ HARDWARE CLOTH AND GRAVEL ` \ \ J I INLET PROTECTION ' - \ \\ /I \ ^\\ `I I \\ \�/J\\ \\�J//' \ 1 \',\\\\I 1 l ;'\ `� e= \? 18" HDPE SLOPE DRAIN \ J / / (SD-B02-1) PER TABLE 6.32a \ \ \ \ \ \ 1 I I \ DA: 0.96 AC, Q10: 3.92 cfs 1jj I \ /^ • ERR-SD-B02) 1 • N \ /l 1 /// 1 1 / %/ ` (SEE CALLS) \ \ // r/ 1 I RR-SD-B02 2 LAYDOWN AREA FOR EMPLOYEE PARKING I (/I I'‘ \ \;\, 1\ \ \ \ `\`� \`\�v-\ \\ 11 10 \\\V\ INV ELEV. = 369.00 \ \\ \\ EXISTING \ SF. 8 •• ,SP Vy �� CHECK DAM, TYP. \\\\\\ \\j \ (. \kZ\ / I\Nt\,\"2,\.\,\\,, \\\\\\\\ \� \\ \ \\\ \ N a\ INV ELEV. = 362.61 )\�6�\` \\\ \\ \� / DIVERSION DITCH #1 \\\ \\\ \\� 1...... � `� EXISTING LINING: STRAW\ \\ \\' \� `1 l� I I NET WITH MAT (TYP) \\ \ \\\\ \\:\\ \ \ ` \\\\\\\\\\\\\�\' \ �) i\\\\\ \\\\` .I 1 1 INV ELEV. = 357.94 �\ . / \ I //\- 1--'`- 1 r `//,/\ � TEMPORARY DIVERSION DITCH (TD-B03-1) AREA: 0.29 AC Q 10= 1.19 cfs Q2= 0.93 cfs POROUS BAFFLES (TYP.) e\I r I Sp 4 \111111.11. - / TEMPORARY DIVERSION DITCH (TD-B02-1) DA: 0.95 AC, Q2= 3.04 cfs \ r-\ \ • 18" HDPE SLOPE DRAIN (SD-B02-2) PER TABLE 6.32a DA: 0.95 AC, Q10: 3.88 cfs t0 /l .- `EMERGENCY SPILLWAY �\00-•-✓ •7 • • • I 1 .362 STREAM BUFFER 5_ J EXISTING TEMPORARY \ INV ELEV. = 367.13 INV ELEV. = 369.00 DRAINAGE AREA #1 10.33 AC OL P6604- TEMPORARY SEDIMENT BASIN #1: TOP BASIN ELEVATION = 358.00' BOTTOM BASIN ELEVATION = 354.00' SURFACE AREA: 18,370 SF SEE DETAIL 1/C9.11 EX TEMPORARY AVERSION DITCH #2 • BLOCK & GRAVEL INLET PROTECTION DRAINAGE AREA #1 REPLACE EXISTING JUTE NET BAFFLE WITH COIR FIBER BAFFLE MATERIAL 5 I W / 1 10' LEVEL ISPREADER (B02-LS) ISEE DEATAIL 9 ON SHEET C9.11 J tic O1d r lam' Goo %` LAP TEMPORARY DIVERSION DITCH (TD-BC DA: 0.96 AC, Q2= 3.07 cfs POROUS BAFFLES (TYP.) DEWATERING SUMP PUMP AND FILTE B-02 (Skimmer Sediment Bas DISTURBED DA TOP OF BERM BOTTOM OF POND SURFACE AREA 0' SPILLWAY CREST ELEV SKIMMER PIPE INVERT 393) EROSION CONTROL LEGEND: SYMBOL DESCRIPTION DETAIL REFERENCE SF SF TP DD BAF DIP LIMITS OF DISTURBANCE SILT FENCE DOUBLE ROW HIGH HAZARD SILT FENCE TREE PROTECTION DIVERSION DITCH BAFFLES 100 YR FLOOD ELEV. HARDWARE CLOTH AND GRAVEL INLET PROTECTION BLOCK AND GRAVEL INLET PROTECTION HORSE SHOE INLET PROTECTION SILT FENCE OUTLET CHECK DAM RIPRAP DISSIPATER TEMPORARY CONSTRUCTION ENTRANCE ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH NORTH N/A 3/C9.10 8/C9.10 2/C9.10 4/C9.10 5/C9.11 N/A 8/C9.11 1/C9.12 7/C9.11 6/C9.11 6/C9.10 N/A 1/C9.10 CAROLINA EROSION CONTROL SPECIFICATIONS NPDES SLOPE STABILIZATION CHART SITE AREA DESCRIIPTION STABILIZATION TIME FRAME STABILIZATION TIME FRAME EXCEPTION PERIMETER DIKES, SWALES, DITCHES AND SLOPES 7 DAYS NONE SLOPES STEEPER THAN 3:1 7 DAYS IF SLOPES ARE 10' OR LESS IN LENGTH AND ARE NOT STEEPER THAN 2:1, 14 DAYS ARE ALLOWED SLOPES 3:1 OR FLATTER 14 DAYS 7 DAYS FOR SLOPES GREATER THAN 50' IN LENGTH 1.000001 ALL OTHER AREAS WITH SLOPES FLATTER THAN 4:1 14 DAYS NONE (EXCEPT AS SHOWN IN CHART) NOTE: CONTRACTOR MUST PERFORM NPDES EROSION AND SEDIMENT CONTROL INSPECTIONS AT LEAST ONCE PER 7 CALENDAR DAYS AND WITHIN 24 HOURS OF A RAINFALL EVENT GREATER THAN 0.5 INCHES PER 24HR PERIOD. 6" FAIRCLOTH SKIMMER & TEMPORARY OUTLET PIPE DOUBLE ROW HIGH HAZARD SILT FENCE PROP. HORSE -SHOE INLET PROTECTION I WI • EX TEMPORARY 24" PIPE AT PATH CROSSING. USE ROLLED EROSION CONTROL PROTECTION AT OUTFALL. INV ELEV. = 357.37 EX RIP -RAP APRON (RR-1) CLASS B 6" 0 STONE EX TEMPORARY 24" HDPE SLOPE DRAIN INTO SEDIMENT BASIN EX RIP -RAP APRON (RR-2) 6" 0 CLASS B STONE EX RIP -RAP APRON (RR-3) 3" 0 CLASS A STONE INVERT ELEVATION = 352.50 EX DEWATERING SUMP PUMP AND FILTER BAG 32' EMERGENCY SPILLWAY EX SKIMMER AND TEMPORARY OUTLET PIPE 03, 6 • 0 40 80 SCALE: 1" = 80' 7 • 160 NORTH This drawing and the design shown are the propero of Little Diversified Architectural Consulting. The reproduction, copying or other use of this drawing without their written consent is prohibited and any infringement will be subject to legal action. ,0 L11111110/ /1//r/7,401:-.‘1.0..° •\\\ BID SET 09.06.2022 NO. REASON DATE 2 EPP ADDENDUM NCDEQ 2ND SUBMITTAL 08.23.22 11.28.22 PRINCIPAL IN CHARGE Jerry Guerrier, AIA PROJECT MANAGER Mary Beth Russo DESIGN TEAM STEWART WAKE COUNTY PUBLIC SCHOOL SYSTEM HILLTOP NEEDMORE ROAD ELEMENTARY SCHOOL 4575 Hilltop Needmore Road Fuquay-Varina, NC 27526 WCPSS# 862-520 SHANE WEBSTER, PM 514.13014.00 EROSION CONTROL PLAN (BUILDING PHASE 1) - NPDES LITTLE DIVERSIFIED ARCHITECTURAL CONSULTING L:\Projects\2020\L20040 - WCPSS E-44\DWGS\2-Design\3-Sheets\L20040-C4.00 Erosion Control Plan_Building Package.dwg Nov 29, 2022 - 10:08am 1 2 /. 1 BP 110P- j)." J 1 Oa 3 8,4 \ / 0 \ l-1� l // (/#/:///;07)-,47/:"------z- ----- MG —tea%� ` - --' — —t—= --;iiii;;It i:: fo , ,, v / HARDWARE CLOTH AND GRAVEL \ \ 3 \ J ) �� INLET PROTECTION \ 4 — \ ,' ___/v v ���vv _ v\ / �i� , 305 CB N. '.'1/ // / (' i ! � -.. \ 1 \ . \ \ � 1 \ �° ° \ l \\ fi k�:II / \ \ \ \ \\\,�.o W [� yr I \ ^- ' \ I I / �' \ ". , 1 I I 1 1 \ •\ -/ \ \`o\���/ \ 1 \ �\ \,t 1 �\ �„`_/\ • a C \ \ \ \ il \ ' 11 \\ \\ i I \,. \ \ \ \ \�\\�// \\\ N\ \ \\r .y \\ \ \ \ \ \ \ \ \� I (( 1-\\ �� \° \ • I 1 ■ (NrJ •' \ \ \ e \� \ \ �i / /l 1 /%/' __ �% /' 1 (/ i1 \ 1 irors—c?zo,... °1 �\ \; / 1 1 ' 6. _ 1 lt,::\\\:•\\\\ 11376�`- ONCE GRADING IS COMPLETE AND THE SITE IS STABILIZED, CALL THE STORMWATER INSPECTIONS REGIONAL COORDINATOR AT (919) 279-6459 TO REQUEST AN INSPECTION AND OBTAIN APPROVAL TO REMOVE TEMPORARY MEASURES. DO NOT REMOVE TEMPORARY MEASURES WITHOUT PRIOR STORMWATER INSPECTOR APPROVAL. 404- MH 16-CB / 115.C-CB / 6" THICK ABC LAYDOWN AREA FOR EMPLOYEE PARKING 112.A - CB RD-1 Raq #57 WASHED STONE PROTECTION. SEE DETAIL 9 ON SHEET C9.11 126D - DI 126G-TD 4 11H-DI 220 - DI LEVEL SPREADER 0 (BY-PASS-LS) SEE DETAIL 9 SHEET C9.11 .3`P_..... 109 - MH Cr SM� 201 - DI 202 - DI 203 - DI BLOCK & GRAVEL INLET PROTECTION \ 5 I Olt C / 's):- 420 - EX MH // 306 - CB —/ / 376 r Il. 304.A - CB 302 - CB 303 - CB 501 - MHDNCE GRADING IS COMPLETE AND THE SITE IS STABILIZED, CALL THE STORMWATER INSPECTIONS REGIONAL COORDINATOR AT (919) 279-6459 TO REQUEST AN INSPECTION AND OBTAIN APPROVAL 500 - DI:MOVE TEMPORARY MEASURES. DO NOT REMOVE TEMPORARY MEASURES WITHOUT PRIOR STORMWATER INSPECTOR APPROVAL. 502 - MH Structure - (240) 301 - CB 300 - CB 1 9/4 EROSION CONTROL LEGEND: SYMBOL SF SF TP DD BAF DESCRIPTION LIMITS OF DISTURBANCE SILT FENCE DOUBLE ROW HIGH HAZARD SILT FENCE TREE PROTECTION DIVERSION DITCH BAFFLES 100 YR FLOOD ELEV. HARDWARE CLOTH AND GRAVEL INLET PROTECTION BLOCK AND GRAVEL INLET PROTECTION HORSE SHOE INLET PROTECTION SILT FENCE OUTLET CHECK DAM RIPRAP DISSIPATER TEMPORARY CONSTRUCTION ENTRANCE ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH NORTH CAROLINA EROSION CONTROL SPECIFICATIONS NPDES SLOPE STABILIZATION CHART SITE AREA DESCRIIPTION PERIMETER DIKES, SWALES, DITCHES AND SLOPES SLOPES STEEPER THAN 3:1 SLOPES 3:1 OR FLATTER ALL OTHER AREAS WITH SLOPES FLATTER THAN 4:1 STABILIZATION TIME FRAME 7 DAYS 7 DAYS 14 DAYS STABILIZATION TIME FRAME EXCEPTION NONE IF SLOPES ARE 10' OR LESS IN LENGTH AND ARE NOT STEEPER THAN 2:1, 14 DAYS ARE ALLOWED 7 DAYS FOR SLOPES GREATER THAN 50' IN LENGTH 14 DAYS NONE (EXCEPT AS SHOWN IN CHART) NOTE: CONTRACTOR MUST PERFORM NPDES EROSION AND SEDIMENT CONTROL INSPECTIONS AT LEAST ONCE PER 7 CALENDAR DAYS AND WITHIN 24 HOURS OF A RAINFALL EVENT GREATER THAN 0.5 INCHES PER 24HR PERIOD. 6 ■ 0 40 80 SCALE: 1" = 80' 7 ■ 160 DETAIL REFERENCE N/A 3/C9.10 8/C9.10 2/C9.10 4/C9.10 5/C9.11 N/A 8/C9.11 1 /C9.12 7/C9.11 6/C9.11 6/C9.10 N/A 1 /C9.10 NORTH www.Iittleonline.com This drawing and the design shown are the property of Little Diversified Architectural Consulting. The reproduction, copying or other use of this drawing without their written consent is prohibited and any infringement will be subject to legal action. 0 Little 2021 `,��1111111111/! ��C;A RO �'• 15834 09.06.2022: !!l1111t11�11 BID SET 09.06.2022 NO. REASON 2 DATE EPP ADDENDUM NCDEQ 2ND SUBMITTAL 08.23.22 11.28.22 PRINCIPAL IN CHARGE Jerry Guerrier, AIA PROJECT MANAGER Mary Beth Russo DESIGN TEAM STEWART WAKE COUNTY PUBLIC SCHOOL SYSTEM HILLTOP NEEDMORE ROAD ELEMENTARY SCHOOL 4575 Hilltop Needmore Road Fuquay-Varina, NC 27526 WCPSS# 862-520 SHANE WEBSTER, PM 514.13014.00 EROSION CONTROL PLAN (BUILDING PHASE 2) - NPDES LITTLE DIVERSIFIED ARCHITECTURAL CONSULTING L:\Projects\2020\L20040 - WCPSS E-44\DWGS\2-Design\3-Sheets\L20040-C4.00 Erosion Control Plan.dwg Nov 29, 2022 - 10:09am GROUND STABILIZATION AND MATERIALS HANDLING PRACTICES FOR COMPLIANCE WITH THE NCGO1 CONSTRUCTION GENERAL PERMIT Implementing the details and specifications on this plan sheet will result in the construction activity being considered compliant with the Ground Stabilization and Materials Handling sections of the NCG01 Construction General Permit (Sections E and F, respectively). The permittee shall comply with the Erosion and Sediment Control plan approved by the delegated authority having jurisdiction. All details and specifications shown on this sheet may not apply depending on site conditions and the delegated authority having jurisdiction. SECTION E: GROUND STABILIZATION Required Ground Stabilization Timeframes Stabilize within this Site Area Description many calendar Timeframe variations days after ceasing land disturbance (a) Perimeter dikes, swales, ditches, and perimeter slopes 7 None (b) High Quality Water 7 None (HQW) Zones (c) Slopes steeper than If slopes are 10' or less in length and are 3:1 7 not steeper than 2:1, 14 days are allowed -7 days for slopes greater than 50' in length and with slopes steeper than 4:1 (d) Slopes 