Loading...
HomeMy WebLinkAbout20150012 Ver 1_More Info Received_201501282 0 1 5 0 0 2 7 State of North Carolina Department of Environment and Natural Resources "Division of Water Resources Division of Water Resources 15A NCAC 0213.0233 (8)(b),.0243 (8)(b),.0250 (11)(b),.0259 (8)(b),.0267 (11)(c),.0607 (e)(2) — Buffer Authorization FORM: BA 10 -2013 Riparian Buffer Authorization Form A. Applicant Information 1. Project information la Name of project Martin Cottage Addition (44 North Pond Road) 1b County Hyde 1 c Nearest municipality Ocracoke 1 d Subdivision name Pamlico Shores le Is the project located in any of North Carolina's twenty coastal counties If yes, answer 1f below X Yes ❑ No 1f is the project located within a NC Division of Coastal Management Area of Environmental Concern (AEC)? X Yes ❑ No 2. Owner Information 2a Name on Recorded Deed Charles R Martin 2b Deed Book and Page No 111 -481 2c Map Book and Page No (include a copy of the recorded map that indicates when the lot was created) X6 -31 2d Responsible Parry (for Corporations) Sally Martin nn a� 2e Street address P O Box 39 2f City, state, zip Jones Mills, PA 15646 2g Telephone no 252 - 921 -0261 2 2h Fax no 21 Email address salnchasmartin@gmail corn 401 & SUEEFR pr-PR ER RESOUR 3. Applicant Information (if different from owner) 3a Applicant is x Agent ❑ Other, specify Contractor 3b Name Thomas Pahl 3c Business name (if applicable) Landmark Building and Design, LLC 3d Street address P O Box 1056 3e City, state, zip Ocracoke, NC 27960 3f Telephone no 860- 933 -0259 3g Fax no 3h Email address thpahl @earthlink net 4. Agent/Consultant Information (if applicable) 4a Name 4b Business name (if applicable) 4c Street address 4d City, state, zip 4e Telephone no 4f Fax no 4g Email address FORM BA 10 -2013 Page 1 of 7 2 Es B. Project Information and Prior Project History 1. Property Identification la Property identification no (tax PIN or parcel ID) 9501 -22 -0243 Lot #9 lb Site coordinates (in decimal degrees) Latitude 35-7-112 Longitude - 75 -58-W 36 1 c Property size 11 acres 2. Surface Waters 2a Name of nearest body of water to proposed project Pamlico Sound 2b Water Quality Classification of nearest receiving water Tidal Saltwater SC 2c River basin N/A 3. Project Description 3a Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application The existing site is developed with an existing 24' X 18' cottage approx 50' back from the high water The site is cleared, with some overgrown brush between the cottage and the road It is in a residential neighborhood 3b Attach an 8 Y2 x 11 excerpt from the most recent version of the USGS topographic map indicating the location of the site 3c Attach an 8' /Z x 11 excerpt from the most recent version of the published County NRCS Sod Survey Map depicting the project site 3d List the total estimated linear feet of all existing streams (intermittent and perennial) on the property -0- 3e Explain the purpose of the proposed project Owner wishes to live there full time and would like to expand the existing cottage to make the current roofed porch into living space and then to add on a new roofed porch, extending the footprint approximately 6' toward Pamlico Sound 3f Describe the overall project in detail, including the type of equipment to be used Most of the project will take place as a remodel within the existing footprint Worts outside of the footprint includes the addition of new 6' x 24' roofed porch, which will require the installation of 5 new 8x8 pilings within the 50' buffer Piling installation will require a small backhoe and a pump to wash the pilings in to a depth of 8' as required by the budding code The project also includes raising the existing structure approximately 18" in order place the new finish floor at or