Loading...
HomeMy WebLinkAboutSW5140801_Plansheet C-3.0 - Grading_Drainage Plan_20220923II METALX. I J POSTS EWOODS I I I I I I r 1 - -�- _� - - i - _ _SP _---�----�\ LAW_ FLANGE 4 RD. --I�----__ - - _490 -------- SANITARY _ - l ►- - - - - - 1- - 1 \� ------ \ I I II SEWER / / ! - CLEANOUT SAN--oTJ SEWE_R- , - \ \ -SAN-► - -__- WOODS 10' WIDE EMERGENCY / SPILLWAY, CLASS B ' RIPRAP ' i ELEV = 486.00 14' MIN. FROM I / TOE OF SLOPE 1 TO WOOD LINE J/ Al / WOODS CLEANOUT � \ \ \ �9 \ \ -SAN-► - -o-- HP: / / / / / / M I I I \ \ \ \ O� r ro a%I - I \ - r' / EDGE OF EX. GRAVEL _ I `9s \�\ 1? " \ C5.1 / / / / EX. GRAVEL / PARKING LOT HP - WOODS 485.60\\ \\ \ \ wall A y /\ co / WEIR ELEV = 483.00 \ I I WET POND A STORMWATER \ , CONTROL MEASURE I 1 I (REFER TO C5.4) I I I 1 \ \ I \ 1 / y0� - Crt \\I _\_ \ � 1 I \\ J \\\\J Y2 1Y2 5.1 C5.193 _ --- C5all / I FUTURE 15" SCH. 40 PVC I� y EP. PAVI - -_- ♦ / I I EP: 7 „ - -493 - _ 492.18 492.18 \� SCy PAVED 1/4 MILE PT TRACK � \\ - \ III 1.5% CROSS SLOPES _ o _ tl-It I oI / � / r i -493- - Y4 \ � 3' SHOULDER \ \ 49� - O C5.1 @ 2% SLOPE \ I \ \. \ I 491.90 492.21P �o� EP: - - 492 - - - - - - H• 4-0 PVC `\ \ \) 8" HDPE T SHOULDER 491.82 INV. ELEV = 480.00 r Q o \ ' r o l @ 2 /o SLOPE r i ��ajV 5 Y3 \ I ENSURE FOREBAY ISM 1 r /v ,moo C5.1 C5.1 SUFFICIENTLY DEEP TO \ DAYLIGHT THE EXISTING I \\ \ \\ \I\ \ 1 INLET PIPE. / 2\EP: \ I I I APPROX. INV. IN:478.00 C5.1 -4 / II 491.82 C) 11 \ \ \ 1 �I IN,\�� / / /� / '/ / 4 INSTALL ON EX. 15"RCP / n. �ji I-t-1 I I-I-I��-I Imo, r `� \\� \ \ 1 r'� C5.1 IM:489.13 r 47 �` I I-1 1 - --1-1-�`. \ / EP Y5 1 I \ \ \ 1 /' _ I - I ALTERNATE #2-. -12.1 1 r 492.21' C5.1 \� <� WOODS \ \ \ _ \ 1 I 'SHOULDER / EX, 15" RCP INV. OUT: 481.98 EP r < 5 1 - I I ARTIFI 1�1 TURF - 1 I 1 o / i 15 PVC INV. IN: 481.98 493.44' , 1 I - EXISTING OUTLET I @ 2I SLOPE ( ./ \C5.1 I - I - I FIELD 2 1 " , ' - y°` . \ N TRUCTURE. RAISE / / ' ' I 15" PVC INV. IN: 481.98 M ` r / -_16.4 -_ r fi' 2 I \ T SHOULDER \ , I I I °� o / \ I I TOP TO 485.10 _ _ I - 1 - I 1�' BASE BID: FINE GRADING I EP: \ @ 2 /o SLOPE \ \ \ 1 \ \ \ I T SHOULDER EP / \ / / / I @ 2% SLOPE N I 493.44' 49 r �.i RF 491.82 O \ \1 \ I \ r o I / 493.56 r ���0�1-I-I-116.4-1-/ /Y' &PERMANENT GRASS , \ 2 i \\ \ 485�'/' \ 1 486 � r r ALTERNATE #2: FG \ I \\ 1 l \ \ r \ --/ 1 ' I r n\ r / r Op 16.4_ -/ /'� C5.2 \ \ S ♦\ _ �'T'' \ � I r �r'>•'r � ` � � \ �'. � 1 ARTIFICIAL TURF 492.21' HP: \ \ \ \ C� 487.50 r �.