3:1 to 4:1 14 -7 days for perimeter dikes, swales, ditches, perimeter slopes and HQW Zones -10 days for Falls Lake Watershed (e) Areas with slopes -7 days for perimeter dikes, swales, ditches, perimeter slopes and HQW Zones flatter than 4:1 14 -10 days for Falls Lake Watershed unless there is zero slope Note: After the permanent cessation of construction activities, any areas with temporary ground stabilization shall be converted to permanent ground stabilization as soon as practicable but in no case longer than 90 calendar days after the last land disturbing activity. Temporary ground stabilization shall be maintained in a manner to render the surface stable against accelerated erosion until permanent ground stabilization is achieved. GROUND STABILIZATION SPECIFICATION will not dislodge the soil. Use one of the Stabilize techniques the ground sufficiently so that rain in the table below: Temporary Stabilization Permanent Stabilization • Temporary grass seed covered with straw or other mulches and tackifiers • Hydroseeding • Rolled erosion control products with or without temporary grass seed • Appropriately applied straw or other mulch • Plastic sheeting • Permanent grass seed covered with straw or other mulches and tackifiers • Geotextile fabrics such as permanent soil reinforcement matting • Hydroseeding • Shrubs or other permanent plantings covered with mulch • uniform and evenly distributed ground cover sufficient to restrain erosion • Structural methods such as concrete, asphalt or retaining walls • Rolled erosion control products with grass seed POLYACRYLAMIDES (PAMS) AND FLOCCULANTS 1. Select flocculants that are appropriate for the soils being exposed during construction, selecting from the NC DWR List of Approved PAMS/Flocculants. 2. Apply flocculants at or before the inlets to Erosion and Sediment Control Measures. 3. Apply flocculants at the concentrations specified in the NC DWR List of Approved PAMS/Flocculants and in accordance with the manufacturer's instructions. 4. Provide ponding area for containment of treated Stormwater before discharging offsite. 5. Store flocculants in leak -proof containers that are kept under storm -resistant cover or surrounded by secondary containment structures. EQUIPMENT AND VEHICLE MAINTENANCE 1. Maintain vehicles and equipment to prevent discharge of fluids. 2. Provide drip pans under any stored equipment. 3. Identify leaks and repair as soon as feasible, or remove leaking equipment from the project. 4. Collect all spent fluids, store in separate containers and properly dispose as hazardous waste (recycle when possible). 5. Remove leaking vehicles and construction equipment from service until the problem has been corrected. 6. Bring used fuels, lubricants, coolants, hydraulic fluids and other petroleum products to a recycling or disposal center that handles these materials. LITTER, BUILDING MATERIAL AND LAND CLEARING WASTE 1. Never bury or burn waste. Place litter and debris in approved waste containers. 2. Provide a sufficient number and size of waste containers (e.g dumpster, trash receptacle) on site to contain construction and domestic wastes. 3. Locate waste containers at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 4. Locate waste containers on areas that do not receive substantial amounts of runoff from upland areas and does not drain directly to a storm drain, stream or wetland. 5. Cover waste containers at the end of each workday and before storm events or provide secondary containment. Repair or replace damaged waste containers. 6. Anchor all lightweight items in waste containers during times of high winds. 7. Empty waste containers as needed to prevent overflow. Clean up immediately if containers overflow. 8. Dispose waste off -site at an approved disposal facility. 9. On business days, clean up and dispose of waste in designated waste containers. PAINT AND OTHER LIQUID WASTE 1. Do not dump paint and other liquid waste into storm drains, streams or wetlands. 2. Locate paint washouts at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 3. Contain liquid wastes in a controlled area. 4. Containment must be labeled, sized and placed appropriately for the needs of site. 5. Prevent the discharge of soaps, solvents, detergents and other liquid wastes from construction sites. PORTABLE TOILETS 1. Install portable toilets on level ground, at least 50 feet away from storm drains, streams or wetlands unless there is no alternative reasonably available. If 50 foot offset is not attainable, provide relocation of portable toilet behind silt fence or place on a gravel pad and surround with sand bags. 2. Provide staking or anchoring of portable toilets during periods of high winds or in high foot traffic areas. 3. Monitor portable toilets for leaking and properly dispose of any leaked material. Utilize a licensed sanitary waste hauler to remove leaking portable toilets and replace with properly operating unit. EARTHEN STOCKPILE MANAGEMENT 1. Show stockpile locations on plans. Locate earthen -material stockpile areas at least 50 feet away from storm drain inlets, sediment basins, perimeter sediment controls and surface waters unless it can be shown no other alternatives are reasonably available. 2. Protect stockpile with silt fence installed along toe of slope with a minimum offset of five feet from the toe of stockpile. 3. Provide stable stone access point when feasible. 4. Stabilize stockpile within the tmeframes provided on this sheet and in accordance with the approved plan and any additional requirements. Soil stabilization is defined as vegetative, physical or chemical coverage techniques that will restrain accelerated erosion on disturbed soils for temporary or permanent control needs. NORTH CAROLINA Environmental Quality = C o 0 sAtapGs (TYPs I-\ eo/ m no,cs dSSTFVIS<00 �' CLEARLY WAXED MACE IOT04 DEVICE 4Ir/Die MVO ELAN ❑NSITE CONCRETE WASHOUT STRUCTURE WITH LINER trootrs SECTIfN A -A Lail YUFL LOCATION D[TEIOIOED M FIELD L 1 CGMCIIETE VAASSIT 5TMXC1URCS ISILL DE NAORADED VMEM THE uDIOD MONO! SOLID NEAOES 77% o• rIE STMFTUES CIMAIXTY. 7IDIOETE VA/DEW 1111tUCTLIRE NEEDS TO CLEARY MARKED VITN 171110E NOTDIG DEVIff. 4Yf RADI WASHOUT STRUCTURE 1021. _L CFrTLIN H- CLEARLY' ISIRIED SD9MDL PETRO SEV7CE unmr IOU ELitif Sti I & LOCATEDI FIELD APLES DETERPEED DI L TIE COMOETE VASIWT EDILLIUES SHALL K INDRAWN VFOI THE LOUD /MAR SOLO REAPES 7O1 IF THE STRUCTURES CNMCITY TO /ROVV1X AEQMTE IOLDDO Ch./CITY VITN A NDORDI 12 DR7ES IF MEWED. MEDI m IC CLEARY WAGED VITM ABOVE GRADE WASHOUT STRUCTURE IOT TO SCALE CONCRETE WASHOUTS 1. Do not discharge concrete or cement slurry from the site. 2. Dispose of, or recycle settled, hardened concrete residue in accordance with local and state solid waste regulations and at an approved facility. 3. Manage washout from mortar mixers in accordance with the above item and in addition place the mixer and associated materials on impervious barrier and within lot perimeter silt fence. 4. Install temporary concrete washouts per local requirements, where applicable. If an alternate method or product is to be used, contact your approval authority for review and approval. If local standard details are not available, use one of the two types of temporary concrete washouts provided on this detail. 5. Do not use concrete washouts for dewatering or storing defective curb or sidewalk sections. Stormwater accumulated within the washout may not be pumped into or discharged to the storm drain system or receiving surface waters. Liquid waste must be pumped out and removed from project. 6. Locate washouts at least 50 feet from storm drain inlets and surface waters unless it can be shown that no other alternatives are reasonably available. At a minimum, install protection of storm drain inlet(s) closest to the washout which could receive spills or overflow. 7. Locate washouts in an easily accessible area, on level ground and install a stone entrance pad in front of the washout. Additional controls may be required by the approving authority. 8. Install at least one sign directing concrete trucks to the washout within the project limits. Post signage on the washout itself to identify this location. 9. Remove leavings from the washout when at approximately 75% capacity to limit overflow events. Replace the tarp, sand bags or other temporary structural components when no longer functional. When utilizing alternative or proprietary products, follow manufacturer's instructions. 10. At the completion of the concrete work, remove remaining leavings and dispose of in an approved disposal facility. Fill pit, if applicable, and stabilize any disturbance caused by removal of washout. HERBICIDES, PESTICIDES AND RODENTICIDES 1. Store and apply herbicides, pesticides and rodenticides in accordance with label restrictions. 2. Store herbicides, pesticides and rodenticides in their original containers with the label, which lists directions for use, ingredients and first aid steps in case of accidental poisoning. 3. Do not store herbicides, pesticides and rodenticides in areas where flooding is possible or where they may spill or leak into wells, stormwater drains, ground water or surface water. If a spill occurs, clean area immediately. 4. Do not stockpile these materials onsite. HAZARDOUS AND TOXIC WASTE 1. Create designated hazardous waste collection areas on -site. 2. Place hazardous waste containers under cover or in secondary containment. 