above the FEMA/Hyde County required elevation (7' AMHSL) 4. Jurisdictional Determinations 4a Have jurisdictional wetland or stream determinations by the ❑ Yes x No ❑ Unknown Corps or State been requested or obtained for this property/ Comments project (including all prior phases) in the past 4b If yes, who delineated the jurisdictional areas? Agency/ Consultant Company Name (if known) Other 4c If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation 5. Project History 5a Have permits or certifications been requested or obtained for this Yes x No Unknown project (including all prior phases) in the past? 5b If yes, explain and detail according to "help file" instructions 6. Future Project Plans 6a Is this a phased project? ❑ Yes x No 6b If yes, explain FORM BA 10 -2013 Page 2 of 7 B. Project Information and Prior Project History FORM SSGP3080 8 -13 Page 3 of 7 C. Proposed Impacts Inventory 1. Buffer Impacts 1 a Project is in which protected basin'? ❑ Neuse X Tar - Pamlico ❑ Catawba ❑ Randleman ❑ Jordan ❑ Goose Creek lb Individually list all buffer impacts below If any impacts require mitigation, then you MUST fill out Section D of this form Buffer impact number — Permanent (P) or Temporary T Reason for impact Type of impact (exempt, allowable, allowable w/ mitigation) Stream name Buffer mitigation required? Zone 1 impact (sq ft) Zone 2 Impact (sq ft) B1 X P ❑ T Addition to existing house allowable Pamlico Sound ❑ Yes X No 0 133 B2 ❑P ❑T El Yes No B3 ❑ P ❑ T ❑ Yes ❑ No B4 ❑ P ❑ T ❑ Yes ❑ No 65 ❑ P ❑ T ❑ Yes ❑ No gg El p ❑ T ❑ Yes ❑ No Total buffer impacts 1 c Comments D. Impact Justification and Mitigation 1. Avoidance and Minimization is Specifically describe measures taken to avoid or minimize the proposed Impacts in designing project The existing footprint of this cottage is only 444 square feet, the proposed expansion will add 133 square feet to the footprint within the buffer This owner wishes to make a space that is both livable and minimal in size and impact The small size of the cottage to start with and the modest addition that is proposed will keep the development on this property to a minimum It is worth noting that both adjoining properties contain residences with significantly larger homes (over 1,000 sq ft of footprint) both of which sit much closer to the high water line than this project will, even after the proposed addition is completed 1 b Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques Use of washed in pilings — no excavation, no concrete foundations, hacking to take place with light equipment, no additional bedrooms or baths, therefore no need to enlarge the septic system FORM. BA 10 -2013 Page 4 of 7 C. Impact Justification and Mitigation, continued 2. Buffer Mitigation 2a Will the project result in an impact within a protected riparian buffer that requires buffer mitigation ❑ Yes x No 2b If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation and calculate the amount of mitigation required in the table below Zone Reason for impact Total impact (square feet Multiplier Required mitigation (square feet Zone 1 3 (2 for Catawba) Zone 2 15 Total buffer mitigation required: 2c If buffer mitigation is required, is payment to a mitigation bank or NC EEP proposed ❑ Yes ❑ No 2d If yes, attach the acceptance letter from the mitigation bank or NC EEP 2e If no, then discuss what type of mitigation is proposed 2f Comments FORM SSGP3080 8 -13 Page 5 of 7 E. Diffuse Flow Plan All buffer Impacts and high ground Impacts require diffuse flow or other form of ❑ Diffuse flow stormwater treatment Include a plan that fully documents how diffuse flow will be ❑ Other BMP maintained If a Level Spreader is proposed, attach a Level Spreader Supplement Form la If due to site constraints, a BMP other than a