HomeMy WebLinkAboutPTIA_SDOrepair_PCN (4)Homewood, Sue
From: Darling, Richard <rdarling @mbakerintl.com>
Sent: Tuesday, January 27, 2015 1:16 PM
To: david.e.bailey2 @usace.army.mil; Homewood, Sue
Cc: Higgins, Karen; rossera @gsoair.org; elmorel @gsoair.org; lallen @mbakerintl.com;
dtorres @mbakerintl.com
Subject: PTIA SDO Repair Bank Stabilization
rdarling(a)mbakerintl.com has sent you an attachment(s) using Baker eFTP
David & Sue:
Thanks for your response - attached is revised PCN itemizing the stream impacts into 1) culvert
extension /installation (Nationwide Permit 18), 2) rip rap dissipater pad installation (NP 18), and 3)
stabilization /natural channel design (NP 13). Section A.1 b. has been updated to include both NP
13 and NP 18. The Site #3 phase 2 section cannot be limited to natural channel design or bank
stabilization only due to the significant elevation difference here:
For Site #3 Phase 2, a proposed drainage structure (manhole) and outlet pipe
are necessary to address the vertical drop from the existing stormwater pipe
outlet elevation to the existing elevation of the adjacent channel. This existing
vertical drop has eroded (and continues to erode) over time due to the hydraulic
energy released by the water cascading from the perched pipe. In order to
protect the channel from this erosive force, the vertical drop will be contained
within the proposed drainage structure. The outfall pipe will be utilized to direct
Message and contain the flow in its proposed direction. An outfall stabilization pad
Text: constructed of rip -rap is proposed to dissipate remaining energy from the
flow. The stabilization pad will be constructed so that the top elevation of the
rip -rip will coincide with the proposed elevation of the channel bottom.
The temporary and permanent Jordan buffer impacts at Site #3 have also been quantified by
Zone 1 and Zone 2 in the attached PCN and revised Permit Drawings by NP 18 and NP 13.
Thanks again for your prompt and helpful recommendations. Please do not hesitate to contact
me at your convenience should you require any additional information to process this request.
Richard
Richard Darling I Environmental Manager I Michael Baker International
8000 Regency Pkwy., Suite 600 1 Cary, NC 27518 1 [O] 919 - 481 -5740
rdarling(a)mbakerintl.com I www.mbakerintl.com
To retrieve your attachment(s), click on the secure link below.
0�_ wATp
Office Use Only:
Corps action ID no.
DWQ project no.
Form Version 1.4 January 2009
Page 1 of 10
PCN Form — Version 1.4 January 2009
Pre - Construction Notification (PCN) Form
A.
Applicant Information
1.
Processing
1 a.
Type(s) of approval sought from the Corps:
❑X Section 404 Permit ❑ Section 10 Permit
1 b. Specify Nationwide Permit (NWP) number: 18 & 13 or General Permit (GP) number: (= NCDENR WQGC 3890 & 3885)
1 c.
Has the NWP or GP number been verified by the Corps?
Q Yes ❑ No
1d.
Type(s) of approval sought from the DWQ (check all that apply):
❑X 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit
❑ 401 Water Quality Certification — Express ❑X Riparian Buffer Authorization
1 e.
Is this notification solely for the record
because written approval is not required?
For the record only for DWQ
401 Certification:
❑ Yes ❑X No
For the record only for Corps Permit:
❑ Yes ❑X No
1f.
Is payment into a mitigation bank or in -lieu fee program proposed for
mitigation of impacts? If so, attach the acceptance letter from mitigation bank
or in -lieu fee program.
❑ Yes ❑X No
1g.
Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h
below.
❑ Yes ❑X No
1 h.
Is the project located within a NC DCM Area of Environmental Concern (AEC)?
❑ Yes ❑X No
2.
Project Information
2a.
Name of project:
PTIA SDO Repair
2b.
County:
Guilford
2c.
Nearest municipality / town:
Greensboro
2d.
Subdivision name:
2e.
NCDOT only, T.I.P. or state project no:
3.
Owner Information
3a.
Name(s) on Recorded Deed:
Piedmont Triad Airport Authority
3b.
Deed Book and Page No.
3c.
Responsible Party (for LLC if
applicable):
3d.
Street address:
1000 -A Ted Johnson Pkwy.
3e.
City, state, zip:
Greensboro, NC 27409
3f.
Telephone no.:
336.665.5600
3g.
Fax no.:
336.665.5694
3h.
Email address:
Page 1 of 10
PCN Form — Version 1.4 January 2009
4.
Applicant Information (if different from owner)
4a.
Applicant is:
❑ Agent ❑ Other, specify:
4b.
Name:
4c.
Business name
(if applicable):
4d.
Street address:
4e.
City, state, zip:
4f.
Telephone no.:
4g.
Fax no.:
4h.
Email address:
5.
Agent/Consultant Information (if applicable)
5a.
Name:
Richard Darling
5b.
Business name
(if applicable):
Michael Baker Engineering, Inc.
5c.
Street address:
8000 Regency Pkwy., Suite 600
5d.
City, state, zip:
Cary, NC 27518
5e.
Telephone no.:
919.481.5740
5f.
Fax no.:
919.463.5490
5g.
Email address:
rdarling @mbakerintl.com
Page 2 of 10
B.
Project Information and Prior Project History
1.
Property Identification
1a.
Property identification no. (tax PIN or parcel ID):
1b.
Site coordinates (in decimal degrees):
Latitude: 36.112877 Longitude: - 79.93112
1c.
Property size:
3 acres
2.
Surface Waters
2a.
Name of nearest body of water to proposed project:
Brush Creek
2b.
Water Quality Classification of nearest receiving water:
WS -III, NSW
2c.
River basin:
Cape Fear
3.
Project Description
3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this
application:
Six (6) airport stormwater discharge outfalls (SDOs) are failing, in disrepair, or are contributing to downstream erosion /sedimetation or channel
degradation. Sites #1, #2, #3, #5, & #6 involve repair of existing structures and immediate outfall area. Sites #1 and #2 include temporary and
permanent restoration of riparian buffer. Site #3 includes minor discharge and downstream channel bank stabilization and restoration.
3b.
List the total estimated acreage of all existing wetlands on the property: 0
3c.
List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 364
3d. Explain the purpose of the proposed project:
Repair existing SDOs and stabilize downstream channel, in response to turbidity benchmark exceedances observed during NPDES monitoring
3e. Describe the overall project in detail, including the type of equipment to be used:
See Notes on Permit Drawings.
4.
Jurisdictional Determinations
4a.
Have jurisdictional wetland or stream determinations by the
Corps or State been requested or obtained for this property /
project (including all prior phases) in the past?
❑ Yes ❑X No ❑ Unknown
Comments:
4b.
If the Corps made the jurisdictional determination, what type
of determination was made?
❑ Preliminary ❑ Final
4c.
If yes, who delineated the jurisdictional areas?
Name (if known):
Agency /Consultant Company:
Other:
4d.
If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation.
5.
Project History
5a.
Have permits or certifications been requested or obtained for
this project (including all prior phases) in the past?
Z Yes ❑ No ❑ Unknown
5b. If yes, explain in detail according to "help file" instructions.
Corps Action ID SAW 2000 - 21655, DWQ File 00 -0846 for the Runway 5L/23R and Fed Ex project included Sites #4 and #5.
6.
Future Project Plans
6a.
Is this a phased project?
❑ Yes ❑X No
6b.
If yes, explain.
Page 3 of 10
PCN Form — Version 1.4 January 2009
C. Proposed Impacts Inventory
1. Impacts Summary
1 a. Which sections were completed below for your project (check all that apply):
❑ Wetlands ❑X Streams — tributaries ❑X Buffers ❑ Open Waters ❑ Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted.
2a.
Wetland impact
number
Permanent (P) or
Temporary T
2b.
Type of impact
2c.
Type of wetland
2d.
Forested
2e.
Type of jurisdiction
Corps (404,10) or
DWQ (401, other)
2f.
Area of
impact
(acres)
W1
Choose one
Choose one
Yes /No
-
W2
Choose one
Choose one
Yes /No
W3
Choose one
Choose one
Yes /No
W4
Choose one
Choose one
Yes /No
W5
Choose one
Choose one
Yes /No
W6
Choose one
Choose one
Yes /No
2g. Total Wetland Impacts:
2h. Comments:
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this
question for all stream sites impacted.
3a.
Stream impact
number
Permanent (P) or
Temporary (T)
3b.
Type of impact
3c.
Stream name
3d.
Perennial (PER) or
intermittent (INT)?
3e.
Type of
jurisdiction
3f.
Average
stream
width
(feet)
3g.
Impact
length
(linear
feet)
S1 P
Manhole (NP18)
UT to Brush Creek
INT
7
18
S2 P
Rip -rap (NP18)
UT to Brush Creek
INT
7
31
S3 P
Stabilization (NP13)
UT to Brush Creek
INT
7
315
S4
Choose one
S5
Choose one
S6
Choose one
3h. Total stream and tributary impacts
364
3i. Comments:
See Drawings SB -3.1, SB -3.2, and SB -3.3 for Stream Bank Restoration plan
Page 4 of 10
PCN Form — Version 1.4 January 2009
4. Open Water Impacts
If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of
the U.S. then indivi ually list all open water impacts below.
4a.
Open water
impact number
Permanent (P) or
Temporary T
4b.
Name of waterbody
(if applicable)
4c.
Type of impact
4d.
Waterbody
type
4e.
Area of impact (acres)
01
Choose one
Choose
O2
Choose one
Choose
03
Choose one
Choose
04
Choose one
Choose
4f. Total open water impacts
4g. Comments:
5. Pond or Lake Construction
If pond or lake construction proposed, the complete the chart below.
5a.
Pond ID number
5b.
Proposed use or
purpose of pond
5c.
Wetland Impacts (acres)
5d.
Stream Impacts (feet)
5e.
Upland
(acres)
Flooded
Filled
Excavated
Flooded
Filled
Excavated
P1
Choose one
P2
Choose one
5f. Total:
5g. Comments:
5h. Is a dam high hazard permit required?
❑ Yes ❑ No If yes, permit ID no:
5i. Expected pond surface area (acres):
5j. Size of pond watershed (acres):
5k. Method of construction:
6. Buffer Impacts (for DWQ)
If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts
below. If any impacts require mitigation, then you MUST fill out Section D of this form.
6a. Project is in which protected basin?
❑ Neuse ❑ Tar - Pamlico ❑ Catawba ❑ Randleman ❑ Other:.lordan Lake
6b.
Buffer Impact
number—
Permanent (P) or
Temporary (T)
6c.
Reason for impact
6d.
Stream name
6e.
Buffer
mitigation
required?
6f.
Zone 1
impact
(square
feet)
6g.
Zone 2
impact
(square
feet)
B1 P
SDO repair
Site #1, SDO 23, LIT to Brush Creek
No
0
580
B2 T
SDO repair
Site #1, SDO 23, LIT to Brush Creek
No
1,060
1,947
B3 P
SDO repair
Site #2, upstream of IS# 02, Brush Creek
No
496
675
B4 T
SDO repair
Site #2, upstream of IS# 02, Brush Creek
No
441
785
B5 P
SDO repair & channel stab.
Site #3, SDO 030, LIT to Brush Creek
No
16,678
1,009
B6 T
SDO repair & channel stab.
Site #3, SDO 030, LIT to Brush Creek
No
6,339
11,597
6h. Total Buffer Impacts:
25,014
16,593
61. Comments: See Drawings SB -1, SB -2, SB -3A, & SB -3B for riparian buffer restoration plans
Page 5 of 10
D.
Impact Justification and Mitigation
1.
Avoidance and Minimization
1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project.
Stream impacts are specifically for purposes of stabilization using natural channel design criteria. Buffer impacts are unavoidable due to outfall
locations near stream origins. Existing buffer conditions will be improved by stabilizing currently eroded slopes and re- vegetating.
1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques.
Construction - related impacts will be avoided and minimized to the extent possible by applying DEMLR- approved sedimentation and erosion control
protocols as noted on construction plans.
2.
Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a.
Does the project require Compensatory Mitigation for
impacts to Waters of the U.S. or Waters of the State?
❑ Yes ❑X No
2b.
If yes, mitigation is required by (check all that apply):
❑ DWQ ❑ Corps
2c.
If yes, which mitigation option will be used for this
project?
❑ Mitigation bank
El Payment to in -lieu fee program
❑ Permittee Responsible Mitigation
3.
Complete if Using a Mitigation Bank
3a.
Name of Mitigation Bank:
3b.
Credits Purchased (attach receipt and letter)
Type: Choose one
Type: Choose one
Type: Choose one
Quantity:
Quantity:
Quantity:
3c. Comments:
4.
Complete if Making a Payment to In -lieu Fee Program
4a. Approval letter from in -lieu fee program is attached.
❑ Yes
4b.
Stream mitigation requested:
linear feet
4c.
If using stream mitigation, stream temperature:
Choose one
4d.
Buffer mitigation requested (DWQ only):
square feet
4e.
Riparian wetland mitigation requested:
acres
4f.
Non - riparian wetland mitigation requested:
acres
4g.
Coastal (tidal) wetland mitigation requested:
acres
4h.
Comments:
5.
Complete if Using a Permittee Responsible Mitigation Plan
5a.
If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan.
Page 6 of 10
PCN Form — Version 1.4 January 2009
6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ
6a. Will the project result in an impact within a protected riparian buffer that requires
Yes X No
buffer mitigation?
6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the
amount of mitigation required.
6c.
6d.
6e.
Zone
Reason for impact
Total impact
Multiplier
Required mitigation
(square feet)
(square feet)
Zone 1
3 (2 for Catawba)
Zone 2
1.5
6f. Total buffer mitigation required:
6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank,
permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund).
6h. Comments:
Page 7 of 10
E.
Stormwater Management and Diffuse Flow Plan (required by DWQ)
1.
Diffuse Flow Plan
1a.
Does the project include or is it adjacent to protected riparian buffers identified
❑X Yes ❑ No
within one of the NC Riparian Buffer Protection Rules?
1b.
If yes, then is a diffuse flow plan included? If no, explain why.
Project involves repair of existing structures and stabilization of eroded surfaces only
❑ Yes ❑X No
2.
Stormwater Management Plan
2a.
What is the overall percent imperviousness of this project?
2b.
Does this project require a Stormwater Management Plan?
❑ Yes ❑X No
2c.
If this project DOES NOT require a Stormwater Management Plan, explain why:
The project itself is maintenance of components of the PTIA stormwater management plan
2d.
If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan:
2e.
Who will be responsible for the review of the Stormwater Management Plan?
3.
Certified Local Government Stormwater Review
3a.
In which local government's jurisdiction is this project?
❑ Phase II
❑ NSW
3b.
Which of the following locally - implemented stormwater management programs
❑ USMP
apply (check all that apply):
❑ Water Supply Watershed
❑ Other:
3c.
Has the approved Stormwater Management Plan with proof of approval been
El Yes ❑ No
attached?
4.
DWQ Stormwater Program Review
❑Coastal counties
❑ HQW
4a.
Which of the following state - implemented stormwater management programs apply
❑ORW
(check all that apply):
E] Session Law 2006 -246
❑ Other:
4b.
Has the approved Stormwater Management Plan with proof of approval been
❑ Yes ❑ No
attached?
5.
DWQ 401 Unit Stormwater Review
5a.
Does the Stormwater Management Plan meet the appropriate requirements?
❑ Yes ❑ No
5b.
Have all of the 401 Unit submittal requirements been met?
❑ Yes ❑ No
Page 8 of 10
PCN Form — Version 1.4 January 2009
F.
Supplementary Information
1.
Environmental Documentation (DWQ Requirement)
1a.
Does the project involve an expenditure of public (federal /state /local) funds or the
0 Yes ❑ No
use of public (federal /state) land?
1b.
If you answered "yes" to the above, does the project require preparation of an
environmental document pursuant to the requirements of the National or State
El Yes 0 No
(North Carolina) Environmental Policy Act (NEPA/SEPA)?
1c.
If you answered "yes" to the above, has the document review been finalized by the
State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval
❑ Yes ❑ No
letter.) FAA has approved project exclusive of additional NEPA documentation
Comments:
2.
Violations (DWQ Requirement)
2a.
Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated
Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards,
E] Yes 0 No
or Riparian Buffer Rules (15A NCAC 2B .0200)?
2b.
Is this an after - the -fact permit application?
El Yes 0 No
2c.
If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s):
3.
Cumulative Impacts (DWQ Requirement)
3a.
Will this project (based on past and reasonably anticipated future impacts) result in
El Yes 0 No
additional development, which could impact nearby downstream water quality?
3b.
If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the
most recent DWQ policy. If you answered "no," provide a short narrative description.
SDO and erosion repair only
4.
Sewage Disposal (DWQ Requirement)
4a.
Clearly detail the ultimate treatment methods and disposition (non- discharge or discharge) of wastewater generated from
the proposed project, or available capacity of the subject facility.
N/A
Page 9 of 10
PCN Form — Version 1.4 January 2009
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or E] Yes M No
habitat?
5b Have you checked with the USFWS concerning Endangered Species Act
El Yes No
impacts?
i 5c. If yes, indicate the USFWS Field Office you have contacted. Raleigh
5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical
Habitat?
�i
http: / /www.fws. gov/ ral eighlspecies /cntylistiguilford.htmi
fford. htmi
i I
http:,I!portal.ncdenr.orgiwebi'nhp/home
6, Essential Fish Habitat (Corps Requirement)
6a Will this project occur in or near an area designated as essential fish habitat? El Yes No
6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat?
htlp:i',Iwmi.habitat.noaa.gov/proteclion/efh.lhabitatmapper.htmi
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a Will this project occur in or near an area that the state, federal or tribal
governments have designated as having historic or cultural preservation
E] Yes Z No
status (e.g., National Historic Trust designation or properties significant in
North Carolina history and archaeology)?
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?
http://gis.ncdcr.gov/hpoweb/
8. Flood Zone Designation (Corps Requirement)
8a. Will this project occur in a FEMA-designated 100-year floodplain? =E] Yes No
8b. if yes, explain how project meets FEMA requirements:
8c. What source(s) did you use to make the floodplain determination?
http:l/www. ncfl ood maps. comf
J. Alex Rosser, PIE
-A
Deputy Executive Director
Applicant/Agent's Printed Name Applicant/Agent's Signature Date
(Agent's signature is valid only if an authorization
letter from the applicant is provided.)
1 4 1 a
INDEX Of DRAWINGS
DESCRIPTION
DRAWING No.
COVER SHEET .... -
GENERAL NOTES
. ... GN -1
SUMMARY OF QUANTITIES ....... Q-1
PROJECT LAYOUT& SAFETY PLAN„ .................... I PL -1
STREAM & BUFFER IMPACTS PLAN ......... . . 1 SB -1 to SB -33
GEOMETRIC LAYOUT & GRADING PLAN .. GL -1 to GL -6
PROFILES. .. ... ..... .. P -1 to P -2
EROSION CONTROL DETAILS ........................... EC-1 to EC -2
NATURAL CREEK DETAILS........ CD -1 to CD -2
PIEDMONT TRIAD INTERNATIONAL AIRPORT KGSO)
GREENSBORO, NORTH CAROLINA
JANUARY 2015
wn.mbAercorp.com
MICNAEI BAKER ENGINEERING, INC.
1800 Airport Center Drive
Suite 100
Greensboro, NC 21409
336.931.1500 (Office)
33641,1501 (Fax
North Carolina License No. HUH
\ pp p9ppppp �/
p ,
t\ p o
\ p \ e I
a (1 p f
' o SEAS
p 02742) p
' p p
// pp opppppp \\
SET No.
PIEDMONT TRIAD IN7'\JION41 AIRPF (KGSO)
Imi,,yEr'y l �'pOi
JANURRY 2015
PROJECT DESCRIPTION
THE PROJECT CONSISTS OF SIX SEPARATE WORK AREAS FO; DRAINAGE REDAIR AND IM'ROVEM1TS.
HAUL ROUTES, STAGING AREAS & CONSTRUCTION ACTIVITIES
1, EXCEPT WHERE DESIGNATE) ON PLANS OR AS AUTHORIZED BY ENGINEER, CONTRACTOR WILL NOT BE
ALLOWED TO LSE ANY OF THE EXISTNG RUNWAYS OR TAXIWAYS AS PART OF THE HAUL ROAD.