3. Do not store hazardous chemicals, drums or bagged materials directly on the ground. NCG01 GROTIND STABILIZATION AND MATERIALS HANDLING EFFECTIVE: 04/01 / 19 www.littleonline.com This drawing and the design shown are the property of Little Diversified Architectural Consulting. The reproduction, copying or other use of this drawing without their written consent is prohibited and any infringement will be subject to legal action. 0 Little 2021 `,��lllllrllllr! �`�' NCA;,7(j, /`', 15834 09.06.2022: rr+�lr111E11S'', BID SET 09.06.2022 NO. REASON DATE PRINCIPAL IN CHARGE Jerry Guerrier, AIA PROJECT MANAGER Mary Beth Russo DESIGN TEAM STEWART WAKE COUNTY PUBLIC SCHOOL SYSTEM HILLTOP NEEDMORE ROAD ELEMENTARY SCHOOL 4575 Hilltop Needmore Road Fuquay-Varina, NC 27526 WCPSS# 862-520 SHANE WEBSTER, PM 514.13014.00 NCG01 PLAN - PART 1 C4.20 1 2 3 4 5 6 7 LITTLE DIVERSIFIED ARCHITECTURAL CONSULTING L:\Projects\2020\L20040 - WCPSS E-44\DWGS\2-Design\3-Sheets\L20040-C4.00 Erosion Control Plan.dwg Nov 29, 2022 - 10:10am F E B A PART 1I1 SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION A: SELF -INSPECTION Self -inspections are required during normal business hours in accordance with the table below. When adverse weather or site conditions would cause the safety of the inspection personnel to be in jeopardy, the inspection may be delayed until the next business day on which it is safe to perform the inspection. In addition, when a storm event of equal to or greater than 1.0 inch occurs outside of normal business hours, the self -inspection shall be performed upon the commencement of the next business day. Any time when inspections were delayed shall be noted in the Inspection Record. Inspect Frequency (during normal business hours) Inspection records must include: (1) Rain gauge maintained in good working order Daily Daily rainfall amounts. If no daily rain gauge observations are made during weekend or holiday periods, and no individual -day rainfall information is availably_, record the cumulative_ rain measurement for those un- attended days (ant this will determine if a site inspection is needed). Days on which no rainfall occurred shall be recorded as "zero." The permittee may use another rain -monitoring device approved by the Division. (2) E&SC Measures At least once per 7 calendar days and within 24 hours of a rain event > 1.0 inch in 24 hours 1. Identification of the measures inspected, 2. Date and time of the inspection, 3. Name of the person performing the inspection, 4. Indication of whether the measures were operating properly, 5. Description of maintenance needs for the measure, 6. Description, evidence, and date of corrective actions taken. (3) stormwater discharge outfalls (5DCs) At least once per 7 calendar days and within 24 hours of a rain events 1.0 inch in 24 hours 1. Identification of the discharge outfalls inspected, 1 Date and time of the inspection, 3. Name of the person performing the inspection, 4. Evidence of indication of stormwater pollution such as oil sheen, floating or suspended solids or discoloration, 5. Indication of visible sediment leaving the site, 6 Description, evidence, and date of corrective actions taken, (4) Perimeter of At bast once per 7 calendar days and within 24 hours of a rain event > 1.0 inch in 24 hours If visible sedimentation is found outside site limits, then a record of the following shall be made: I, Actions taken to clean up or stabilize the sediment that has left site the site limits, 2- Description, evidence, and date of corrective actionstaken; and 1 An explanation as to the actions taken to control future releases. (5) Streams or wetlands onsite or offsite (where accessible) At least once per 7 calendar days and within 24 hours of a rain event > 1.0 inch in 24 hours If the stream or wetland has increased visible sedimentation or a stream has visible increased turbidity from the construction activity, then a record of the following shall be made: 1. Description, evidence and date of corrective actions taken, and 2. Records of the required reports to the appropriate Division Regional Office per Part III, Section C, Item (2)(a) of this permit. (6) Ground stabilization After Bath phase of grading 1. The phase of grading (installation of perimeter E&SC measures, clearing and grubbing, installation of storm drainage facilities, completion of all land -disturbing activity, construction or redevelopment, permanent ground cover). 2. Documentation that the required ground stabilization measures have been provided within the required timefrarne or an assurance that they will be provided as soon as possible. measures NOTE: The rain inspection resets the required 7 calendar day inspection requirement. SELF -INSPECTION, RECORDKEEPING SECTION B: RECORDKEEPING PART III AND REPORTING deviation shall be kept on the site. The throughout the coverage under this permit. plan shall be kept on site and available for hours. 1. 2. 3. E&SC Plan Documentation The approved E&SC plan as well as any approved approved E&SC plan must be kept up-to-date The following items pertaining to the E&SC inspection at all times during normal business Documentation Requirements Item to Document (a) Each E&SC measure has been installed and does not significantly deviate from the Initial and date each E&SC measure on a copy of the approved E&SC plan or complete, date and sign an inspection report that lists each E&SC measure shown on the approved E&SC plan. This documentation is required upon the initial installation of the E&SC measures or if the E&SC measures are modified after initial installation. locations, dimensions and relative elevations shown on the approved E&SC plan. (b) A phase of grading has been completed. Initial or date a copy f t e approved E&SC planp sign an inspection report to indicate completion of the construction phase. (c) Ground cover is located and installed in accordance with the approved E&SC plan. Initial and date a copy of the approved E&SC plan or complete, date and sign an inspection report to indicate compliance with approved ground cover specifications. (d) The maintenance and repair requirements for all E&SC measures have been performed. Complete, date and sign an inspection report. (e) Corrective actions have been taken to E&SC measures. Initial and date a copy of the approved E&SC plan or complete, date and sign an inspection report to indicate the completion of the corrective action. Additional Documentation to be Kept on Site In addition to the E&SC plan documents above, the following items shall be kept on the site and available for inspectors at all times during normal business hours, unless the Division provides a site -specific exemption based on unique site conditions that make this requirement not practical: (a) This General Permit as well as the Certificate of Coverage, after it is received. (b) Records of inspections made during the previous twelve months. The permittee shall record the required observations on the Inspection Record Form provided by the Division or a similar inspection form that includes all the required elements. Use of electronically -available records in lieu of the required paper copies will be allowed if shown to provide equal access and utility as the hard -copy records. Documentation to be Retained for Three Years All data used to complete the e-NOI and all inspection records shall be maintained for a period of three years after project completion and made available upon request. [40 CFR 122.41] PART II, SECTION G, ITEM (4) DRAW DOWN OF SEDIMENT BASINS FOR MAINTENANCE OR CLOSE OUT basinsand traps that receiverunoff from drainage areas ofone acre or moreshall use outlet structures thatwithdraw water from the surface when these devices need to be drawn down Sediment ad p tat t no rt for maintenance or close out unless this is infeasible. The circumstances in which it is not feasible to withdraw water from the surface shall be rare (for example, times with extended cold weather). Non -surface withdrawals from sediment basins shall be allowed only when all of the following criteria have been met: (a) The E&SC plan authority has been provided with documentation of the non -surface withdrawal and the specific time periods or conditions in which it will occur. The non -surface withdrawal shall not commence until the E&SC plan authority has approved these items, The non -surface withdrawal has been reported as an anticipated bypass in accordance with Part III, Section C, Item (2)(c) and (d) of this permit, Dewatering discharges are treated with controls to minimize discharges of pollutants from stormwater that is removed from the sediment basin. Examples of appropriate controls include properly sited, designed and maintained dewatering tanks, weir tanks, and filtration systems, (d) Vegetated, upland areas of the sites or a properly designed stone pad is used to the extent feasible at the outlet of the dewatering treatment devices described in Item (c) above, (e) Velocity dissipation devices such as check dams, sediment traps, and riprap are provided at the discharge points of all dewatering devices, and (f) Sediment removed from the dewatering treatment devices described in Item (c) above is disposed of in a manner that does not cause deposition of sediment into waters of the United States. (b) (c) PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION C: REPORTING 1. Occurrences that Must be Reported Permittees shall report the following occurrences: (a) Visible sediment deposition in a stream or wetland. (b) Oil spills if: • They are 25 gallons or more, • They are Tess than 25 gallons but cannot be cleaned up within 24 hours, • They cause sheen on surface waters (regardless of volume), or • They are within 100 feet of surface waters (regardless of volume). (c) Releases of hazardous substances in excess of reportable quantities under Section 311 of the Clean Water Act (Ref: 40 CFR 110.3 and 40 CFR 117.3) or Section 102 of CERCLA (Ref: 40 CFR 302.4) or G.S. 143-215.85. (d) Anticipated bypasses and unanticipated bypasses. (e) Noncompliance with the conditions of this permit that may endanger health or the environment. 