HomeMy WebLinkAboutPTIA_SDOrepair_PCN (4)Homewood, Sue From: Darling, Richard <rdarling @mbakerintl.com> Sent: Tuesday, January 27, 2015 1:16 PM To: david.e.bailey2 @usace.army.mil; Homewood, Sue Cc: Higgins, Karen; rossera @gsoair.org; elmorel @gsoair.org; lallen @mbakerintl.com; dtorres @mbakerintl.com Subject: PTIA SDO Repair Bank Stabilization rdarling(a)mbakerintl.com has sent you an attachment(s) using Baker eFTP David & Sue: Thanks for your response - attached is revised PCN itemizing the stream impacts into 1) culvert extension /installation (Nationwide Permit 18), 2) rip rap dissipater pad installation (NP 18), and 3) stabilization /natural channel design (NP 13). Section A.1 b. has been updated to include both NP 13 and NP 18. The Site #3 phase 2 section cannot be limited to natural channel design or bank stabilization only due to the significant elevation difference here: For Site #3 Phase 2, a proposed drainage structure (manhole) and outlet pipe are necessary to address the vertical drop from the existing stormwater pipe outlet elevation to the existing elevation of the adjacent channel. This existing vertical drop has eroded (and continues to erode) over time due to the hydraulic energy released by the water cascading from the perched pipe. In order to protect the channel from this erosive force, the vertical drop will be contained within the proposed drainage structure. The outfall pipe will be utilized to direct Message and contain the flow in its proposed direction. An outfall stabilization pad Text: constructed of rip -rap is proposed to dissipate remaining energy from the flow. The stabilization pad will be constructed so that the top elevation of the rip -rip will coincide with the proposed elevation of the channel bottom. The temporary and permanent Jordan buffer impacts at Site #3 have also been quantified by Zone 1 and Zone 2 in the attached PCN and revised Permit Drawings by NP 18 and NP 13. Thanks again for your prompt and helpful recommendations. Please do not hesitate to contact me at your convenience should you require any additional information to process this request. Richard Richard Darling I Environmental Manager I Michael Baker International 8000 Regency Pkwy., Suite 600 1 Cary, NC 27518 1 [O] 919 - 481 -5740 rdarling(a)mbakerintl.com I www.mbakerintl.com To retrieve your attachment(s), click on the secure link below. 0�_ wATp Office Use Only: Corps action ID no. DWQ project no. Form Version 1.4 January 2009 Page 1 of 10 PCN Form — Version 1.4 January 2009 Pre - Construction Notification (PCN) Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: ❑X Section 404 Permit ❑ Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: 18 & 13 or General Permit (GP) number: (= NCDENR WQGC 3890 & 3885) 1 c. Has the NWP or GP number been verified by the Corps? Q Yes ❑ No 1d. Type(s) of approval sought from the DWQ (check all that apply): ❑X 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑X Riparian Buffer Authorization 1 e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ❑ Yes ❑X No For the record only for Corps Permit: ❑ Yes ❑X No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. ❑ Yes ❑X No 1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ❑ Yes ❑X No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ❑X No 2. Project Information 2a. Name of project: PTIA SDO Repair 2b. County: Guilford 2c. Nearest municipality / town: Greensboro 2d. Subdivision name: 2e. NCDOT only, T.I.P. or state project no: 3. Owner Information 3a. Name(s) on Recorded Deed: Piedmont Triad Airport Authority 3b. Deed Book and Page No. 3c. Responsible Party (for LLC if applicable): 3d. Street address: 1000 -A Ted Johnson Pkwy. 3e. City, state, zip: Greensboro, NC 27409 3f. Telephone no.: 336.665.5600 3g. Fax no.: 336.665.5694 3h. Email address: Page 1 of 10 PCN Form — Version 1.4 January 2009 4. Applicant Information (if different from owner) 4a. Applicant is: ❑ Agent ❑ Other, specify: 4b. Name: 4c. Business name (if applicable): 4d. Street address: 4e. City, state, zip: 4f. Telephone no.: 4g. Fax no.: 4h. Email address: 5. Agent/Consultant Information (if applicable) 5a. Name: Richard Darling 5b. Business name (if applicable): Michael Baker Engineering, Inc. 5c. Street address: 8000 Regency Pkwy., Suite 600 5d. City, state, zip: Cary, NC 27518 5e. Telephone no.: 919.481.5740 5f. Fax no.: 919.463.5490 5g. Email address: rdarling @mbakerintl.com Page 2 of 10 B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): 1b. Site coordinates (in decimal degrees): Latitude: 36.112877 Longitude: - 79.93112 1c. Property size: 3 acres 2. Surface Waters 2a. Name of nearest body of water to proposed project: Brush Creek 2b. Water Quality Classification of nearest receiving water: WS -III, NSW 2c. River basin: Cape Fear 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Six (6) airport stormwater discharge outfalls (SDOs) are failing, in disrepair, or are contributing to downstream erosion /sedimetation or channel degradation. Sites #1, #2, #3, #5, & #6 involve repair of existing structures and immediate outfall area. Sites #1 and #2 include temporary and permanent restoration of riparian buffer. Site #3 includes minor discharge and downstream channel bank stabilization and restoration. 