HomeMy WebLinkAboutSite Inspection 12.7.22 Br 3 ChinquapinWetland Inspection Report
Inspection Type:
Reason for Inspection:
Inspection Date:
Site Owner Name:
Latitude:
County:
Project Name:
Project Num:
Location:
SW Plan Location:
20211560
TPB NCDOT - Replace Bridge 3 on SR 1887
Haywood
TPB NCDOT - Replace Bridge 3 on SR 1887
NC DOT Division 14 - Sylva
12/7/2022
Routine
Site Inspection (DOT)
Version: 1 Status:Issued
Project Type:Replace bridge with bridge
Region:Asheville
Longitude:-82° 48' 41''+35° 25' 04''
Inspection Contact Person:Title:Phone:
On-Site Representative(s):
Secondary Inspector(s):
Primary Inspector:Phone:Robert K Mitchell
Facility Compliance Status:Compliant Not Compliant
Question Areas:
Program Areas:401 (includes isolated/non-404)
Permit (401 WQC)
Site inspection was conducted on December 7, 2022 by Kevin Mitchell with the Asheville Regional Office. Michael
Pittman was present during the inspection. The following are items that need attention:
- Station L 10+70 LT - Stabilize slope at upper end of rip rap. Repair silt fence at top of bank.
NPDES records were up to date.
Inspection Summary:
page:1
Inspection Date:
Site Number:
Inspection Type:
Owner:
Reason for Visit:
20211560
12/7/2022
Blazer, Keith
Site Inspection (DOT)Routine
Permit (401 WQC)Yes No NA NE
Does the impact(s) match what was approved in the 401 WQC or non 404 permit?
Are the culverts and/or filled areas installed properly?
Is the site compliant with additional conditions of the 401 WQC or non 404 permit?
Comment:
page:2