2. Reporting Timeframes and Other Requirements After a permittee becomes aware of an occurrence that must be reported, he shall contact the appropriate Division regional office within the tmeframes and in accordance with the other requirements listed below. Occurrences outside normal business hours may also be reported to the Department's Environmental Emergency Center personnel at (800) 858-0368. Occurrence (a) Visible sediment deposition in a stream or wetland (b) Oil spills and release of hazardous substances per Item 1(b)-(c) above (c) Anticipated bypasses [40 M 122.41(m)(3)] Reporting Timeframes (After Discovery) and Other Requirements • (d) Unanticipated bypasses [40 CFR 122.41(m)(3)] (e) Noncompliance with the conditions of this permit that may endanger health or the environment[40 CFR 122.41(1)(7)] • Within 24 hours, an oral or electronic notification. Within 7 calendar days, a report that €ontains a description of the sediment and action; taken to address the cause of the deposition. Division staff may waive the requirement for a written report on a case -by -ease basis. If the stream is named on the NC 303(d) list as impaired for sediment - related causes, the permittee may be required to perform additional monitoring, inspections or apply more stringent practices if staff determine that additional requirements are needed to assure compliance with the federal or state impaired -waters conditions. Within 24 hours, an oral or electronic notification. The notification shall include information about the date, time, nature, volume and location of the spill cr release. A report at least ten days before the date of the bypass, if possible. The report shall include an evaluation of the anticipated quality and effect of the bypass. Within 24 hours, an oral or electronic notification. Within 7 calendar days, a report that includes an evaluation of the quality and effect of the bypass. Within 24 hours, an oral or electronic notification. Within 7 calendar days, a report that contains a description of the noncompliance, and its causes; the period of noncompliance, including exact dates and times, and if the noncompliance has not been corrected, the anticipated time noncompliance is expected to continue; and steps taken or planned to reduce, eliminate, and prevent reoccurrence of the noncompliance. [40 CFR 122.41(I)(6). Division staff may waive the requirement for a written report on a case -by -case basis. NORTH CAROLINA Environmental Quality NCGO1 SELF -INSPECTION, RECORDKEEPING AND REPORTING EFFECTIVE: 04/01 / 1 9 www.Iittleonline.com This drawing and the design shown are the property of Little Diversified Architectural Consulting. The reproduction, copying or other use of this drawing without their written consent is prohibited and any infringement will be subject to legal action. 0 Little 2021 ``jlttllIltl/fr, '�..CAR0 "...,% 15834 • + 09.06.2 22 ' 90 ,'.MGIN (41 414. / f// H i l l II { t t`t‘t‘ BID SET 09.06.2022 NO. REASON DATE PRINCIPAL IN CHARGE Jerry Guerrier, AIA PROJECT MANAGER Mary Beth Russo DESIGN TEAM STEWART WAKE COUNTY PUBLIC SCHOOL SYSTEM HILLTOP NEEDMORE ROAD ELEMENTARY SCHOOL 4575 Hilltop Needmore Road Fuquay-Varina, NC 27526 WCPSS# 862-520 SHANE WEBSTER, PM 514.13014.00 NCGO1 PLAN - PART 2 C4.21 SILT FENCE TO BE AROUND THE AREA OF THE OPEN CUT. ADD STONE CHECK DAM IN THE DITCH TO PREVENT ANY SEDIMENT FROM LEAVING THE FORCEMAIN EXCAVATION. WHERE THE FORCEMAIN IS RUNNING PARALLEL TO THE ROAD ADD SILT FENCE TO BE PARALLEL TO THE ROAD WHERE IT CROSSES UNDER THE ROAD. / SEE SHEET C6.21 FOR CONTINUATION GO"' 2 PQ�NG SC �PNO PROPOSED PUMPSTATION; SEE PLANS BY OTHER e PROPOSED 5' CONSTRUCTION EASEM ENT N „CP N \ \ SILT FENCE TO BE AROUND THE AREA OF THE OPEN CUT. ADD STONE CHECK DAM IN THE DITCH TO PREVENT ANY SEDIMENT FROM LEAVING THE FORCEMAIN EXCAVATION. WHERE THE FORCEMAIN IS RUNNING PARALLEL TO THE ROAD ADD SILT FENCE TO BE PARALLEL TO THE ROAD WHERE IT CROSSES UNDER THE ROAD. O \� \ UTILITY LEGEND: SYMBOL DESCRIPTION DETAIL REFERENCE FM PROPOSED FORCEMAIN 6/C9.32 EXISTING WATER LINE N/A PROPOSED WATER LINE 8/C9.30 W EXISTING SANITARY SEWER LINE N/A PROPOSED SANITARY SEWER LINE 4/C9.31 SS EX. UNDERGROUND ELECTRIC N/A EX. GAS LINE N/A EX. UNDERGROUND TELECOMM N/A EX. WATER METER VALVE N/A EX. IRRIGATION CONTROL VALVE N/A EX. TREES N/A PROPOSED FIRE HYDRANT 3/C9.30 PROPOSED WATER VALVE 5+6/C9.30 EXISTING SANITARY SEWER MANHOLE N/A PROPOSED SANITARY SEWER MANHOLE 5/C9.31 PROPOSED CLEANOUT 7/C9.32 PROPOSED FDC 1/C9.31 PROPOSED PLUG VALVE N/A PROPOSED BACKFLOW METER 7/C9.30 PROPOSED POST INDICATOR VALVE (PIV) 9/C9.30 GREASE INTERCEPTOR 2/C9.32 OPEN CUT BORE PIT 300' HYDRANT COVERAGE CIRCLE N/A UGE — g — { — 0 " "ip.z 1r 0 O OCO 0 FDC N PIV • 000 f3 z — — NOTES: 1. SEE SHEET C0.10 FOR GENERAL AND UTILITY NOTES. 2. CONTRACTOR TO FIELD VERIFY CONDITIONS AND MATERIALS, I.E. DRIVEWAYS, VEGETATION AND UTILITES, ALONG PROPOSED FORCEMAIN PATH. 3. NCDOT CONSTRUCTION PERMITS TO BE OBTAINED PRIOR TO ANY WORK WITHIN THE DOT RIGHT-OF-WAYS. 4. HORIZONTAL SEPARATIONS: 4.1. FORCEMAIN TO BE 5' FROM RIGHT OF WAY. 4.2. FORCEMAIN TO BE 10' FROM GAS PIPELINE. NORTH SE 15834 O9.Q6.2 22/ ••.-,,,�, ....... NULT" ti BID SET 09.06.2022 NO. REASON DATE PRINCI Jer PAL IN CHARGE ry Guerrier, AIA PROJECT MANAGER Mary Beth Russo DESIGN TEAM STEWART WAKE COUNTY PUBLIC SCHOOL SYSTEM HILLTOP NEEDMORE ROAD ELEMENTARY SCHOOL 4575 Hilltop Needmore Road Fuquay-Varina, NC 27526 WCPSS# 862-520 SHANE WEBSTER, PM 514.13014.00 EROSION CONTROL PLAN - FORCE MAIN 2 3 4 5 6 7 C4.22 LITTLE DIVERSIFIED ARCHITECTURAL CONSULTING L:\Projects\2020\L20040 - WCPSS E-44\DWGS\2-Design\3-Sheets\L20040-C4.22 Erosion Control Plan_Force Main.dwg Nov 29, 2022 - 10:11 am 1 SILT FENCE TO BE AROUND THE AREA OF THE OPEN CUT. ADD STONE CHECK DAM IN THE DITCH TO PREVENT ANY SEDIMENT FROM LEAVING THE FORCEMAIN EXCAVATION. WHERE THE FORCEMAIN IS RUNNING PARALLEL TO THE ROAD ADD SILT FENCE TO BE PARALLEL TO THE ROAD, WHERE IT CROSSES UNDER THE ROAD. SILT FENCE TO BE AROUND THE AREA OF THE OPEN CUT. ADD STONE CHECK DAM IN THE DITCH TO PREVENT ANY SEDIMENT FROM LEAVING THE FORCEMAIN EXCAVATION. WHERE THE FORCEMAIN IS RUNNING PARALLEL TO THE ROAD ADD SILT FENCE TO BE PARALLEL TO THE ROAD WHERE IT CROSSES UNDER THE ROAD. 2 3 TIE IN TO EXISTING SSMH-153394 3 / / SEE SHEET C6.20 FOR CONTINUATION PROPOSED 4" PVC FORCEMAIN DIRECTIONALLY BORED / 4 / / / / E Fv $ �F 6- �O6 G \-1 ki 6 QG pc0 00M Zo1 SILT FENCE TO BE AROUND THE AREA OF THE OPEN CUT. ADD STONE CHECK DAM IN THE DITCH TO PREVENT ANY SEDIMENT FROM LEAVING THE FORCEMAIN EXCAVATION. WHERE THE FORCEMAIN IS RUNNING PARALLEL TO THE ROAD ADD SILT FENCE TO BE PARALLEL TO THE ROAD,WHERE IT CROSSES UNDER THE ROAD. 5 CEO ' \ \ \ 0 000' EXISTING TREES TO BE PROTECTED \ • \ NOTES: 1. SEE SHEET C0.10 FOR GENERAL AND UTILITY NOTES. 2. CONTRACTOR TO FIELD VERIFY CONDITIONS AND MATERIALS, I.E. DRIVEWAYS, VEGETATION AND UTILITES, ALONG PROPOSED FORCEMAIN PATH. 3. NCDOT CONSTRUCTION PERMITS TO BE OBTAINED PRIOR TO ANY WORK WITHIN THE DOT RIGHT-OF-WAYS. 4. HORIZONTAL SEPARATIONS: 4.1. FORCEMAIN TO BE 5' FROM RIGHT OF WAY. 4.2. FORCEMAIN TO BE 10' FROM GAS PIPELINE. 6 vc9 'O_ ST CT. -SR '.Y I 1 EXISTING TREES TO BE PROTECTED UTILITY LEGEND: SYMBOL FM W — C J SS UGE — 9 t 0 ►�1 O 000 0 FDC 0 0 d 0 N c) DESCRIPTION / / EXISTING TREES TO BE PROTECTED PROPOSED FORCEMAIN EXISTING WATER LINE PROPOSED WATER LINE EXISTING SANITARY SEWER LINE PROPOSED SANITARY SEWER LINE EX. UNDERGROUND ELECTRIC EX. GAS LINE EX. UNDERGROUND TELECOMM EX. WATER METER VALVE EX. IRRIGATION CONTROL VALVE EX. TREES PROPOSED FIRE HYDRANT PROPOSED WATER VALVE EXISTING SANITARY SEWER MANHOLE PROPOSED SANITARY SEWER MANHOLE PROPOSED CLEANOUT PROPOSED FDC PROPOSED PLUG VALVE PROPOSED BACKFLOW METER DETAIL REFERENCE 6/C9.32 N/A 8/C9.30 N/A 4/C9.31 N/A N/A N/A N/A N/A N/A 3/C9.30 5+6/C9.30 N/A 5/C9.31 7/C9.32 1 /C9.31 N/A 7/C9.30 PIV PROPOSED POST INDICATOR VALVE (PIV) 9/C9.30 • 000 GREASE INTERCEPTOR OPEN CUT BORE PIT — — 300' HYDRANT COVERAGE CIRCLE LIMITS OF DISTURBANCE 2/C9.32 N/A N/A 7 NORTH www.Iittleonline.com This drawing and the design shown are the property of Little Diversified Architectural Consulting. The reproduction, copying or other use of this drawing without their written consent is prohibited and any infringement will be subject to legal action. 0 Little 2021 `0111111I1,,,, SE 15834 9 . 09.06.2 22: ., %•*• G f N E 1‘, BID SET 09.06.2022 NO. REASON DATE EPP ADDENDUM 1 PRINCIPAL IN CHARGE Jerry Guerrier, AIA 08.23.22 PROJECT MANAGER Mary Beth Russo DESIGN TEAM STEWART WAKE COUNTY PUBLIC SCHOOL SYSTEM HILLTOP NEEDMORE ROAD ELEMENTARY SCHOOL 4575 Hilltop Needmore Road Fuquay-Varina, NC 27526 WCPSS# 862-520 SHANE WEBSTER, PM 514.13014.00 EROSION CONTROL PLAN - FORCE MAIN C4.23 E D C E 0 0 NO T FOR CONSTRUCTION 1 • • • • TIE PROPOSED SURFACE INTO ROADWAY FINISHED GRADE REFERENCE ROADWAY IMPROVEMENTS FOR WCPSS E-44 PLANS • • • • • • • 24" RCP • • i\//)/iz,/\/\/) • (-) ) ) Y -/-.' 11((QT9 „li fillillrg // ' - ' 51 -.27'4: 7: /-.-.--'° . :4 , i ' )r. - IT/ ,---; - ; - -- -,;11-11: I - ,. / r\ __/___.,,(,...,/,...4___---,)_ ,... ....