level spreader is proposed, please provide a Butters will catch plan for stormwater treatment as outlined in Chapter 8 of the NC Stormwater BMP roof runoff _and _ Manual and attach a BMP Supplement Form remove it to a diffuser beyond If you answered "yes" to the above, does the project require preparation of an the buffer, per attached plan F. Supplementary information 1. Environmental Documentation la Does the project involve an expenditure of public (federallstate/local) funds or the use of ❑ Yes x No public (federal /state) land? lb If you answered "yes" to the above, does the project require preparation of an ❑ Yes ❑ No environmental document pursuant to the requirements of the National or State (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c if you answered "yes" to the above, has the document been finalized by the State ❑ Yes ❑ No Clearing House'? (If so, attach a copy of the NEPA or SEPA final approval letter) Comments 2. Violations 2a Is the site in violation of DWR Wetland Rules (15A NCAC 02H 0500), Isolated Wetland ❑ Yes x No Rules (15A NCAC 02H 1300), DWR Surface Water or Wetland Standards, or Riparian Buffer Rules (15A NCAC 02B 0200) 2b Is this an after- the -fact permit application) ❑ Yes x No 2c If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s) �g's Sign re 12' "t Ap I Applicant/Agent's Printed Name Date (Agents signature is valid only if an authorization letter from the applicant is provided ) Send 3 complete sets of this form and accompanying documents to the following For government transportation projects sent For government transportation projects sent by First Class Mail via the US Postal Service by delivery service (UPS, FedEx, etc) NC DWR, Transportation Permitting Unit OR NC DWR, Transportation Permitting Unit 1650 Mail Service Center 512 N Salisbury Street Raleigh, NC 27699 - 1650 Raleigh, NC 27604 For all other projects sent by First Class Mail For all other projects sent by delivery service via the US Postal Service (UPS, FedF_x, etc) Karen Higgins OR Karen Higgins NCDWR — 401 & Buffer Permitting Unit NCDWR — 401 & Buffer Permitting Unit 1650 Mail Service Center 512 N Salisbury Street FORM BA 10 -2013 Page 6 of 7 Raleigh, NC 27699 -1650 Raleigh, NC 27604 FORM SSGP3080 8 -13 Page 7 of 7 N R Hiah Wa Aw _ 50' Rpanan Buffer_ _ Zone 2 • PAMLICO SOUND Existing Piled Riprap X% 1 I I 1 1 f I I CAMA Buffer I I ' I ' ' O, I p OI l �I I C I I DI m l 1 0 Q I Existing Roofed - Over Porch Y U �aQ' I }' r I I C� Existing two SR House I �' I I m I I Roof Overhang I 1 ' I ' I ' Existing Septic System I ' I ' I I ' 1 Sand Driveway I 1 ' L _ A - - North Pond Road (Blacktop) North r w2 C N R CL v � d 0 � v O ei r v m CD 0 i O fY E U c cao z o► N 0 PAMLICO SOUND I Hiah Water Existing Piled Riprap b , o' cY) 8,_0„ 30' CAMA Buffer O' 0 O New 8x8 Pilings 8'0 C 8' deep o. Addrfion`= ,Roofed Porch." 50' R!p rlan- Buffer- - - - -_' - w`` ,, --------- - Zone 2 a� o Existing House with -2 L - Uj proposed additions 0, (shaded) i Gutter downspout a� Into difuser I c' m ; Root Overhang i Existing Septic System Sand Driveway - - - `- - - - - - - - - - - - - - - - - - - - - - Note: 20.1 Impervious surface within 75' of Normal High Water North Pond Road (Blacktop) North 11 v e 2 :- aN rn v a a o M m �'a L 0 E C O IE a. t N Z vi � a 76 °00' 35 °07'30 "� E 3'8700D iN Ferry office United States�(i Park Service Dccics Windmill Point z '11 Gap Point Gap Inlet MC- Ipso Pamlico Oyster Shores Creek Sound X3''1 British Cem o .S Shores Horsepi Ocracoke 3 NC. 356 � PO a`.