\ I I FIELD 2 \ \ 'S I �j I \ � / `4-� 1� r � FUTURE: HP: \ 2 I \\ \ \ C5.1 .. � ' 491.90 \ 8 S` / c;UNCRETE TRAINING / \ , ` - _ _ _ I \ \ �2 / .�- HP: \ cy \ r I \ \ I - 492 40 AREA2 \ \ \ \ \ \\\\\ \ \ \ 2 \ 1\ I ON\ \ I \ \ \ \ \ C5.1 r /r'T. EP I s \ 1 "RCP • \ \ \ \ \ \ \ / \ \ \ \ \ \ EP: d -� Sc 493.44' 93 \\ \ \\ \ V=478-aK' ��\\ \ \ \ ri* �� I-I-I--I-I-Ofh'4�`.�%i / ` y \ \ \ 491.86 / % - BASE B 1 - I 0�°l 4` `BOA HP: I < \ \ \ 4 \ ' TIFICIAL TUR Y7 1 �' 493.56 I BASE BID: FINE GRADING-493- \ \ \ EP I I `F-I-I-il c \ \ \ \ \ \ \ \\ \\ \ \ 492.21 I-1-1-16.4' C5.1 \ I I \ \ fn \ w \ \ -FI LD 1 - - ' & PERMANENT GRASS \ \ \ \ oh \ \ \ sr \ -lf�7 ALTERNATE #1: 492.00' \. 5 I-1-1-� �1 1�� 16.4-1 a yam\/ CONCRETE I \ \ \ \ \ \ \ HP: C5.1 1 �� 11-1-1-r r /: r ! I - Y8 TRAINING AREA \ \ \ \ ��$o 1-t� 1-I/ h J3 y- I \ \ \ \ y. v / C5.1 1 \ \ \\ \ \\ \ \ 491.90 �1-1 D/ \ ♦ \ \ \ \ \ r r r FG \ \ \ \ \ 1 \ ii "-� �7 / 493.44' N EP: \ A C �� ' ALTERN #1: / HP: cwj HP: I \ \ \ \ \ \ \ \ \ ♦ �� \ \ \ �\ / , 492.18 \ / -12.1 1 - 1 ' `',C / 49�.56 r �°� 492.50 I \ \ \ - - \ \ \ ` cp \ \ \ �� ` TS+ \ 7 \ ALT. #1 3 1 - 1 CONCRETE TRAI G r \ \ \ \ 1 / r EPIN: A \ \ \ \ \ \ \ \ `YC \ \ y OF A' • O SC \ TD-1 C5.1 ' / v AREA 1 rr� ' 'VS \ 10 4 \ ' � / `/\ 6 /( % \ 493.44' / 490.40 - I I I i \ \ \ \ \ HP: / v. / /. , T / a . \ / r / \ A INV. IN: A \ \ \♦ \ \ \ \ ` \ k CT C 491.90 INV. IN: \ \ \ \ \ \ ` \ \ \ \ \ \ \ \` \ \ �'ON \ ♦ / `//�` 7- EP: I i I EP: - 490.44 491.70 R r HP: 491.92 C5.1 492 -<�ti � o\/r %/.\ /� 2�rI - -- 492.2840 \ \ \\ yo \ car \ \ I - / ` -/ / 9� o EP. -� 493.60 493.00 \ \ \ \\ \ \♦ \\\ \ \ \ \ \ \ \ \ \ 1 491.90 ` '� INV. OUT: 490. 5 C5.6 \ - 49 EP: I - HP: 493.68 \ \ \ \ I \ ♦ \ C5.1 S'C'� �� r 491.92 b EP: 493.08 \ \ EX.�POI�D`E lli \ \ I \ I I \ \ \ y 40A 491H 5 - / 1 /� 492.00 \ \ _EX. \ \ Vc _ RAISE / _ \ 4 4 HP: r r� EXISTING RIM �� ' r 9\ �, 494.: / \ WOODS \\ \ 1 1 492 EP 3 ALT. #1 TO 489.90 / /' / / \ \ \1-00�1 C5.1 \ 492.21' C5.1 TD-1 3 SHOULDER /� r R�V�/ - � 6 �t ♦ \ - _ \ \ \ \ � 1 @ 2% SLOPE RR-C ♦ \ \ �` 100 13 EP \ / , / �, R ' a9 �INV. OUT: 491.10 C5.6r C5.1 491.85' 1190 _ / r / 9 6 R-B \ \ \ \ \ --A\ \ INV. OUT: 490.20 ' 491.85' �� r / \ 4 / / EX. RIP. V - - - - ' ' / FOREBAY BERM / / / / \ 15" FES \ \ \ \ Zino. INV. = 490.87' \ \\ / / \ \ \ \ \ ♦ EP: _ T SHOULDER / , 492.18 @ 2% SLOPE oh'O\\ \ � ' \ \♦\ \\ EX RIPRAP LINED EMERGENCY SPILL WAY / /'� ( RISER ELEV. = 490.10' \ ^' \ \ \ \ \ \ \ 490J - \ // / 49> - 40 6,7 WOODS \ \' / \ \ 18" FES , r < \ - - ` \\ \\ INV =485.74'\------ GRADING & DRAINAGE GENERAL NOTES 1. ALL CONSTRUCTION SHALL COMPLY WITH ALL APPLICABLE STATE & LOCAL CODES, AND OSHA STANDARDS. 