2. CONTRACTOR SHALL MAINTAIN ALL AIRFIELD SAFETY DEVICES SUCH AS STAKED LIMIT LINES, FOR THE
DURATION OF THE PROJECT AS REQUIREO, OAVACED STAKES OR FAGGING SHALL BE REPLACED
IMMEDIATELY, CONTRACTOR TO SUBMIT PLAN SHOWING LOCATION OF LIMIT LINES FOR EACH PHASE AND
FOR PROJECT DURATION TO THE ENGINEER FOR ADPROVAL
3. THE CONTRACTOR'S STAGING AREAS', AND HAuL ROUTES SHOWN ON THE PLANS ARE GENERAL AND FOR
INFORMATON PURPOSES ONLY, THE ACTUAL SIZE AND LCCATON OF STAGING AREAS AND HAUL ROUTES
WILL BE APPROVED BY OWNER PRIOR TO CONSTRUCTION,
4, ALL EXISTING GRASSED AREAS WHICH ARE DISTURBED AS PART OF THE CONTRACTOR'S ACCESS ROAD,
CONTRACTOR'S STACING AREA, AND HAUL ROUTES SHALL BE FESTOFED TO THEIR ORIGINAL CONDITION
AFTER COVPZION Or THE PROJECT, IN ADDITION, ALL EXISTING ROADS, THAT WILL BE USE] AS THE
CONTRACTOR'S HA,L ROUTE SHALL BE MAINTAINED DURING CONSTRJCTION AND RESTORED TO THEIR
PRE — CONSTRUCTION CONDITION, CONTRACTOR SHALL PROTECT NEWLY INSTALLED PAVEMENTS DURING
POST— CONSTR,CTION REMOVAL OF EROSION CONTROL MEASURES WITH STEEL PLATES AND/OR LIGHTLY
LOADED EQUIPMENT NO SEPARATE MEASUREMENT OR PAYMENT WILL BE MADE FOR THIS ITEM.
5. ALL EQUIFMENT MST BE RETURNED TO THE APPROPRIATE STAGING AREA (TRACK VERSUS NON —TRACK
VEHICLES) AT THE END OF EACH WORK DAY AND WHEN NOT ENGAGED IN THE CONSTRJCTION DURING
RCN— WORKING GAYS AND NIGHTS, OWHER WILL DESICNATE AFEAS FOR CONTRACTOR'S EMPLOYEES AUTO
DARKING.
6, THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING AND PROVIDING ALL PERMANENT AND TEMPORARY
,TILITY CONNECTIONS FOR THE PROJECT.
7, CONTPACTOR TO FIELD VERIFY EXISTING CONDITIONS PRIOR TO �BEGINNIIG CONSTR,CTION A1D REPORT TO
ENGINEER ANY VARIATIONS FFOV THE NFCRMATION SHOWN ON COKSTROCTIM PLANS,
8, THE'ROVISON AID MAINTENANCE OF HAUL FOADS, HAIL ROAD STONE, TEMPORARY HAUL SLABS AND
STEEL PLATES SHALL BE CONSIDERED INCIDENTAL TO PROJECT.
9.
00ITFACTOR SHALL PROVIDE STONE FOR CONSTRUCTOR EN �RANCE PADS AND PERFORM MAINTENANCE AS
NECESSARY OR AS FEQUIFED BY THE ENGINEER,
1 CONTRACTOF SHALL BE RESPONSIBLE FOR THE LOCATON, IDENTIFICATION, AND PROTECTION OF ALL
EXISTING UTLITIES AND NAVAIDS IN CONSTRUCTION AREA, ANY DAMAGES TO EXSTNG UTLITIES,'IPELINES
AND NAVAIDS ON OR OFF AIRPORT PROPERTY SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. NO
REIMBURSEMENT WILL BE ALLOWED FOR UTILITY PIPELINES/NAVAID LOCATION, REPAIR, OR REPLACEMENT.
11. ALL PAVEMENT SHALL BE KEPT FREE OF ALL DEBRIS, DIRT, ETC., AT ALL TIMES, ANY SPILLAGE OF
EXCAVATION OR OTHER MATERIALS SHALL BE CLEANED UP IMMEDIATELY BY THE CONTRACTOR WITH A
MOTOR RIVEN SWEEPER, A PROGRAM OF REGULAR INSPECTION WIL_ BE PLWED BY THE CONTRACTOR,
12. BURNING OF DEBRIS WILL NOT BE ALLOWED ON AIRPORT PROPERTY,
13. CONSTRUCTION STAKE —OUT SHALL BE PERFORMED BY CONTRACTOR IV ACCORDANCE WITH ARTICLE 50 -06
OF THE GENERAL PROVISIONS,
14. NOTICE TO AIRMEN (NOTAV) — THE CONTRACTOR WILL PROVIDE THE NECESSARY INFORMATION ON
CONSTRUCTION CONDITIONS TO THE OWNER IN ORDER FOR MAYS TO BE ISSUE" IN ACCORDANCE WITH
ESTABLISHED CRITERIA, THE OWNER SHALL BE GIVEN A NOTICE OF CONDITION CHANGES IN ACCORDANCE
WITH THE GUIDELINES PROVIDED IN THE PROJECT MANUAL
15. CONTRACTOR STAGING OF TRACK EQUIPMENT SHALL REMAIN OFF OF EXISTING PAVED SURFACES AND
OUTSIDE OF TAXIWAY OBJECT FREE AREAS,
EXISTING CONDITIONSIUNDERGROUND & CONCEALED FACILITIES
16. FAA CABLES WILL BE LOCATED AN] MARKED BY FAA PRIOR TC CONSTRUCTION, CONTRACTOR IS TO NOTIFY
FAA 30 DAYS IN ADVANCE SO THAT FAA CAN SCHEDULE THE REOLIRED MARKING TO PROTECT CABLES
DURING CONSTRUCTION. ANY CABLES DAMAGE" DURING CONSTRUCTION WILL BE REPLACED BY
CONTRACTOR, CONTRACTOR SHALL PAY ALL COSTS ASSOCIATED WITH THE REPAIR OF DAMAGED CABLES AT
NO COST TO OWNER,
17, CONTRACTOR SHALL BE RESPONSIBLE FOR THE LOCATION AND IDENTIFICATION OF ALL EXISTING UTILITIES
AND PIPELINES IN THE CONSTRUCTION AREA, ANY DAMAGE TO EXISTING UTILITIES OR PIPELINES 'ON OR
OFF AIRPORT PROPERTY) DAMAGED BY CONTRACTOR SHALL BE THE RES'ONSIBILITY OF THE CONTRACTOR.
CONTRACTOR SHAD REPAIR ALL JTI_ITYPIPELINE DAMAGED BY CONTRACTOR AT NO ADDITIONAL COST TO
OWNER,
18, CONTRACTOR SHALL MAINTAIN Al STATIONARY AND MOBILE EQUIPMENT AGAINST SPILLS AND LID
LEAKAGE, CONTRACTOR SHALL DIAPER Al LEAKING EQUIPMENT OPERATE] WITHIN 150 FEET OF ANY
STREAV, WATER BOGY OR WETLAND, UNLESS SUITABLE CONTAINMENT IS PROVIDED TO PREVENT POTENTIAL
SPILLS FROM ENTERING ANY STREAM OR WATER BODY,
19, CONTRACTOR SHALL FROTECT EXISTING RUNWAY AND TAXIWAY LIGHTING SYSTEMS AND APPROACH LIGHTING
SYSTEMS,
20 ANY UNPLANNED, JNAPPROVED OR ACCIDENTAL SHUTDOWN OR INTERFU'TON OF SERVICE TO ANY
MINTING CIRCUIT OR NAVIGATIONAL AID FECuIRES IMMEDIATE NOTIFICATION OF AIRPORT OPERATIONS AND
ENGINEER BY THE CONTRACTOR. ALL NECESSARY REPAIPS NULL BE AT CONTRACTORS EXPENSE
21, THE CONTRACTOR WILL BE RESPONSIBLE FOR STAKING AND GRADE CONTROL OF ALL ELEMENTS OF THE
CONSTRUCTION FOR THE DURATION OF THE PROJECT
22, CONTRACTOR SHALL FIELD VERIFY EXISTING SOIL CONDITONS, SOIL VOISTURE CONTENT, SOIL TYPE PRIOR
TO "CNSTFJCTION. ALL COSTS FOR VERRIFYING EXISTING SOIL CONDITION SHALL BE INCI]ENTAL TO THE
PROJECT.
a
TEMPORARY MARKINGS, BARRICADES, TRAFFIC CONTROL
23. SEE SPECIFICATION SECTION 01030 AND 0151
r�
c>
SAFETY & SECURITY NOTES
1. IH ORDER TO CONSTRUCT THIS PROJECT WITH MIKIMAL INTERFERENCE TO AIRPORT
OPERATIONS, THE CONTRACTOR SHALL CONDUCT HIS CONSTRUCTION OPERATORS AS
SHO''WN ON THE PROJECT LAYOUT AND SAFETY PLAN, AND HIS APPROVED CONSTRUCTION
PROGRESS SCHEDULE THE CONTRACTOR SHALL COORDINATE ALL CONSTRUCTION
ACTIVITIES WITH THE ENGINEER TO MINIMIZE DISRUPTION TO AIRPORT OPERATIONS, IT IS
THE CONTRACTOR'S RESPONSIBILITY TO ENSURE COMPUANCE WITH SAFETY REQUIREVENTS
AND TO MINIMIZE INTERFERENCE TO AIRPORT OPERATORS DURING CONSTRUCTOR,
2, CONTRACTOR SHALL OBTAIN, HAVE KNOWLEDGE OF, AND INCOR'ORATE THE FOLLOWING
SAFETY PROVISIONS INTO THE CONSTRUCTION PROJECT,
OPERATIONAL SAFETY ON AIPPORTS DURING CONSTRUCTION —
AC 15o/537G -2F.
AIRPORT SAFETY SELF — INSPECTION — AC 15G�52C0 -18C.
SAFETY REQUIREMENTS OF THE SPECIFICATIONS
SECURITY REQLIREMENTS OF THE SPECIFICATIOKS,
3, Al VEHICLES USED ON THE AIRFIELD SHALL MEET AIRPORT REQUIREMENTS FOR MARKING
AND LIGHTING,
5. CONSTRLCTI01 ACTIVITIES ARE SCHEDULED TO BE CONDUCTE) IN AREAS WHICH WILL
AFFECT THE AIRPORT OPERATORS AREA (AOA), THEREFORE, THIS PROJECT MUST BE
CONSTRUCTED WITH MINIMAL INTERFERENCE TC AIRCRAFT AN) SERVICE VEHICLE
OPERATIONS, CLOSURES OF THE AOA SHALL BE COMPLETE) IN ACCORDANCE WITH THE
CONSTRUCTION SEQJENCES WITHIN THIS PLAN SET OR AS ORDERED BY THE ENGINEER.
6, SINCE THE AIRPORT USERS SHAD BE WITHIN 'ROXIMITY OF THE PPO,ECT LIMITS
THROUGHOUT THE DURATION OF THIS PROJECT, A COORDINATED EFFORT IN RESPECT TO
SECJRTY, SAFETY, AND CONSTRUCTOR IS ESSENTIAL NUMEROUS CONSIDERATIONS MUST
BE ADDRESSEt) IN THE CONTRACTORS WORK AND SCHEDULE INCLUDING BUT NOT LIMITED
TO THE FOLLOWING,
CONSTRUCTOR SEQUENCE
SECJRITY CHECK POINTS
PROJECT CONSTUCTIOK TRAFFIC
CONTRACTOR'S STAGING AREA
AREAS UTILIZED BY AIRPORT USERS
ADJACENT CONSTRJCTION EY OTHERS
7, CONTRACTOR WILL MAINTAIN SECURITY WITHIN THE PROJECT SITE AT ALL TIMES,
NO JNAUTHORIZED'ERSONNEL SHALL BE ALLOWED ON THE SITE.
8, ALL CONSTRICTION TRAFFIC SHALL ENTER AND EXIT THE PROJECT SITE ONLY THROUGH
CONSTRUCTION ENTRANCE LOCATIONS DESIGNATED BY THE ENGINEER, CONTRACTOP WALL
BE RESPONSIBLE FOR SEC3TY OF DESIGNATE) ENTRANCE GATES AND MUST ENSJRE
THAT THE GATES ARE MARKED AT ALL TIMES WHILE UNLOCKED.
9. CON- RACTOR SHALL 'RUDE FLAGMEN AT ACCESS/HAJL WES ON OR ADJACENT TO
RUIiWAYS OR TAXIWAYS OR AS DIRECTED BY THE ENGINEER TO ENSJRE THAT TRAFFIC S
MAINTAINE) ON THE DESIGNATED ROJTE.
10, AREAS OUTSIDE THE PROJECT LIMITS ARE DESIGNATED AS RESTRICTED AREAS, THE
CONTRACTOR'S FORCES ARE PROHIBITED FROM ENTERING RESTRICTED AREAS AT ANY
TIME, JNLESS SPECIFICALLY AUTHORIZED BY THE ENGINEER OR AIR'ORT MANAGEMENT,
11. CONTRACTOR SHALL OBSCURE Al TAXIWAY EDGE LIGHTS LOCATED ON PORTIONS OF
TAXIWAYS SCHEDULED TO BE CLOSED DURING THE PROJECT. ALL COST FOR OBSCURING
TAXIWAY EDGE LIGHTS IS INCIDENTAL TO PROJECT.
12. CONTRACTOP SHALL REMOVE ALL FOREIGN 0EJECT DEBRIS (FC5) CONTINUOUSLY ON ALL
HAJL ROUTES THAT CROSS AIRCRAFT MOVEMENT AREAS,
13, EACH CONTRACTOR VEHICLE DRIVER WITHIN THE AIRPORT SECJRITY FENCE MUST HAVE
COMPLETED OR BE ESCORTED BY A CONTRACTOR VEHICLE DRIVER THAT HAS COMPLETED
THE AIRPORTS GROJND VEHICLE DRIVER TRAINING PROGRAM.
1 THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PENALTIES ASSOCIATED WITH
CONTRACTOR AND SUBCONTRACTOR FORCES THAT ARE INVOLVED IN A VEHICLE
DEVIATION /RUNWAY INCURSION.
15. Al CONTRACTOR AN) SUBCONTRACTOR EMPLOYEES SHALL ENTER THE AIRPORT WITHIN
CONTRACTOR VEHICLES, CONTRACTOR EMPLOYEE PARKING SHALL NOT BE INSIDE THE
AIRPORT OPERATIONS AREA,
il}
T1
PIEDMONT TRIAD AIRPORT AUTHORITY
PIEDMONT TRIAD
AIRPORT AUTHORITY
GUILFORD COUNTY, NR CAROUNA
www,mboOrcolp.com
MICHAEL BAKER ENGINEERING, INC.
7800 AlToO CkF Drive
Suile 100
Greensboro, NC 27409
336.931,1500 (Office)
336.931.1501 (Fax)
North Carolina License No, E -1084
Oesigrer:
DCT
\ � tltlp000ptltl � //
Techricicr.
tl �tl
DCT 1( , tl7
= SEAL a =
Checked hy: = a 027429 1
0 0
LJA o a
� G � I-p1I � o ti
/��tl000�J�I�G�tlCO \\
Project No: A tl0ctlootl °tl (�\
m
0
a
L
U
J
0
0
z
Project Name:
STORMWATER
OUTFALL
REPAIR
Drawing Name,
GENERAL NOTES
PIEDMONT TRIAD
INTERNATIONAL AIRPORT
Aufccad Drowing Reference;
le, 02 — Gsiero Noles,5wa
Sa c, C.0 03, 2014 —1, 41pm h9 Jvrss
otls9:.�� 21,1715— 'I:Hcm
Date; Drowirg Number:
JAIIUAR'r 2 ('1
Bueinesu Unit: G� -1
(SECTION
4. FOR ADDITIONAL SAFETY AND SECURITY
REQUIREMENTS, SEE SPECIFICATIONS
01 0,30)).
5. CONSTRLCTI01 ACTIVITIES ARE SCHEDULED TO BE CONDUCTE) IN AREAS WHICH WILL
AFFECT THE AIRPORT OPERATORS AREA (AOA), THEREFORE, THIS PROJECT MUST BE
CONSTRUCTED WITH MINIMAL INTERFERENCE TC AIRCRAFT AN) SERVICE VEHICLE
OPERATIONS, CLOSURES OF THE AOA SHALL BE COMPLETE) IN ACCORDANCE WITH THE
CONSTRUCTION SEQJENCES WITHIN THIS PLAN SET OR AS ORDERED BY THE ENGINEER.
6, SINCE THE AIRPORT USERS SHAD BE WITHIN 'ROXIMITY OF THE PPO,ECT LIMITS
THROUGHOUT THE DURATION OF THIS PROJECT, A COORDINATED EFFORT IN RESPECT TO
SECJRTY, SAFETY, AND CONSTRUCTOR IS ESSENTIAL NUMEROUS CONSIDERATIONS MUST
BE ADDRESSEt) IN THE CONTRACTORS WORK AND SCHEDULE INCLUDING BUT NOT LIMITED
TO THE FOLLOWING,
CONSTRUCTOR SEQUENCE
SECJRITY CHECK POINTS
PROJECT CONSTUCTIOK TRAFFIC
CONTRACTOR'S STAGING AREA
AREAS UTILIZED BY AIRPORT USERS
ADJACENT CONSTRJCTION EY OTHERS
7, CONTRACTOR WILL MAINTAIN SECURITY WITHIN THE PROJECT SITE AT ALL TIMES,
NO JNAUTHORIZED'ERSONNEL SHALL BE ALLOWED ON THE SITE.
8, ALL CONSTRICTION TRAFFIC SHALL ENTER AND EXIT THE PROJECT SITE ONLY THROUGH
CONSTRUCTION ENTRANCE LOCATIONS DESIGNATED BY THE ENGINEER, CONTRACTOP WALL
BE RESPONSIBLE FOR SEC3TY OF DESIGNATE) ENTRANCE GATES AND MUST ENSJRE
THAT THE GATES ARE MARKED AT ALL TIMES WHILE UNLOCKED.
9. CON- RACTOR SHALL 'RUDE FLAGMEN AT ACCESS/HAJL WES ON OR ADJACENT TO
RUIiWAYS OR TAXIWAYS OR AS DIRECTED BY THE ENGINEER TO ENSJRE THAT TRAFFIC S
MAINTAINE) ON THE DESIGNATED ROJTE.
10, AREAS OUTSIDE THE PROJECT LIMITS ARE DESIGNATED AS RESTRICTED AREAS, THE
CONTRACTOR'S FORCES ARE PROHIBITED FROM ENTERING RESTRICTED AREAS AT ANY
TIME, JNLESS SPECIFICALLY AUTHORIZED BY THE ENGINEER OR AIR'ORT MANAGEMENT,
11. CONTRACTOR SHALL OBSCURE Al TAXIWAY EDGE LIGHTS LOCATED ON PORTIONS OF
TAXIWAYS SCHEDULED TO BE CLOSED DURING THE PROJECT. ALL COST FOR OBSCURING
TAXIWAY EDGE LIGHTS IS INCIDENTAL TO PROJECT.
12. CONTRACTOP SHALL REMOVE ALL FOREIGN 0EJECT DEBRIS (FC5) CONTINUOUSLY ON ALL
HAJL ROUTES THAT CROSS AIRCRAFT MOVEMENT AREAS,
13, EACH CONTRACTOR VEHICLE DRIVER WITHIN THE AIRPORT SECJRITY FENCE MUST HAVE
COMPLETED OR BE ESCORTED BY A CONTRACTOR VEHICLE DRIVER THAT HAS COMPLETED
THE AIRPORTS GROJND VEHICLE DRIVER TRAINING PROGRAM.
1 THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PENALTIES ASSOCIATED WITH
CONTRACTOR AND SUBCONTRACTOR FORCES THAT ARE INVOLVED IN A VEHICLE
DEVIATION /RUNWAY INCURSION.
15. Al CONTRACTOR AN) SUBCONTRACTOR EMPLOYEES SHALL ENTER THE AIRPORT WITHIN
CONTRACTOR VEHICLES, CONTRACTOR EMPLOYEE PARKING SHALL NOT BE INSIDE THE
AIRPORT OPERATIONS AREA,
il}
T1
PIEDMONT TRIAD AIRPORT AUTHORITY
PIEDMONT TRIAD
AIRPORT AUTHORITY
GUILFORD COUNTY, NR CAROUNA
www,mboOrcolp.com
MICHAEL BAKER ENGINEERING, INC.
7800 AlToO CkF Drive
Suile 100
Greensboro, NC 27409
336.931,1500 (Office)
336.931.1501 (Fax)
North Carolina License No, E -1084
Oesigrer:
DCT
\ � tltlp000ptltl � //
Techricicr.
tl �tl
DCT 1( , tl7
= SEAL a =
Checked hy: = a 027429 1
0 0
LJA o a
� G � I-p1I � o ti
/��tl000�J�I�G�tlCO \\
Project No: A tl0ctlootl °tl (�\
m
0
a
L
U
J
0
0
z
Project Name:
STORMWATER
OUTFALL
REPAIR
Drawing Name,
GENERAL NOTES
PIEDMONT TRIAD
INTERNATIONAL AIRPORT
Aufccad Drowing Reference;
le, 02 — Gsiero Noles,5wa
Sa c, C.0 03, 2014 —1, 41pm h9 Jvrss
otls9:.�� 21,1715— 'I:Hcm
Date; Drowirg Number:
JAIIUAR'r 2 ('1
Bueinesu Unit: G� -1
SUMMARY OF QUANTITIES
ITEM
NO.
SPEC
NO.
DESCRIPTION
QTY.