--..-------\\ It' ,/,/,,,„,_ _f Ili MI 111 PRI _LELVIENTARY SCHOOL FORCE MAIN As8.* RIM: 385.65' 15" RCP 18" RCP 15" RCP 5' RCP 15" RCP 4" PVC 4 PVC • 3 • • • 4 TIE PROPOSED SURFACE INTO ROADWAY FINISHED GRADE REFERENCE ROADWAY IMPROVEMENTS FOR WCPSS E-44 PLANS o WETLAND IMPACTS: 188 SF / 0.004 AC GRADING LEGEND: DETAIL SYMBOL DESCRIPTION REFERENCE 200 LIMITS OF DISTURBANCE N/A PROPOSED MAJOR CONTOUR N/A PROPOSED MINOR CONTOUR N/A EXISTING MAJOR CONTOUR N/A EXISTING MINOR CONTOUR N/A UV PROPOSED STORM DRAINAGE .1 PROPOSED JUNCTION BOX PROPOSED CATCH BASIN 1/C9.20 PROPOSED DROP INLET 2/C9.20 RIPRAP APRON LI EEI FLOW DIRECTION N/A TC 44.50 TOP/BOTTOM OF CURB N/A TW 46.00 TOP/BOTTOM OF WALL N/A NOTES: 1. SEE SHEET C0.10 FOR GENERAL AND GRADING NOTES. 2. RETAINING WALLS OVER 4' IN HEIGHT WILL REQUIRE A • SCALE: • 80 160 NOT FOR CONSTRUCTION L TT LE DIVERSIFIED ARCHITECTURAL CONSULTING This drawing and the design shown are the property of Lillie Diversified Architectural, Consulting. The reproduction, copying or other use of this drawing without their written consent is pmhibited and any infringement will be suly.ect to legal action. CD Little 2019 rsa STEWART 223 S. WEST STREET SUITE 1100 RALEIGH, NC 27603 FIRM LICENSE #: C-1051 NOT FOR CONSTRUCTION Site Plan Issue Date 2021.12.21 NO. REASON DATE PRINCIPAL IN CHARGE Jerry Guerrier PROJECT MANAGER KS, RL DESIGN TEAM ML, EM, RB, HH HILLTOP NEEDMORE ROAD ELEMENTARY SCHOOL WCPSS# 862-520 SHANE WEBSTER, PM 5141301400 GRADING & STORM DRAINAGE PLAN - OVERALL COI FORAiONSTRUCTION s 1 TYPE CODE: DI = DROP INLET FES = FLARED END SECTION MH JB RI CB CO TD = MANHOLE = JUNCTION BOX = RISER = CATCH BASIN =CLEANOUT = TRENCH DRAIN STORM DRAINAGE NETWORK UPSTREAM STRC UPSTREAM GRD. ELEV. FLOW — UPSTREAM INVERT DOWNSTREAM INVERT DOWNSTREAM STRC DOWNSTREAM GRD. ELEV. NOTES: 1. STRUCTURES WITHIN NCDOT RIGHT-OF-WAY SHALL BE TO NCDOT STANDARDS. 2. STRUCTURES NOT WITHIN RIGHT OF WAY SHALL EITHER ALL BE TO NCDOT STANDARDS OR SHALL ALL BE TO LOCAL JURISDICTIONAL STANDARDS. 3. ALL STORM PIPES TO BE CLASS III RCP UNLESS OTHERWISE NOTED. 4. ALL CATCH BASIN RIM ELEVATIONS MEASURED FROM THE TOP OF CURB AT THE CENTER OF THE STRUCTURE. 2° x st 3qb• x/ SH`( MEP,DO`N`j DR• D\Z • ) 50 (Z�11 g1\2017 PG 415-4161 )GSGN S N3b3 pb1G q PO • $3g3eGg8 %4 0-\ 1� MATCH LINE SEE SHEET C5.03 2 Ni \-10QGV9 TIE PROPOSED SURFACE INTO ROADWAY FINISHED GRADE REFERENCE ROADWAY IMPROVEMENTS FOR WCPSS E-44 PLANS CIP CONCRETE RETAINING WALL OA 3 ic\\ 340\ N N N N I \ : ip".i-/ )/////e/:////r//j. // PUBLIC UTILITY EASEMENT / N VP 4 FIRE LANE 2 FIFE LPIEE HP 378 3.61-9- 3'71.80 BC 20.00' PRIVATE DRAINAGE EASEMENT (404 - MH) COMMUNITY CENTER DESIGNED BY OTHERS 379.12 TR 378.62 BR FFE 379 ArN TC 376 33 \ 376 (113.A - CN 0 Lri KEY PLAN: GRADING LEGEND: SYMBOL 200 TC 44.50 BC 44.00 TW 46.00 DESCRIPTION LIMITS OF DISTURBANCE PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR PROPOSED STORM DRAINAGE DETAIL REFERENCE N/A N/A N/A N/A N/A PROPOSED JUNCTION BOX PROPOSED CATCH BASIN 1/C9.20 PROPOSED DROP INLET 2/C9.20 RIPRAP APRON FLOW DIRECTION PROPOSED ELEVATION TOP/BOTTOM OF CURB N/A N/A N/A TOP/BOTTOM OF WALL N/A NOTES: 1. SEE SHEET C0.10 FOR GENERAL AND GRADING NOTES. 2. RETAINING WALLS OVER 4' IN HEIGHT WILL REQUIRE A SEPARATE BUILDING PERMIT. • SCALE: • 30 60 NORTH NSTRUCTION LITTLE DIVERSIFIED ARCHITECTURAL CONSULTING This drawing and the design shown are the property of Lillie Diversified Architectural, Consulting. The reproduction, copying or other use of this drawing without their written consent is pmhibited and any infringement 'pill be suly.ect to legal action. CD Little 2019 STEWART 223 S. WEST STREET SUITE 1100 RALEIGH, NC 27603 FIRM LICENSE #: C-1051 RELIMINAI NOT FOR NSTRUCTIQ NOT FOR CONSTRUCTION Site Plan Issue Date 2021.12.21 NO. REASON DATE PRINCIPAL IN CHARGE Jerry Guerrier PROJECT MANAGER KS, RL DESIGN TEAM ML, EM, RB, HH HILLTOP NEEDMORE ROAD ELEMENTARY SCHOOL WCPSS# 862-520 SHANE WEBSTER, PM 5141301400 GRADING & STORM DRAINAGE PLAN - AREA 1 E O O E L 8 7)) 0) 1� 378.70 TF� p� -- 378.29BC NOT F.Q13,4coNsTRus.74Q _ \ \ \\\ \ — —� \ \ \ \\\ f.-T�� 3 \ \ \ _________ 387- - ----386 ='S GAS -- / / / -- \ / 1 ` `/ REPLACE EXISTING HDPE PIPE WITH \ \ 7 42TC A ` v / DROP-OFF ZONE) \ A 3.7$�7 HP \ '� 7 \ \ GAS t tom= ` —G,S— t A _-fse , ---- % / - -- � -- 3 '8.89 , iFFE 379 \ FIRELANE 1 \ — �/ X378 26 \ \o,) % / (113 A - CB) 113 - CB \ / 37188 Tt / 3 7..38/6C MATCH LINE SEE SHEET C5.03 •— / 112.A-CB \ \ \ \‘: \ \ \ 1 \ \ \ LIMITS OF DISTURBANCE / • / 401 - MH 109 - MH BW:366.07 BW: 66.92 SEGMENTAL BLOCK RETAINING WALL SEE DETAIL 5/C9.00 BW:365.41 421 - EX DI 35 BS BW:363.02 60. 14`387 305 - CB 6.p0 BR 311 - DI 310 - CB WETLANDS IMPACT AREA: 1,233 SF Cer 420 - EX \\ / � y 479 1 IN // CROSS -ACCESS EASEMENT / FROM BACK OF CURB TO BACK OF CURB / • 306 - CB ' / / �377— • • ✓ 375. — -374. --r-373,\ o+ • • • 304.A - CB TIE PROPOSED SURFACE INTO ROADWAY FINISHED GRADE REFERENCE ROADWAY IMPROVEMENTS FOR WCPSS E-44 PLANS \ OA 00 \ 411444, N 302 - CB \ \, ) / / / / / / 4111: Ate / at 0. \,1\0.\.\-f\N\\\\--94\'''' ?.00''6'3°''3 • • SS • KEY PLAN: GRADING LEGEND: SYMBOL DESCRIPTION DETAIL REFERENCE 200 TC 44.50 TW 46.00 LIMITS OF DISTURBANCE PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR PROPOSED STORM DRAINAGE N/A N/A N/A N/A N/A PROPOSED JUNCTION BOX PROPOSED CATCH BASIN 1/C9.20 PROPOSED DROP INLET 2/C9.20 RIPRAP APRON FLOW DIRECTION PROPOSED ELEVATION TOP/BOTTOM OF CURB N/A N/A N/A TOP/BOTTOM OF WALL N/A NOTES: 1. SEE SHEET C0.10 FOR GENERAL AND GRADING NOTES. 2. RETAINING WALLS OVER 4' IN HEIGHT WILL REQUIRE A SEPARATE BUILDING PERMIT. STORM DRAINAGE NETWORK TYPE CODE: DI = DROP INLET FES = FLARED END SECTION MH JB RI CB CO TD = MANHOLE = JUNCTION BOX = RISER = CATCH BASIN = CLEANOUT = TRENCH DRAIN UPSTREAM STRC UPSTREAM GRD. ELEV. FLOW UPSTREAM INVERT DOWNSTREAM INVERT DOWNSTREAM STRC DOWNSTREAM GRD. ELEV. NOTES: 1. STRUCTURES WITHIN NCDOT RIGHT-OF-WAY SHALL BE TO NCDOT STANDARDS. 2. STRUCTURES NOT WITHIN RIGHT OF WAY SHALL EITHER ALL BE TO NCDOT STANDARDS OR SHALL ALL BE TO LOCAL JURISDICTIONAL STANDARDS. 3. ALL STORM PIPES TO BE CLASS III RCP UNLESS OTHERWISE NOTED. 4. ALL CATCH BASIN RIM ELEVATIONS MEASURED FROM THE TOP OF CURB AT THE CENTER OF THE STRUCTURE. 356\ NQJ FOR CONSTRlJ3°1CT L TT LE DIVERSIFIED ARCHITECTURAL CONSULTING This drawing and the design shown are the property of Little Diversified Architectural Consulting. The reproduction, copying or other use of this drawing without their written consent is prohibited and any infringement will be subject to legal action. FYI STEWART 223 S. WEST STREET SUITE 1100 FIRM LICENSE #: C-1051 www.stewartinc.com RELIMINAI NOT FOR NOT FOR CONSTRUCTION Site Plan Issue Date 2021.12.21 NO. REASON DATE PRINCIPAL IN CHARGE Jerry Guerrier PROJECT MANAGER KS, RL DESIGN TEAM ML, EM, RB, HH HILLTOP NEEDMORE ROAD ELEMENTARY SCHOOL WCPSS# 862-520 SHANE WEBSTER, PM 5141301400 GRADING & STORM DRAINAGE PLAN - AREA 2 4 N C�-T�9F�GO�J�T SANITARY MH FORCE MAIN RIM: 385.65' TW:382.29 BW:379.87 430 - HW AILBSX 230-A-HW TW:382.29 BW:379.87 TW:378.06 BW:378.06 \ \ \ \ \ i/11,1 \\\\ \ \ \ \\ 1 FRENCH UNDERDRAINS \ \ INSTALLED WITH EARLY `\ \ \ \ \ \ \ SITE PACKAGE (TYP.) / / 1 1 1 1�\ I I /--r�����all I\ I1 1 I \ \ \ I "` a,)�8 cam' �r\\ \ \ \ \ 389 - \\ \\\ \ o `�cP � `" `n \ \ \ \ \ \\\ \ 11 \\\\ \ \ \ \ \ \ \ \ \ \I\ \ \ \ \ \ \ \ \`\ \ ++\RC'� \ 'I\ ) 1•lc\--k5-\ \ INV: 75.6 \ \ \ - — may/' 11 ` I ` I�///��� I -J \\ - / ( r 1 //, AI 11 II N \ `I 1 1 1 '1\ \ I 1 1 \ 1` ice\ \ 1 \ _ ( \ I I' \\\\\ c\ N I ^� \\\\\ \ N I / 1 1\\ \ \\ � I 1\ J/ \ Y \ \ \/ \ \ \ \ \ \\ \ \ I A 1 R \\ \\ \\ 1 1 441 �+HW G�,,O� 1 \ \ \ \ 1 • 369.11' 1 I I I 1 230 - DI 125 - CB I 10.00' 377__ 376 115B - TD H I L LTO F u (RD-38) ORE ELEMENTAL HOOL 126A-DI (RD-29) 211 B-D I 211A-DI (C0-19) (RD-19) 126B - TD (RD-30) 126C-DI BUILDING FFE: 376.50 211 C-D I 211E-DI 126D - DI 211D-DI BUILDING (RD-20) FFE: 376.50 BUILDING / FFE: 376.50 / 211F-DI (RD-21) 126E-DI (RD-40) CO-32 RD-32) 126I-CD) 211 G-D I (RD-25) 211H-DI (CO 16) (RD-41) 126F-DI 126H-CO 4 (RD-4) (CO-9) (RD-9) (CD-201 F) (RD-15)J L EXISTING DEWATERING PIPE KEY PLAN: (co- (Stru 2C MWS RI GRADING LEGEND: SYMBOL DESCRIPTION LIMITS OF DISTURBANCE 200 PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR PROPOSED STORM DRAINAGE TC 44.50 BC 44.00 TW 46.00 BW 44.00 NOTES: DETAIL REFERENCE N/A N/A N/A N/A N/A PROPOSED JUNCTION BOX PROPOSED CATCH BASIN 1/C9.20 PROPOSED DROP INLET 2/C9.20 RIPRAP APRON FLOW DIRECTION PROPOSED ELEVATION TOP/BOTTOM OF CURB TOP/BOTTOM OF WALL N/A N/A N/A 1. SEE SHEET C0.10 FOR GENERAL AND GRADING NOTES. 2. RETAINING WALLS OVER 4' IN HEIGHT WILL REQUIRE A SEPARATE BUILDING PERMIT. 0 15 30 • 60 ONW't3CTFON LITTLE DIVERSIFIED ARCHITECTURAL CONSULTING www.Iittleonline.com This drawing and the design shown are the property of Lillie Diversified Architectural Consulting. The reproduction, copying or other use of this drawing without their written consent is prohibited and any infringement will be subject to legal action. CD Little 2019 rsa STEWART 223 S. WEST STREET SUITE 1100 RALEIGH, NC 27603 T 919.380.8750 FIRM LICENSE #: C-1051 www.stewartinc.com RELIMINARY, NOT FOR NSTRUCTId NOT FOR CONSTRUCTION Site Plan Issue Date 2021.12.21 NO. REASON PRINCIPAL IN CHARGE Jerry Guerrier PROJECT MANAGER KS, RL DESIGN TEAM ML, EM, RB, HH DATE HILLTOP NEEDMORE ROAD ELEMENTARY SCHOOL WCPSS# 862-520 SHANE WEBSTER, PM 5141301400 GRADING & STORM DRAINAGE PLAN - AREA 3 C5.03 oo E 0 ozs 0) h C:\C3 -'f MATCH LINE SEE SHEET C5.02 \\\ BUILDING FFE: 376.50 i i 107.0 DI (RD-4) (C0-4) i i i (Structure - (346)) BUILDING FFE: 376.50 201.E - DI 201.F - DI CONNECT EXISTING DEWATERING PIPE TO STRUCTURE 107.E - DI RD-6 CONNECT EXISTING DEWATERING PIPE TO STRUCTURE 201.E - DI 201.E - DI 201.C-DI 201.D - DI // _ - - � BUILDING ERD-11) (CO 12) )-201F) FFE: 376.50 (RD-12) ERING i i i RD-131 CO-13A MATCH LINE I SEE SHEET C5.05 108 - CB / J. SEGMENTAL BLOCK RETAINING WALL 66.61 BW:36 I \ I 1 I R/p / / • /. ./ / /. 