HomeMy WebLinkAboutSW5140801_Plansheet C-5.4 - SCM Detail_20220923AQUATTIC BENCH ELEV: 484.50 OUTSIDE EDGE OF AQUATIC BENCH IS 6-IN ABOVE PERMANENT POOL ELEV DRY DETENTION BASIN MAINTENANCE SCHEDULE DESCRIPTION METHOD FREQUENCY SEASON EMBANKMENT INSPECT AND REPAIR EROSION/ANIMAL NESTINGS VISUAL ONCE PER YEAR ALL INSPECT AND RESEED GRASS COVERAGE VISUAL WHENEVER NEEDED ALL OUTLET STRUCTURE DEBRIS / OBSTRUCTIONS BY HAND WHENEVER NEEDED ALL EROSION A OUTLET DISCHARGE VISUAL ONCE PER YEAR ALL FOREBAY/ MAIN POOL SEDIMENT / DEBRIS BY HAND ONCE PER YEAR ALL REMOVE TRASH BY HAND WHENEVER NEEDED ALL CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTENANCE UNTIL SUBSTANTIAL COMPLETION AT WHICH TIME OWNER WILL ASSUME MAINTENANCE RESPONSIBILITY. SEQUENCE OF CONVERSION FROM SEDIMENT BASIN TO STORMWATER CONTROL MEASURE 1. MAINTAIN EXISTING BARREL AND OUTLET STRUCTURE 2. UPDATE EMBANKMENT AND ALL OTHER POND COMPONENTS. 3. INSTALL TEMPORARY SKIMMER TO OUTLET STRUCTURE. 4. EXCAVATE POND TO TEMPORARY SKIMMER BASIN DIMENSIONS, SEE EROSION CONTROL PLAN. 5. INSTALL BAFFLES AND OTHER TEMPORARY SKIMMER BASIN COMPONENTS, SEE TEMPORARY SKIMMER BASIN DETAIL. 6. REFER TO TEMPORARY SEDIMENT SKIMMER BASIN DETAIL FOR ELEVATION OF SKIMMER CONNECTION. 7. SEE CONSTRUCTION SEQUENCE ON EROSION CONTROL PLAN FOR INFORMATION. 8. ONCE SITE IS APPROVED BY NCDEQ, REMOVE TEMPORARY SKIMMER, BAFFLES AND OTHER TEMPORARY COMPONENTS 9. FILL HOLE IN OUTLET STRUCTURE FROM SKIMMER WITH NON -SHRINK GROUT. PROVIDE PERMANENT WATERTIGHT SEAL. 10. EXCAVATE SEDIMENT AND GRADE TO FINAL CONTOURS, SEE GRADING PLAN. 11. CONSTRUCT WET POND STORMWATER CONTROL MEASURE AS SHOWN ON THE DRAWINGS. 4S-BUILT SURVEY REQUIREMENTS NOTE: CONTRACTOR SHALL PROVIDE AS -BUILT TOPOGRAPHIC SURVEY PERFORMED BY A PROFESSIONAL LAND SURVEYOR CERTIFYING WET DETENTION POND AREA DIMENSIONS AND ELEVATIONS OF THE FOLLOWING: 1. TOPOGRAPHIC SURVEY OF THE WET POND AND EMBANKMENT 2. OUTLET STRUCTURE TOPS AND INVERTS 3. OUTLET STRUCTURE DIMENSIONS 4. ORIFICE DIAMETERS 5. BARREL PIPE SIZES AND INVERTS 6. EMERGENCY SPILLWAY ELEVATION AND DIMENSIONS. OUTLET STRUCTURE NOTES 1. CAST -IN -PLACE CONCRETE RISER IS REQUIRED WITHOUT EXCEPTION. 2. CLASS "A" (3,000 PSI) CONCRETE TO BE USED. 6. ALL MORTOR JOINTS ARE 1/2" f 1/8". 7. GROUT SHALL BE NON -SHRINK (ASTM-C1107) S. ALL STRUCTURES OVER 3'-6" IN DEPTH TO BE PROVIDED WITH STEPS V-2" ON CENTERS. STEPS SHALL BE IN ACCORDANCE WITH STANDARD 840.66. 