UNIT
1
01000
Mobilization
1
LS
2
S- 101 -3.1
Construction Staking and Survey
1
LS
3
S- 102 -3.1
Maintenance and Protection of Traffic
1
LS
4
S- 103 -3.1
Site 3 Stream Diversion
1
LS
5
S-140-3.1a
Remove Existing Drainage Structure
2
EA
6
S- 140 -3.1 b
Remove Concrete Pipe
60
LF
7
S- 140 -3.1 c
Remove Existing Concrete Flume
550
SY
8
P- 151 -4.1
Clearing And Grubbing
2
Acre
9
P- 152 -4.1
Compacted Embankment in Place
6,000
CY
10
P- 152 -4.2
Unsuitable Excavation
3,600
CY
11
P- 152 -4.3
Borrow Excavation
1,500
CY
12
P- 152 -4.4
Temporary Diversion Ditch
1,100
CY
13
P- 152 -4.5
Silt Excavation
500
CY
14
D- 701 -5.1a
24 -inch Reinforced Concrete Pipe Class IV
40
LF
15
D- 701 -5.1b
42 -inch Reinforced Concrete Pipe Class IV
12
LF
16
D- 701 -5.1 c
48 -inch Corrugated Steel Pipe
18
LF
17
D- 751 -5.1a
Precast Junction Box (NCDOT Std 840.31)
1
EA
18
D- 751 -5.1b
Precast Manhole 5 -foot Diameter (NCDOT Std 840.52)
1
EA
19
D- 751 -5.1c
Manhole Top Section (NCDOT Std 840.52)
1
EA
20
D- 751 -5.1 d
Manhole Frame and Cover (NCDOT Std 840.54)
2
EA
21
D- 751 -5.1e
Joint Sealing of Manhole and Culverts
200
LF
22
D- 752 -5.1 a
Reinforced Endwalls, 18 -inch
1
EA
23
D- 752 -5.1 b
Reinforced Endwalls, 42 -inch
1
EA
24
D- 752 -5.1 c
Reinforced Endwalls, 48 -inch
1
EA
25
D- 753 -5.1 a
Rip -Rap - Class A
650
Ton
26
D- 753 -5.1 b
Rip -Rap - Class B
550
Ton
27
D- 753 -5.1 c
Rip -Rap - Class 1
2,850
Ton
28
D- 753 -5.1 d
Rip -Rap - Class 11
1,200
Ton
29
D- 753 -5.1 e
Boulder
350
Ton
30
D- 753 -5.1 f
Washed No. 57 Rock
350
Ton
31
D- 753 -5.1 g
Rip Rap Filter Fabric
3,000
SY
32
D- 754 -5.1
Concrete Expressway Gutter (NCDOT Std 846.01)
40
LF
33
E- 891 -5.1
Inlet Protection
3
EA
34
E- 893 -5.2
Temporary Silt Fence
1,500
LF
35
E- 893 -5.3a
Maintain and Remove Existing 4 Foot Orange HDPE Barrier Fencing
80
LF
36
E- 893 -5.3b
4 Foot Orange HDPE Barrier Fencing
160
LF
37
E- 895 -5.1 a
Coir Fiber Matting
1,720
SY
38
E- 895 -5.1 b
Excelsior Fiber Matting
6,785
SY
39
E- 895 -5.2
Wattle
600
LF
40
T- 901 -5.1 a
Temporary Seeding
2
Acre
41
T- 901 -5.1 b
Permanent Seeding
2
Acre
42
T- 901 -5.1c
Permanent Non - Riparian Seeding
0.10
Acre
43
T- 901 -5.1d
Permanent Riparian Seeding
0.12
Acre
44
T- 903 -5.2
Live Stakes
1,900
EA
45
T- 903 -5.3
Vegetated Geolifts
17
SY
46
T- 903 -5.4
Amended Soil Mix
30
CY
47
T- 908 -5.1
Mulching
2
Acre
48
1607 -4.1
Gravel Construction Entrance
4
EA
STREAM &BUFFER IMPACTS
IMPACT SUMMARY
STREAM IMPACT
BUFFER IMPACT
Intermittent
(Liner Feet)
Perennial
(Liner Feet)
Zone 1
(Square Feet)
Zone 2
(Square Feet)
a° e �
Permanent
0
0
0
580
Site 1
Temporary
0
0
1060
1947
Permanent
0
0
496
675
Site 2
Temporary
0
0
441
785
Site 3
Permanent
49
0
2923
211
NP18
Temporary
0
0
820
895
Site 3
Permanent
315
0
13755
798
NP13
Temporary
0
0
5519
10702
Permanent
0
0
0
0
Site 4
Temporary
0
0
0
0
Permanent
0
0
0
0
Site 5
Temporary
0
0
0
0
Permanent
0
0
0
0
Site 6
Temporary
0
0
1 0
0
Permanent
364
0
17174
2264
Total
Temporary
0
0
7840
14329
T1
PIEDMONT TRIAD AIRPORT AUTHORITY
PIEDMONT TRIAD
AIRPORT AUTHORITY
GUILFORD COUNTY, NORTH CAROLINA
a r
www.mbakercorp.com
MICHAEL BAKER ENGINEERING, INC.
7800 Airport Center Drive
Suite 100
Greensboro, NC 27409
336.931.1500 (Office)
336.931.1501 (Fax)
North Carolina License No. F -1084
Designer:
DCT
N° C R��
Technician:
"q- °A
= e�F ESS/0 °
1
DCT
a° e �
- SEAL -_
Checked by:
= 027429 -
LJA
Project No:
CRY J.
138535
10
..
a
0
Z
0
cn
LL
O
a
L
U
W
Q)
0
z
Project Name:
STORMWATER
OUTFALL
REPAIR
Drawing Name:
SUMMARY
OF
QUANTITIES
PIEDMONT TRIAD
INTERNATIONAL AIRPORT
Autocad Drawing Reference
Date:
JANUARY 2015
Business Unit:
GREENSBORO
Drawing Number:
Q -1
WORK SUMMARY
SITE #1:
Reparation of failed drainage pipe system via removing /replacing damaged pipe sections
and manhole structure as shown on plans. Backfilling of washed out terrain and fine
grading for positive drainage shall also be accomplished at this location.
SITE #2:
Improve drainage conditions via of removing and replacing existing concrete flume
system with proposed rip -rap lined channel to line and grades shown on the plans.
SITE #3:
Improve drainage conditions via adding manhole, outfall pipe and outfall protection.
Re- alignment, re- grading and stabilizing existing drainage channel to proposed lines and
grades shown on the plans.
SITE #4:
Reparation of failed drainage outfall via installing proposed drainage structure and new
outfall protection to lines and grades shown on the plans.
RUNWAY 5L -23R
X
X
r
k
S #1
a
0
0
�E
I�
�N
a..
�N
N
oN
o�
a�
o�
3 a
� T
N E
a o
� I
M �
N O
� N
� o
a o
WORK SUMMARY
SITE #5:
Repair existing drainage structure leaks and re -grade and stabilize adjacent taxiway side
slope as shown on the plans.
SITE #6:
Improve drainage conditions via modifying, re- grading and stabilizing existing rip -rap
drainage channel to proposed lines and grades shown on the plans.
I.D.
NORTHING
EASTING
ELEVATION
DESCRIPTION
T.B.M. 1
T.B.M. 2
858651.21
1 861084.95
1721203.65
1 1725020.34
826.32
1 832.06
Center, top of existing sanitary manhole cover
Invert at outfall of existing 3011 cmp
X X X X X
X X J X
S x
T. B. M. ' TED JOHNSON PARKWALY X -__ X
1 -- - X
SITE #2 - �-
000000 /
0
\
00 00 UJ o --
0 PTI DRIVE -
X
0000 00� °000000 000
0 0
000 00 C
\ 0000c
0000 000000
_ _______________________________ _______________________________
TERMINAL o SITE #6
I X X I X I �°
USNGS BENCHMARKS
- ---------
�x
0
SITE #3
1. D.
NORTHING
FASTING
ELEVATION
DESCRIPTION
DE 9347
864199.42
1725510.57
833.9
Survey Disk
DE 9462
859114.43
1718500.41
875.5
Survey Disk
DE 9461
1 855418.13
1718202.25
907.0
Survey Disk
SITE #4
13
0
0
0
__J�
CONTRACTOR
STAGING AREA
400 200 0 200 400 800
GRAPHIC SCALE BAR
cn
Z
0
w
c
0
_Q
•L
U
1n
N
0
O
Z
Project Name:
STORMWATER
OUTFALL
REPAIR
Drawing Name:
PROJECT LAYOUT
AND
SAFETY PLAN
PIEDMONT TRIAD
INTERNATIONAL AIRPORT
4utocad Drawing Reference:
File: 04 — Project Layout & Safety Plan.dwg
Saved: Dec 03, 2014 — 1:50pm by dtorres
Plotted: Jon 27, 2015 — 11: 27am
)ate: Drawing Number:
JANUARY 2015
Business Unit: PL -1
GREENSBORO
T1
PIEDMONT TRIAD AIRPORT AUTHORITY
PIEDMONT TRIAD
AIRPORT AUTHORITY
ol
LEGENDOMFOW
COUNTY, IIVORM CAR=A
X
EXISTING FENCE
STREAM CENTERLINE
—
WETLANDS
www.mbakercorp.com
MICHAEL BAKER ENGINEERING, INC.
7800 Airport Center Drive
PROJECT LIMITS
Suite 100
Greensboro, NC 27409
336.931.1500 (Office)
336.931.1501 (Fax)
STAGING AREA
North Carolina license No. F -1084
Designer:
\1111111111 / ///
DCT
N C A RO��' %,
HAUL /ACCESS ROUTE
Technician:
���`���
��OF ESS /O* °
°C�iL��
DCT
TEMPORARY BENCHMARK
SEAL
_ 027429
Checked by.
LJA
<1 ° FN
° GINE
0 o
PROPOSED WORK AREA
Project No:
,�� �R y ° i ° ;�`��\
138535
'//111,1,1,1111`\
13
0
0
0
__J�
CONTRACTOR
STAGING AREA
400 200 0 200 400 800
GRAPHIC SCALE BAR
cn
Z
0
w
c
0
_Q
•L
U
1n
N
0
O
Z
Project Name:
STORMWATER
OUTFALL
REPAIR
Drawing Name:
PROJECT LAYOUT
AND
SAFETY PLAN
PIEDMONT TRIAD
INTERNATIONAL AIRPORT
4utocad Drawing Reference:
File: 04 — Project Layout & Safety Plan.dwg
Saved: Dec 03, 2014 — 1:50pm by dtorres
Plotted: Jon 27, 2015 — 11: 27am
)ate: Drawing Number:
JANUARY 2015
Business Unit: PL -1
GREENSBORO
3
H
N
E
E
a
�E
of
oN
�o
o a
a�
3 a
E T
N E
Q�
a N
� I
M �
N O
� N
� o
a o
NOTE
T1
1.
CONTRACTOR SHALL LOCATE EXISTING PIPES AND INVERTS IN THE FIELD AND
- - -�
LEGEND
PIEDMONT TRIAD
AIRPORT AUTHORITY
PROVIDE VERIFIED INFORMATION TO ENGINEER PRIOR TO INSTALLING ANY
EXISTING FENCE
CLRFORD COUNTY, NORTH CAROLINA
D
PROPOSED REPAIRS.
cry
P EXISTING POWER LINE
STREAM CENTERLINE
I
EXISTING PIPE
www.mbakercorp.com
MICHAEL BAKER ENGINEERING, INC.
2.
CONTRACTOR SHALL VIDEO THE REMAINING 24" RCP PIPES AND JOINTS, THEN
7800 Airport Center Drive
Suite 100
Greensboro, NC 27409
GRADING /CONSTRUCTION LIMIT
336.931.1500 (Office)
PROVIDE VIDEO TO THE ENGINEER PRIOR TO COMMENCEMENT OF WORK.
336.931.1501 (Fax)
PROPOSED PIPE
North Carolina license No. F -1084
3.
CONTRACTOR SHALL LOCATE AND REMOVE BROKEN PIPE SECTIONS FROM
EXISTING MINOR CONTOUR
�
.�`�� N CAR"
PROPOSED MAJOR CONTOUR
CONSTRUCTION AREA AS DIRECTED BY THE ENGINEER.
ESS /p ° ° °
Technician:
�»
4.
CONTRACTOR SHALL CLEAR THIS AREA OF ALL TREES, BUSHES, ETC. AND REMOVE
DCT
< �7 _
,
SEAL -_
EXISTING KNOLLED TERRAIN AS DIRECTED BY THE ENGINEER. UPON COMPLETION
W
= 0 027429 -
-"
SILT FENCE
OF THE AFOREMENTIONED TASKS, THIS AREA SHALL BE FINISHED GRADED TO
LJA
= °°
to
Y ° �.
PROVIDE POSITIVE DRAINAGE TO ADJACENT INLETS AND /OR AWAY FROM
138535
6
INLET PROTECTION
ROADWAY.
x
5.
LOCATING ALL EXISTING UNDERGROUND UTILITIES WITHIN THE PROJECT WORKy„
AREA SHALL BE THE CONTRACTOR'S RESPONSIBILTY.
6.
EXCELCIOR EROSION CONTROL MATTING SHALL BE PLACED ON ALL DISTURBED
>
SLOPED AREA.
>
U)
7.
ALL DISTURBED AREAS SHALL BE SEEDED AND MULCHED WITH PERMANENT UPON
COMPLETION OF WORK.
Q
D
RETAIN EXISTING PIPES
Q CA
c� J
�w
�v
C1
( In
PROPOSED MANHOLE AND PIPE REPAIRS.
(SEE SHEET GL -1)
C/)
>>'0 ,
PROPOSED BACKFILL AREA
(SEE SHEET GL -1)
D D'.
c�
� �D
l
0.1
X01
a
h
f �
Ut
4
Llul
1
CONSTRUCTION
EC -1 ENTRANCE
EXISTING 24" RCP
(SEE NOTES 1 & 2)
PIPELINE UTILITIES SHALL BE PROTECTED DD D C1\J _
FROM CONSTRUCTION TRAFFIC BY USING
TIMBER MATTING OR OTHER METHOD DDDD
APPROVED BY THE UTILITY COMPANIES. D D ^ X X
X
X
co
X
co
X
X
X
i
JORDAN BUFFER (20' Zone 2)
Permanent Impact = 580 s.f.
X
LIMIT OF CONSTRUCTION
(SEE SHEET GL -1)
SILT FENCE I l2
(TYP) '"EC-1
INLET PROTECTION 3
(TYP) k EC -1
m
TEMPORARY STREAM IMPACT
JORDAN BUFFER (30' ZONE 1)
888M TEMPORARY STREAM IMPACT
JORDAN BUFFER (20' ZONE 2)
P RMANENT STREAM IMPACT
0 00 C? X 0 0 D� ` <" X� JORDAN BUFFER (0 ZONE 1)
on Ors
PERMANENT STREAM IMPACT
JORDAN BUFFER (20' ZONE 2)
TOTAL DISTURBED AREA = 0.25 AC.
.SITE LOCATION 1
01S
D
Cd
cn
z
0
w
c
0
_Q
•L
U
U)
N
0
O
z
Project Name:
STORMWATER
OUTFALL
REPAIR
Drawing Name:
SITE 1
STREAM & BUFFER
IMPACTS PLAN
PIEDMONT TRIAD
INTERNATIONAL AIRPORT
4utocad Drawing Reference:
File: 05a — Stream Impact Plans ST -1 to ST- 8>.dwg
Saved: Dec 03, 2014 — 12:19pm by dtorres
Plotted: Jan 27, 2015 — 11:19am
)ate: Drawing Number:
JANUARY 2015
Business Unit: SB_1
GREENSBORO
T1
PIEDMONT TRIAD AIRPORT AUTHORITY
- - -�
LEGEND
PIEDMONT TRIAD
AIRPORT AUTHORITY
EXISTING FENCE
CLRFORD COUNTY, NORTH CAROLINA
D
GAS EXISTING GAS LINE
P EXISTING POWER LINE
STREAM CENTERLINE
I
EXISTING PIPE
www.mbakercorp.com
MICHAEL BAKER ENGINEERING, INC.
BACKFILL GRADING LIMIT
7800 Airport Center Drive
Suite 100
Greensboro, NC 27409
GRADING /CONSTRUCTION LIMIT
336.931.1500 (Office)
336.931.1501 (Fax)
PROPOSED PIPE
North Carolina license No. F -1084
EXISTING MAJOR CONTOUR
Designer:
EXISTING MINOR CONTOUR
DCT
.�`�� N CAR"
PROPOSED MAJOR CONTOUR
ESS /p ° ° °
Technician:
870
PROPOSED MINOR CONTOUR
DCT
< �7 _
SEAL -_
Checked by.
= 0 027429 -
-"
SILT FENCE
_
LJA
= °°
ORANGE SAFETY FENCE
Y ° �.
Project No:
138535
J
INLET PROTECTION
SILT FENCE I l2
(TYP) '"EC-1
INLET PROTECTION 3
(TYP) k EC -1
m
TEMPORARY STREAM IMPACT
JORDAN BUFFER (30' ZONE 1)
888M TEMPORARY STREAM IMPACT
JORDAN BUFFER (20' ZONE 2)
P RMANENT STREAM IMPACT
0 00 C? X 0 0 D� ` <" X� JORDAN BUFFER (0 ZONE 1)
on Ors
PERMANENT STREAM IMPACT
JORDAN BUFFER (20' ZONE 2)
TOTAL DISTURBED AREA = 0.25 AC.
.SITE LOCATION 1
01S
D
Cd
cn
z
0
w
c
0
_Q
•L
U
U)
N
0
O
z
Project Name:
STORMWATER
OUTFALL
REPAIR
Drawing Name:
SITE 1
STREAM & BUFFER
IMPACTS PLAN
PIEDMONT TRIAD
INTERNATIONAL AIRPORT
4utocad Drawing Reference:
File: 05a — Stream Impact Plans ST -1 to ST- 8>.dwg
Saved: Dec 03, 2014 — 12:19pm by dtorres
Plotted: Jan 27, 2015 — 11:19am
)ate: Drawing Number:
JANUARY 2015
Business Unit: SB_1
GREENSBORO
N
E
E
a
�o
�N
�I
0
oN
�o
o a
a�
3 a
ET
N E
Q�
a N
� I
M �
N O
� N
� o
a o
EXISTING BOX CULVERT
�F
NOTE
1. ALL CLEARING, REMOVAL OF EXISTING CONCRETE
FEATURES AND /OR INSTALLATION OF PROPOSED CHANNEL
SHALL PROGRESS IN AN UPSTREAM MANNER AS INDICATED
ON THE PLAN - BEGINNING WITH CONSTRUCTION OF ZONE 1
AND TERMINATING WITH CONSTRUCTION OF ZONE 3.
2. CONTRACTOR SHALL DEMOLISH THE EXISTING FLUME,
RE -GRADE THE DISTURBED AREA, PLACE NEW RIP -RAP
CHANNEL, AND INSTALL EROSION CONTROL MATTING IN
SEGMENTS OF WORK THAT CAN BE COMPLETED IN ONE
DAY. AT THE END OF EACH WORKDAY, THE NEW RIP -RAP
CHANNEL SHALL BE CONSTRUCTED UP TO THE END OF THE
EXISTING CONCRETE FLUME.
3. CONTRACTOR SHALL SCHEDULE ALL WORK TO BE
PERFORMED DURING DRY WEATHER CONDITIONS AND
COMPLETED BEFORE THE NEXT FORECASTED RAIN EVENT.
WORK ZONES SHOWN ON THE PLAN ARE FOR GENERAL
REFERENCE AND MAY BE ADJUSTED AS NECESSARY WITH
APPROVAL OF THE ENGINEER.
4. GRADED SIDE SLOPES SHALL BE SEEDED, MULCHED AND
STABILIZED USING EXCELCIOR EROSION CONTROL
MATTING.
5. IMPACTS INSIDE THE 50' JORDAN BUFFER = 0.00 s.f., AS THE
WORK IS BEING PERFORMED IS REPLACING AN EXISTING
FACILITY.
6. PIPELINE UTILITIES SHALL BE PROTECTED FROM
CONSTRUCTION TRAFFIC BY USING TIMBER MATTING OR
OTHER METHOD APPROVED BY THE UTILITY COMPANIES.
7. EXCELCIOR EROSION CONTROL MATTING SHALL BE
PLACED ON ALL DISTURBED SLOPE AREAS.
8. ALL DISTURBED AREAS SHALL BE SEEDED AND MULCHED
WITH PERMANENT SEEDING UPON COMPLETION OF WORK.
bh
rz
Yrp
Q"
!I n
S „"v
, J
C'S
POE 14 +46.77
N 858662.3137
E 1721166.8724
JORDAN BUFFER (30' Zone 1)
Permanent Impact = 496 s.f.
o�
P�
�J
y �C�
14+
SS
JORDAN BUFFER (20' Zone 2)
Permanent Impact = 675 s.f.
TOTAL DISTURBED AREA = 0.55 AC.
SITE LOCATIOIIIIIIII4 2
13 +00
PROPOSED RIP RAP CHANNEL
(SEE SHEET GL -2)
12 +00
tis
PT 11 +75.34
N 858469.3753
E 1721357.7778
EXI TING 18" RCP
TAT ` M
r� W
Z
01
�s
Pte' T
Ca �-
7,,,
JORDAN BUFFER (20' Zone 2) %
Temporary Impact = 785 s.f.
of
' LIMIT OF CONSTRUCTION
i
t >_ LIMIT OF PROPOSED GRADING
(SEE SHEET GL -2)
F-
CONSTRUCTION 1
ENTRANCE EC -1
OL
U TIL.