62.05 ZNE TW:360.14 BW:361. I I W .66 jjR1 PARIqiv B FF :360.10. BW:360.61R 203 - DI RIPARI;, 107.A - CB 107 - CB 201 - DI / �' I 1 . . / 4 I I .� /• \‘ I / ' = \•ll /. )1II • _33.58-- rga) BW:35.00 :36 job 1 7 �� `-° ( 1• BW:48110 1II 106.A- CB TW:362.00 BW:362.00 SEGMENTAL BLOCK RETAINING WALL 300.B- CB 300.A CB 301 - CB 300 - CB TW: 359.0 BW: 356.0 ic„. 502 - MH `Y7 SEGMENTAL BLOCK RETAINING WALL / 355700 BW:355.00 - . S cture - (240) ./ / /,Q/A 2 -sTRF Mg cv /' �9/�• vp, /PN R/p�ZOil F,Q • • • WETLAND IMPACTS: 188 SF / 0.004 AC • • 4* 7 F \ \ \ \ • EX. WETLANDS 0 ?RX\INI.E SG ps TENPNCE EPSEW / / /' \ MPW ,,. , \ v ' \ / WET POND SCM \ 11I \ \ \ ` \\ \\\\I\ ` \ 102-HW \ \\\\\\ \\ \\\\\ \\\*\\ \�`� 1 I \ i TYPE CODE: DI = DROP INLET FES = FLARED END SECTION MH JB RI CB CO TD = MANHOLE = JUNCTION BOX = RISER = CATCH BASIN = CLEANOUT = TRENCH DRAIN KEY PLAN: GRADING LEGEND: SYMBOL TC 44.50 BC 44.00 TW 46.00 BW 44.00 NOTES: DESCRIPTION LIMITS OF DISTURBANCE PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR PROPOSED STORM DRAINAGE DETAIL REFERENCE N/A N/A N/A N/A N/A PROPOSED JUNCTION BOX PROPOSED CATCH BASIN 1/C9.20 PROPOSED DROP INLET 2/C9.20 RIPRAP APRON FLOW DIRECTION PROPOSED ELEVATION TOP/BOTTOM OF CURB N/A N/A N/A TOP/BOTTOM OF WALL N/A 1. SEE SHEET C0.10 FOR GENERAL AND GRADING NOTES. 2. RETAINING WALLS OVER 4' IN HEIGHT WILL REQUIRE A SEPARATE BUILDING PERMIT. STORM DRAINAGE NETWORK -UPSTREAM STRC UPSTREAM GRD. ELEV. FLOW - UPSTREAM INVERT DOWNSTREAM INVERT DOWNSTREAM STRC DOWNSTREAM GRD. ELEV. NOTES: 1. STRUCTURES WITHIN NCDOT RIGHT-OF-WAY SHALL BE TO NCDOT STANDARDS. 2. STRUCTURES NOT WITHIN RIGHT OF WAY SHALL EITHER ALL BE TO NCDOT STANDARDS OR SHALL ALL BE TO LOCAL JURISDICTIONAL STANDARDS. 3. ALL STORM PIPES TO BE CLASS III RCP UNLESS OTHERWISE NOTED. 4. ALL CATCH BASIN RIM ELEVATIONS MEASURED FROM THE TOP OF CURB AT THE CENTER OF THE STRUCTURE. ■ ■ 0 15 STR3lift 0 60N _v N T ION LITTLE DIVERSIFIED ARCHITECTURAL CONSULTING www.Iittleonline.com This drawing and the design shown are the property of Lillie Diversified Architectural Consulting. The reproduction, copying or other use of this drawing without their written consent is prohibited and any infringement will be subject to legal action. CD Little 2019 r7i2 STEWART 223 S. WEST STREET SUITE 1100 RALEIGH, NC 27603 T 919.380.8750 FIRM LICENSE #: C-1051 www.stewartinc.com RELIMINARY NOT FOR NSTRUCTI NOT FOR CONSTRUCTION Site Plan Issue Date 2021.12.21 NO. REASON DATE PRINCIPAL IN CHARGE Jerry Guerrier PROJECT MANAGER KS, RL DESIGN TEAM ML, EM, RB, HH HILLTOP NEEDMORE ROAD ELEMENTARY SCHOOL WCPSS# 862-520 SHANE WEBSTER, PM 5141301400 GRADING & STORM DRAINAGE PLAN - AREA 4 C5.04 KEY PLAN: NOT FOR CONSTRUCTION co ai N N O (NI ai N O z a) cts otS 0 h_2273E\L20040-05.00 Grad U E a) 1- 0 co 0 _! MATCH LINE SEE SHEET C5.03 \ \ \ AREA 5a 1 11 • / / / / I I I \ I 1 I\ N\ \ I I \ \ 1 \ I 1 \ \ \\ I \ 1 \\ '------- 1 \ 1 \ \ \ _ ,\ \ I 1 \ ` \ \ —�\ \ I \ • \ • • \ • • • \\ 1 • \ c� \ • • __1111.111— -11111:\ PLAN \ \ MATCH LINE \ SEE SHEET C5.04 —\ \ X \\ \\ \Ili \I 11 1 I I 1\ ; ► 1 ; I 1 1 1 1 1 I I \ I 1 11 1 1, I I ', I 1 1 1 I I I I \ II 1 I \ 1 11 \ 1 II \ I I I/ l /) I r 1 ► ► I I , I I I \ \ \\ I I I 1 1 \ I I` 1 1 I I 11\ I I \ / / I I 1 / , \1 I 1 I I I\ I 1 1 I I I I I I I I I\ 11 I 1 1 I I I 1 I \e q, oe I AREA 5b PLAN \ • 11 1 1 I I ►� 1 1r ` 1 \ \ r \\\ \ `\ \ \ \\ \ \\ \ • \ \ \I \\ \\ \\ \ \ I \ \ \ I \ \ \ 1 I I \ \ r \\\'' I \\ \ \ \ \\\\ \\ \ \\ \\ \ \ \ \ \ \ \ \ 1 1 \ \ \ \ \ 1 11I1111 ,\\\ \\ I MATCH LINE j, SEE SHEET C5.04 \ \ \ \ I \ \ \ /. \ \ \ \ �\ / / .„,„>\ / / NIF \o s o\N e‘ i,r\ChoN , • GRADING LEGEND: SYMBOL DESCRIPTION DETAIL REFERENCE 200 TC 44.50 BC 44.00 TW 46.00 BW 44.00 LIMITS OF DISTURBANCE PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR PROPOSED STORM DRAINAGE N/A N/A N/A N/A N/A PROPOSED JUNCTION BOX PROPOSED CATCH BASIN 1/C9.20 PROPOSED DROP INLET 2/C9.20 RIPRAP APRON FLOW DIRECTION PROPOSED ELEVATION TOP/BOTTOM OF CURB TOP/BOTTOM OF WALL N/A N/A N/A N/A NOTES: 1. SEE SHEET C0.10 FOR GENERAL AND GRADING NOTES. 2. RETAINING WALLS OVER 4' IN HEIGHT WILL REQUIRE A SEPARATE BUILDING PERMIT. • 15 SCALE: • 30 60 NORTH NOT FOR CONSTRUCTION LITTLE DIVERSIFIED ARCHITECTURAL CONSULTING This drawing and the design shown are the propeny of Little Diversffied Architectural Consulting. The reproduction, copying or other use of this drawing without their written consent is prohibited and any infringement will be subject to legal action. COI STEWART 223 S. WEST STREET SUITE 1100 RALEIGH, NC 27603 T 919.380.8750 FIRM LICENSE #: C-1051 www.stewartinc.com RELIMINAI NOT FOR NSTRUCTI NOT FOR CONSTRUCTION Site Plan Issue Date 2021.12.21 NO. REASON DATE PRINCIPAL IN CHARGE Jerry Guerrier PROJECT MANAGER KS, RL DESIGN TEAM ML, EM, RB, HH HILLTOP NEEDMORE ROAD ELEMENTARY SCHOOL WCPSS# 862-520 SHANE WEBSTER, PM 5141301400 GRADING & STORM DRAINAGE PLAN - AREA 5 C5.05 2 3 E D C C:\C3DTemp\AcPublish_227 \L20040-05.00 Grading & Storm Drainage Plan.dwg Nov 29, 2022 - 9:40i QNS ,TRRRUECTRtON INVERTS OTUL NAM ST R 100 - HW 355.54 INV IN: 351.00 18" RCP (101 - OCS) 115B - TD 370.28 INV OUT: 368.76 15" RCP (115.A - CB) 101 - OCS 385.25 INV OUT: 351.92 18" RCP (100 - HW) 116 - CB 376.53 INV IN: 372.01 15" RCP (117 - CB) INV IN: 366.39 18" RCP (122 - DI) INV OUT: 365.89 24" RCP (115 - CB) 102 - HW 359.92 INV IN: 355.00 54" RCP (103 - MH) 103 - MH 368.11 INV IN: 355.54 54" RCP (104 - MH) INV OUT: 355.34 54" RCP (102 - HW) 117 - CB 377.34 INV IN: 372.85 15" RCP (118 - CB) INV IN: 372.85 15" RCP (117.A - CB) INV OUT: 372.65 15" RCP (116 - CB) 104 - MH 368.88 INV IN: 356.73 48" RCP (105 - CB) INV IN: 358.85 30" RCP (201 - DI) INV OUT: 356.53 54" RCP (103 - MH) 117.A - CB 377.92 INV IN: 373.50 15" RCP (117.B - DI) INV OUT: 373.20 15" RCP (117 - CB) 105 - CB 367.64 INV IN: 357.88 42" RCP (300 - CB) INV IN: 359.18 30" RCP (106 - CB) INV OUT: 357.68 48" RCP (104 - MH) 117.E - DI 378.16 INV OUT: 373.56 15" RCP (117.A - CB) 118 - CB 378.52 INV IN: 373.55 15" RCP (119 - CB) INV OUT: 373.35 15" RCP (117 - CB) 106 - CB 367.64 INV IN: 360.28 30" RCP (107 - CB) INV IN: 362.50 15" RCP (106.A- CB) INV OUT: 360.08 30" RCP (105 - CB) 119 -CB 379.13 INV IN: 374.59 15" RCP (120 - CB) INV OUT: 374.39 15" RCP (118 - CB) 106.A- CB 370.71 INV OUT: 364.94 15" RCP (106 - CB) 120 - CB 381.47 INV IN: 377.50 15" RCP (121 - CB) INV OUT: 377.30 15" RCP (119 - CB) 107 - CB 371.60 INV IN: 366.00 15" RCP (107.A - CB) INV IN: 361.00 30" RCP (108 - CB) INV OUT: 360.80 30" RCP (106 - CB) 121 - CB 381.78 INV OUT: 377.69 15" RCP (120 - CB) 122 - DI 376.97 INV IN: 367.26 18" RCP (123 - MH) INV OUT: 367.06 18" RCP (116 - CB) 107.A - CB 371.60 INV IN: 366.44 15" RCP (107.B) INV OUT: 366.24 15" RCP (107 - CB) 123 - MH 378.41 INV IN: 374.00 15" RCP (124 - CB) INV IN: 368.20 18" RCP (125 - CB) INV OUT: 368.00 18" RCP (122 - DI) 107.B 374.89 INV IN: 371.56 12" (107.0 DI) INV OUT: 371.31 15" RCP (107.A - CB) 107.0 DI 374.75 INV OUT: 372.50 6" (CO-4) INV OUT: 371.71 12" (107.B) 124 - CB 380.19 INV OUT: 374.59 15" RCP (123 - MH) 125 - CB 374.25 INV IN: 368.99 18" RCP (126 - DI) INV OUT: 368.79 18" RCP (123 - MH) 108 - CB 374.12 INV IN: 361.90 30" RCP (109 - MH) INV IN: 370.64 8" (CO-3) INV OUT: 361.70 30" RCP (107 - CB) 126 - DI 375.40 INV IN: 369.39 15" RCP (126A - DI) INV IN: 369.86 10" (RD-29) INV OUT: 369.19 18" RCP (125 - CB) 109 - MH 375.50 INV IN: 362.74 30" RCP (112.A - CB) INV OUT: 362.54 30" RCP (108 - CB) 126A - DI 375.90 INV IN: 370.13 12" (126D - DI) INV IN: 370.13 12" (126B - TD) INV IN: 370.69 10" (RD-36) INV OUT: 369.70 15" RCP (126 - DI) 112 -CB 375.00 INV IN: 363.77 30" RCP (113 - CB) INV OUT: 363.57 30" RCP (112.A - CB) 112.A - CB 374.84 INV IN: 363.45 30" RCP (112 - CB) INV IN: 364.70 15" RCP (112.B - DI) INV OUT: 363.25 30" RCP (109 - MH) 126B - TD 375.54 INV OUT: 370.50 12" (126A - DI) 126C-DI 376.32 INV OUT: 370.49 12" (126D - DI) 112.B - DI 376.03 INV IN: 370.78 10" (RD-40) INV OUT: 364.99 15" RCP (112.A - CB) 126D - DI 376.50 INV IN: 371.85 12" (126E-DI) INV IN: 370.34 12" (126C-DI) INV OUT: 370.34 12" (126A - DI) 113 -CB 374.67 INV IN: 364.36 30" RCP (114 - CB) INV IN: 370.01 15" RCP (113.A - CB) INV OUT: 364.16 30" RCP (112 - CB) 126E-DI 376.33 INV IN: 372.27 12" (126F-DI) INV IN: 375.00 8" (126G-TD) INV OUT: 372.07 12" (126D - DI) 113.A - CB 375.42 INV OUT: 370.34 15" RCP (113 - CB) 114 GB 375.15 INV IN: 364.85 30" RCP (115 - CB) INV OUT: 364.65 30" RCP (113 - CB) 126E-DI 376.10 INV IN: 373.22 4" (126H-CO) INV OUT: 372.54 12" (126E-DI) 115 CB 375.21 INV IN: 365.60 24" RCP (116 - CB) INV IN: 368.13 15" RCP (115.A - CB) INV IN: 370.40 15" RCP (115.0 - CB) INV OUT: 365.10 30" RCP (114 - CB) 126G-TD 0.17 INV OUT: 375.50 8" (126E-DI) 126H-CO 373.69 INV IN: 373.30 4" (1261-CD) INV OUT: 373.30 4" (126F-DI) 115.A CB 375.91 INV IN: 368.51 15" RCP (115B - TD) INV OUT: 368.31 15" RCP (115 - CB) 1261-CD 374.00 INV OUT: 373.61 4" (126H-CO) 115.0 - CB 375.63 INV OUT: 370.70 15" RCP (115 - CB) STRUCTURE TABLE STRUCTURE TABLE STRUCTURE NAME STRUCTURE RIM INVERTS STRUCTURE NAME STRUCTURE RIM INVERTS 211F-DI 376.25 INV IN: 370.50 