9. LOCATE MANHOLE OVER STEPS. PIPE CONCF ANC 6' WIDE AQUATIC BENCH AROUND ENTIRE POND (SEE SHEETS C3.0 & C3.1) 31 3' SUBMERGED 1 10-FT WEIR WIDTH 1 FOREBAY WEIR CREST ELEV:483 FOREBAY WEIR SECTION CFOREBAYWEIR RM AQUATIC BENCH ELEV: 483.50 5.00 INSIDE EDGE OF AQUATIC NGTH BENCH IS 6-IN BELOW PERMANENT POOL ELEV 83.00 PERMANENT POOL ELEV: 4 4.00 3 1 ENTRANCE ELEV: )�, EBAY 478.00 EXIT ELEV: 479.00 RIPRAP PAD EX. 15" INLET PIPE J TOP OF PERM. SED. STOR. FOREBAY ENTRANCE ELEV: 478.00 BOT. OF PERM. SED. STOR. FOREBAY ENTRANCE ELEV: 477.00 BOT. OF PERM. SED. STOR. FOREBAY EXIT ELEV: 477.50 SCHEDULE A PRE -INSTALLATION CONFERENCE PRIOR TO 13 CONSTRUCTION OF THE STORMWATER CONTROL MEASURE 24-IN THICK CLASS B RIPRAP OVER FILTER FABRIC TOP OF EMBANKMENT ELEV: 487.00 100-YR STORM ELEV 486.48 10-YR STORM ELEV 486.02 2-YR STORM ELEV 485.56 1-YR STORM ELEV 485.36 10-FT WEIR WIDTH SPILLWAY CREST ELEV: 486.00 EXISTING CONCRETE EMERGENCY SPILLWAY SECTION OUTLET STRUCTURE WITH TRASH RACK 6-FT WIDE ACCESS PAD TO OUTLET STRUCTURE 6-IN BELOW WEIR 10-FT 1F 1 3 5 _ _ EMERGENCY SPILLWAY CREST ELEV: 486.00 FLOATING TEMPORARY SKIMMER I•' PROVIDE 6' X 6' DEPRESSED AREA PRINCIPAL EXISTING SMANUFACTURER: J.W. 2-FT BELOW PRINCIPAL SPILLWAY SPILLWAY OUTLET FAIRCLOTH &SONS WITHIN AQUATIC BENCH FOR �: i STRUCTURE I j� ADEQUATE DRAINAGE I SEE DETAIL ON �' .� L 6-IN COMPACTED PERMANENT POOL ELEV: 484.00 - I THIS SHEET f• .? SELECT FILL? - - INV= 484.00 I •� EX. INV= �478.00 PLUG _ _ _ _ FOREBAY 11 MAIN POOL i EXISTING 4" - - - - - - EMBANKMENT ` I INV= 483.78 FLOW TOP OF PERM. SED. STOR. EL : 478.00 BOT. OF PE D TOR. 0 I III FI V 477.nn a' ' CUT -OFF (KEY TRENCH) TOP OF PERM. SED. STOR. FOREBAY EXIT ELEV: 478.00 8" IMPERVIOUS FILL LAYER UNDER ALL WATER SURFACES / END CAP WITH \ / DRILL OPENING \ / DIAMETER \ /A A A\ / ANCHOR \ DRAWDOWN \ e PIPE TO \ 10-IN WALL 4"PVC I 4"PVC ° d PRIMARY 1. -•- = - UNDISTURBED SOIL 5' WIDE X 2' DEEP MIN. INTO EXISTING 6" �.• . '_ _ -I_.a UNDISTURBED SOIL ALONG DUCTILE IRON - - i LENGTH OF EMBANKMENT DRAIN PIPE 1:1 SLOPE EXISTING OUTLET STRUCTURE POND AND EMBANKMENT SECTION WET DETENTION BASIN MAINTENANCE SCHEDULE DESCRIPTION METHOD FREQUENCY SEASON EMBANKMENT INSPECT AND REPAIR EROSION / ANIMAL NESTINGS VISUAL ONCE PER YEAR ALL INSPECT AND RESEED GRASS COVERAGE VISUAL WHENEVER NEEDED ALL OUTLET STRUCTURE DEBRIS / OBSTRUCTIONS BY HAND WHENEVER NEEDED ALL OPERATE POND DRAIN VALVE BY HAND ONCE PER YEAR ALL EROSION AT OUTLET DISCHARGE VISUAL ONCE PER YEAR ALL FOREBAY / MAIN POOL SEDIMENT / DEBRIS BY HAND ONCE PER YEAR ALL REMOVE TRASH BY HAND WHENEVER NEEDED ALL CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTENANCE UNTIL PROJECT CLOSE OUT AT WHICH TIME OWNER WILL ASSUME MAINTENANCE RESPONSIBILITY. I TEE SPILLWAY I INV=720.50 PERM. POOL ELEV: 484.00 I I I '.