BLO�.,
POB 10 +00.00
N 858398.1585
E 1721516.3884
Y \
`i
SS
PC 11 +31.69, 80' R
or, N 858448.0335
d E 1721395.2365
- - - - - -- S S
PT 10 +94.44
N 858438.9968
E 1721431.3718
— PC 10 +76.53, 80' R
N 858432.7489
E 1721448.1220
� 1
�n
BASELINE - B
SEE SHEET P -2
•
1�
SS
LEGEND
TEMPORARY STREAM IMPACT
JORDAN BUFFER (20' ZONE 2)
0 0 0 PERMANENT STREAM IMPACT
000000 00 TT 0 JORDAN BUFFER (30' ZONE 1)
PERMANENT STREAM IMPACT
JORDAN BUFFER (20' ZONE 2)
,
J
t iM1,,,.sf („ n° i t t To G (: „ O i
IY1
l o �
�J
T1
PIEDMONT TRIAD AIRPORT AUTHORITY
PIEDMONT TRIAD
AIRPORT AUTHORITY
OMFOW COUNTY, IVOR'lli CAR= A
� I
www.mbakercorp.com
MICHAEL BAKER ENGINEERING, INC.
EXISTING FENCE
GAS
EXISTING GAS LINE
SS
EXISTING SANITARY SEWER LINE
North Carolina license No. F -1084
STREAM CENTERLINE
EXISTING PIPE
N° C A
GRADING /CONSTRUCTION LIMIT
: \_ � ESS /o�
EXISTING MAJOR CONTOUR
EXISTING MINOR CONTOUR
870
PROPOSED MAJOR CONTOUR
PROPOSED MINOR CONTOUR
Checked by.
SILT FENCE
J
TEMPORARY STREAM IMPACT
138535
JORDAN BUFFER (30' ZONE 1)
TEMPORARY STREAM IMPACT
JORDAN BUFFER (20' ZONE 2)
0 0 0 PERMANENT STREAM IMPACT
000000 00 TT 0 JORDAN BUFFER (30' ZONE 1)
PERMANENT STREAM IMPACT
JORDAN BUFFER (20' ZONE 2)
,
J
t iM1,,,.sf („ n° i t t To G (: „ O i
IY1
l o �
�J
T1
PIEDMONT TRIAD AIRPORT AUTHORITY
PIEDMONT TRIAD
AIRPORT AUTHORITY
OMFOW COUNTY, IVOR'lli CAR= A
� I
www.mbakercorp.com
MICHAEL BAKER ENGINEERING, INC.
7800 Airport Center Drive
Suite 100
Greensboro, NC 27409
336.931.1500 (Office)
336.931.1501 (Fax)
North Carolina license No. F -1084
Designer:
DCT
N° C A
: \_ � ESS /o�
Technician:
DCT
= SEAL 1 =
= 027429 =
Checked by.
LJA
J
Project No:
138535
0
D
cn
z
0
w
c
0
Q
U
U)
a�
D
0
z
Project Name:
STORMWATER
OUTFALL
REPAIR
Drawing Name:
SITE 2
STREAM & BUFFER
IMPACTS PLAN
PIEDMONT TRIAD
INTERNATIONAL AIRPORT
4utocad Drawing Reference:
File: osa — stveam Impa�e clans sr —, m sr— e).dwg
Saved: Dec 03, 2014 — 72:19pm by dtorres
Plotted: Jan 27, 2075 — 11: 27am
date: Drawing Number:
JANUARY 2015
3usiness Unit: SB-2
GREENSBORO
LEGEND
— — — — — LIMIT OF CONSTRUCTION
EXISTING CONTOUR
835 PROPOSED CONTOUR
0 00 , GRAVEL CONSTR. ENTRANCE
00
SILT FENCE
DIVERSION CHANNEL
DIRE
OF FLOW
STRAW WATTLE
x x X TEMPORARY STREAM IMPACT
X X X X JORDAN BUFFER (30' ZONE 1)
X X X TOTAL IMPACT = 5,519 s.f.
s.f. SUB -AREA MEASUREMENT
TZ1 TEMPORARY STREAM IMPACT
JORDAN BUFFER (30' ZONE 1)
TEMPORARY STREAM IMPACT
JORDAN BUFFER (20' ZONE 2)
TOTAL IMPACT = 10,702 s.f.
s.f. SUB -AREA MEASUREMENT
TZ2 TEMPORARY STREAM IMPACT
JORDAN BUFFER (20' ZONE 2)
PERMANENT STREAM IMPACT
7fofofo� JORDAN BUFFER (30' ZONE 1)
TOTAL IMPACT = 13,755 s.f.
s.f. SUB -AREA MEASUREMENT
PZ1 PERMANENT STREAM IMPACT
JORDAN BUFFER (30' ZONE 1)
PERMANENT STREAM IMPACT
JORDAN BUFFER (20' ZONE 2)
total impact = 798 S.F.
s.f. SUB -AREA MEASUREMENT
PZ2 PERMANENT STREAM IMPACT
JORDAN BUFFER (20' ZONE 2)
BEGIN WORK
STA 10 +51.30
N 861219.0755
E 1724984.3356
�J
1_ X 7_1_
e j
" _
4-
f
PROPOSED LIMIT OF GRADING
(TYP)
PHASE 1 CONSTRUCTION SEQUENCE: T1
1. INSTALL EROSION CONTROL PERIMETER MEASURES AND SILT FENCE PER PLAN. PIEDMONT TRIAD AIRPORT AUTHORITY
2. AREA PREPARATION: PIEDMONT TRIAD
AIRPORT AUTHORITY
a) DRY WORK AREA USING SANDBAG DIKES WITH PLASTIC BARRIER LINERS AT UPSTREAM
AND DOWNSTREAM LOCATIONS AS SHOWN. GUILFORD COUNTY, NORTH CAROLINA
b) PUMP WATER AROUND WORK AREA UNTIL AREA IS DRY ENOUGH FOR CONSTRUCTION.
c) WATER FROM DISTURBED AREA SHALL BE PUMPED THROUGH AN ACCEPTABLE
EROSION CONTROL DEVICE (SILT BAGS, SEDIMENT TRAP, ETC.)
3. CONSTRUCT PROPOSED CHANNEL IMPROVEMENT BETWEEN SANDBAG DIKES 1 AND 2. www'mbakereorp.com
MICHAEL BAKER ENGINEERING, INC.
4. SEED AND MAT NEW SLOPES, EMBANKMENTS, ETC AND STABILIZE AREA. 7800 Airport Center Drive
Suite 100
Greensboro, NC 27409
336.931.1500 (Office)
336.931.1501 (Fax)
North Carolina License No. F -1084
Designer:
DCT
\\\� N C A R 0 " ","
Technician:
.�
° ° °F ESS /0
��
\ moo`
DCT
Quo
— SEAL —_
Checked by:
= 027429 —
LJA
° ° ° F �� o °
NG
Project No:
I NE
' 9R ° ° ° ° ° °° °° ° °��?\;
RY P�
138535
J.
r7nNE 1)
x 10' SILT BAG OR
'ROVED MEASURE
1)_ I
M
BUFFER ZONE 2)
0
0
U)
z
0
Cn
w
D'
C
0
Q
L
U
U)
N
z
Project Name:
STORMWATER
OUTFALL
REPAIR
Drawing Name:
SITE 3
STREAM & BUFFER
IMPACTS PLAN
(PHASE 1)
PIEDMONT TRIAD
INTERNATIONAL AIRPORT
lAutocad Drawing Reference:
Date: Drawing Number:
20 10 0 20 JANUARY 2015
SCALE IN FEET Business Unit: SB-3.1
GREENSBORO
LEGEND
— — — — — LIMIT OF CONSTRUCTION
EXISTING CONTOUR
PHASE 2 CONSTRUCTION SEQUENCE: T1
1. RELOCATE SANDBAG DIKE #1 TO STATION 11 +00 ( + / -). PIEDMONT TRIAD AIRPORT AUTHORITY
2. INSTALL PROPOSED MANHOLE, DRAINAGE PIPE AND ENDWALL PER PLAN. PIEDMONT TRIAD
AIRPORT AUTHORITY
3. TEMPORARILY CLOSE OFF MANHOLE OUTLET VIA INSTALLING AN INFLATABLE
PIPE PLUG OR AN APPROVED MEASURE. GUILFORD COUNTY, NORTH CAROLINA
4. RELOCATE PUMP AND HOSE AS SHOWN OR AS DIRECTED.
835 PROPOSED CONTOUR / 5. PUMP WATER FROM MANHOLE AROUND WORK AREA AS SHOWN. WATER FROM
rl. DISTURBED AREA SHALL BE PUMPED THROUGH AN ACCEPTABLE EROSION
CONTROL DEVICE (SILT BAGS, SEDIMENT TRAP, ETC.)
oo °000 GRAVEL CONSTR. ENTRANCE www.mbakercorp.com
TOTAL DISTURBED AREA = 1.3 Ac. r' 6. BACKFILL AREA BETWEEN MANHOLE AND ENDWALL AS DIRECTED. MICHAEL BAKER ENGINEERING, INC.
7800 Airport Center Drive
SITE LOCATION 3 { ` 7. DRY AREA BETWEEN SANDBAG DIKES 1 & 2 IN PREPARATION FOR PHASE #3. suite NC
SILT FENCE `� _ T 336.93b 1500 (Office)
r� 336.931.1501 (Fax)
\ North Carolina License No. F -1084
DIVERSION CHANNEL
DIRE
OF FLOW
STRAW WATTLE
x X X TEMPORARY STREAM IMPACT
X X X X JORDAN BUFFER (30' ZONE 1)
X X X TOTAL IMPACT = 820 s.f.
s.f. SUB -AREA MEASUREMENT
TZ1 TEMPORARY STREAM IMPACT
JORDAN BUFFER (30' ZONE 1)
TEMPORARY STREAM IMPACT
JORDAN BUFFER (20' ZONE 2)
TOTAL IMPACT = 895 s.f.
s.f. SUB -AREA MEASUREMENT
TZ2 TEMPORARY STREAM IMPACT
JORDAN BUFFER (20' ZONE 2)
PERMANENT STREAM IMPACT
7fofofo� JORDAN BUFFER (30' ZONE 1)
TOTAL IMPACT = 2,923 s.f.
s.f. SUB -AREA MEASUREMENT
PZ1 PERMANENT STREAM IMPACT
JORDAN BUFFER (30' ZONE 1)
ti
PERMANENT STREAM IMPACT
JORDAN BUFFER (20' ZONE 2)
TOTAL IMPACT = 211 S.F.
s.f. SUB -AREA MEASUREMENT
PZ2 PERMANENT STREAM IMPACT
JORDAN BUFFER (20' ZONE 2)
�v
r '�J
BEGIN WORK
STA 10 +51.0
N 8612195 -
E 1724984.3356 '
r / /
I
TZ1 820 s.f.
r7nNE 1)
2)
Designer:
DCT
.�\\\�\A CARS/
�� ° ° °F ESS /0
Technician:
\ moo`
DCT
Quo
— SEAL —_
= 027429 —
Checked by:
LJA
° ° ° F �� o °
NC I NE
'' 9R ° ° ° ° ° °° ° ° ° °��?\;
R Y
Project No:
138535
J.
0
0
U)
z
0
Cn
w
D'
C
0
Q
L
U
U)
N
Z
Project Name:
STORMWATER
OUTFALL
REPAIR
Drawing Name:
SITE 3
STREAM & BUFFER
IMPACTS PLAN
(PHASE 2)
PIEDMONT TRIAD
INTERNATIONAL AIRPORT
lAutocad Drawing Reference:
Date: Drawing Number:
20 10 0 20 JANUARY 2015
SCALE IN FEET Business Unit: SB-3.2
GREENSBORO
LEGEND
— — — — — LIMIT OF CONSTRUCTION
EXISTING CONTOUR
835 PROPOSED CONTOUR
0 00 GRAVEL CONSTR. ENTRANCE
00
SILT FENCE
DIVERSION CHANNEL
DIRE
OF FLOW
STRAW WATTLE
1
r '�J
BEGIN WORD
STA 10+51/.30
N 8612195
E 1724984.3356 /
.- .- ._._._ .._.__ e l i
ire
PHASE 3 CONSTRUCTION SEQUENCE: T1
1. REMOVE SANDBAG DIKES AS DIRECTED BY THE ENGINEER. PIEDMONT TRIAD AIRPORT AUTHORITY
2. COMPLETE CONSTRUCTION OF OUTFALL APRON AND CHANNEL PER PLAN. PIEDMONT TRIAD
AIRPORT AUTHORITY
3. SEED AND MAT NEW SLOPES, EMBANKMENTS, ETC. AND STABILZE AREA.
GUILFORD COUNTY, NORTH CAROLINA
4. STRAW WATTLES SHALL REMAIN IN PLACE UNTIL HERBACEOUS VEGETATION
BECOMES ESTABLISHED.
5. REMOVE PUMP AND HOSE DEVICES AS DIRECTED BY THE ENGINEER.
6. REMOVE AND /OR RETAIN EXISTING EROSION CONTROL MEASURES (I.E. SILT
FENCE, DIVERSION DITCHES, ETC) ADJACENT TO FINISHED CONSTRUCTION www.mbakereorp.com
AS DIRECTED BY THE ENGINEER. MICHAEL BAKER ENGINEERING, INC.
7800 Airport Center Drive
Suite 100
7. CONTRACTOR SHALL RESTORE ALL TEMPORARY AREAS TO PRE - CONSTRUCTION Greensboro, NC 27409
CONDITIONS PRIOR TO COMPLETION OF THE PROJECT. 336.931.1500 (office)
336.931.1501 (Fax)
North Carolina License No. F -1084
r7nNE 1)
2)
Designer:
DCT
\\\� N C A R 0 " ","
Technician:
.�
° ° °F ESS /0
��
\ moo`
DCT
Quo
— SEAL —_
Checked by:
= 027429 —
LJA
° ° ° F �� o °
NG
Project No:
I NE
' 9R ° ° ° ° ° °° °° ° °��?\;
RY P�
138535
J.
U)
z
0
Cn
w
D'
C
0
Q
L
U
U)
N
Z
Project Name:
STORMWATER
OUTFALL
REPAIR
Drawing Name:
SITE 3
STREAM & BUFFER
IMPACTS PLAN
(PHASE 3)
PIEDMONT TRIAD
INTERNATIONAL AIRPORT
lAutocad Drawing Reference:
Date: Drawing Number:
20 10 0 20 JANUARY 2015
SCALE IN FEET Business Unit: SB-3.3
GREENSBORO
tY
5
3
H
N
O
7
E
E
a
i E
�N
of
oN
�o
o a
a�
3 a
E T
N E
a
a N
� I
M �
N O
� N
� o
t
IN
%'
'J1a� a{ 4
WETLAND P
PROPOSED
DRAINAGE AND OUTFALL CONSTRUCTION
(SEE SHEET GL -4)
1
cni i 5 0
1
j
N
SERVATION A
CONSTRUCTION SHALL NOT
INTRUDE WETLAND PRESERVATION AREA
(TYP)
87 L.F. OF EXISTING STREAM TO BE
IMPACTED DURING CONSTRUCTION
1 -
T SILT FENCE 2
(TYP) EC -1
is
J \
�
PROPOSED LIMIT OF GRADING
(SEE SHEET GL -4)
8 EXISTING RISER DO NOT DISTURB
SEE NOTE 1
NOTE
1. CONTRACTOR SHALL LOWER THE WATER LEVEL WITHIN
THE EXISTING POND TO 2FT BELOW THE TOP OF THE RISER
ELEVATION. ALL WORK IN THIS AREA SHALL BE
PERFORMED UNDER DRY CONDITIONS.
2. GRADED SIDE SLOPES SHALL BE SEEDED, MULCHED AND
STABILIZED USING EXCELCIOR EROSION CONTROL
MATTING.
3. EXCELCIOR EROSION CONTROL MATTING SHALL BE
PLACED ON ALL DISTURBED SLOPE AREAS.
4. ALL DISTURBED AREAS SHALL BE SEEDED AND MULCHED
WITH PERMANENT SEEDING UPON COMPLETION OF WORK.
TOTAL DISTURBED AREA = 0.25 AC.
SITE LOCATION 4
1 1 1 1 1 •1
LEGEND
870
11 ��
i
qP
STREAM CENTERLINE
EXISTING PIPE
GRADING /CONSTRUCTION LIMIT
EXISTING MINOR CONTOUR
EXISTING MAJOR CONTOUR
PROPOSED MAJOR CONTOUR
PROPOSED MINOR CONTOUR
SILT FENCE
ORANGE SAFETY FENCE
PROPOSED RIP RAP CHANNEL
PROPOSED CONCRETE CURB
`C TURF MATTING (TYPE C 125)
W " it
itii�r► l l► :.•IMF
www.mbakercorp.com
MICHAEL BAKER ENGINEERING, INC.
7800 Airport Center Drive
Suite 100
Greensboro, NC 27409
336.931.1500 (Office)
336.931.1501 (Fax)
North Carolina license No. F -1084
Designer:
DCT
�.�� N° CA R0'' %,
Technician:
:_ ' ESS /O�
.
DCT
– SEAL =
Checked by.
= 027429 =
LJA
Project No:
\r. ° J
138535
/1I1II
..
a)
41
0
0
V)
I
O
w
n,
c
0
_Q
•L
U
U)
a)
0
Z
Project Name:
STORMWATER
OUTFALL
REPAIR
Drawing Name:
SITE 4
STREAM & BUFFER
IMPACTS PLAN
PIEDMONT TRIAD
INTERNATIONAL AIRPORT
Autocad Drawing Reference:
File: 05. — Stream Impact Plans ST -1 to ST- 6).dwg
Saved: Dec 03, 2014 — 12:19pm by dtorres
Plotted: Jan 27, 2015 — 11:22am
Date: Drawing Number:
JANUARY 2015
isiness Unit: SB_4
GREENSBORO
NOTE
1. CONTRACTOR SHALL LOCATE EXISTING PIPES AND INVERTS IN THE FIELD AND
PROVIDE VERIFIED INFORMATION TO ENGINEER PRIOR TO INSTALLING ANY
PROPOSED REPAIRS.
2. CONTRACTOR SHALL VIDEO THE REMAINING 24" RCP PIPES AND JOINTS, THEN
PROVIDE VIDEO TO THE ENGINEER PRIOR TO COMMENCEMENT OF WORK.
3. CONTRACTOR SHALL LOCATE AND REMOVE BROKEN PIPE SECTIONS FROM
CONSTRUCTION AREA AS DIRECTED BY THE ENGINEER.
4. CONTRACTOR SHALL CLEAR THIS AREA OF ALL TREES, BUSHES, ETC. AND REMOVE
EXISTING KNOLLED TERRAIN AS DIRECTED BY THE ENGINEER. UPON COMPLETION
OF THE AFOREMENTIONED TASKS, THIS AREA SHALL BE FINISHED GRADED TO
PROVIDE POSITIVE DRAINAGE TO ADJACENT INLETS AND /OR AWAY FROM
ROADWAY.
5. LOCATING ALL EXISTING UNDERGROUND UTILITIES WITHIN THE PROJECT WORK
AREA SHALL BE THE CONTRACTOR'S RESPONSIBILTY.
6. EXCELCIOR EROSION CONTROL MATTING SHALL BE PLACED ON ALL DISTURBED
SLOPED AREA.
7. ALL DISTURBED AREAS SHALL BE SEEDED AND MULCHED WITH PERMANENT UPON
COMPLETION OF WORK.
2f
Q
Z
1=
W
d
0
E
0 E
I�
a
L
� N
2 O
0
O �
a�
3 �
E
N E
Q o
� I
M U
N
. O
M N
/ r
H N
a o
3>
cry
ku�RR`t
t b,A
i
4i „>_
� m a'
A
e
a
PIPELINE UTILITIES SHALL BE PROTECTED
FROM CONSTRUCTION TRAFFIC BY USING
TIMBER MATTING OR OTHER METHOD
CIi
Q
° 0
Q Cl)
c�
z
F=
cry
X
w
Cn
c�
APPROVED BY THE UTILITY COMPANIES. 0
U)
DO NOT DISTURB EXISTING GAS LINE.
tt r
�Z„'.,
0
N
Q� J
470f
0
4
r4
RETAIN
EXISTING PIPE
txt
\ Q.
00
RETAIN EXISTING PIPE
�v
LOCATION TO BE VERIFIED IN THE FIELD. 4A
CONSTRUCTION
�—i ENTRANCE
PIPELINE UTILITIES SHALL BE PROTECTED
FROM CONSTRUCTION TRAFFIC BY USING
TIMBER MATTING OR OTHER METHOD
APPROVED BY THE UTILITY COMPANIES.
U
rn___j
W
E—
W
J
co
IX
W
V
:r -mmmm
I EXISTING 24" RCP
(SEE NOTES 1 & 2)
0
c� J
r k
i
I\
STORAGE EXCAV "A"
D.A. =0.40 Ac., 10 YR Q =1.37 ds
DISTURBED AREA =0.25 Ac.
