Loading...
HomeMy WebLinkAbout20221500 Ver 1_More Info Received_20221206Baker, Caroline D From: Jennifer Robertson <jrobertson@atlasenvi.com> Sent: Tuesday, December 6, 2022 2:07 PM To: Homewood, Sue; aparker@crescentcommunities.com Cc: Phillips, George L CIV USARMY CESAW (USA) Subject: [External] RE: Additional Information Request for Trinity Rd Industrial project - Randolph County - DWR#20221500 Attachments: WL 2200 Connection Map.pdf Follow Up Flag: Flag for follow up Flag Status: Flagged CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Sue, Thank you for the clarification on number 1 below. As we discussed yesterday, I will find out who to contact for number 2 below. See the attached map regarding number 3 below. WL 2200 is an upland depression. The hydrology is 100% stormwater. If we provide a culvert (shown in pink on the attached map) down to the property line would you agree that Corps jurisdiction will not be lost. Lyle, Do you have any thoughts regarding number 3? Thank you, Jennifer L Robertson, President ATLAS Environmental, Inc. 338 S. Sharon Amity Road #411 Charlotte, NC 28211 (704) 512-1206 office (828) 712-9205 mobile www.atiasenvi.com Offices in Asheville and Charlotte ONMENTAL From: Homewood, Sue <sue.homewood@ncdenr.gov> Sent: Monday, December 5, 2022 8:29 AM To: Jennifer Robertson <jrobe rtson@atlasenvi.com>; aparker@crescentcommunities.com Cc: Phillips, George L CIV USARMY CESAW (USA) <George.L.PhiIli ps@usace.army.miI> Subject: Additional Information Request for Trinity Rd Industrial project - Randolph County - DWR#20221500 El I have reviewed the application materials for the above referenced project and require additional information to continue my review. Please provide a response to the items below within 30 days of receipt of this application. The application will be placed "on hold" until a complete response is received. 1. Pursuant to 15A NCAC 02H .1305(c)(3), isolated wetland impacts and jurisdictional wetland impacts shall not be combined for the purposes of determining mitigation requirements. Therefore mitigation is not required for the project. 2. The project lies within the Randleman Lake Watershed and is therefore subject to the Randleman Lake Riparian Buffer Regulations. Can you provide confirmation that the local government has conducted a buffer determination for the site, or has accepted your streams calls for buffer implementation. I recognize that the proposed project does not appear to impact any streams or buffers, however since there is a stream origin point on the property, for the purposes of buffer applicability the local government must confirm the origin point of the buffer requirements. 3. Pursuant to 15A NCAC 02H.0506(b) "a 401 Water Quality Certification may only be issued upon determining that the proposed activity will comply with state water quality standards which includes designated uses, numeric criteria, narrative criteria and the state's antidegradation policy, as defined in rules of 15A NCAC 02B .0200... In assessing whether the proposed activity will comply with water quality standards, the Division shall evaluate if the proposed activity: (2) would cause or contribute to a violation of water quality standards; (3) would result in secondary or cumulative impacts that cause or contribute to, or will cause or contribute to, a violation of water quality standards;". It appears that the project is likely to disconnect WL2200 such that it will not remain jurisdictional Waters of the US. The Division must consider loss of jurisdiction to be a secondary impact since the wetland would no longer be afforded the same protections. Thanks, Sue Homewood Division of Water Resources, Winston Salem Regional Office Department of Environmental Quality 336 776 9693 office 336 813 1863 mobile Sue. Homewood@ncdenr.gov 450 W. Hanes Mill Rd, Suite 300 Winston Salem NC 27105 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. � Ili oZ f i 810 WET DETENTION POND Impact W2 :yr PROPOSED WETLAND IMPACT - WL2100 f s - _ i r S SHEET: EXI.ISo t'\- -•� — PROPOSED BUILDING: / 120,000 SF ( / FIFE: 834.5 �1 F1 I — -7 PROPOSED WETLAND IMPACT - WL2c.00 8 `I Impact W1:-,' III \ ROELEE \ I i STREET I PROPOSED WETLAND IMPACT - WL2200 W3 —Impact SHEET: EX1.2 PROPOSED WETLAND IMPACT - WL3000 Impact W4 SHEET: EXLi—� PROJECT RED OAK THOMAS SHEET: & OVERALL WETLAND IMPACTS HUTTON CLIENT: CRESCENT COMMUNITIES 1020 Euclid Avenue LOCATION: ARCHDALE, NC Charlotte, NC 28203 • 980.201.5505 DATE: 10/12/22 JOB NUMBER: J-30390.0000 DRAWN BY: ATK SHEET: EX1.0 REVIEWED BY: MSK SCALE: 1" = 200' www.thomasandhutton.com