° WATERTIGHT 4"PVC NON -SHRINK A. GROUT / 8-IN �° ANCHORDRAWDOWN / \ °a PIPE TO WALL \ ° ❑E \ END CAP WITH / EXTEND EXISTING RISER TOP ELEVATION: 485.10 ❑E \ DRILL OPENING / \ DIAMETER:1.25-IN / \ PRIMARY SPILLWAY / EX. RISER TOP ELEVATION: 484.83 \ \ ENLARGEMENT / \ 8-IN \ PRIMARY d <z \ SPILLWAY / iq A W a. d. \ --- �. LEI I FTEMPORARY SKIMMER \ \ \ \ \ EXISTING Y CONCRETE EXISTING 15" RCP PVC PRIMARY A SPILLWAY ORIFICE (� DIAMETER: 1.25IN 8-IN 4-FT - LL d � a TEMPORARY SKIMMER TO �A BE REMOVED (SEQUENCE OF CONVERSION FROM FILL SEDIMENT BASIN TO SKIMMER STORMWATER CONTROL HOLE WITH MEASURE) NON -SHRINK GROUT FOR X WATERTIGHT SEAL OUTLET STRUCTURE PLAN VIEW OUTLET BARREL INV.: 479.19 4 a TO BE REMOVED ( SEE CONSTRUCTION \ \ SEQUENCE) \ \ TOP PERMANENT SEDIMENT STORAGE ELEV: 479.00 �° EX. 6" DUCTILE IRON DEWATERING PIPE BOTTOM PERMANENT SEDIMENT STORAGE ELEV: 478.00 EX. CONCRETE s/ / \ / PIPE ANCHOR - a \ / �24-IN / . • . °. I • • , ; . ° • ; 6-IN DIP .. 41 36-IN I ° •' , . s. ,° e \ • ' ', ° j a • A. • ' \ CONCRETE PIPE ANCHOR \ ENLARGEMENT / EXTEND EXISTING VALVE STEM REINSTALL EX. ALUMINUM WHEEL IF NEEDED TRASH RACK, BAR GRATING 5" x 5" OPENINGS OBSTRUCT ORIFICES DURING EROSION CONTROL WITH WOOD AND BUTYL ADHESIVE TAPE ON THE INSIDE OF RISER INV=484.00 OUTLET STRUCTURE SECTION Y-Y I 1 I8-IN L 6-IN EX. OUTLET BARREL INV.: 479.19 DAM CORE (SEE NOTES) T 2-FT BELOW UNDISTURBED SOIL 24-IN THICK CLASS B RIPRAP OVER FILTER FABRIC #67 STONE BEDDING 1. 4" DRAIN OUTLET FOR DIAPHRAGM SHALL BE PROTECTED BY AN APPROPRIATE RODENT GUARD: 2" X 2" STAINLESS STEEL MESH SECURED WITH STAINLESS STEEL CLAMP OR APPROVED EQUAL. 2. PIPE SHALL INCLUDE EXPANSION JOINTS SPACED EVERY 8 FEET ON CENTER. 3. JOINTS WRAPPED WITH DOUBLE LAYER OF NON -WOVEN GEOTEXTILE FILTER FABRIC ON OUTSIDE OF PIPE SHALL COVER 2 FEET BY 3 FEET OF PIPE CENTERED ON JOINT. 4. CONTRACTOR SHALL SUBMIT ONE (1) 5 GALLON BUCKET SAMPLE OF FILTER MEDIA TO THE GEOTECHNICAL ENGINEER FOR APPROVAL PRIOR TO PLACEMENT IN THE FILTER DIAPHRAGM. 5. DURING CONSTRUCTION OF THE DAM, INSTALL DRAIN BEDDING COURSES AND HDPE DRAINS AS SHOWN ON THE DRAWINGS. 6. BACKFILL THE SOLID DRAIN PIPE WITH EMBANKMENT FILL AND COMPACT WITH HAND -OPERATED MECHANICAL COMPACTORS WITHIN 2 FEET OF THE TOP OF PIPE TO THE REQUIRED COMPACTIONS IN THE PREVIOUS SECTION. 7. BACKFILL THE SLOTTED DRAIN PIPE WITH FILTER MEDIA AND COMPACT WITH HAND -OPERATED MECHANICAL COMPACTORS. 8. REMOVE ANY SOIL CONTAMINATION AS DIRECTED BY THE GEOTECHNICAL ENGINEER OR HIS REPRESENTATIVE. 9. FILTER MEDIA SHALL BE PLACED IN 10 TO 12 INCH LOOSE LIFTS, ADEQUATELY WATERED AS NEEDED TO A NEAR -SATURATED CONDITION, AND COMPACTED WITH A VIBRATORY ROLLER OR PLATE COMPACTOR TO THE SATISFACTION OF THE GEOTECHNICAL ENGINEER. 