2. THE CONTRACTOR SHALL NOT COMMENCE WITH LAND DISTURBANCE UNTIL PERIMETER EROSION CONTROL DEVICES ARE INSTALLED. REFER TO EROSION CONTROL DRAWINGS AND SPECIFICATIONS. FOLLOW EROSION CONTROL PLAN DURING SEQUENCE OF GRADING AND ADD/ADJUST EROSION CONTROL MEASURES AS NECESSARY TO CONTROL SEDIMENT AND EROSION. 3. COORDINATE THE PROJECT SCHEDULE WITH THE NATIONAL GUARD (OWNER), SMITH SINNETT (ARCHITECT), TIMMONS GROUP (CIVIL ENGINEER), AND ADJACENT USERS OF THE PROPERTY. MAINTAIN TRAFFIC FLOW AND DO NOT INTERRUPT UTILITIES AROUND THE SITE. DO NO DISTURB OPERATIONS OF ONSITE AND ADJACENT FACILITIES. 4. OBTAIN OWNERS WRITTEN APPROVAL FOR ANY REQUESTED SHORT-TERM, OFF -HOUR, OR TEMPORARY UTILITY SHUT- DOWNS OR DISRUPTIONS. 5. DISPOSE OFF -SITE WASTE MATERIALS GENERATED DURING CONSTRUCTION AND FOR OBTAINING ALL APPLICABLE PERMITS FOR OFF -SITE STOCKPILES AND/OR WASTE AREAS. IF THE SAME PERSON CONDUCTS THE LAND -DISTURBING ACTIVITY AND ANY RELATED BORROW OR WASTE ACTIVITY, THE RELATED BORROW OR WASTE ACTIVITY IS PART OF THE LAND DISTURBING ACTIVITY. IF THE BORROW OR WASTE ACTIVITY ARE NOT CONDUCTED BY THE SAME PERSON, THEY SHALL BE CONSIDERED SEPARATE LAND DISTURBING ACTIVITY AND MUST BE PERMITTED THROUGH THE SEDIMENT POLLUTION CONTROL ACT. 6. SEE GENERAL NOTES ON EXISTING CONDITIONS AND DEMOLITION PLAN FOR REQUIREMENTS FOR REMOVAL AND PATCHING OF PAVEMENT FOR UTILITY/STORM INSTALLATION. 7. REPAIR OR REPLACE ANY ITEMS DAMAGED DUE TO CONSTRUCTION (ONSITE AND/OR OFFSITE) AT NO EXPENSE TO THE OWNER. 8. MAINTAIN ALL EROSION CONTROL DEVICES AFTER EACH RAINFALL EVENT IN ACCORDANCE WITH NCDEQ LAND QUALITY REQUIREMENTS AND AS DIRECTED BY THE NCDEQ AND THE CIVIL ENGINEER. 9. FLUSH ALL SEDIMENT OUT OF STORM DRAINAGE PIPES AND STRUCTURES FOLLOWING SITE STABILIZATION AND AT THE END OF CONSTRUCTION. FLUSH OUT PIPES AS NEEDED THROUGHOUT CONSTRUCTION TO MAINTAIN PROPER FUNCTIONING OF THE DRAINAGE SYSTEM. 10. IN DISTURBED AREAS, AMEND THE TOP 6 INCHES OF LAWN AREAS WITH 3 INCHES OF IMPORTED AND TESTED TOPSOIL THAT MEET THE SPECIFICATIONS. SUBMIT DOCUMENTATION ON THE PROPERTIES OF IMPORTED TOPSOIL FOR REVIEW. EXISTING TOPSOIL MAY BE USED IF PROPERLY SCREENED AND AMENDED. REFER TO PLANTING SPECIFICATIONS. 