` ~ t 5 Okracoke dC Jacks) 's Fire 410 Ocracoke Light O�S� House Cockle Shoal light Springers Point First Grass Teaches Hole Channel Light Okracoke Sheriffs Office V PS� SF' PS P� P OQ� Py� SE' aP� aP PS �P 4� (P 7 F. M� M 19£ as -qL m 0 U r Z 0 U v v m S, m2166 A Z !1l19Rflf 099989E OGS99W 005999£ 010988£ z F, h M SE 85 e&1 -IT m O Q r o W M (11 N N �a z U) U) z U 2 =. o 1n o � 8 � o m z -8 v x $. a � QQ N o v Z 2U m 21 AS oGl RK z a m Montalvo, Sheri A From: Tom Pahl <thpahl @earthlink net> Sent: Wednesday, January 28, 2015 3 25 PM To: Montalvo, Sheri A Subject: Re FW Martin Cottage Addition Attachments: DWQ Authorization Signed pdf, Revised Site Plan P2 1 -28 -15 pdf, ATT00001 c Sheri, Thanks for staying on top of this for me As I explained, I have been having a hard time communicating with the landowner because she's elderly and her computer skills are limited You may recall that I asked whether we even had to go forward with this application, because the specifications had changed to eliminate the roof over the proposed porch It is now just an open deck At your suggestion, I called Mr Scarbrough He says the application still needs to be processed and updated to reflect the change To that end, I have attached a revised drawing showing the proposed porch as now an open (un- roofed) deck I have also attached the authorization form signed by the howeowner If you need anything additional please feel free to contact me Again, thanks for your attention to this project Tom Pahl Landmark Building and Design, LLC At 02 48 PM 1/21/2015, you wrote Good afternoon Mr Pahl, As per our conversation today here is the contact information for you so you can have an answer to your question Anthony Scarbrough Phone 252- 948 -3924 Email Anthony scarbroughkncdenr gov Thank you, Sheri Montalvo From: Montalvo, Sheri A Sent: Thursday, January 08, 2015 12 11 PM To: thpahlgearthlmk net Subject: Martin Cottage Addition Importance: High Good morning, We have received the application for the above referenced project We require an agent authorization form to be filled out that I have attached for your use You can fill it out and email it back to me at Sheri montalvogncdenr gov or mail it to Sheri Montalvo 401 & Buffer Permitting Unit NCDENR- Division of Water Resources 1617 Mail Service Center, Raleigh, NC 27699 -1617 This project will be ppaced on hold until receipt of this form Thank you for your help Sheri Phone (919 )807 -6303 Email Sheri montalvogncdenr gov E -mail correspondence to and from this address may be subject to public records laws and may be disclosed to third parties t ��a SAMPLE AGENT AUTHORIZATION FORM PROPERTY LEGAL DESCRIPTION. } ('AwtL � C-,1 LOT NO. PLAN NO. SitLCZ-- S PARCEL ID• —Z 13 6 -3 11 STREET ADDRESS: L4 it vita 2\iac t N,C Please print. Property Owner: J A L Property Owner: The undersigned, registered property owners of the above noted property, do hereby authorize I w Lis PA Vt L. , of L As N la k LL �--V t 0 6- (Contractor J Agent) (Name of consulting firm) to act on my behalf and take all actions necessary for the processing, issuance and acceptance of this permit or certification and any and all standard and special conditions attached. Property Owner's Address (if different than property above): N .3 6 3`f out VV�, i��S l5G4� Telephone: we hereby certify the above information submitted in this application is true and accurate to the best of our knowledge Authorized Signature S Date. i ! 1 �5��— Authorized Signature Date: Normal Hiah Wa f\ 0 0 co PAMLICO SOUND no Existing Piled Riprap 'A o� �r 30' CAMA Buffer North o, , O New 8x8 Pilings 8'0 C 4�-; 8'deep _I D i l� 0 New Open Deck - No Roof . Q)! spaced decking boards to y y _ - - allow drainage = 1 0 �- � a a� Existing House with j In proposed added deck i R ,°„', (shaded) a Q +T: I « rn N N � an 7 pp c r N N m Roof Overhang 0 fx -a O y o Septic a O r a N T Z Existing � fn 7 a Sand Driveway `-- ---- ------------------- -� North Pond Road (Blacktop) Note 14 6% Impervious surface within 75' of Normal High Water