REQ'D STORAGE VOLUME =900 CF
DESIGN STORAGE VOLUME= 1300.76 CF
REQ'D SURFACE AREA =595.9 SF
DESIGN SURFACE AREA =874 SF
DIMENSIONS =30' L x 15'W x 2'D
1 +79.85, EXISTING MANHOLE
REMOVE AND REPLACE EXISTING TOP SECTION.
INTAKE INVERT TO BE SET IN THE FIELD.
PROPOSED 24" RCP, APPROXIMATELY 35 LF
TIE TO PROPOSED MANHOLE TOP SECTION.
(SEE NOTE 3)
CONNECT PROPOSED 24" RCP TO
EXISTING PIPE WITH CONCRETE COLLAR
,t.
LIMIT OF BACKFILL GRADING.
SLOPES SHALL BE 3:1 MAX.
GRADE AS DIRECTED BY THE
ENGINEER.
LIMIT OF
CONSTRUCTION
N
� TYP
SILT FENCE , %2
(TYP) ' EC -1
MAINTAIN 3 FEET COVER
OVER EXISTING GAS MAIN
INLET PROTECTION 3
(TYP) k EC -1
m
LEGEND
EXISTING FENCE
GAS EXISTING GAS LINE
P EXISTING POWER LINE
STREAM CENTERLINE
EXISTING PIPE
BACKFILL GRADING LIMIT
GRADING /CONSTRUCTION LIMIT
PROPOSED PIPE
EXISTING MAJOR CONTOUR
EXISTING MINOR CONTOUR
870 PROPOSED MAJOR CONTOUR
PROPOSED MINOR CONTOUR
SILT FENCE
ORANGE SAFETY FENCE
INLET PROTECTION
20 10 0 20 40 60
GRAPHIC SCALE BAR
TOTAL DISTURBED AREA = 0.25 AC.
1�TE LOCATION 1
�r� 1
DO NOT DISTURB EXISTING U.G. POWER.
LOCATION TO BE VERIFIED IN THE FIELD.
T
T1
PIEDMONT TRIAD AIRPORT AUTHORITY
PIEDMONT TRIAD
AIRPORT AUTHORITY
G EX-OW COUNTY, NORTH CMMM
� I
www.mbakercorp.com
MICHAEL BAKER ENGINEERING, INC.
7800 Airport Center Drive
Suite 100
Greensboro, NC 27409
336.931.1500 (Office)
336.931.1501 (Fax)
North Carolina license No. F -1084
Designer:
DCT �.�� \A CAR o'� %,
Technician: :_ ��OF ESS /O�
DCT = Q < ��
SEAL =_
Checked by — 027429 —
LJA
Project No: \r. ° J
138535
cn
z
0
w
c
0
_Q
•L
U
U)
N
0
O
z
Project Name:
STORMWATER
OUTFALL
REPAIR
Drawing Name:
GEOMETRIC LAYOUT
GRADING PLAN
PIEDMONT TRIAD
INTERNATIONAL AIRPORT
4utocad Drawing Reference:
File: 05 — Geometric Layout & Grading Plan (GL -1 to GL- 6).dwg
Saved: Jan 27, 2015 — 11:33a1 by dtorraa
Plotted: Jan 27, 2015 — 11:58am
)ate: Drawing Number:
JANUARY 2015
Business Unit: GL -1
GREENSBORO
d
0
0
E
e
E
Im
O
L
� N
2 O
oa
a�
3 �
E
N E
Q o
� I
M U
N
� O
M N
/ r
H N
a o
5' MIN.
/TVn\
SECTION A -A
NOT TO SCALE
�S
NOTE
1. ALL CLEARING, REMOVAL OF EXISTING CONCRETE
FEATURES AND /OR INSTALLATION OF PROPOSED CHANNEL
SHALL PROGRESS IN AN UPSTREAM MANNER AS INDICATED
ON THE PLAN - BEGINNING WITH CONSTRUCTION OF ZONE 1
AND TERMINATING WITH CONSTRUCTION OF ZONE 3.
2. CONTRACTOR SHALL DEMOLISH THE EXISTING FLUME,
RE -GRADE THE DISTURBED AREA, PLACE NEW RIP -RAP
CHANNEL, AND INSTALL EROSION CONTROL MATTING IN
SEGMENTS OF WORK THAT CAN BE COMPLETED IN ONE
DAY. AT THE END OF EACH WORKDAY, THE NEW RIP -RAP
CHANNEL SHALL BE CONSTRUCTED UP TO THE END OF THE
EXISTING CONCRETE FLUME.
3. CONTRACTOR SHALL SCHEDULE ALL WORK TO BE
PERFORMED DURING DRY WEATHER CONDITIONS AND
COMPLETED BEFORE THE NEXT FORECASTED RAIN EVENT.
WORK ZONES SHOWN ON THE PLAN ARE FOR GENERAL
REFERENCE AND MAY BE ADJUSTED AS NECESSARY WITH
APPROVAL OF THE ENGINEER.
4. GRADED SIDE SLOPES SHALL BE SEEDED, MULCHED AND
STABILIZED USING EXCELCIOR EROSION CONTROL
MATTING.
5. IMPACTS INSIDE THE 50' JORDAN BUFFER = 0.00 s.f., AS THE
WORK IS BEING PERFORMED IS REPLACING AN EXISTING
FACILITY.
6. PIPELINE UTILITIES SHALL BE PROTECTED FROM
CONSTRUCTION TRAFFIC BY USING TIMBER MATTING OR
OTHER METHOD APPROVED BY THE UTILITY COMPANIES.
7. EXCELCIOR EROSION CONTROL MATTING SHALL BE
PLACED ON ALL DISTURBED SLOPE AREAS.
8. ALL DISTURBED AREAS SHALL BE SEEDED AND MULCHED
WITH PERMANENT SEEDING UPON COMPLETION OF WORK.
L VER T
�O
JP
�Q0
S
C S
J
POE 14 +46.77
N 858662.3137
E 1721166.8724
SEE NOTE 3
J
14±
DO NOT DISTURB f � ",
EXISTING SANITARY O LIMIT OF CONSTRUCTION -
SEWER LINES (TYP) Oo ,'
_ r
cn
INSTALL CHECK
p F, n.da
�-2DAM AT BUFFER = LIMIT OF GRADING ,f
aT SS, 6 HT = 18 ") �} 0, f
S�
CD�
13 +08
13 +00
f o
TOTAL DISTURBED AREA = 0.55 AC. — PROPOSED RIP RAP
LINED CHANNEL
SITE LOCATIO 2 o
.x
A
CONSTRUCTION 1 O
ENTRANCE EC -1
O '
s
N
REMOVE EXISTING CONCRETE FLUME (TYP)
a.r
frzh� SEE NOTE 2 OQ
O - a O SEE NOTE 6 <,
�
a a
00 ° _
12 +00 UT/ .
FS ,
OO BL D` -- -- S S - -- - -- c S - - - --
=
11+83
F O
"
�a — �C
PT 11 +75.34
I'd N 858469.3753
E 1721357.7778
PC 11 +31.69, 80' R
O r N 858448.0335
EXI TING 1 B" RCP �� E 1721395.2365
oO 0,r
REMOVE CONCRETE FLUME O PT 10 +94.44 CD
N 858438.9968 (�
REMOVE 18" RCP AS DIRECTED AND E 1721431.3718
INSTALL NCDOT STD 838.01 ENDWALL
INSTALL RIP -RAP SWALE TO NEW CHANNEL
PC 10 +76.53, 80' R
a � - N 858432.7489
rr r,1 k E 1721448.1220
S
10 +50
J>
BASELINE - B
rl� SEE PROFILE SHEET P -2
zz
REMOVE CONRETE
FLUME AND INSTALL
RIP -RAP SWALE TO
NEW CHANNEL ,' 7 °'
y:
POB 10 +00.00
N 858398.1585
E 1721516.3884
SS
30 15 0 30 60 90
GRAPHIC SCALE BAR
LEGEND
r % I Y% ` r
r.
1�
L
T1
PIEDMONT TRIAD AIRPORT AUTHORITY
PIEDMONT TRIAD
AIRPORT AUTHORITY
GLEX-OW COUNTY, NORTH CAROL M
AM
www.mbakercorp.com
MICHAEL BAKER ENGINEERING, INC.
EXISTING FENCE
GAS
EXISTING GAS LINE
SS
EXISTING SANITARY SEWER LINE
North Carolina license No. F -1084
STREAM CENTERLINE
\ \\ \1111111 / / ///
EXISTING PIPE
\
\A C A R�'' %,
GRADING /CONSTRUCTION LIMIT
:��
EXISTING MAJOR CONTOUR
EXISTING MINOR CONTOUR
870
PROPOSED MAJOR CONTOUR
PROPOSED MINOR CONTOUR
Checked by.
SILT FENCE
O O O
PROPOSED RIP RAP CHANNEL
r % I Y% ` r
r.
1�
L
T1
PIEDMONT TRIAD AIRPORT AUTHORITY
PIEDMONT TRIAD
AIRPORT AUTHORITY
GLEX-OW COUNTY, NORTH CAROL M
AM
www.mbakercorp.com
MICHAEL BAKER ENGINEERING, INC.
7800 Airport Center Drive
Suite 100
Greensboro, NC 27409
336.931.1500 (Office)
336.931.1501 (Fax)
North Carolina license No. F -1084
Designer:
\ \\ \1111111 / / ///
DCT
\
\A C A R�'' %,
�.��
: \_ � ESS /0�
Technician:
DCT
- SEAL -
= 027429 =
Checked by.
LJA
J
Project No:
138535
cn
z
0
w
0
Q
U
0
6
z
Project Name:
STORMWATER
OUTFALL
REPAIR
Drawing Name:
GEOMETRIC LAYOUT
GRADING PLAN
PIEDMONT TRIAD
INTERNATIONAL AIRPORT
4utocad Drawing Reference:
File: 05 — Geometric Layout & Grading Plan (GL -1 to GL- 6).dwg
Saved: Jan 27, 2015 — 11: 33am by dtorraa
Plotted: Jan 27, 2015 — 11:59am
)ate: Drawing Number:
JANUARY 2015
Business Unit: GL-2
GREENSBORO
SEED AND MULCH s? /
EXISTING GRAVEL ROAD
UPON COMPLETION OF WORK ` J / S1
BEGIN WORK - STA 10 +51.30
INSTALL PRECAST MANHOLE (5' DIA.) PROPOSED STREAM CONSTRUQf ION
NCDOT STD 840.52 (SEE NOTE 1)
N 861219.0755
E 1724984.3356
24" INV IN: 827.3 ( + / -) LIMIT
48" INV OUT: 818.28
j ROCK CROSS VANE (TYP)
(SEE NOTE 4) GEOLIFT (TYP)
® ®� (SEE NOTE4)
r_
I
0 ^\\
- - - -- r. X c.. , ...
--
- k
L f r 4 y BASELINE "C"
v,,ufz'c,c �fFur'
,� cxti ji�YJr� :.:::. >�-.�i`- �Y-," ✓"- ,-� -. t Jf
�,^ r
48" CMP 18 L.F.
s._
PRECAST CONCRETE ENDWALL
NCDOT STD 838.80 ° o C 1 f q\ '
OUTFALL PROTECTION C3
GL -3A 16'W x 31'L (15" DEPTH) J -HOOK VANE
CLASS 1 RIP -RAP (29 TONS) Z' (SEE NOTE 4)
FILTER FABRIC (50 S.Y.) STA 11 +06 _ ®_ ®_ ®_ d
__�® _ _
l END CLASS 1
RIP -RAP APRON
\ RIFFLE 2
4r /
1 (77) GL -3A
-- TOP OF TERRACE
Exist. Ground /" °° °®� . Exist. Ground (SEE NOTE 3)
(TYP) (TYP)
10' MIN. 11.8' 10' MIN.
FILTER FABRIC
CLASS 1 PROPOSED GRADE
RIP -RAP BANKFULL ELEV.
1Y2:1 MAX. (TYP) (SEE PROFILE)
5 PROPOSED GRADE
MAX. � ,i` <�� } �� �� �� � 15..
NOTE: 2:1 MAX. (TYP)
SEE SHEETS CD1 THRU CD2 FOR
16' STREAM CONSTRUCTION DETAILS 7 7
OUTFALL RIFFLE CROSS SECTION
1 PROTECTION 2 STA 11 +06 - 13 +37.62
GL -3A NOT TO SCALE GL -3A NOT TO SCALE
a/
835
: •
825
: •
Exist. Ground
(TYP)
5' MIN.
BANKFULL ELEV.
(SEE PROFILE)
5� OR
1
.r)c,AN g_UF FER (ZON___-----
15'
3' /<
TOP OF TERRACE
(SEE NOTE 3)
5' MIN.
"- PROPOSED GRADE
NOTE: 2:1 MAX. (TYP)
SEE SHEETS CD1 THRU CD2 FOR
STREAM CONSTRUCTION DETAILS 3'
POOL CROSS SECTION
3 STA 11 +06 - 13 +37.62
NOT TO SCALE
$ e
11+00
12 +00
BASELINE'C' PROFILE
13 +00
ME
835
: •
825
WIN
: •
1
CURVE DATA
I.D.
Station
Northing
Easting
Arc
PC 10 +91.52
861259.1344
1724980.684
R = 18'
C�
PI 10 +95.86
861263.4541
1724980.29
L = 8.51'
PT 11 +00.04
861267.1204
1724977.972
T = 4.34'
Technician:
PC 11 +08.12
861273.9507
1724973.653
R = 100'
C2
PI 11 +29.32
861291.8691
1724962.323
L = 41.78'
LJA
PT 11 +49.90
861312.8436
1724959.238
T = 21.2'
' ///��y J,
11IIII101 \\
PC 11 +80.09
861342.71
1724954.845
R - 25'
C3
PI 11 +92.38
861354.869
1724953.056
L = 22.84'
PT 12 +02.93
861360.8789
1724942.336
T = 12.29'
PC 12 +09,49
861364.0885
1724936,611
R = 25'
C4
PI 12 +18.22
861368.3571
1724928.997
L = 16.8'
PT 12 +26.29
861376.4375
1724925.695
T = 8.73'
PC 12 +41.52
861390.5365
1724919.933
R - 25'
C5
PI 12 +46.28
861394.9423
1724918.132
L = 9.41'
PT 12 +50.93
861398.3783
1724914.838
T = 4.76'
PC 12 +61,12
861405.7346
1724907,787
R - 50'
C6
PI 12 +69.13
861411.5169
1724902.244
L = 15.88'
PT 12 +77.00
861418.7414
1724898.785
T = 8.01'
PC 13 +17.55
861455.3111
1724881.276
R = 50'
C7
O
PI 13 +27.72
861464.4887
1724876.882
L = 20.08'
PT 13 +37.62
861474.6537
1724876.424
T = 10.18
83
20 10 0 20
SCALE IN FEET
NOTES:
1. LAYOUT AN GRADING INFORMATION SHOWN ARE FOR GENERAL
REFERENCE ONLY. FINAL CONSTRUCTION LINES AND GRADES MAY
VARY DUE TO FIELD CONDITIONS AND WILL BE AS DIRECTED BY
THE ENGINEER IN THE FIELD.
2. EXISTING TREES THAT ARE ADJACENT TO PROPOSED WORK AREA
SHALL ONLY BE REMOVED IF NECESSARY FOR THE PURPOSE OF
MEETING GRADING REQUIREMENTS. ALL TREE REMOVALS WILL BE
AS APPROVED BY THE ENGINEER.
3. STREAM BANKS AND TERRACE SLOPES SHALL BE LIVE STAKED AND /OR
MATTED USING TURF ENFORCEMENT BLANKKETS (TYPE C -125) FROM
NORTH AMERICAN GREEN OR APPROVED EQUIVALENT.
4. SEE SHEETS CD -1 THRU CD -2 FOR STREAM CONSTRUCTION DETAILS.
5. ALL DISTURBED AREAS SHALL BE SEEDED AND MULCHED WITH
PERMANENT SEEDING UPON COMPLETION OF WORK.
PIEDMONT TRIAD AIRPORT AUTHORI',TY
PIEDMONT TRIAD
AIRPORT AUTHORITY
GUILFORD COUNTY, NORTH CAROLINA
T
M
N
Cn
z
0
Cn
w
c
0
Q
U
U)
Q)
0
0
z
Project Name:
STORMWATER
OUTFALL
REPAIR
Drawing Name:
PIEDMONT TRIAD
INTERNATIONAL AIRPORT
Autocad Drawing Reference:
ate: Drawing Number:
JANUARY 2015 GL-3A
usiness Unit:
GREENSBORO
www'mbakercorp.com
MICHAEL BAKER ENGINEERING, INC.
7800
Airport Center Drive
Suite 100
Greensboro, NC 27409
336.931.1500 (Office)
336.931.1501 (Fax)
North Carolina License No. F -1084
Designer:
II
`CIII
DCT
, ``\
Technician:
°
ESS /0 �
_ ,F '4G
DCT
SEAL =_
Checked by:
= 027429 -
LJA
NGINE° °
Project No:
...........
' 9j�
R P�
138535
' ///��y J,
11IIII101 \\
T
M
N
Cn
z
0
Cn
w
c
0
Q
U
U)
Q)
0
0
z
Project Name:
STORMWATER
OUTFALL
REPAIR
Drawing Name:
PIEDMONT TRIAD
INTERNATIONAL AIRPORT
Autocad Drawing Reference:
ate: Drawing Number:
JANUARY 2015 GL-3A
usiness Unit:
GREENSBORO
PHASE 1 CONSTRUCTION SEQUENCE: z "t f
LEGEND 4 P T
1. INSTALL EROSION CONTROL PERIMETER MEASURES AND SILT FENCE PER PLAN. PIEDMONT TRIAD AIRPORT AUTHORITY
— — — — — LIMIT OF CONSTRUCTION `� " 2. AREA PREPARATION: PIEDMONT TRIAD
a) DRY WORK AREA USING SANDBAG DIKES WITH PLASTIC BARRIER LINERS AT UPSTREAM AIRPORT AUTHORITY
YqO AND DOWNSTREAM LOCATIONS AS SHOWN. GUILFORD COUNTY, NORTH CAROLINA
EXISTING CONTOUR /
r
b) PUMP WATER AROUND WORK AREA UNTIL AREA IS DRY ENOUGH FOR CONSTRUCTION.
835 PROPOSED CONTOUR
c) WATER FROM DISTURBED AREA SHALL BE PUMPED THROUGH AN ACCEPTABLE
rl. EROSION CONTROL DEVICE (SILT BAGS, SEDIMENT TRAP, ETC.)
°00 GRAVEL CONSTR. ENTRANCE ? 3. CONSTRUCT PROPOSED CHANNEL IMPROVEMENT BETWEEN SANDBAG DIKES 1 AND 2.
O o r www.mbakercorp.com
00 TOTAL DISTURBED AREA = 1.3 AC. r' MICHAEL BAKER ENGINEERING, INC.
4. SEED AND MAT NEW SLOPES, EMBANKMENTS, ETC AND STABILIZE AREA. 7800 Airport Center Drive
SITE LOCATION 3 Suite 100
SILT FENCE ♦ � _ _ % �, � 336.931.1500 (Office)
T ,, Greensboro, NC 27409
r
336.931.1501 (Fax)
r / North Carolina License No. F -1084
DIVERSION CHANNEL Designer:
DIRECTION DCT ` N° CAR'/'/,
OF FLOW Q�� F ESS /� OCR
O y
Technician: ,° 0 °
r
00 OO DCT e < a
STRAW WATTLE _ O O°�o 00 `� checked b SEAL
O x = e 027429 e =
1J 00 °
Oo 0( o Oo -;r> LJA ° FtiCiNE�� °
00 CHECK DAM O o7= r' Ry P�
OOOO O 000 Project No: ' 9R ° ° ° ° ° ° ° ° °
O) r `. 138535
1
r '�J
BEGIN WORK
STA 10 +51.30
N 861219.0755
E 1724984.3356
O �
— /P e
� 11 `f
I � -1
PROPOSED LIMIT OF GRADING :f�
(TYP)
r7nNE 1)
D MEASURE
=ER (_ZONE._ 1)
M
2)
Q)
0
0
U)
z
0
Cn
w
ry
C
O
Q
L
U
U)
N
Z
Project Name:
STORMWATER
OUTFALL
REPAIR
Drawing Name:
PHASE 1
CONSTRUCTION
PLAN
PIEDMONT TRIAD
INTERNATIONAL AIRPORT
Autocad Drawing Reference:
Date: Drawing Number:
20 10 0 20 JANUARY 2015
SCALE IN FEET Business Unit: GL -3B
GREENSBORO
LEGEND
— — — — — LIMIT OF CONSTRUCTION
EXISTING CONTOUR
PHASE 2 CONSTRUCTION SEQUENCE: T1
1. RELOCATE SANDBAG DIKE #1 TO STATION 11 +00 ( + / -). PIEDMONT TRIAD AIRPORT AUTHORITY
2. INSTALL PROPOSED MANHOLE, DRAINAGE PIPE AND ENDWALL PER PLAN. PIEDMONT TRIAD
AIRPORT AUTHORITY
3. TEMPORARILY CLOSE OFF MANHOLE OUTLET VIA INSTALLING AN INFLATABLE
PIPE PLUG OR AN APPROVED MEASURE. GUILFORD COUNTY, NORTH CAROLINA
4. RELOCATE PUMP AND HOSE AS SHOWN OR AS DIRECTED.
835 PROPOSED CONTOUR D 5. PUMP WATER FROM MANHOLE AROUND WORK AREA AS SHOWN. WATER FROM
rl. DISTURBED AREA SHALL BE PUMPED THROUGH AN ACCEPTABLE EROSION
CONTROL DEVICE (SILT BAGS, SEDIMENT TRAP, ETC.)
