Loading...
HomeMy WebLinkAboutSW5140801_Add Info_20220830ROY COOPER Governor ELIZABETH S. BISER Secretary BRIAN WRENN Director Timmons Group Attn: Francis Slinsky, PE 5410 Trinity Road, Suite 102 Raleigh, NC 27607 AND North Carolina National Guard Attn: Col. Rodney D. Newton 1636 Gold Star Drive, Suite 2600 Raleigh, NC 27607 NORTH CAROLINA Environmental Quality August 30, 2022 Subject: Request for Additional Information Stormwater Permit No. SW5140801 NCNG Camp Butner Training Center ACFT Granville County Dear Mr. Slinsky and Col. Newton: The Division of Energy, Mineral and Land Resources (DEMLR), received a Stormwater Management Permit Application for the subject project on June 1, 2022. A review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: This project is located within the Falls watershed and the project is owned by a federal entity. Please ensure that the requirements outlined in 15A NCAC 02B .0281 are being met. 2. Please clarify how much BUA will exist on -site in both existing and proposed conditions (so that the %BUA calculation may be verified since this project is located within a critical WS-III watershed (per 15A NCAC 02B .0275(2) and is limited to a maximum of 30% BUA). Plan sheet C3.1 indicates that there is 26,671 sf (z 0.61 ac) of BUA on -site in proposed conditions (but does not show the location of this BUA (the layer may be turned off?)), but the BUA summary in the stormwater narrative indicates that there is only 0.06 ac of existing BUA on -site. Similarly, plan sheet C3.2 indicates that there will be 72,313 sf (z 1.66 ac) of on -site BUA draining to the SCMs and there appears to be additional BUA located on -site, but not draining to the SCMs (Portions of the gravel area North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources 512 North Salisbury Street 1 1612 Mail Service Center I Raleigh, North Carolina 27699-1612 NORTH CAROLINA _ oepm nt of EnvimnmwUl uwl ry 919.707.9200 & road in the north, northeast, and east parts of the project area) that would increase the on -site BUA in proposed conditions above 1.66 ac (the amount shown in the stormwater narrative). Please revise as needed. You may wish to include a bypass area on the plans/stormwater narrative indicating how much BUA is located on -site but bypassing the SCM so that the total amount of BUA on -site in proposed conditions can be determined. 3. There appears to be a BUA mismatch between the information shown in Section IV, 10 of the Application and as shown on the Drainage Area Page of the Supplement-EZ Form. The BUA in the Application is all shown under the "Other" type while the Supplement- EZ form breaks it down into "Sidewalk" and "Future" BUA. Please revise as needed. 4. Wet Pond MDC 1, 2, & 3 — Please do not include the sediment storage zone in the main pool calculations. Plan sheet C5.4 indicates that the excavated bottom of the pond (bottom of the sediment storage zone) for the main pool is at elevation 478.0' and that the top of the sediment storage zone is at elevation 479.0'. The sediment storage table in the calculation booklet indicates that the top of the sediment storage zone is at elevation 478.0'. Please revise as needed. NOTE: The pond cross-section on plan sheet C5.4 indicates that the top of the sediment storage zone for the forebay is at elevation 478.0' but the plans (cross-section on sheet C5.4 and grading on sheet C3.0 seem to indicate that the forebay and main pool bottoms/sediment storage zones would be at the same elevation. Please revises if needed. 5. Wet Pond MDC 4 — Please indicate the location of the forebay weir on the plans. The detail provided on plan sheet C5.4 indicates that there is a riprap lined weir on the forebay berm, but the plan views of the pond do not appear to show this. It is recommended to place the weir as far away from the outlet structure as possible to increase the flow path of the pond and prevent short-circuiting. Please also increase the elevation of the forebay embankment so that the pond does not short-circuit since the inlet and outlet are located fairly close to each other and the top of the forebay embankment is at the permanent pool elevation (it does not currently impact the flow path of the temporary pool). 6. Please correct the following information for the Supplement-EZ Form: a. Drainage Area Page: i. Please complete the entire site column. The entire site column is an accounting of all of the BUA located within the project area (not just a sum of the DA columns). The entire site column should include the on -site BUA that drains to the SCMs plus the BUA that is located on -site but bypasses the SCMs. b. Wet Pond Page: i. Lines 20 & 21 — Revise if needed (see earlier comment). ii. Lines 27 & 28 — Revise if needed (see earlier comment). iii. Lines 43 & 44 — Per the provided plans, the bottom of the forebay at the entrance is shown to be at elevation 477.0', the bottom of the forebay at the exit is shown to be at elevation 477.5' and the permanent pool surface elevation is shown to be at elevation 484.0'. This results in a depth to the forebay entrance of 84" (484.0' — 477.0') and a depth to the forebay exit of 78" (484.0' — 477.5'). Please revise as needed. 7. Provide PDFs of all revisions, 2 hardcopies of revised plan sheets, 1 hardcopy of other documents, and a response to comments letter briefly describing how the comments have been addressed. a. PDFs must be uploaded using the form at: https://edocs.deq.nc.gov/Forms/SW-Supplemental-Upload b. Hard copies must be mailed or delivered to the following address: i. For FedEx/UPS: Jim Farkas 512 N. Salisbury Street, Office 640E Raleigh, NC 27604 ii. For LISPS: Jim Farkas 1612 Mail Service Center Raleigh, NC 27699-1612 iii. Hand Delivery: Please reach out to me prior to hand delivering a submission to make sure that I (or someone else in my group) will be able to receive the submission. Do not leave the package in the foyer with the security guard. NOTE: Hard copies should not be sent to a Regional Office. Doing so will delay the review process and the submission package may be lost while being sent from the Regional Office to me in the Central Office. Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to September 29, 2022, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. Please reference the State assigned project number SW5140801 on all correspondence. If you need additional time to submit the information, please submit your request for a time extension to the Division at the contact below. The request must indicate the date by which you expect to submit the required information. The Division is allowed 90 days from the receipt of a completed application to issue the permit. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. If you have any questions concerning this matter please feel free to contact me at Jim.Farkas@ncdenr.jzov or (919) 707-3646. Sincerely, V- "I Jim Farkas Environmental Engineer Stormwater Program cc: Raleigh Regional Office