Loading...
HomeMy WebLinkAboutNCS000512_Inspection Report_20221206Compliance Inspection Report Permit: NCS000512 Effective: 12/01/10 Expiration: 11/30/15 Owner: Hoover Treated Wood Products Inc SOC: Effective: Expiration: Facility: Hoover Treated Wood Products, Inc County: Halifax 1262 Trueblood Rd Region: Raleigh Halifax NC 27839 Contact Person: Curtis Rhodes Title: Phone: 706-962-8994 Directions to Facility: System Classifications: SWNC, Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 12/06/2022 Primary Inspector: Lauren Garcia Secondary Inspector(s): Entry Time 10:30AM Reason for Inspection: Routine Permit Inspection Type: Stormwater Discharge, Individual Facility Status: Compliant ❑ Not Compliant Question Areas: Storm Water (See attachment summary) Certification: Phone: Exit Time: 11:OOAM Phone: 919-707-3648 Inspection Type: Compliance Evaluation Page 1 of 3 Permit: NCS000512 Owner - Facility: Hoover Treated Wood Products Inc Inspection Date: 12/06/2022 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: Inspection was in response to the permit renewal The last DMRs available for the facility in the Laserfiche Public Portal are from 2019. Make sure to submit DMRs in accordance with permit requirements. Please send analytical data from 2020-2022 via email to brianna.young@ncdenr.gov for review during the permit renewal if they have not already been provided. The facility operates on a small parcel of land adjacent to a large saw mill. Site conditions match the site map provided with the application. The outfall is not listed on the map, but the site drains to one outfall located adjacent to Trueblood Road, near the southern entrance to the site. The outfall is labeled onsite. The facility transitioned to treating wood with copper napthenate. All treatment takes place inside the treatment plant. Products were stated to be dried within the treatment plant as much as possible beforethe product is transferred to the drip pad. There is residue of the copper napthenate material visible on the drip pad. This may need to be addressed through the polluton prevention and good housekeeping portion of the SWPPP. The drip pad is contained under a metal roof, but rain may come into contact with the drip pad during a heavy storm event where it is raining sideways. Measures are taken to prevent the treated wood product from getting wet. Unloading and loading of product is done is this area as well. There was no visible residue outside of the drip pad. Filters used in the process are labeled as hazardous waste and stored in barrels in the drip pad while waiting for disposal. There are tanks at the exterior of the facility that were either once used in the process or currently used. Tanks are stored in concrete bermed vaults. Any rain water is pumped and recycled into the system. The splitting shed identified on the facility map is mainly used for wrapping treated wood with paper packaging now. Maintenance to equipment also happens in the splitting shed as needed. Used oil is stored in propper secondary containment. A diesel tank is also located in the shed in propper secondary containment. Page 2 of 3 Permit: NCS000512 Owner - Facility: Hoover Treated Wood Products Inc Inspection Date: 12/06/2022 Inspection Type: Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? ❑ ❑ ❑ # Does the Plan include a BMP summary? ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ ❑ ❑ # Does the facility provide and document Employee Training? 0 ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? 0 ❑ ❑ ❑ # Is the Plan reviewed and updated annually? 0 ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? 0 ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? 0 ❑ ❑ ❑ Comment: When the permit is renewed, the SWPPP will need to be updated to fit the new template. Make sure that all sections of the SWPPP listed in the permit are addressed. Make sure to update the SWPPP annuallV. Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring? 0 ❑ ❑ ❑ Comment: Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? 0 ❑ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? 0 ❑ ❑ ❑ Comment: Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? 0 ❑ ❑ ❑ # Were all outfalls observed during the inspection? 0 ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ❑ ❑ 0 ❑ Comment: Page 3 of 3