10" (211G-DI) INV IN: 370.50 10" (211H-DI) INV OUT: 370.30 10" (211E-DI) 400 - MH - LS 369.58 INV IN: 366.83 24" RCP (401 - MH) 401 MH 375.66 INV IN: 367.27 24" RCP (404 - MH) INV OUT: 367.09 24" RCP (400 - MH - LS) 211G-DI 376.34 INV IN: 372.77 4" (CO-211) INV IN: 373.05 6" (CO 23) INV OUT: 370.84 10" (211F-DI) 404 - MH 377.63 INV IN: 368.93 24" RCP (Structure - (241)) INV OUT: 368.73 24" RCP (401 - MH) 211 H DI 376.34 INV OUT: 371.02 10" (211 F-DI) 405 - MH 380.89 INV IN: 375.55 15" RCP (406.A - MH) INV OUT: 375.45 24" RCP (405A) 220 DI 375.60 INV IN: 369.22 15" RCP (221 - DI) INV OUT: 369.02 15" RCP (202 - DI) 405A 381.71 INV IN: 375.31 24" RCP (405 - MH) INV OUT: 375.11 24" RCP (Structure - (241)) 221 - DI 374.79 INV IN: 370.26 15" RCP (221.A - DI) INV OUT: 370.06 15" RCP (220 - DI) 406.A MH 389.47 INV IN: 376.77 15" RCP (406.B - DI) INV OUT: 376.57 15" RCP (405 - MH) 221.A- DI 374.78 INV OUT: 370.64 15" RCP (221 - DI) 406.B - DI 382.51 INV OUT: 376.89 15" RCP (406.A - MH) 230-A-HW 363.81 INV IN: 362.00 15" (230 - DI) 420 - EX MH 378.21 INV IN: 366.26 18" RCP (421 - EX DI) 230 - DI 367.92 INV OUT: 365.12 15" (230-A-HW) 421 - EX DI 372.07 INV OUT: 370.27 18" RCP (420 - EX MH) 300 - CB 365.74 INV IN: 359.92 18" RCP (300.A - CB) INV IN: 358.74 42" RCP (301 - CB) INV OUT: 358.54 42" RCP (105 - CB) 430 - HW 384.21 INV IN: 382.27 15" RCP (431 - HW) 431 - HW 384.93 INV OUT: 382.99 15" RCP (430 - HW) 300.A - CB 365.74 INV IN: 360.61 18" RCP (300.B - CB) INV OUT: 360.41 18" RCP (300 - CB) 440 - HW 365.21 INV IN: 364.00 18" RCP (441 - HW) 300.E - CB 365.74 INV OUT: 360.67 18" RCP (300.A - CB) 441 - HW 370.21 INV OUT: 368.00 18" RCP (440 - HW) 301 - CB 365.74 INV IN: 359.27 36" RCP (302 - CB) INV OUT: 358.77 42" RCP (300 - CB) 500 - DI 366.08 INV OUT: 360.01 12" (501 - MH) 501 - MH 369.38 INV IN: 359.87 12" (500 - DI) INV OUT: 359.87 12" (502 - MH) 302 - CB 368.53 INV IN: 360.41 36" RCP (303 - CB) INV OUT: 360.21 36" RCP (301 - CB) 502 - MH 357.97 INV IN: 348.51 12" (501 - MH) INV OUT: 348.51 12" (Structure - (240)) 303 - CB 369.58 INV IN: 360.97 36" RCP (310 - CB) INV IN: 364.83 15" RCP (304 - CB) INV OUT: 360.77 36" RCP (302 - CB) CD-201 F 374.00 INV OUT: 373.61 4" (CO-201 F) 304 - CB 373.00 INV IN: 368.69 15" RCP (305 - CB) INV IN: 367.74 15" RCP (304.A - CB) INV OUT: 367.54 15" RCP (303 - CB) CD-211 374.07 INV OUT: 373.68 4" (CO-211) CO-3 372.86 INV IN: 372.08 8" (RD-2) INV IN: 372.08 6" (RD-3) INV OUT: 372.08 8" (108 - CB) 304.A - CB 373.13 INV OUT: 367.98 15" RCP (304 - CB) 305 - CB 376.54 INV IN: 371.62 15" RCP (306 - CB) INV OUT: 371.42 15" RCP (304 - CB) CO-4 373.74 INV IN: 372.59 6" 0 INV IN: 372.59 6" (RD-4) INV IN: 372.59 6" (107.0 DI) 306 - CB 376.23 INV OUT: 372.05 15" RCP (305 - CB) CO-7 373.28 INV IN: 372.53 8" (RD-7) INV OUT: 372.53 8" (201.B- DI) 310 - CB 374.23 INV IN: 361.78 36" RCP (311 - DI) INV OUT: 361.58 36" RCP (303 - CB) CO-9 372.86 INV IN: 371.75 6" (RD-9) INV OUT: 371.75 6" (201.F - DI) 311 - DI 374.45 INV IN: 362.12 36" RCP (312 - DI) INV IN: 369.55 15" RCP (311.A - DI) INV OUT: 361.92 36" RCP (310 - CB) CO-12 373.68 INV IN: 373.05 6" (RD-12) INV IN: 373.05 6" (RD-11) INV OUT: 373.05 6" (201.D - DI) 311.A - DI 375.72 INV OUT: 371.29 15" RCP (311 - DI) 312 DI 374.56 INV IN: 362.71 36" RCP (313 - DI) INV OUT: 362.21 36" RCP (311 - DI) 313 - DI 372.65 INV OUT: 363.05 36" RCP (312 - DI) PIPE TABLE PIPE TABLE PIPE TABLE PIPE TABLE START STRUCTURE END STRUCTURE START INVERT END INVERT SIZE LENGTH SLOPE MATERIAL START STRUCTURE END STRUCTURE START INVERT END INVERT SIZE LENGTH SLOPE MATERIAL START STRUCTURE END STRUCTURE START INVERT END INVERT SIZE LENGTH SLOPE MATERIAL START STRUCTURE END STRUCTURE START INVERT END INVERT SIZE LENGTH SLOPE MATERIAL RD-40 112.B - DI 370.89 370.78 10" 6.92' 1.47% 355.00 348.63 18" 161.24' 3.95% RCP RD-29 126 - DI 370.42 369.86 10" 56.74' 1.00% HDPE CO-12 201.D - DI 373.05 372.86 6" 9.62' 2.00% HDPE 113.A- CB 113-CB 370.34 370.01 15" 16.42' 2.00% RCP 101 - OCS 100 - HW 351.92 351.00 18" 139.05' 0.66% RCP 126A-DI 126 - DI 369.70 369.39 15" 63.21' 0.48% RCP 201.F - DI 201.E - DI 368.83 368.50 12" 16.54' 2.00% HDPE 114-CB 113-CB 364.65 364.36 30" 57.95' 0.50% RCP 103 - MH 102 - HW 355.34 355.00 54" 67.16' 0.50% RCP 126B - TD 126A - DI 370.50 370.13 12" 7.85' 4.72% HDPE CO-201 F 201.F - DI 373.56 373.39 4" 8.47' 2.00% HDPE 115-CB 114 -CB 365.10 364.85 30" 49.98' 0.50% RCP 104 - MH 103 - MH 356.53 355.54 54" 198.13' 0.50% RCP RD-36 126A - DI 370.91 370.69 10" 10.79' 2.00% HDPE RD-10 201.F - DI 373.47 373.33 6" 6.98' 2.00% HDPE 115.C-CB 115-CB 370.70 370.40 15" 14.46' 2.12% RCP 201 - DI 104 - MH 360.01 358.85 30" 115.59' 1.00% RCP 126D - DI 126A - DI 370.34 370.13 12" 41.45' 0.50% HDPE CO-9 201.F - DI 371.75 371.70 6" 9.86' 0.58% HDPE 116-CB 115-CB 365.89 365.60 24" 57.55' 0.50% RCP 105 - CB 104 - MH 357.68 356.73 48" 190.69' 0.50% RCP 126C-DI 126D - DI 370.49 370.34 12" 29.46' 0.50% HDPE 220 - DI 202 - DI 369.02 367.07 15" 389.24' 0.50% RCP 115.A- CB 115-CB 368.31 368.13 15" 36.66' 0.50% RCP 106 - CB 105 - CB 360.08 359.18 30" 48.67' 1.84% RCP 126E-DI 126D - DI 372.07 371.85 12" 44.37' 0.50% HDPE 203 - DI 202 - DI 361.05 360.84 30" 41.14' 0.50% RCP 115B - TD 115.A - CB 368.76 368.51 15" 40.91' 0.60% RCP 300 - CB 105 - CB 358.54 357.88 42" 131.14' 0.50% RCP 126G-TD 126E-DI 375.50 375.00 8" 30.94' 1.62% HDPE 204 - DI 203 - DI 363.25 362.71 18" 90.25' 0.60% RCP 122 - DI 116-CB 367.06 366.39 18" 67.25' 1.00% RCP 106.A- CB 106 - CB 364.94 362.50 15" 106.12' 2.30% RCP 126F-DI 126E-DI 372.54 372.27 12" 53.33' 0.50% HDPE 203A 203 - DI 362.05 361.25 30" 160.48' 0.50% RCP 117-CB 116-CB 372.65 372.01 15" 58.29' 1.09% RCP 107 - CB 106 - CB 360.80 360.28 30" 104.46' 0.50% RCP 126H-CO 126F-DI 373.30 373.22 4" 2.82' 3.00% HDPE 205 - DI 203A 363.05 362.50 24" 108.85' 0.51% RCP 118-CB 117-CB 373.35 372.85 15" 56.35' 0.89% RCP 108 - CB 107 - CB 361.70 361.00 30" 139.68' 0.50% RCP 126I-CD 126H-CO 373.61 373.30 4" 10.49' 3.00% HDPE CO-13A 204 - DI 371.00 370.63 8" 18.74' 2.00% HDPE 117.A- CB 117-CB 373.20 372.85 15" 42.84' 0.82% RCP 107.A - CB 107 - CB 366.24 366.00 15" 36.53' 0.66% RCP 202 - DI 201 - DI 360.64 360.21 30" 86.14' 0.50% RCP CO-16 205 - DI 368.53 367.45 8" 54.02' 2.00% HDPE 117.B - DI 117.A-CB 373.56 373.50 15" 6.07' 1.00% RCP 107.B 107.A - CB 371.31 366.44 15" 180.96' 2.69% RCP 201.A - CB 201 - DI 365.00 363.75 15" 124.52' 1.00% RCP 206 - DI 205 - DI 363.75 363.25 24" 99.97' 0.50% RCP 119-CB 118-CB 374.39 373.55 15" 23.72' 3.55% RCP 107.0 DI 107.6 371.71 371.56 12" 30.03' 0.50% HDPE 201.B - DI 201.A - CB 366.38 365.20 15" 117.80' 1.00% RCP 207 - DI 206 - DI 364.57 363.95 24" 124.03' 0.50% RCP 120-CB 119-CB 377.30 377.69 374.59 377.50 15" 15" 126.94' 39.24' 2.13% 0.50% RCP RCP CO-3 108 - CB 372.08 362.54 370.64 361.90 8" 30" 71.97' 126.95' 2.00% 0.50% HDPE RCP 123 - MH 122 - DI 368.00 367.26 18" 76.74' 0.96% RCP 112.A-CB 109 - MH 363.25 362.74 30" 60.72' 0.84% RCP Structure - (356) 371.80 369.00 6" 279.09' 1.00% HDPE 207 - DI 364.95 364.77 24" 36.42' 0.50% RCP Structure - (356) 371.80 369.00 6" 279.09' 1.00% HDPE 207 - DI 365.84 365.29 15" 109.23' 0.50% RCP 123 - MH 368.79 368.20 18" 118.12' 0.50% RCP 364.16 363.77 30" 77.77' 0.50% RCP 372.53 372.31 8" 10.75' 2.00% HDPE 209 - CB 365.73 365.15 24" 116.18' 0.50% RCP 123 - MH 374.59 374.00 15" 29.87' 2.00% RCP 112.A-CB 363.57 363.45 30" 24.71' 0.50% RCP 367.21 366.58 15" 38.83' 1.63% RCP 211 -DI 368.67 368.17 15" 35.73' 1.42% RCP 369.19 368.99 18" 39.02' 0.50% RCP 112.A-CB 364.99 364.70 15" 57.93' 0.50% RCP 367.77 367.46 12" 15.18' 2.00% HDPE 369.26 368.92 12" 23.40' 1.42% HDPE PIPE TABLE PIPE TABLE 368.30 367.46 12" 41.71' 2.00% HDPE 370.38 369.64 8" 37.23' 2.00% HDPE START STRUCTURE END STRUCTURE START INVERT END INVERT SIZE LENGTH SLOPE MATERIAL START STRUCTURE END STRUCTURE START INVERT END INVERT SIZE LENGTH SLOPE MATERIAL PIPE TABLE PIPE TABLE 211E-DI 211 -DI 369.54 369.09 10" 44.42' 1.00% HDPE 367.98 367.74 15" 48.89' 0.50% RCP START STRUCTURE END STRUCTURE START INVERT END INVERT SIZE LENGTH SLOPE MATERIAL START STRUCTURE END STRUCTURE START INVERT END INVERT SIZE LENGTH SLOPE MATERIAL 211B-DI 211A-DI 369.64 369.42 10" 21.12' 1.00% HDPE 371.42 368.69 15" 176.70' 1.55% RCP 107.0 DI 372.50 372.59 6" 4.12' -2.00% RD-38 372.29 372.18 6" 3.44' 3.21% HDPE 211A-DI 369.83 369.42 10" 40.22' 1.00% HDPE 372.05 371.62 15" 73.07' 0.59% RCP 372.96 372.59 6" 18.88' 2.00% 372.05 371.59 6" 55.86' 0.84% HDPE RD-28 211B-DI 371.35 370.63 8" 35.90' 2.00% HDPE 310 - CB 361.92 361.78 36" 27.05' 0.50% RCP RD-4 372.90 372.59 6" 11.47' 2.70% 373.61 373.56 4" 2.69' 2.00% HDPE 370.30 370.03 10" 26.92' 1.00% HDPE 371.29 369.55 15" 87.82' 1.98% RCP RD-7 372.97 372.53 8" 21.96' 2.00% 373.68 373.23 4" 22.82' 2.00% HDPE 211F-DI 211E-DI 370.30 369.74 10" 56.49' 1.00% HDPE 312 - DI 362.21 362.12 36" 17.72' 0.50% RCP RD-9 371.79 371.75 6" 7.29' 0.50% RD-1 RD-2 373.48 372.63 6" 42.51' 2.00% HDPE 211G-DI 211F-DI 370.84 370.50 10" 33.98' 1.00% HDPE 313 - DI 363.05 362.71 36" 67.51' 0.51% RCP RD-12 CO-12 373.45 373.05 6" 20.15' 2.00% RD-8 RD-7 371.53 371.49 6" 8.64' 0.50% HDPE 211H-DI 211F-DI 371.02 370.50 10" 51.94' 1.00% HDPE 401 - MH 400 - MH - LS 367.09 366.83 24" 51.03' 0.50% RCP RD-11 373.50 373.05 6" 9.34' 4.82% RD-6 RD-7 373.50 373.13 6" 18.07' 2.00% HDPE 211G-DI 373.23 372.77 4" 22.87' 2.00% HDPE 401 - MH 368.73 367.27 24" 290.60' 0.50% RCP 371.63 371.24 8" 19.24' 2.00% RD-13 373.12 373.42 6" 15.00' -2.00% HDPE 211G-DI 373.54 373.05 6" 24.41' 2.00% HDPE 370.06 369.22 15" 167.49' 0.50% RCP 370.64 370.26 15" 18.87' 2.00% RCP 230 - DI 230-A-HW 365.12 362.00 15" 