000 °00� GRAVEL CONSTR. ENTRANCE , www.mbakercorp.com
TOTAL DISTURBED AREA = 1.3 Ac. r' 6. BACKFILL AREA BETWEEN MANHOLE AND ENDWALL AS DIRECTED. MICHAEL BAKER ENGINEERING, INC.
7800 Airport Center Drive
SITE LOCATION 3 { ` 7. DRY AREA BETWEEN SANDBAG DIKES 1 & 2 IN PREPARATION FOR PHASE #3. suite NC
SILT FENCE `� _ T 336.93b 1500 (Office)
r� 336.931.1501 (Fax)
\ North Carolina License No. F -1084
DIVERSION CHANNEL
DIRE
OF FLOW
STRAW WATTLE
0,
1
r '�J
BEGIN WORK
STA 10 +51.30
N 861219.0755 -
E 1724984.3356 '
D
D
ACTUAL PUMP AND HOSE
LOCATION SHALL BE
DETERMINED IN THE FIELD
r7nNE 1)
2)
Designer:
DCT
.�\\\�\A CARS/
�� ° ° °F ESS /0
Technician:
\ moo`
DCT
Quo
— SEAL —_
= 027429 —
Checked by:
LJA
° ° ° F �� o °
NC I NE
'' 9R ° ° ° ° ° °° °° ° °��?\;
RY P�
Project No:
138535
J.
0
0
U)
z
0
Cn
w
D'
C
0
Q
L
U
U)
N
Z
Project Name:
STORMWATER
OUTFALL
REPAIR
Drawing Name:
PHASE 2
CONSTRUCTION
PLAN
PIEDMONT TRIAD
INTERNATIONAL AIRPORT
lAutocad Drawing Reference:
Date: Drawing Number:
20 10 0 20 JANUARY 2015
SCALE IN FEET Business Unit: GL -3C
GREENSBORO
LEGEND
— — — — — LIMIT OF CONSTRUCTION
EXISTING CONTOUR
835 PROPOSED CONTOUR
0 00 GRAVEL CONSTR. ENTRANCE
00
SILT FENCE
DIVERSION CHANNEL
DIRE
OF FLOW
STRAW WATTLE
PHASE 3 CONSTRUCTION SEQUENCE: T1
1. REMOVE SANDBAG DIKES AS DIRECTED BY THE ENGINEER. PIEDMONT TRIAD AIRPORT AUTHORITY
2. COMPLETE CONSTRUCTION OF OUTFALL APRON AND CHANNEL PER PLAN. PIEDMONT TRIAD
AIRPORT AUTHORITY
3. SEED AND MAT NEW SLOPES, EMBANKMENTS, ETC. AND STABILZE AREA.
GUILFORD COUNTY, NORTH CAROLINA
4. STRAW WATTLES SHALL REMAIN IN PLACE UNTIL HERBACEOUS VEGETATION
BECOMES ESTABLISHED.
5. REMOVE PUMP AND HOSE DEVICES AS DIRECTED BY THE ENGINEER.
6. REMOVE AND /OR RETAIN EXISTING EROSION CONTROL MEASURES (I.E. SILT
FENCE, DIVERSION DITCHES, ETC) ADJACENT TO FINISHED CONSTRUCTION www.mbakereorp.com
AS DIRECTED BY THE ENGINEER. MICHAEL BAKER ENGINEERING, INC.
7800 Airport Center Drive
Suite 100
7. CONTRACTOR SHALL RESTORE ALL TEMPORARY AREAS TO PRE - CONSTRUCTION Greensboro, NC 27409
CONDITIONS PRIOR TO COMPLETION OF THE PROJECT. 336.931.1500 (office)
336.931.1501 (Fax)
North Carolina License No. F -1084
r7nNE 1)
2)
Designer:
DCT
\\\� N C A R 0 " ","
Technician:
.�
° ° °F ESS /0
��
\ moo`
DCT
Quo
— SEAL —_
Checked by:
= 027429 —
LJA
° ° ° F �� o °
NG
Project No:
I NE
' 9R ° ° ° ° ° °° °° ° °��?\;
RY P�
138535
J.
0
0
U)
z
0
Cn
w
D'
C
0
Q
L
U
U)
N
Z
Project Name:
STORMWATER
OUTFALL
REPAIR
Drawing Name:
PHASE 3
CONSTRUCTION
PLAN
PIEDMONT TRIAD
INTERNATIONAL AIRPORT
lAutocad Drawing Reference:
Date: Drawing Number:
20 10 0 20 JANUARY 2015
SCALE IN FEET Business Unit: GL -3D
GREENSBORO
� J
�j
.,PRECAST MANHOLE (5' DIA.)
STA 10 +51.30
r °
S
I
I r
48 CMP
� \ d
PRECAST CONCRETE ENDWALL
NCDOT STD 838.80
' RI A.RR 1 -RIP -RAP AP0Y
PERMANENT NON - RIPARIAN SEED
/ RIFFLE (TYP)
ROCI\VANE
OSED TOP OF BANK /
=UL El_ `NATION (TYP)
PROPOSED GRADING AND PLANTING PLAN
PERMANENT RIPARIAN SEED
Permanent seed mixtures for the project site shall be planted throughout the floodplain and riparian buffer areas.
Permanent seed mixtures shall be applied with temporary seed, as defined in the construction specifications.
Common Name
Scientific Name
Percentage
of
Total
Density
(Ibs /ac)
Tall Fescue
Festuca arundinacea
72%
200
Kentucky Bluegrass
Poa pratensis
14%
40
Red (fine) Fescue
Festuca rubra
14%
40
Panicum virgatum
Total
100%
280
/ RIFFLE (TYP)
ROCI\VANE
OSED TOP OF BANK /
=UL El_ `NATION (TYP)
PROPOSED GRADING AND PLANTING PLAN
PERMANENT RIPARIAN SEED
Permanent seed mixtures for the project site shall be planted throughout the floodplain and riparian buffer areas.
Permanent seed mixtures shall be applied with temporary seed, as defined in the construction specifications.
Common Name
Scientific Name
Percent
of
Mixture
Seeding
Density
(Ibs /acre)
Wetness
Tolerance
Redtop
Agrostls alba
10%
1.5
FACW
F (Z E
Elymus virg/nicus
15%
2.25
ER
RDPN
Switchgrass
Panicum virgatum
15%
2.25
FAC+
\
PROPOSED LIMIT OF GRADING
5%
0.75
LIMIT OF BtNCHING
(TYP)
n
FER (ZONE
- i�
30?-'Dl
ROCK CROSS VANE (TYP) (TYP) \\
0.75
/
O/
x
5%
0.75
FACU
Soft Rush
Juncus effusus
5%
d
FACW+
Beggars Tick
'MATCH EXISTING FLOWLINE
5%
0.75
FACW
STA 13 +37.62
Coreopsls lanceolate
10%
1.5
FAC
Tioga Deer Tongue
Dlchanthelium clandestinum
OH5r:C
2.25
/ RIFFLE (TYP)
ROCI\VANE
OSED TOP OF BANK /
=UL El_ `NATION (TYP)
PROPOSED GRADING AND PLANTING PLAN
PERMANENT RIPARIAN SEED
Permanent seed mixtures for the project site shall be planted throughout the floodplain and riparian buffer areas.
Permanent seed mixtures shall be applied with temporary seed, as defined in the construction specifications.
Common Name
Scientific Name
Percent
of
Mixture
Seeding
Density
(Ibs /acre)
Wetness
Tolerance
Redtop
Agrostls alba
10%
1.5
FACW
Virginia Wildrye
Elymus virg/nicus
15%
2.25
FAC
Switchgrass
Panicum virgatum
15%
2.25
FAC+
Eastern Gamma Grass
Tripsacum dactyloides
5%
0.75
FAC+
Pennsylvania Smartweed
Polygonum pennsylvanicum
5%
0.75
FACW
Little Blue Stem
Schizachyrium scoparium
5%
0.75
FACU
Soft Rush
Juncus effusus
5%
0.75
FACW+
Beggars Tick
Bidens frondosa (or aristosa)
5%
0.75
FACW
Lance - Leaved Tick Seed
Coreopsls lanceolate
10%
1.5
FAC
Tioga Deer Tongue
Dlchanthelium clandestinum
15%
2.25
FACW
Big Blue Stem
Andropogon gerardii
5%
0.75
FAC
Indian Grass
Sorgastrum nutans
5%
0.75
FACU
III 1114 t i • : _
�j
20 10 0
SCALE IN FE
20
OZONE
.N g�1FF,
(ZONE
The following table lists temporary seed species for the projec site. All disturbed areas
will be stabilized using mulch and temporary seed.
Common Name
Rate
Dates
CEREAL RYE
130 LBS /ACRE
SEPTEMBER TO MARCH
BROWNTOP MILLET
40 LBS /ACRE
APRIL TO AUGUST
LIVE STAKING /CUTTINGS
Live staking and live cuttings will be applied to all restored streambanks and within the geolift
structure following the details in this plan set and according to the construction specifications.
Common Name
Scientific Name
Percentage
of
Total
Wetness
Tolerance
Elderberry
Sambucus canadensis
20%
FACW -
Silky Dogwood
Corpus amonum
25%
FACW+
Silky Willow
Salix sericea
25%
OBL
Black Willow
Salix nigra
10%
OBL
Ninebark
Physocarpus opulifolius
20%
FAC-
LEGEND
EXISTING CONTOUR
835 1 PROPOSED CONTOUR
GEOLIFT ZONE (17 S.Y.)
RIPARIAN SEEDING ZONE (0.10 Ac.)
X X X X X X
X
X x x x x x x x x x x LIVE STAKING ZONE (0.14 Ac.)
X X X X X X
ImNON - RIPARIAN SEEDING ZONE (0.08 Ac.)
T1
PIEDMONT TRIAD AIRPORT AUTHORI',TY
PIEDMONT TRIAD
AIRPORT AUTHORITY
GUILFORD COUNTY, NORTH CAROLINA
www'mbakercorp.com
MICHAEL BAKER ENGINEERING, INC.
7800 Airport Center Drive
Suite 100
Greensboro, NC 27409
336.931.1500 (Office)
336.931.1501 (Fax)
North Carolina License No. F -1084
Designer:
DCT
0\`\A`
�N
Technician:
°� °ARC
ESS /0
_ ,�0�
��
DCT
e° Q e 7
SEAL =_
Checked by:
= 027429 -
LJA
Project No:
R y ° P�
138535
J,
T
M
N
V)
Z
0
U)
w
o'
0
Q
U
U)
Q)
0
0 TT—r
z
Project Name:
STORMWATER
OUTFALL
REPAIR
Drawing Name:
GRADING AND
PLANTING PLAN
PIEDMONT TRIAD
INTERNATIONAL AIRPORT
utocad Drawing Reference:
ate: Drawing Number:
DECEMBER 2014
usiness Unit: GL
-3E
GREENSBORO
E
o
o
0 N
O
N
� N
2 O
0
O �
O �
3
E
N E
Q o
.0
.o
M
/ r
H N
a o
T1
PIEDMONT TRIAD AIRPORT AUTHORITY
EXISTING
PIEDMONT TRIAD
GROUND
CONCRETE JUNCTION BOX (42" DIA.) WITH
AIRPORT AUTHORITY
TYP
COVER AND FRAME (NCDOT STD 840.31)
5 MIN.
��,, �i CAROUNA
_I
TOP ELEV : 812.50'
(TYP)
I I
PROPOSED GRADE
�
EXISTING
GROUND (TYP)
�
(SLOPE VARIES)
2:1 MAX. (TYP)
'' . III I I SEE NOTE 2
r l
III
www.mbakercorp.com
PRECAST CONCRETE HEADWALL
CLASS I RIP RAP
I I-
I
MICHAEL BAKER ENGINEERING, INC.
7800 Airport erDrive
EXISTING 42" RCP
(d50 = 12�� )
Suite 1oo
(NCDOT STD 838.80)
Greensboro, NC 27409
TOP ELEV : 804.50'
3:1
50(Office)
36.931.101
CONCRETE
EXPRESSWAY GUTTER
(TYP)
x)
3
INV. ELEV 807.00
(NCDOT STD 846.01)
O
North Carolina Incense No. F -1084
Designer:
:
2' MIN.
i
MATCH
EXISTING
O
O 4' MIN.
DCT
\\
C A 0
PROPOSED GRADE GROUND
O O O O
OT OTC o
\
\:= Q�.FESS /p °
Technician:
T� g
DCT
=
INV. ELEV : 799.60'
ELEV : 799.10'
- SEAL
Checked by.
PROPOSED 42" RCP (TYP)
_ 027429 =
-1 % ---
SLOP E CARIES
FILTER FABRIC
LJA
°J
Project No:
, _ LiI7LJ�C)
Y
INV. ELEV: 796.71'
—� _
I�
I�� _......,..° III
38535
INV. ELEV :799.71' III ' ' I _III
III III III I '
- WIDTH VARIES —
13.25' M I N. TO 40' MAX.
1
SECTION B-B
5'
10.5' 50.5'
4' 14.5' MIN
(I•D)
OUTFALL PROTECTION
SECTION A -A
NOT TO SCALE
NOT TO SCALE
NOTE
1. CONTRACTOR SHALL LOWER THE WATER LEVEL WITHIN
THE EXISTING POND TO 2FT BELOW THE TOP OF THE RISER
ELEVATION. ALL WORK IN THIS AREA SHALL BE
LEGEND
PERFORMED UNDER DRY CONDITIONS.
WETLAND
P SERVATION A /q
2. GRADED SIDE SLOPES SHALL BE SEEDED, MULCHED AND
STREAM CENTERLINE
STABILIZED USING EXCELCIOR EROSION CONTROL
MATTING.
EXISTING PIPE
3. EXCELCIOR EROSION CONTROL MATTING SHALL BE
GRADING /CONSTRUCTION LIMIT
PLACED ON ALL DISTURBED SLOPE AREAS.
EXISTING MINOR CONTOUR
4. ALL DISTURBED AREAS SHALL BE SEEDED AND MULCHED
WITH PERMANENT SEEDING UPON COMPLETION OF WORK.
EXISTING MAJOR CONTOUR
CONSTRUCTION SHALL
870 PROPOSED MAJOR CONTOUR
NOT INTRUDE WETLAND
PRESERVATION AREA
INSTALL CHECK DAM AT 1
PROPOSED MINOR CONTOUR
�. (TYP) PRESERVATION LIMIT EC -2
��
SILT FENCE
(MIN. HT = 2')
0 0 ORANGE SAFETY FENCE
40 L.F. CONRETE EXPRESSWAY GUTTER
(NCDOT STD 846.01) °
ti
O O O PROPOSED RIP RAP CHANNEL
m
ti _.
PROPOSED CONCRETE CURB
1
1r
„
�
42 CONCRETE HEADWALL
..... ... ....
TURF MATTING (TYPE C 125)
00 _
= SILT FENCE 2
(I
10 L.F. 42" RCP
O O (TYP) EC-1
O
_
O o o O
- ---- - - - -_- -----_-
-
- --
TOTAL DISTURBED AREA = 0.25 AC. - -- --
z
REMOVE EXISTING HEADWALL.
REPLACE WITH 42" JUNCTION BOX.
SITE LO CAT I O N 4
O
w
1`315
-��
LIMIT OF
GRADING
-
o
— LIMIT OF CONSTRUCTION
`°.
PROPOSED
OUTFALL
- -- CHANNEL
`.
o
-,,
(t0 rr�r
Vs
r,
Project Name:
ifs'
--
U
STORMWATER
q
OUTFALL
N
REPAIR
O�
Drawing Name:
/
GEOMETRIC LAYOUT
EXISTING RISER DO NOT DISTURB
�° �
��
R
GRADING PLAN
SEE NOTE 1
�-
PIEDMONT TRIAD
1;,
AAtizxeni S� [0111 tf}
tIf 1SAix. T
INTERNATIONAL AIRPORT
mruKF lr" silv,;9uVS
20 10 0 20 40 60
Autocad Drawing Reference:
File: 05 — Geometric Layout & Grading Plan (GL -1 to GL- 6).dwg
Saved: Jan 27, 2015 — 11: 33am by dtorraa
Plotted: Jan 27, 2015 — 12:00pm
GRAPHIC CALE BAR
Date:
Drawing Number:
JANUARY 2015
GL-4
Business Unit:
GREENSBORO
3
C7
E
0
E
c� E
I�
Q N
L' a
N
� N
2 O
0
O �
ac
3 �
E
N E
a rte^
� I
M U
N
.0
�N
W " it
i�•► r •�I
AM
www.mbakercorp.com
MICHAEL BAKER ENGINEERING, INC.
7800 Airport Center Drive
Suite 100
Greensboro, NC 27409
336.931.1500 (Office)
336.931.1501 (Fax)
North Carolina license No. F -1084
Designer:
DCT
\
�.�� N° C A R' -)
Technician:
:_ ��0� ESS /0�
DCT
— SEAL —
Checked by.
= 027429 =
LJA
<1
Project No:
\r. ° J
138535
..
a)
41
0
0
Cn
I
O
w
n,
c
0
_Q
�L
U
U)
a)
D
N
Project Name:
STORMWATER
OUTFALL
REPAIR
Drawing Name:
GEOMETRIC LAYOUT
GRADING PLAN
PIEDMONT TRIAD
INTERNATIONAL AIRPORT
4utocad Drawing Reference:
File: 05 — Geometric Layout & Grading Plan (GL -1 to GL- 6).dwg
Saved: Jan 27, 2015 — 11:33— by dtorraa
Plotted: Jan 27, 2015 — 12:01pro
)ate: Drawing Number:
JANUARY 2015
isiness Unit: GL -5
GREENSBORO
3
C7
E
0
E
�E
N
Io
Q N
L
N
� N
2 O
0
O �
ac
3 �
E
N E
a rte^
� I
M U
N
.0
M N
/ r
H N
W " it
i�•► r •�I
AM
www.mbakercorp.com
MICHAEL BAKER ENGINEERING, INC.
7800 Airport Center Drive
Suite 100
Greensboro, NC 27409
336.931.1500 (Office)
336.931.1501 (Fax)
North Carolina license No. F -1084
Designer:
DCT
\
N° C A R' -)
�.��
:_ ��0� ESS /0�
Technician:
DCT
— SEAL —
= 027429 =
Checked by.
LJA
<1
\r. ° J
Project No:
138535
..
a)
41
0
0
Cn
I
O
w
n,
c
0
_Q
�L
U
U)
a)
D
N
Project Name:
STORMWATER
OUTFALL
REPAIR
Drawing Name:
GEOMETRIC LAYOUT
GRADING PLAN
PIEDMONT TRIAD
INTERNATIONAL AIRPORT
4utocad Drawing Reference:
File: 05 — Geometric Layout & Grading Plan (GL -1 to GL- 6).dwg
Saved: Jan 27, 2015 — 11: 33am by dtorraa
Plotted: Jan 27, 2015 — 12:02pm
)ate: I Drawing Number:
JANUARY 2015
isiness Unit: GL-6
GREENSBORO
905
'•1
•
..1
875
•
m 0 of
q
�E
a�
oN
o�
a�
o�
3 a
� T
N E
aN
� l
M �
N O
� N
� o
a o
EXISTING GRADE
EXISTING GAS LINES
(DEPTHS UNKNOWN)
0 +50
;lt
EXISTING
EXISTING ELEVATION TO BE
LOCATED IN THE FIELD.
1+00
1+50
..•.• 9
PROPOSED 24" RCP AND COLLAR.
MATCH GRADE OF EXISTING 24" RCP.
PROPOSED MANHOLE - TOP ELEV. AND
INTAKE INVERT TO BE SET IN THE FIELD
REMOVE EXISTING MANHOLE
SECTIONS AS DIRECTED
XlS7lVG..24.
2 +00
2 +50
905
F6161 �*R
'•1
•
..1
Eou
. J
•
1 860
3 +00
5
0
2.
5
VERTICAL SCALE BAR
1 10 1 20 41 61
1110 =W
PIEDMONT TRIAD
AIRPORT AUTHORITY
CIAFOW COUNTY, NOFiiH CMMM
AM
www.mbakercorp.com
MICHAEL BAKER ENGINEERING, INC.
7800 Airport Center Drive
Suite 100
Greensboro, NC 27409
336.931.1500 (Office)
336.931.1501 (Fax)
North
Carolina license No. F -1084
Designer:
\ \\ \1111111 / / ///
DCT
\
�.�� N° C A
Technician:
: \_ � ESS /0�
DCT
— SEAL —
Checked by.