11. REMOVE ALL STONES, VEGETATION, AND DEBRIS LARGER THAN 1.5" WITHIN TOP 5" OF FINISH GRADE SURFACE. 12. CONTACT OWNER AND CIVIL ENGINEER FOR AN INSPECTION OF FINISH GRADE AND SLOPES PRIOR TO PERMANENT SEEDING. OWNER / CIVIL ENGINEER MUST APPROVE FINISH GRADES PRIOR TO SEEDING. 13. ALL SIDEWALKS SHALL HAVE MAXIMUM CROSS SLOPE OF 2%. 14. INSTALL ALL STORM SEWERS TO PROVIDE REQUIRED CLEARANCES TO CROSSING UTILITIES AS INDICATED IN THE DRAWINGS AND SPECIFICATIONS. 15. ALL PVC PIPING SHALL BE SCHEDULE 40 THICKNESS. USE DUCTILE IRON WHEN COVER IS LESS THAN 24-IN. ADD ADAPTERS AS NECESSARY TO CONNECT SMALLER TO LARGER PIPES. 16. INSTALL ADDITIONAL DRAINAGE SWALES IF DIRECTED BY THE CIVIL ENGINEER. LOCALIZED DEPRESSIONS AT DROP INLETS SHALL EXCEED 10:1 SLOPE 17. PRIOR TO FINAL PROJECT ACCEPTANCE, PROVIDE AN AS -BUILT SURVEY OF ALL UTILITY SYSTEMS, STORM SEWERS, AND THE STORM WATER CONTROL MEASURE (WET POND). 18. EXISTING MANHOLES, VALVE BOXES, VAULTS, CLEANOUTS, UTILITY POLES ETC. TO REMAIN WITHIN THE GRADING LIMITS SHALL BE ADJUSTED AS NEEDED TO FUNCTION PROPERLY WITH THE PROPOSED FINISHED GRADES (WHETHER OR NOT INDICATED TO BE MODIFIED). KEY NOTES 1 INLINE DRAIN C5.1 2 C5.1 STORM SEWER TRENCHES 3 C5.1 TRENCH DRAIN 4 C5.1 CONCRETE DROP INLET 5 C5.1 STANDARD CLEANOUT 6 C5.6 RIPRAP OUTLET PROTECTION A 18" CLASS B RIPRAP co 00 0 Q z ABBREVIATIONS EP = EDGE OF PAVEMENT ELEVATION FG = FINISH GROUND ELEVATION FFE = FINISH FLOOR ELEVATION RCP = REINFORCED CONCRETE PIPE DIP = DUCTILE IRON PIPE PVC = POLYVINYL CHLORIDE PIPE SCH = SCHEDULE HP= HIGH POINT ELEVATION LP = LOW POINT ELEVATION SW = SIDEWALK ELEVATION FL = FLOW LINE TG = TOP OF GRATE TL = TOP OF LID T 919 7818582 F 919 7813979 4600 Lake Boone Trail Suite 205 Raleigh, 127607 info@smithsinnett.com a� O O N IS) o N 7 o U O w' o m C/) o W z !2 aI ma co co O a w , = r,- L0 P U) °° m • z U) U m Ln • o z •Ez cq 2 w co• rn > U_ E o ii H '� d ° J zFa��iiILL • • O E I- C/) CD ,,���pN FQP��• c O m o E-15 c O 7 N C N d- N U_F_ d pm R R N H LLJ lc� LLJ - NO C d -cc H ` gCO :6 CO � M u_ c14 cc E o p o¢ o cm CO ,�_. N c N 3 0 3 a d LLJ z d o_ to O_ O_ L yL--. 7 E L O¢ 2E Q- = LLJ ,� Qa M_ o E g m Z Q m p L) 00 LO N O � � J a Z Q E Z ED cn Z W Q CQ Z Q Z U) LU w Z Z Z J L m O s LL N V LU Z H O Q O w(-) M Z H W Ln 2 9/23/22 NCDEQ STORM #2 ID DATE DESCRIPTION DRAWN BY: JL CHECKED BY: FS GRADING & DRAINAGE PLAN 2021009 8 J U L 2022 SCALE 1 "=30' NOR 0 30' 60'