174.73' 1.78% HDPE 301 - CB 300 - CB 358.77 358.74 42" 6.04' 0.50% RCP 360.41 359.92 18" 48.83' 1.00% RCP 360.67 360.61 18" 5.96' 1.01% RCP 302 - CB 360.21 359.27 36" 187.92' 0.50% RCP 360.77 360.41 36" 71.57' 0.50% RCP 367.54 364.83 15" 135.73' 2.00% RCP RCP 2 Structure - (241) 369.13 368.93 24" 47.55' 0.42% RCP CO-13 CO-13A 371.24 371.00 8" 12.09' 2.00% RD-14 373.09 373.45 6" 18.21' -2.00% HDPE 373.18 371.80 6" 69.14' 2.00% RD-17 RD-16 372.90 372.03 6" 43.33' 2.00% HDPE 405 - MH 376.57 375.55 15" 203.83' 0.50% RCP 373.49 373.18 6" 15.51' 2.00% RD-17 373.41 372.90 6" 25.89' 2.00% HDPE 405 - MH 405A 375.45 375.31 24" 14.15' 1.00% RCP 369.41 368.53 8" 44.11' 2.00% RD-20 RD-19 371.78 370.63 8" 57.52' 2.00% HDPE 376.89 376.77 15" 23.41' 0.54% RCP CO-18 373.53 373.41 6" 5.77' 2.00% RD-21 RD-20 372.54 371.94 6" 30.02' 2.00% HDPE 420 - EX MH 370.27 366.26 18" 152.28' 2.63% RCP 370.63 370.38 8" 12.38' 2.00% RD-22 RD-21 373.51 372.54 6" 48.06' 2.00% HDPE 431 - HW 430 - HW 382.99 382.27 15" 40.86' 1.77% RCP 373.70 373.54 6" 8.06' 2.00% RD-23 373.60 373.54 6" 2.04' 2.94% HDPE 441 - HW 440 - HW 368.00 364.00 18" 59.88' 6.68% RCP CO-32 372.94 372.43 6" 25.76' 2.00% RD-25 RD-26 373.80 372.71 6" 54.51' 2.00% HDPE 501 - MH RD-3 501 - MH 502 - MH 360.01 359.87 372.50 359.87 348.51 372.08 12" 12" 6" 15.45' 173.57' 14.38' 0.90% 6.55% 2.92% HDPE HDPE HDPE RD-32 CO-35 371.81 372.09 373.33 371.74 371.85 371.85 12" 6" 8" 3.12' 11.97' 74.14' 2.00% 2.00% 2.00% RD-26 0:: RD-27 9 372.54 Co 371.91 NS 8" 31.83' 2 0' 2.00% UOC HDPE TI L TT LE DIVERSIFIED ARCHITECTURAL CONSULTING This drawing and the design shown are the property of Lillie Diversified Architectural, Consulting. The reproduction, copying or other use of this drawing without their written consent is prohibited and any infringement will be suly.ect to legal action. CD Little 2019 r7i2 STEWART 223 S. WEST STREET SUITE 1100 RALEIGH, NC 27603 FIRM LICENSE #: C-1051 RELIMINAI NOT FOR NOT FOR CONSTRUCTION Site Plan Issue Date 2021.12.21 NO. REASON DATE PRINCI Jer PAL IN CHARGE ry Guerrier PROJECT MANAGER KS, RL DESIGN TEAM ML, EM, RB, HH HILLTOP NEEDMORE ROAD ELEMENTARY SCHOOL WCPSS# 862-520 SHANE WEBSTER, PM 5141301400 STORM DRAINAGE TABLES ON C5.10 361.58 360.97 36" 121.78' 0.50% RD-2 CO-3 372.46 372.08 3" 19.19' 2.00% HDPE 4 372.18 372.05 6" 3.44' 3.54% RD-30 371.16 370.89 8" 27.10' 6 1.00% HDPE "^T FOR CONS cage Plan.dwg Nov 29, 2022 E 0 VJ ozs 0) h 227\L20040-05.00 Grad C:\C3DTemp\AcPubl STRUCTURE TABLE STRUCTURE NAME STRUCTURE RIM INVERTS CO-13 373.78 INV IN: 371.24 8" (CO-14) INV OUT: 373.12 6" (RD-13) INV OUT: 371.24 8" (CO-13A) CO-13A 371.75 INV IN: 371.00 8" (CO-13) INV OUT: 371.00 8" (204 - DI) CO-14 373.73 INV IN: 371.80 6" (CO-15) INV OUT: 371.63 8" (CO-13) INV OUT: 373.09 6" (RD-14) CO-15 373.74 INV IN: 373.18 6" (RD-15) INV OUT: 373.18 6" (CO-14) CO-16 369.28 INV IN: 368.53 8" (RD-16) INV OUT: 368.53 8" (205 - DI) CO-18 373.98 INV IN: 373.41 6" (RD-18) INV OUT: 373.41 6" (RD-17) CO-19 371.13 INV IN: 370.38 8" (RD-19) INV OUT: 370.38 8" (211 - DI) CO-23 374.16 INV IN: 373.54 6" (RD-24) INV OUT: 373.60 6" (RD-23) INV OUT: 373.54 6" (211G-DI) CO-32 373.04 INV IN: 372.43 6" (RD-33) INV IN: 371.74 12" (RD-32) INV OUT: 372.26 8" (RD-31) CO-35 372.61 INV IN: 371.85 8" (RD-34) INV IN: 371.85 6" (RD-35) INV OUT: 371.85 8" (RD-36) CO-37 373.16 INV IN: 372.05 6" (RD-37) INV OUT: 372.05 6" (CO-38) CO-38 373.31 INV IN: 371.59 6" (CO-37) INV IN: 372.18 6" (RD-38) INV OUT: 371.59 8" (RD-39) CO-201 F 373.94 INV IN: 373.56 4" (CD-201 F) INV OUT: 373.56 4" (201.F - DI) CO-211 373.61 INV IN: 373.23 4" (CD-211) INV OUT: 373.23 4" (211G-DI) RD-1 374.05 INV OUT: 373.48 6" (RD-2) RD-2 373.21 INV IN: 372.63 6" (RD-1) INV OUT: 372.46 8" (CO-3) RD-3 372.67 INV OUT: 372.50 6" (CO-3) RD-4 372.87 INV OUT: 372.90 6" (CO-4) RD-6 374.06 INV OUT: 373.50 6" (RD-7) RD-7 373.79 INV IN: 373.13 6" (RD-6) INV IN: 371.49 6" (RD-8) INV OUT: 372.97 8" (CO-7) RD-8 372.63 INV OUT: 371.53 6" (RD-7) RD-9 372.90 INV OUT: 371.79 6" (CO-9) RD-10 374.03 INV OUT: 373.47 6" (201.F - DI) ■ ■ v vi . ! v ■ W STRUCTURE TABLE STRUCTURE NAME STRUCTURE RIM INVERTS RD-11 372.89 INV OUT: 373.50 6" (CO-12) RD-12 374.02 INV OUT: 373.45 6" (CO-12) RD-13 373.99 INV IN: 373.42 6" (CO-13) RD-14 374.02 INV IN: 373.45 6" (CO-14) RD-15 374.05 INV OUT: 373.49 6" (CO-15) RD-16 372.73 INV IN: 372.03 6" (RD-17) INV OUT: 369.41 8" (CO-16) RD-17 373.46 INV IN: 372.90 6" (CO-18) INV OUT: 372.90 6" (RD-16) RD-18 374.09 INV OUT: 373.53 6" (CO-18) RD-19 371.38 INV IN: 370.63 8" (RD-20) INV OUT: 370.63 8" (CO-19) RD-20 372.53 INV IN: 371.94 6" (RD-21) INV OUT: 371.78 8" (RD-19) RD-21 373.11 INV IN: 372.54 6°' (RD-22) INV OUT: 372.54 6" (RD-20) RD-22 374.07 INV OUT: 373.51 6" (RD-21) RD-23 373.48 INV IN: 373.54 6" (CO-23) RD-24 374.27 INV OUT: 373.70 6" (CO-23) RD-25 374.37 INV OUT: 373.80 6" (RD-26) RD-26 373.29 INV IN: 372.71 6" (RD-25) INV OUT: 372.54 8" (RD-27) RD-27 372.83 INV IN: 371.91 8" (RD-26) INV OUT: 371.91 8" (RD-28) RD-28 372.28 INV IN: 371.35 8" (RD-27) INV OUT: 371.35 8" (211B-DI) RD-29 371.35 INV IN: 370.42 10" (RD-30) INV OUT: 370.42 10" (126 - DI) RD-30 371.65 INV IN: 370.898" (RD-31) INV OUT: 370.72 10" (RD-29) RD-31 371.91 INV IN: 371.16 8" (CO-32) INV OUT: 371.16 8" (RD-30) RD-32 372.91 INV OUT: 371.81 12" (CO-32) RD-33 373.51 INV OUT: 372.94 6" (CO-32) STRUCTURE TABLE STRUCTURE NAME STRUCTURE RIM INVERTS RD-34 374.08 INV OUT: 373.33 8" (CO-35) RD-35 372.66 INV OUT: 372.09 6" (CO-35) RD 36 371.83 INV IN: 371.07 8" (CO-35) INV OUT: 370.91 10" (126A - DI) RD-37 373.28 INV OUT: 372.18 6" (CO-37) RD-38 373.39 INV OUT: 372.29 6" (CO-38) RD-39 372.61 INV IN: 371.50 8" (CO-38) INV OUT: 371.50 8" (RD-40) RD-40 372.00 INV IN: 370.89 8" (RD-39) INV IN: 370.89 6" (RD-41) INV OUT: 370.89 10" (112.B - DI) RD-41 372.19 INV OUT: 371.09 6" (RD-40) Structure - (240) 353.02 INV IN: 348.42 12" (502 - MH) Structure - (241) 377.45 INV IN: 370.55 24" RCP (405A) INV OUT: 369.13 24" RCP (404 - MH) Structure - (346) 372.38 Structure - (356) 372.40 INV OUT: 371.80 6" (201.B - DI) INV OUT: 371.80 6" (201.B - DI) PIPE TABLE START STRUCTURE END STRUCTURE START INVERT END INVERT SIZE LENGTH SLOPE MATERIAL CO-32 RD-31 372.26 371.16 8" 74.09' 1.49% HDPE CO-35 RD-36 371.85 371.07 8" 38.87' 2.00% HDPE CO-38 RD-39 371.59 371.50 8" 9.63' 0.84% HDPE RD-41 RD-40 371.09 370.89 6" 23.23' 0.84% HDPE RD-39 RD-40 371.50 370.89 8" 73.93' 0.84% HDPE 502 - MH Structure - (240) 348.51 348.42 12" 16.05' 0.51% HDPE 405A Structure - (241) 375.11 370.55 24" 304.16' 1.50% RCP STRUCTURE TABLE STRUCTURE NAME STRUCTURE RIM INVERTS 201 - DI 371.44 INV IN: 360.21 30" RCP (202 - DI) INV IN: 363.75 15" RCP (201.A - CB) INV OUT: 360.01 30" RCP (104 - MH) 201.A - CB 372.51 INV IN: 365.20 15" RCP (201.B - DI) INV OUT: 365.00 15" RCP (201 - DI) 201.B - DI 375.34 INV IN: 366.58 15" RCP (201.0 - DI) INV IN: 372.31 8" (CO-7) INV IN: 369.00 6" (Structure - (356)) INV IN: 369.00 6" (Structure - (356)) INV OUT: 366.38 15" RCP (201.A - CB) 201.0 - DI 375.82 INV IN: 367.46 12" (201.E - DI) INV IN: 367.46 12" (201.D - DI) INV OUT: 367.21 15" RCP (201.B - DI) 201.D - DI 375.83 INV IN: 372.86 6" (CO-12) INV OUT: 367.77 12" (201.0 - DI) 201.E - DI 375.83 INV IN: 368.50 12" (201.F - DI) INV OUT: 368.30 12" (201.0 - DI) 201.F - DI 375.83 INV IN: 371.70 6" (CO-9) INV IN: 373.33 6" (RD-10) INV IN: 373.39 4" (CO-201 F) INV OUT: 368.83 12" (201.E - DI) 202 - DI 375.96 INV IN: 360.84 30" RCP (203 - DI) INV IN: 367.07 15" RCP (220 - DI) INV OUT: 360.64 30" RCP (201 - DI) 203 - DI 373.34 INV IN: 361.25 30" RCP (203A) INV IN: 362.71 18" RCP (204 - DI) INV OUT: 361.05 30" RCP (202 - DI) 203A 376.37 INV IN: 362.50 24" RCP (205 - DI) INV OUT: 362.05 30" RCP (203 - DI) 204 - DI 374.83 INV IN: 370.63 8" (CO-13A) INV OUT: 363.25 18" RCP (203 - DI) 205 - DI 374.36 INV IN: 363.25 24" RCP (206 - DI) INV IN: 367.45 8" (CO-16) INV OUT: 363.05 24" RCP (203A) 206 - DI 374.04 INV IN: 363.95 24" RCP (207 - DI) INV OUT: 363.75 24" RCP (205 - DI) 207 - DI 374.36 INV IN: 364.77 24" RCP (209 - CB) INV IN: 365.29 15" RCP (208 - DI) INV OUT: 364.57 24" RCP (206 - DI) 208 - DI 368.77 INV OUT: 365.84 15" RCP (207 - DI) 209 - CB 375.45 INV IN: 365.15 24" RCP (210 - DI) INV OUT: 364.95 24" RCP (207 - DI) 210 - DI 374.04 INV IN: 368.17 15" RCP (211 - DI) INV OUT: 365.73 24" RCP (209 - CB) 211 - DI 375.26 INV IN: 369.09 10" (211E-DI) INV IN: 369.64 8" (CO-19) INV IN: 368.92 12" (211A-DI) INV OUT: 368.67 15" RCP (210 - DI) 211A-DI 376.25 INV IN: 369.42 10" (211B-DI) INV IN: 369.42 10" (211C-DI) INV OUT: 369.26 12" (211 - DI) 211E-DI 376.23 INV IN: 370.63 8" (RD-28) INV OUT: 369.64 10" (211A-DI) 211C-DI 376.28 INV IN: 370.03 10" (211D-DI) INV OUT: 369.83 10" (211A-DI) 211D-DI 376.28 INV OUT: 370.30 10" (211C-DI) 211E-DI 376.25 INV IN: 369.74 10" (211F-DI) INV OUT: 369.54 10" (211 - DI) NOT FOR CONSTRUCTION LITTLE DIVERSIFIED ARCHITECTURAL CONSULTING www.Iittleonline.com This drawing and the design shown are the property of Lillie Diversified Architectural Consulting. The reproduction, copying or other use of this drawing without their written consent is prohibited and any infringement will be subject to legal action. CD Little 2019 r7i2 STEWART 223 S. WEST STREET SUITE 1100 RALEIGH, NC 27603 T 919.380.8750 FIRM LICENSE #: C-1051 www.stewartinc.com RELIMINARY, NOT FOR NSTRUCTId NOT FOR CONSTRUCTION Site Plan Issue Date 2021.12.21 NO. REASON DATE PRINCIPAL IN CHARGE Jerry Guerrier PROJECT MANAGER KS, RL DESIGN TEAM ML, EM, RB, HH HILLTOP NEEDMORE ROAD ELEMENTARY SCHOOL WCPSS# 862-520 SHANE WEBSTER, PM 5141301400 STORM DRAINAGE TABLES C5.11 1 2 3 4