Loading...
HomeMy WebLinkAboutSite Inspection 12.7.22 Br 3 ChinquapinWetland Inspection Report Inspection Type: Reason for Inspection: Inspection Date: Site Owner Name: Latitude: County: Project Name: Project Num: Location: SW Plan Location: 20211560 TPB NCDOT - Replace Bridge 3 on SR 1887 Haywood TPB NCDOT - Replace Bridge 3 on SR 1887 NC DOT Division 14 - Sylva 12/7/2022 Routine Site Inspection (DOT) Version: 1 Status:Issued Project Type:Replace bridge with bridge Region:Asheville Longitude:-82° 48' 41''+35° 25' 04'' Inspection Contact Person:Title:Phone: On-Site Representative(s): Secondary Inspector(s): Primary Inspector:Phone:Robert K Mitchell Facility Compliance Status:Compliant Not Compliant Question Areas: Program Areas:401 (includes isolated/non-404) Permit (401 WQC) Site inspection was conducted on December 7, 2022 by Kevin Mitchell with the Asheville Regional Office. Michael Pittman was present during the inspection. The following are items that need attention: - Station L 10+70 LT - Stabilize slope at upper end of rip rap. Repair silt fence at top of bank. NPDES records were up to date. Inspection Summary: page:1 Inspection Date: Site Number: Inspection Type: Owner: Reason for Visit: 20211560 12/7/2022 Blazer, Keith Site Inspection (DOT)Routine Permit (401 WQC)Yes No NA NE Does the impact(s) match what was approved in the 401 WQC or non 404 permit? Are the culverts and/or filled areas installed properly? Is the site compliant with additional conditions of the 401 WQC or non 404 permit? Comment: page:2