= 027429 =
LJA
F ��
°° N GINS
Project No:
° .
R Y
138535
/ 111111 \ \
N
41
0
0
cn
I
O
w
l
O
41
Q
�L
U
U)
N
D
zl
Project Name:
STORMWATER
OUTFALL
REPAIR
Drawing Name:
PROFILES
PIEDMONT TRIAD
INTERNATIONAL AIRPORT
4utocad Drawing Reference:
Flle: 06 — Profiles (P -1 to P- 2).dwg
Saved: Dec 03, 2014 — 1: 55pm by dtorres
Plotted: Jan 27, 2015 — 11:33am
)ate: Drawing Number:
JANUARY 2015
Business Unit: P -1
GREENSBORO
•
%16 m
855
•
•
835
1
E'M•
•
i
q
�E
a�
oN
o�
a�
o�
3 a
� T
N E
aN
� l
M �
N O
� N
� o
a o
PROFILE BASELINE B
1 11
1 1
11+00
11+50
12 +00
12 +50
11
13 +50
14 +00
14 +50
6
•
••
•s
855
•
.�
•
015 us
835
•
•
15 +00
1
0
2.5
5 3 VERTICAL SCALE BAR
20 10 0 20 40 60
HORIZONTAL SCALE BAR
# r <
at `ifr?ti4j3��i���'l���i7t'�iS2{t? { T1 I I
PIEDMONT TRIAD
AIRPORT AUTHORITY
CIAFOW COUNTY, NOFiiH CMMM
AM
www.mbakercorp.com
MICHAEL BAKER ENGINEERING, INC.
7800 Airport Center Drive
Suite 100
Greensboro, NC 27409
336.931.1500 (Office)
336.931.1501 (Fax)
North
Carolina license No. F -1084
Designer:
\1111111 / / ///
BEGIN PGL = 10+50.76
\\\\
�.�� \A C A R�'' %,
Technician:
: \_ � ESS /o�
DCT
- SEAL -
Checked by.
= 027429 =
ELEV = 854.650
<`
� ° F. °
0
°!IGINE
138535
J.
I�
ao
I I
0
o
—
- —
EXl S T �8 RCP
W
�
d-.
o
�
.. .. ..
.. .. ..
.. .. ...
—
—1 : 7 0 —
CO
W,
I
+
.
Q
Wl
J.
...
.. �
W.
'Q
��
....
TA: 1 + .1
PVI 4
S 0 8
d
0
o
ELEV• 85 . -- 4. 08
EXISTING GRADE
w
N
VC: 25.00
CO
o0
o
W
II
�
W
J
10
. ... ..
..
C�
W .. .. ..
.. .. ..
.. .. ..
.. ...
�o .
X-1
.. .
.
PROPOSED GRADE
0%
.
ELEV.-823-19
VC: 25.00
.
.
10
1 p0
END PGL = 14+25.58
.
. ELEV = 820.63
MATCH EXISTING
• st
V
o
1 11
1 1
11+00
11+50
12 +00
12 +50
11
13 +50
14 +00
14 +50
6
•
••
•s
855
•
.�
•
015 us
835
•
•
15 +00
1
0
2.5
5 3 VERTICAL SCALE BAR
20 10 0 20 40 60
HORIZONTAL SCALE BAR
# r <
at `ifr?ti4j3��i���'l���i7t'�iS2{t? { T1 I I
PIEDMONT TRIAD
AIRPORT AUTHORITY
CIAFOW COUNTY, NOFiiH CMMM
AM
www.mbakercorp.com
MICHAEL BAKER ENGINEERING, INC.
7800 Airport Center Drive
Suite 100
Greensboro, NC 27409
336.931.1500 (Office)
336.931.1501 (Fax)
North
Carolina license No. F -1084
Designer:
\1111111 / / ///
DCT
\\\\
�.�� \A C A R�'' %,
Technician:
: \_ � ESS /o�
DCT
- SEAL -
Checked by.
= 027429 =
LJ A
<`
� ° F. °
Project No:
°!IGINE
138535
J.
Cn
Z
0
w
0
Q
�L
U
U)
N
0
O
Z
Project Name:
STORMWATER
OUTFALL
REPAIR
Drawing Name:
PROFILES
PIEDMONT TRIAD
INTERNATIONAL AIRPORT
4utocad Drawing Reference:
Flle: 06 — Profiles (P -1 to P- 2).dwg
Saved: Dec 03, 2014 — 1: 55pm by dtorres
Plotted: Jan 27, 2015 — 11:32am
)ate: Drawing Number:
JANUARY 2015
Business Unit: P_2
GREENSBORO
■
w�
IM
a.:
�N
o�
o�
a�
o�
3 a
� T
N E
Q _a
a
� I
M �
N O
� o
a o
f t y i _�� :1 a DA .7 Eel ► i a
INSTALL FILTER FABRIC
PRIOR TO WASHED STONE.
MIRAFI 180 —N OR APPROVED
EQUIVALENT.
NOTES:
1. AGGREGATE SIZE — USE 2 -3 INCH WASHED STONE
2. DIMENSIONS OF GRAVEL PAD —
THICKNESS: 6 INCHES MINIMUM
WIDTH: 12 FOOT MINIMUM OR FULL WIDTH AT ALL POINTS
OF THE VEHICULAR ENTRANCE & EXIT AREA;
WHICHEVER IS GREATER.
LENGTH: 50 FOOT MINIMUM
3. LOCATION: LOCATE CONSTRUCTION ENTRANCES & EXITS TO LIMIT SEDIMENT FROM
LEAVING THE SITE & TO PROVIDE FOR MAXIMUM UTILITY BY ALL CONSTRUCTION
VEHICLES.
4. AVOID STEEP GRADES & ENTRANCES AT CURVES.
5. NO SEPARATE MEASUREMENT OR PAYMENT WILL BE MADE FOR THIS ITEM.
6. INSPECT THE SURFACE & TOP DRESS THE SURFACE AS NEEDED WITH GRAVEL.
6" MIN.
TEMPORARY CONSTRUCTION ENTRANCE PAD
NOT TO SCALE
EROSION CONTROL CONSTRUCTION
SEQUENCE NOTES:
GENERAL
THE CONTRACTOR SHALL SUBMIT TO THE ENGINEER AND OWNER A DETAILED CONSTRUCTION PROGRESS SCHEDULE. THESE PLANS
AND SPECIFICATIONS PROVIDE GENERAL CONSTRUCTION SEQUENCE AND SAFETY PARAMETERS WHICH MUST BE INCORPORATED INTO
THE APPROVED SCHEDULE. THE CONTRACTOR'S APPROVED EROSION CONTROL PLAN SHALL BE INCORPORATED INTO THE
CONSTRUCTION SEQUENCE PLAN.
THE CONSTRUCTION OF THE PROJECT MUST BE COMPLETED IN SEQUENTIAL ORDER AS LISTED BELOW:
* MOBILIZATION
* EROSION CONTROL
* CONSTRUCT WORK ELEMENTS
* SEEDING AND MULCHING
PLANNED TEMPORARY EROSION CONTROL FEATURES
1. TEMPORARY CONSTRUCTION ENTRANCE PAD
2. DROP INLET PROTECTION
3. EROSION CONTROL MATTING
ALL DISTURBED AREAS ARE TO BE SEEDED AND MULCHED IN ACCORDANCE WITH ITEMS T -901 AND T -908 OF THE
SPECIFICATIONS, WITHIN 14 DAYS FOLLOWING COMPLETION OF ANY PHASE OF GRADING. PERMANENT GROUND COVER SHALL BE
OBTAINED WITHIN 15 WORK DAYS OR 90 CALENDAR DAYS (WHICHEVER IS SHORTER) FOLLOWING COMPLETION OF THE PROJECT.
ANY FINES, PENALTIES, OR OTHER COSTS ASSESSED BY STATE, LOCAL OR THE GOVERNMENTAL AGENCIES FOR
NON— PERFORMANCE OF THE EROSION CONTROL REQUIREMENTS OF THIS PROJECT AGAINST THE OWNER SHALL BECOME THE
RESPONSIBILITY OF THE CONTRACTOR, AND ANY SUCH ASSESSMENTS, IF NOT PAID BY THE CONTRACTOR, WILL BE DEDUCTED
FROM MONIES DUE AT THE COMPLETION OF THIS PROJECT.
PHASING
1. ATTEND PRECONSTRUCTION CONFERENCE
2. INSTALL EROSION CONTROL MEASURES
3. PERFORM CONSTRUCTION OPERATIONS
4. SEED AND MULCH ANY DISTURBED AREAS
5. ONCE PERMANENT SEEDING HAS BEEN ESTABLISHED, REMOVE ALL TEMPORARY EROSION CONTROL FEATURES. SEED AND
MULCH THE AREAS EFFECTED BY THE REMOVAL
MAINTENANCE PLAN
1. ALL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE CHECKED FOR STABILITY AND OPERATION FOLLOWING EVERY
RUNOFF — PRODUCING RAINFALL BUT IN NO CASE LESS THAN ONCE EVERY WEEK. ANY NEEDED REPAIRS WILL BE MADE
IMMEDIATELY TO MAINTAIN ALL PRACTICES AS DESIGNED.
2. SEDIMENT WILL BE REMOVED FROM BEHIND THE SILT FENCE OR INLET PROTECTION WHEN IT BECOMES ABOUT 0.5 FT.
DEEP. THE EROSION CONTROL BARRIER WILL BE REPAIRED AS NECESSARY TO MAINTAIN A BARRIER.
3. THE ENGINEER MAY DIRECT THAT ADDITIONAL SILT FENCING OR INLET PROTECTION BE INSTALLED AT ANY TIME PRIOR TO
FINAL ACCEPTANCE.
8„ MIN
Li
NOTE: W = 8' MAX STANDARD STRENGTH FABRIC WITH WIRE FENCE
OR 6' MAX. EXTRA STRENGTH FABRIC WITHOUT WIRE FENCE.
WIRE W -
FENCE
THREE PLASTIC OR
WIRE TIES
''MIN. 2. ATTACH WIRE FENCING TO STEEL POST
1. SET STEEL POST AND EXCAVATE A 4"x8" TRENCH WITH PLASTIC OR WIRE TIES.
UPSLOPE ALONG THE LINE OF POST.
3. ATTACH THE FILTER FABRIC TO THE WIRE
FENCE AND EXTEND IT INTO THE TRENCH.
4. BACKFILL AND COMPACT THE EXCAVATED SOIL.
SEDIMENT FENCE
NOT TO SCALE
TEMPORARY
SEDIMENT
POOL
SEDIMENT
NO. 57 STONE
2:1 SLOPE, GRAVEL FILTER
WIRE SCREEN
DROP INLET WITH GRATE
G
FILTER FABRIC
BACKFILL TRENCH &
COMPACT THOROUGHLY
NATURAL
GROUND
STEEL
POST
WIRE 1
FENCE 00
4 "MIN.
CROSS - SECTION VIEW
EXTENSION OF FABRIC AND WIRE INTO TRENCH
N OTE:
INSTALL SEDIMENT FENCE WHERE SHOWN ON THE PLANS AND
MAINTAIN UNTIL DISTURBED AREA IS COMPLETELY STABILIZED,
AND INSPECT THE SILT FENCE WEEKLY AND AFTER RAINFALL.
2
EC -1
2 x 4" ALUMINUM FRAME
N OTE:
1. CONTRACTOR HAS OPTION OF WHICH METHOD OF INLET PROTECTION TO USE.
2. CONTRACTOR SHALL MAINTAIN INLET PROTECTION UNTIL DISTURBED AREA IS
COMPLETELY STABILIZED AND INSPECT THE TEMPORARY INLET PROTECTION
WEEKLY AND AFTER EACH RAINFALL.
TEMPORARY INLET PROTECTION
NOT TO SCALE
I_ 2 _ I (ALL DIR.)
1. TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURERS SPECIFICATIONS.
2. TYPE I MATTING SHALL BE CURLED WOOD EXCELSIOR. ALLOWABLE SHEAR STRESS =
1.55 LB /FTZ.
3. THE MATTING OF SLOPES MUST BE PROVIDED TO THE CLOSEST SEDIMENT TRAP, ROCK
DAM, OR SEDIMENT BASIN.
MATTING FOR EROSION CONTROL
NOT TO SCALE
Q =
J �
� 0
>
0
z �
w
LINE DIVERSION WITH TY
COMPACTED SOIL
2' MIN.
6' TYPICAL
00 z F LOAN
TEMPORARY DIVERSION
NOT TO SCALE
WITH GRATE
C�1�J \l�J \7�■ 1 � !I � ,
GATHER EXCESS
AT CORNERS
T1
PIEDMONT TRIAD AIRPORT AUTHORITY
PIEDMONT TRIAD
AIRPORT AUTHORITY
GUILFORD COUNTY, NORTH CAROLINA
Alft
z zi
www.mbakercorp.com
MICHAEL BAKER ENGINEERING, INC.
7800 Airport Center Drive
Suite 100
NOTE: W = 8' MAX STANDARD STRENGTH FABRIC WITH WIRE FENCE
OR 6' MAX. EXTRA STRENGTH FABRIC WITHOUT WIRE FENCE.
WIRE W -
FENCE
THREE PLASTIC OR
WIRE TIES
''MIN. 2. ATTACH WIRE FENCING TO STEEL POST
1. SET STEEL POST AND EXCAVATE A 4"x8" TRENCH WITH PLASTIC OR WIRE TIES.
UPSLOPE ALONG THE LINE OF POST.
3. ATTACH THE FILTER FABRIC TO THE WIRE
FENCE AND EXTEND IT INTO THE TRENCH.
4. BACKFILL AND COMPACT THE EXCAVATED SOIL.
SEDIMENT FENCE
NOT TO SCALE
TEMPORARY
SEDIMENT
POOL
SEDIMENT
NO. 57 STONE
2:1 SLOPE, GRAVEL FILTER
WIRE SCREEN
DROP INLET WITH GRATE
G
FILTER FABRIC
BACKFILL TRENCH &
COMPACT THOROUGHLY
NATURAL
GROUND
STEEL
POST
WIRE 1
FENCE 00
4 "MIN.
CROSS - SECTION VIEW
EXTENSION OF FABRIC AND WIRE INTO TRENCH
N OTE:
INSTALL SEDIMENT FENCE WHERE SHOWN ON THE PLANS AND
MAINTAIN UNTIL DISTURBED AREA IS COMPLETELY STABILIZED,
AND INSPECT THE SILT FENCE WEEKLY AND AFTER RAINFALL.
2
EC -1
2 x 4" ALUMINUM FRAME
N OTE:
1. CONTRACTOR HAS OPTION OF WHICH METHOD OF INLET PROTECTION TO USE.
2. CONTRACTOR SHALL MAINTAIN INLET PROTECTION UNTIL DISTURBED AREA IS
COMPLETELY STABILIZED AND INSPECT THE TEMPORARY INLET PROTECTION
WEEKLY AND AFTER EACH RAINFALL.
TEMPORARY INLET PROTECTION
NOT TO SCALE
I_ 2 _ I (ALL DIR.)
1. TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURERS SPECIFICATIONS.
2. TYPE I MATTING SHALL BE CURLED WOOD EXCELSIOR. ALLOWABLE SHEAR STRESS =
1.55 LB /FTZ.
3. THE MATTING OF SLOPES MUST BE PROVIDED TO THE CLOSEST SEDIMENT TRAP, ROCK
DAM, OR SEDIMENT BASIN.
MATTING FOR EROSION CONTROL
NOT TO SCALE
Q =
J �
� 0
>
0
z �
w
LINE DIVERSION WITH TY
COMPACTED SOIL
2' MIN.
6' TYPICAL
00 z F LOAN
TEMPORARY DIVERSION
NOT TO SCALE
WITH GRATE
C�1�J \l�J \7�■ 1 � !I � ,
GATHER EXCESS
AT CORNERS
T1
PIEDMONT TRIAD AIRPORT AUTHORITY
PIEDMONT TRIAD
AIRPORT AUTHORITY
GUILFORD COUNTY, NORTH CAROLINA
Alft
z zi
www.mbakercorp.com
MICHAEL BAKER ENGINEERING, INC.
7800 Airport Center Drive
Suite 100
Greensboro, NC 27409
336.931.1500 (Office)
336.931.1501 (Fax)
North
Carolina license No. F -1084
Designer:
\ \\ \1111111/////
DCT
\
�.�� N° C A RO'' %,
Technician:
: \_ � E S S i;cI,�
DCT
= o Q < e�
– SEAL –
Checked by.
= 027429 =
LJA
<y
Project No:
X�, /
Y ° J
138535
/ /�,R
1
B
0
Cn
z
0
w
c
0
Q
•L
U
N
0
0
z
Project Name:
STORMWATER
OUTFALL
REPAIR
Drawing Name:
EROSION CONTROL
DETAILS
PIEDMONT TRIAD
INTERNATIONAL AIRPORT
4utocad Drawing Reference:
File: 07 — Erosion Control Details.dwg
Saved: Dec 03, 2014 — 2:01pm by dtorres
Plotted: Jon 27, 2015 — 11: 34am
)ate: Drawing Number:
JANUARY 2015
3usiness Unit: EC�1
GREENSBORO
16141,
1/G
E) (--)I I I LLI \4 I— I V I I— IVI UI \--/I\1
FACE 20 MIL THICK
1 F7,'
I IL ILI\ I /UI \IV
CLASS B EROSION
CONTROL STONE
A
SECTION A -A
TOP WIDTH =1.5 MIN.
24" MAX.
2 7 AT CENTER
FILTER FABRIC. MIRAFI 180 —N
OR APPROVED EQUIVALENT.
L = THE DISTANCE SUCH THAT POINTS
A & B ARE OF EQUAL ELEVATION
L -B
TEMPORARY ROCK CHECK DAM
NOT TO SCALE
POLYETHYLENE MEMBRANE ON
w
a�
�N
,N
oN
o�
a�
o�
3 a
� T
N E
a o
10
a
� I
M �
N O
� N
�o
COFFERDAM DETAIL /0-2
NOT TO SCALE
EC -2
I OF BANK OR
RIP RAP OR
APPROVED
L (IF USING RIP
WN STREAM SLOPE
TER THAN 2: 1)
TER FABRIC
I" x I" x 30" HT. WOODEN STAKE
3' CENTER TO CENTER SPACING (TYP)
DRIVE STAKE 15" INTO THE GROUND
FLOW 12" DIA WATTLE
- - -i- (SEE PLAN FOR LOCATION)
PROPOSED GRADE
ENSURE TIGHT FIT BETWEEN
WATTLE AND MATTING
\�X \,X \,X \,X \,X \,X \�� \�\�\
A\\�V�iV� /�,
TERRACE MATTING
CONSTRUCTED BENCHING
SECTION A -A
i" V i" V -�n" NT \AinnnP-Ni CTAI-C�-
TOP OF BANK
(BANKFUL ELEV.)
CONSTRUCTED CHANNEL
AREA TO BE PROTECTED
1MV141T,
WATTLE AT O• OF BANK
NOT TO SCALE
NOTES:
1. CHECK WATTLES AFTER EACH STORM EVENT.
REPAIR WATTLES AND RESET STAKES AS NEEDED.
W " .
�i,�•► r :•�I r �r
Alft
www.mbakercorp.com
MICHAEL BAKER ENGINEERING, INC.
7800 Airport Center Drive
Suite 100
Greensboro, NC 27409
336.931.1500 (Office)
336.931.1501 (Fax)
North Carolina license No. F -1084
Designer:
\ \\ \1111111 / / ///
DCT
\
�.�� N° C A
Technician:
U
DCT
= SEAL =
Checked by.
= 027429 =
1-JA
<y
Project No:
Y ° J
138535
01111110\
..
c�
z
U
w
m
w
f-
U
t-
(�
cn
z
z
o
U
C/)
w
n,
c
0
41
_Q
�L
U
N
0
0
z
Project Name:
STORMWATER
OUTFALL
REPAIR
Drawing Name:
EROSION CONTROL
DETAILS
PIEDMONT TRIAD
INTERNATIONAL AIRPORT
Autocad Drawing Reference:
File: 07 — Erosion Control Details.dwg
Saved: Dec 03, 2014 — 2:01pm by dtorres
Plotted: Jon 27, 2015 — 11:36 —
Date: Drawing Number:
JANUARY 2015
Business Unit: EC-2
GREENSBORO
3
0
U
0
0
U
zE
IM
ar
�N
�a
od
aN
00
3 �
� T
N L
� c
a N
M �
N O
� N
� o
a o
GRADE CONTROL J -HOOK VANE
1/3 BOTTOM _
1/3 BOTTOM
WIDTH OF
T� WIDTH OF
CHANNEL
CHANNEL
200 TO 300
FLOW
_
B
A
W
O
H
U)
J
J
u-
Y
z
<
m
co
a
A' i
NO GAPS
BETWEEN Q
BOULDERS c~/)
_I
Y
/ \ z
Q
m
SCOUR
POOL
M
I �
SCOUR POOL (EXCAVATED)
\ PER DIRECTION OF ENGINEER
# 57 STONE
BACKFILL
(ON &TE ALLUVIUM) 1' �-
1'
STREAMBED
o o o�0. do o o ° °o
ono s`o°
o
CLASS A STONE o o °g� o -�ao�°
FILTER FABRIC 1'
10' MINIMUM
3/4 BANKFULL STAGE
COVER LOGS FLOW -- -. -�
(INSTALL COVER LOGS
AS DIRECTED BY THE STREAMBED
PLAN VIEW PROJECT ENGINEER) ELEVATION °o°4
BACKFILL WITH ON -SITE STREAM
ALLUVIUM (IF AVAILABLE), OTHERWISE R
USE A WELL GRADED MIX OF CLASS A,
NOTES: CLASS B, AND #57 STONE
1. BOULDERS MUST BE AT LEAST 3'x 2'x 2'.
2. INSTALL FILTER FABRIC FOR DRAINAGE BEGINNING AT THE MIDDLE OF THE HEADER ROCKS AND EXTEND
DOWNWARD TO THE DEPTH OF THE BOTTOM FOOTER ROCK, AND THEN UPSTREAM TO A MINIMUM OF TEN FEET.