10. THE SEEPAGE FILTER CAN BE CONSTRUCTED CONCURRENTLY WITH THE EMBANKMENT OR THE SEEPAGE FILTER CAN BE CONSTRUCTED BY CUTTING OUT PREVIOUSLY PLACED EMBANKMENT FILL AND BACKFILLING WITH FILTER MEDIA. 13-FT MIN /3.5 .51\\ SEED & MULCH EMBANKMENT SEE SEEDING SCHEDULE T MIN (INSTALL SLOPE PROTECTION MATTING ON ALL i 1 LOPES STEEPER THAN 6: 1) AQOMPACTED SELECT FILL? EXISTING OUTFALL / \ - - - _ _ _ INV: 478.47 / TOP OF DAM ELEV: 728.00 \ / 2-FT FROM TOP OF DAM \ -- ----- --40 FT 70-FT 11 TOP ELEV: 726.00 / 6„ 11.17' \� \ I \ I 30" - _ _ _ _ - RCP CONCRETE I 21 PIPE CRADLE 2 1 1 2-FT / \ -- 7 ELEV: 709.66 �{ 1. 5' 4 \ 10-FT 40 FT / DAM CORE, CUTOFF TRENCH, AND EMBANKMENT FILL NOTES: 1. DAM CORE AND CUTOFF TRENCH FILL MATERIAL SHALL CLASSIFY AS ML, MH, CL OR CH PER USCS. THIS MATERIAL MAY CONSIST OF MATERIAL FROM ON -SITE BORROW PITS, OR APPROVED OFF -SITE BORROW SOURCES. 2. EMBANKMENT FILL SOIL MATERIAL SHALL CALSIFY SM, SC, ML OR CL PER USCS. THIS MATERIAL MAY CONSIST OF MATERIAL FROM ON -SITE EXCAVATIONS, ON -SITE BORROW PIS OR APPROVED OFF -SITE BORROW SOURCES. 3. UNSUITABLE EMBANKMENT FILL IS CLASSIFIED AS GW, GP, GM, GC, SW, SP, OH, OL PER USCS \ FILTER DIAPHRAGM \ \ ENLARGEMENTS EMBANKMENT CONSTRUCTION STANDARDS 1. CONTROLLED FILL, AS SPECIFIED BY THE GEOTECHNICAL ENGINEER, IN THE DAM EMBANKMENT SHALL BE PLACED IN 6-INCH LOOSE LAYERS (3-INCH LOOSE LAYERS WITHIN 3-FEET OF EITHER SIDE OF THE PRINCIPAL SPILLWAY PIPE TO A DEPTH OF 2-FEET OVER THE PIPE) AND SHALL BE COMPACTED TO A DENSITY OF NO LESS THAN 95% OF THE STANDARD PROCTOR MAXIMUM DENSITY AT A MOISTURE CONTENT OF + OR - TWO PERCENTAGE POINTS OF THE OPTIMUM MOISTURE CONTENT IN ACCORDANCE WITH ASTM D698. 2. ALL VISIBLE ORGANIC DEBRIS SUCH AS ROOTS AND LIMBS SHALL BE REMOVED FROM THE FILL MATERIAL PRIOR TO COMPACTION TO THE REQUIRED DENSITY. SOILS WITH ORGANIC MATTER CONTENT EXCEEDING 5% BY WEIGHT SHALL NOT BE USED. STONES GREATER THAN 3-INCH (IN ANY DIRECTION) SHALL BE REMOVED FROM THE FILL PRIOR TO COMPACTION. 3. FILL MATERIAL PLACED AT DENSITIES LOWER THAN SPECIFIED MINIMUM DENSITIES OR AT MOISTURE CONTENTS OUTSIDE THE SPECIFIED RANGES OR OTHERWISE NOT CONFORMING TO SPECIFIED REQUIREMENTS SHALL BE REMOVED AND REPLACED WITH ACCEPTABLE MATERIALS. 