3. DIG A TRENCH BELOW THE BED FOR FOOTER ROCKS AND PLACE FILL ON UPSTREAM SIDE OF VANE ARMS,
BETWEEN THE ARMS AND STREAMBANK.
4. START AT BANK AND PLACE FOOTER ROCKS FIRST AND THEN HEADER (TOP) ROCK.
5. CONTINUE WITH STRUCTURE, FOLLOWING ANGLE AND SLOPE SPECIFICATIONS.
6. AN EXTRA BOULDER CAN BE PLACED IN SCOUR POOL FOR HABITAT IMPROVEMENT.
7. USE CLASS A, CLASS B, AND #57 STONE TO BACKFILL UPSTREAM SIDE OF BOULDERS TO THE ELEVATION OF THE
TOP OF THE HEADER ROCK.
8. BOULDER SILL MUST BE A MINIMUM OF 6'.
9. GRAPHICS ARE A REPRESENTATION AND DO NOT INDICATE THE ACTUAL NUMBER OF BOULDERS TO BE USED.
SILL
W
C�
H
J
J
u_
Y
z
Q
m
M
PLAN VIEW
Y
z
<
m
u_
O
W
O
ROCK CROSS VANE
# 57 STONE
SECTION A - A'
SECTION B - B'
BACKFILL
(ON -SITE ALLUVIUM) 1'
1'
STREAMBED
° °°
o. 0008 °
oso °� o
CLASS A STONE
°88 °0 8 t°
FILTER FABRIC 1
X10' MINIMUMS
SECTION A - A
3/4 BANKFULL ST
F� - SILL
J` �� I
6' MIN.
NOTES:
1. BOULDERS MUST BE AT LEAST 3'x 2'x 2'.
2. INSTALL FILTER FABRIC FOR DRAINAGE BEGINNING AT THE MIDDLE OF THE HEADER
ROCKS AND EXTEND DOWNWARD TO THE DEPTH OF THE BOTTOM FOOTER ROCK,
AND THEN UPSTREAM TO A MINIMUM OF TEN FEET.
3. DIG A TRENCH BELOW THE BED FOR FOOTER ROCKS AND PLACE FILL ON UPSTREAM
SIDE OF VANE ARMS, BETWEEN THE ARMS AND STREAMBANK.
4. START AT BANK AND PLACE FOOTER ROCKS FIRST AND THEN HEADER (TOP) ROCK.
5. CONTINUE WITH STRUCTURE, FOLLOWING ANGLE AND SLOPE SPECIFICATIONS.
6. AN EXTRA BOULDER CAN BE PLACED IN SCOUR POOL FOR HABITAT IMPROVEMENT.
7. USE CLASS A, CLASS B, AND #57 STONE TO BACKFILL UPSTREAM SIDE OF BOULDERS
TO THE ELEVATION OF THE TOP OF THE HEADER ROCK.
8. BOULDER SILL MUST BE A MINIMUM OF 6'.
9. GRAPHICS ARE A REPRESENTATION AND DO NOT INDICATE THE ACTUAL NUMBER
OF BOULDERS TO BE USED.
FLOW --
RIFFLE
R,R
io° ° R°'
°
FILTER FABI
CROSS VANE INVERT /GRADE POINT
CLASS B STONE
HEADER ROCK
FOOTER ROCK
SCOUR POOL
(EXCAVATED)
CLASS B STONE
PROFILE VIEW C , C
HEADER ROCK
STREAM BANK
B
FOOTER ROCK
.ALE
# 57 STONE
AlR &33- ��i1019
TOP
OF BANK
D
PROFILE VIEW
A
O r
J
U_
�
° 8
�o o
�o �o 000S
O Q)_ 00
0 ° ° �°0
CD o o o o°$�
0 000 °00 8cp-
o (90 0
®
® sorb° ��
8o o O9®
6° _ ° ° 0opQ.� ° °�
00 O jJ
C95(9 00 0K)g°®
°o°1oObqog 5%
C90°60 o°pO�O°,C)9® �0q,
000 0000 0'0°0'0 0v
o® °° °� °° o °° ° o0
°
0� Nco
g° ° fig® o�
0.
"� o ° o
&'S So or,D9® o
oo° ®0 °oobV� o
A
PLAN VIEW
SECTION A - A
CONSTRUCTED RIFFLE
TOE
EROSION CONTROL
MATTING
DEFINE THALWEG IN -
CENTER OF CHANNEL
HEAD OF RIFFLE
INKFULL
Qo7
- EROSION CONTROL MATTING
SHOULD
BE PLACED BENEATH ROCKS
24" NOM. THICKNESS WELL GRADED MIX OF CLASS II,
CLASS A, CLASS B, AND #57 STONE. ON -SITE
ALLUVIUM
SHALL BE INCORPORATED IF AVAILABLE.
SECTION B - B'
24" NOM. THICKNESS WELL GRADED MIX OF CLASS II,
CLASS A, CLASS B, AND #57 STONE. ON -SITE
ALLUVIUM
SHALL BE INCORPORATED IF AVAILABLE.
R� FLE
° �°o\
°° 0°°
PROFILE A -
NOTES: A'
1. DIG A TRENCH BELOW THE BED FOR THE BED MATERIAL INSTALLATION.
2. FILL TRENCH WITH WELL GRADED MIX OF CLASS 2, CLASS A, CLASS B, AND #57 STONE.
TO THE BED ELEVATION OF THE CHANNEL. ON -SITE ALLUVIUM SHALL BE INCORPORATED
IF AVAILABLE
3. DEFINE THALWEG IN CENTER OF CHANNEL.
POOL
T1
PIEDMONT TRIAD AIRPORT AUTHORITY
PIEDMONT TRIAD
AIRPORT AUTHORITY
0"OW COUIMY, INOFiili CMMM
Mm.mbakercorp.com
MICHAEL BAKER ENGINEERING, INC.
7800 Airport Center Drive
Suite 100
Greensboro, NC 27409
336.931.1500 (Office)
336.931.1501 (Fax)
North Carolina license No. F -1084
Designer:
J B N C A R O
°
Technician: ��OF ESS /�* °
DCT
SEAL =_
Checked by. - 027429 -
LJA
GIN• ° .
Project No: J
138535
cn
z
O
>
w
c
0
41
Q
U
N
0
0
z
Project Name:
STORMWATER
OUTFALL
REPAIR
Drawing Name:
NATURAL CREEK
DETAILS
PIEDMONT TRIAD
INTERNATIONAL AIRPORT
4utocad Drawing Reference:
File: 08 - Natural Creek Details (CD -1 to CD- 2).dwq
Saved: Dec 03, 2014 - 2: 06pm by dtorres
Plotted: Jan 27, 2015 - 11: 37cm
date: Drawing Number:
JANUARY 2015 (�
3usiness Unit: `-'D -�
GREENSBORO
ROCK VANE
1/3
BOTTOM
WIDTH
OF
CHANNEL
W
26 TO 30 ° FLOW
NOTES:
O
1.
BOULDERS MUST BE AT LEAST Tx 2'x 2'.
2.
INSTALL FILTER FABRIC FOR DRAINAGE BEGINNING AT THE MIDDLE OF THE HEADER
J
ROCKS AND EXTEND DOWNWARD TO THE DEPTH OF THE BOTTOM FOOTER ROCK,
J
AND THEN UPSTREAM TO A MINIMUM OF TEN FEET.
LL
3.
DIG A TRENCH BELOW THE BED FOR FOOTER ROCKS AND PLACE FILL ON UPSTREAM
z
q
R
SIDE OF VANE ARMS, BETWEEN THE ARMS AND STREAMBANK.
m
�,
4.
START AT BANK AND PLACE FOOTER ROCKS FIRST AND THEN HEADER (TOP) ROCK.
d
5.
CONTINUE WITH STRUCTURE, FOLLOWING ANGLE AND SLOPE SPECIFICATIONS.
cc i
°�a
6.
AN EXTRA BOULDER CAN BE PLACED IN SCOUR POOL FOR HABITAT IMPROVEMENT.
A
7.
USE CLASS A, CLASS B, AND #57 STONE TO BACKFILL UPSTREAM SIDE OF BOULDERS
e °
TO THE ELEVATION OF THE TOP OF THE HEADER ROCK.
�a
8.
BOULDER SILL MUST BE A MINIMUM OF 6'.
9.
GRAPHICS ARE A REPRESENTATION AND DO NOT INDICATE THE ACTUAL NUMBER
/
OF BOULDERS TO BE USED.
°
R
SCOUR POOL
NO GAPS
SCOUR POOL (EXCAVATED) PER
BETWEEN
DIRECTION OF ENGINEER
BOULDERS
BOTTOM WIDT
PLAN VIEW
# 57 STONE
AlR &33- ��i1019
TOP
OF BANK
D
PROFILE VIEW
A
O r
J
U_
�
° 8
�o o
�o �o 000S
O Q)_ 00
0 ° ° �°0
CD o o o o°$�
0 000 °00 8cp-
o (90 0
®
® sorb° ��
8o o O9®
6° _ ° ° 0opQ.� ° °�
00 O jJ
C95(9 00 0K)g°®
°o°1oObqog 5%
C90°60 o°pO�O°,C)9® �0q,
000 0000 0'0°0'0 0v
o® °° °� °° o °° ° o0
°
0� Nco
g° ° fig® o�
0.
"� o ° o
&'S So or,D9® o
oo° ®0 °oobV� o
A
PLAN VIEW
SECTION A - A
CONSTRUCTED RIFFLE
TOE
EROSION CONTROL
MATTING
DEFINE THALWEG IN -
CENTER OF CHANNEL
HEAD OF RIFFLE
INKFULL
Qo7
- EROSION CONTROL MATTING
SHOULD
BE PLACED BENEATH ROCKS
24" NOM. THICKNESS WELL GRADED MIX OF CLASS II,
CLASS A, CLASS B, AND #57 STONE. ON -SITE
ALLUVIUM
SHALL BE INCORPORATED IF AVAILABLE.
SECTION B - B'
24" NOM. THICKNESS WELL GRADED MIX OF CLASS II,
CLASS A, CLASS B, AND #57 STONE. ON -SITE
ALLUVIUM
SHALL BE INCORPORATED IF AVAILABLE.
R� FLE
° �°o\
°° 0°°
PROFILE A -
NOTES: A'
1. DIG A TRENCH BELOW THE BED FOR THE BED MATERIAL INSTALLATION.
2. FILL TRENCH WITH WELL GRADED MIX OF CLASS 2, CLASS A, CLASS B, AND #57 STONE.
TO THE BED ELEVATION OF THE CHANNEL. ON -SITE ALLUVIUM SHALL BE INCORPORATED
IF AVAILABLE
3. DEFINE THALWEG IN CENTER OF CHANNEL.
POOL
T1
PIEDMONT TRIAD AIRPORT AUTHORITY
PIEDMONT TRIAD
AIRPORT AUTHORITY
0"OW COUIMY, INOFiili CMMM
Mm.mbakercorp.com
MICHAEL BAKER ENGINEERING, INC.
7800 Airport Center Drive
Suite 100
Greensboro, NC 27409
336.931.1500 (Office)
336.931.1501 (Fax)
North Carolina license No. F -1084
Designer:
J B N C A R O
°
Technician: ��OF ESS /�* °
DCT
SEAL =_
Checked by. - 027429 -
LJA
GIN• ° .
Project No: J
138535
cn
z
O
>
w
c
0
41
Q
U
N
0
0
z
Project Name:
STORMWATER
OUTFALL
REPAIR
Drawing Name:
NATURAL CREEK
DETAILS
PIEDMONT TRIAD
INTERNATIONAL AIRPORT
4utocad Drawing Reference:
File: 08 - Natural Creek Details (CD -1 to CD- 2).dwq
Saved: Dec 03, 2014 - 2: 06pm by dtorres
Plotted: Jan 27, 2015 - 11: 37cm
date: Drawing Number:
JANUARY 2015 (�
3usiness Unit: `-'D -�
GREENSBORO
STAKE TOP LAYER
OF MATTING IN 6" TRENCH
(SEE MATTING DETAIL)
4' DEEP (TYP)
GEOLIFT
TOP OF BANK / BANKFULL STAGE
qY \ � CONTROL MATTING
ENCOMPASSES LI
LIVE BRANCH CUTTINGS (SEE
PLANTING PLAN FOR SPECIES)
00000 Oo0o00000000 OOO�
O n 000 00 00 00 n 000 00 n
r) 42 r, 2r -
WELL GRADED MIX OF
CLASS 1 AND CLASS B STONE
U
0
0
U
zE
l�
aM
�N
N
�a
o�
aN
�o
3 �
�T
N
Qa
� c
a N
M �
�o
�N
�o
a o
STONE TOE APPROX. 0.5 FT
ABOVE BASEFLOW
BASEFLOW
n
FINISHED BED
ELEVATION—
STONE TOE APPROX. 1 FT BELOW
OoOC FINISHED BED ELEVATION
001—
NOTES:
1. NUMBER OF LIFTS WILL BE DETERMINED IN THE FIELD BY THE ENGINEER.
F�
tis
TOP OF STREAMBANK
TOE OF BANK
LIVE STAKING
BOTTOM OF CHANNEL
CROSS - SECTION VIEW OF LIVE STAKING SPECIFICATION
2'- 3'
TOP OF STREAMBAN
�ES SHOULD BE CUT AND INSTALLED ON THE SAME DAY.
2. DO NOT INSTALL STAKES THAT HAVE BEEN SPLIT.
3. STAKES MUST BE INSTALLED WITH BUDS POINTING UPWARDS.
4. STAKES SHOULD BE INSTALLED PERPENDICULAR TO BANK.
5. STAKES SHOULD BE 1/2 TO 2 INCHES IN DIAMETER AND 18" TO 30" LONG.
6. STAKES SHOULD BE INSTALLED LEAVING 1/5 OF STAKE ABOVE GROUND.
SQUARE CU
BUDS FACING UPW
. LIVE CUTTING MIN. 1/2" 1
TRENCH
TOP OF
STREAMBANK
ANGLE CUT 30 - 45 DEGt
\L-L-�
PLAN VIEW OF LIVE STAKING SPECIFICATION
18" - 30" LENGTH
LIVE STAKE DETAIL
FIBER MATTING
T1
PIEDMONT TRIAD AIRPORT AUTHORITY
PIEDMONT TRIAD
AIRPORT AUTHORITY
G�uFOiFlD COUMY, Noani CAROLNA
www.mbakercorp.com
MICHAEL BAKER ENGINEERING, INC.
7800 Airport Center Drive
27.94 CM
Suite 100
i\ •
Greensboro, NC 27409
•
336.931.1500 (Office)
1.02 CM
336.931.1501 (Fax)
North
Carolina Mcense No. F -1084
Designer:
0.40 IN
J13
\
�,�� N° C A R 0'� %�
Technician:
: \_ ��0�
DCT
- SEAL -
Checked by.
= 027429 =
LJA
<y
Project No:
Y ° J
138535
01111110\
•
+
•
•
PLANT STAKES FROM
•
•
•
• .
•
•
•
•
TOP OF BANK TO TOE OF BANK
TOE OF SLOPE
•,
•,
•
•
•
•
•
TRENCH
TOP OF
STREAMBANK
ANGLE CUT 30 - 45 DEGt
\L-L-�
PLAN VIEW OF LIVE STAKING SPECIFICATION
18" - 30" LENGTH
LIVE STAKE DETAIL
FIBER MATTING
T1
PIEDMONT TRIAD AIRPORT AUTHORITY
PIEDMONT TRIAD
AIRPORT AUTHORITY
G�uFOiFlD COUMY, Noani CAROLNA
www.mbakercorp.com
MICHAEL BAKER ENGINEERING, INC.
7800 Airport Center Drive
27.94 CM
Suite 100
i\ •
Greensboro, NC 27409
•
336.931.1500 (Office)
1.02 CM
336.931.1501 (Fax)
North
Carolina Mcense No. F -1084
Designer:
0.40 IN
J13
\
�,�� N° C A R 0'� %�
Technician:
: \_ ��0�
DCT
- SEAL -
Checked by.
= 027429 =
LJA
<y
Project No:
Y ° J
138535
01111110\
PLACE COIR FIBER MATTING IN 6 INCH DEEP m
TRENCH, STAKE, BACKFILL, AND COMPACT
TOP OF STREAMBANK 41
B
0
LARGEST,
TOE OF SLOPE
BOTTOM OF CHANNEL
PLACE COIR FIBER MATTING AT TOE OF SLOPE.
SECURE MATTING WITH LARGE MATTING STAKE
CROSS SECTION VIEW
NOTES:
1. BANKS SHOULD BE SEEDED AND MULCHED PRIOR TO PLACEMENT OF MATTING.
2. USE COIR FIBER MATTING.
3. LARGE STAKES SHOULD NOT BE SPACED FURTHER THAN 18" APART.
4. PLACE LARGE STAKES ALONG ALL SEAMS, IN THE CENTER OF BANK, AND TOE OF SLOPE.
• • • • • • • • • • • •
PLAN VIEW
- TRENCH
TOP OF
STREAMBANK
- STAKES
COIR FIBER MATTING
TO BE EXTENDED TO
TOE OF SLOPE
TYPICAL SMALL MATTING STAKE
THE WOOD STAKE SHALL BE THE NORTH AMERICAN
GREEN ECO -STAKE OR APPROVED EQUAL WITH THE
FOLLOWING DIMENSIONS:
LEG LENGTH
11.00 IN
27.94 CM
HEAD WIDTH
i\ •
3.18 CM
•
•
1.02 CM
LEG WIDTH
0.60 IN 1.52 CM
TAPERED TO POINT
LEG THICKNESS
0.40 IN
1.02 CM
TOTAL LENGTH
12.00 IN
(30.48 CM)
TOE OF SLOPE
BOTTOM OF CHANNEL
PLACE COIR FIBER MATTING AT TOE OF SLOPE.
SECURE MATTING WITH LARGE MATTING STAKE
CROSS SECTION VIEW
NOTES:
1. BANKS SHOULD BE SEEDED AND MULCHED PRIOR TO PLACEMENT OF MATTING.
2. USE COIR FIBER MATTING.
3. LARGE STAKES SHOULD NOT BE SPACED FURTHER THAN 18" APART.
4. PLACE LARGE STAKES ALONG ALL SEAMS, IN THE CENTER OF BANK, AND TOE OF SLOPE.
• • • • • • • • • • • •
PLAN VIEW
- TRENCH
TOP OF
STREAMBANK
- STAKES
COIR FIBER MATTING
TO BE EXTENDED TO
TOE OF SLOPE
TYPICAL SMALL MATTING STAKE
THE WOOD STAKE SHALL BE THE NORTH AMERICAN
GREEN ECO -STAKE OR APPROVED EQUAL WITH THE
FOLLOWING DIMENSIONS:
LEG LENGTH
11.00 IN
27.94 CM
HEAD WIDTH
1.25 IN
3.18 CM
HEAD THICKNESS
0.40 IN
1.02 CM
LEG WIDTH
0.60 IN 1.52 CM
TAPERED TO POINT
LEG THICKNESS
0.40 IN
1.02 CM
TOTAL LENGTH
12.00 IN
(30.48 CM)
1[ i I k[ y C 1:10101 a 10 Eel I /_1 I
TYPICAL LARGE MATTING STAKE
THE WOOD STAKE SHALL BE THE NORTH AMERICAN
GREEN ECO -STAKE OR APPROVED EQUAL WITH THE
FOLLOWING DIMENSIONS:
LEG LENGTH
17.00 IN 43.18 CM TAPERED TO POINT
WIDTH
2.00 IN 2.54 CM
THICKNESS
2.00 IN (2.54 CM)
Un
z
0
w
n,
c
0
_Q
�L
U
N
D
O
z
Project Name:
STORMWATER
OUTFALL
REPAIR
Drawing Name:
0651 May-Aim
PIEDMONT TRIAD
INTERNATIONAL AIRPORT
4utocad Drawing Reference:
File: 08 — Natural Creek Detalls (C[)_1 to CD- 2).dwq
Saved: Dec 03, 2014 — 2: O6pm by dtorree
Plotted: Jan 27, 2015 — 11:38am
)ate: Drawing Number:
JANUARY 2015 (�
3usiness Unit: `-' D -�
GREENSBORO