4. ANY FILL LAYER THAT IS SMOOTH DRUM ROLLED TO REDUCE MOISTURE PENETRATION DURING A STORM EVENT SHALL BE PROPERLY SCARIFIED PRIOR TO THE PLACEMENT OF THE NEXT SOIL LIFT. 5. SURFACE WATER AND STREAM FLOW SHALL BE CONTINUOUSLY CONTROLLED THROUGHOUT CONSTRUCTION AND THE PLACEMENT OF CONTROLLED FILL. 6. FOUNDATION AREAS MAY REQUIRE UNDERCUTTING OF COMPRESSIBLE AND/OR UNSUITABLE SOILS IN ADDITION TO THAT INDICATED ON THE PLANS. ALL SUCH UNDERCUTTING SHALL BE PERFORMED AT THE DISCRETION OF THE GEOTECHNICAL ENGINEER AND SHALL BE MONITORED AND DOCUMENTED. IN NO CASE SHALL THERE BE AN ATTEMPT TO STABILIZE ANY PORTIONS OF THE FOUNDATION SOILS WITH CRUSHED STONE. 7. FILL ADJACENT TO THE RISER AND PRINCIPAL SPILLWAY PIPE SHALL BE PLACED SO THAT LIFTS ARE AT THE SAME LEVEL ON BOTH SIDES OF THE STRUCTURES. 8. HEAVY EQUIPMENT SHALL NOT BE ALLOWED TO PASS OVER CAST -IN -PLACE STRUCTURES (INCLUDING THE CRADLE) UNTIL ADEQUATE CURING TIME HAS ELAPSED. 9. TO RE-ESTABLISH VEGETATION AFTER CONSTRUCTION, PLACE A 3-INCH LAYER OF TOPSOIL ON THE DISTURBED EMBANKMENT SURFACE AND SEED AND MULCH OR HYDROSEED THE AREA. TESTING, OBSERVATION, AND CERTIFICATION 1. TESTS OF THE DEGREE (%) OF COMPACTION OF THE PLACED FILL IN THE DAM SHALL BE PERFORMED AS A PART OF THE CONTRACTOR'S NORMAL QUALITY CONTROL PROGRAM FOR THE CONSTRUCTION OF THE DAM. TESTS SHALL BE CONDUCTED CONCURRENT WITH THE INSTALLATION OF THE COMPACTED FILL AND THE CONTRACTOR SHALL COORDINATE THE CONSTRUCTION OF THE DAM SO THAT THE TESTING CAN BE COMPLETED. SHOULD THE RESULTS OF THE TESTS INDICATE THAT THE SPECIFIED DEGREE OF COMPACTION HAS NOT BEEN OBTAINED; THE PORTIONS OF THE DAM REPRESENTED BY SUCH TESTS SHALL BE REWORKED OR REBUILT. ALL PORTIONS OF THE DAM SHALL ACHIEVE THE SPECIFIED MINIMUM DEGREE OF COMPACTION. 6-FT WIDE ACCESS PAD TO OUTLET STRUCTURE 6-IN BELOW WEIR 3.5 1� PRIMARY SPILLWAY INV=484.00 I OUTLET STRUCTURE SECTION X-X 6-FT X 6-FT X 2.5-FT DEEP DEPRESSION UNDER PRINCIPAL SPILLWAY FOR ADEQUATE DRAINAGE. TIE BACK TO AQUATIC BENCH AT 3:1 SLOPE. T 919 7818582 F 919 7813979 4600 Lake Boone Trail Suite 205 Raleigh, NC 27607 info@smithsinnett.com CL 0 IN O � LO N � > � i CD U i x LLI r o m a U) o 1/ W -0 C CL 5) m o 0 Oa W 0 00 M - z 55 UrnLo • o Z c Z - 00 > 1:`F- UoLL z J E O 0X U._.-N CO t M Ho > z F- Q Lo LL 1111/////'' L.L.I CNW Q co J U) m\ Z �V W cN L ) ,,�dp FQP��• ///III11111111``` m � o LL to L O � O O � O O CO ¢ M ¢ C 13> aD 12O .L--. C v U_ CV _-' U) .0 L .� Q O s N¢ - as _E Q�-o a� Y c"E o 0 2LQ E_-_ z zo cmcn Q� a � o w �`� � o ;v 0 `� 4 ;v-�� o"�� �, U) oz O Q O E S W Qa QQ o E S V> H m cn U) W LL Q m p V 00 LO Q � N V J Q Z a E ZLU O Q 4-0 ^ Z LU Q ' Q m Z U) 0 Q Z w J OL (fl t LIL V Q W Q L = v C) N m Z O 0 a w U M Z t� U) Lo 2 9/23/22 NCDEQ STORM #2 ID DATE DESCRIPTION DRAWN BY: JL CHECKED BY: FS SITE DETAILS 2021009 8 J U L 2022 PERMANENT WET DETENTION POND STORMWATER CONTROL MEASURE (SCM) NTSWET DETENTION POND STORMWATER CONTROL MEASURE (SCM) NTSS