3b. List the total estimated acreage of all existing wetlands on the property: 0 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 364 3d. Explain the purpose of the proposed project: Repair existing SDOs and stabilize downstream channel, in response to turbidity benchmark exceedances observed during NPDES monitoring 3e. Describe the overall project in detail, including the type of equipment to be used: See Notes on Permit Drawings. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the past? ❑ Yes ❑X No ❑ Unknown Comments: 4b. If the Corps made the jurisdictional determination, what type of determination was made? ❑ Preliminary ❑ Final 4c. If yes, who delineated the jurisdictional areas? Name (if known): Agency /Consultant Company: Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? Z Yes ❑ No ❑ Unknown 5b. If yes, explain in detail according to "help file" instructions. Corps Action ID SAW 2000 - 21655, DWQ File 00 -0846 for the Runway 5L/23R and Fed Ex project included Sites #4 and #5. 6. Future Project Plans 6a. Is this a phased project? ❑ Yes ❑X No 6b. If yes, explain. Page 3 of 10 PCN Form — Version 1.4 January 2009 C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ❑ Wetlands ❑X Streams — tributaries ❑X Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. Wetland impact number Permanent (P) or Temporary T 2b. Type of impact 2c. Type of wetland 2d. Forested 2e. Type of jurisdiction Corps (404,10) or DWQ (401, other) 2f. Area of impact (acres) W1 Choose one Choose one Yes /No - W2 Choose one Choose one Yes /No W3 Choose one Choose one Yes /No W4 Choose one Choose one Yes /No W5 Choose one Choose one Yes /No W6 Choose one Choose one Yes /No 2g. Total Wetland Impacts: 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Stream impact number Permanent (P) or Temporary (T) 3b. Type of impact 3c. Stream name 3d. Perennial (PER) or intermittent (INT)? 3e. Type of jurisdiction 3f. Average stream width (feet) 3g. Impact length (linear feet) S1 P Manhole (NP18) UT to Brush Creek INT 7 18 S2 P Rip -rap (NP18) UT to Brush Creek INT 7 31 S3 P Stabilization (NP13) UT to Brush Creek INT 7 315 S4 Choose one S5 Choose one S6 Choose one 3h. Total stream and tributary impacts 364 3i. Comments: See Drawings SB -3.1, SB -3.2, and SB -3.3 for Stream Bank Restoration plan Page 4 of 10 PCN Form — Version 1.4 January 2009 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then indivi ually list all open water impacts below. 4a. Open water impact number Permanent (P) or Temporary T 4b. Name of waterbody (if applicable) 4c. Type of impact 4d. Waterbody type 4e. Area of impact (acres) 01 Choose one Choose O2 Choose one Choose 03 Choose one Choose 04 Choose one Choose 4f. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If pond or lake construction proposed, the complete the chart below. 5a. Pond ID number 5b. Proposed use or purpose of pond 5c. Wetland Impacts (acres) 5d. Stream Impacts (feet) 5e. Upland (acres) Flooded Filled Excavated Flooded Filled Excavated P1 Choose one P2 Choose one 5f. Total: 5g. Comments: 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. Project is in which protected basin? ❑ Neuse ❑ Tar - Pamlico ❑ Catawba ❑ Randleman ❑ Other:.lordan Lake 6b. Buffer Impact number— Permanent (P) or Temporary (T) 6c. Reason for impact 6d. Stream name 6e. Buffer mitigation required? 6f. Zone 1 impact (square feet) 6g. Zone 2 impact (square feet) B1 P SDO repair Site #1, SDO 23, LIT to Brush Creek No 0 580 B2 T SDO repair Site #1, SDO 23, LIT to Brush Creek No 1,060 1,947 B3 P SDO repair Site #2, upstream of IS# 02, Brush Creek No 496 675 B4 T SDO repair Site #2, upstream of IS# 02, Brush Creek No 441 785 B5 P SDO repair & channel stab. Site #3, SDO 030, LIT to Brush Creek No 16,678 1,009 B6 T SDO repair & channel stab. Site #3, SDO 030, LIT to Brush Creek No 6,339 11,597 6h. Total Buffer Impacts: 25,014 16,593 61. Comments: See Drawings SB -1, SB -2, SB -3A, & SB -3B for riparian buffer restoration plans Page 5 of 10 D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. Stream impacts are specifically for purposes of stabilization using natural channel design criteria. Buffer impacts are unavoidable due to outfall locations near stream origins. Existing buffer conditions will be improved by stabilizing currently eroded slopes and re- vegetating. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Construction - related impacts will be avoided and minimized to the extent possible by applying DEMLR- approved sedimentation and erosion control protocols as noted on construction plans. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ❑ Yes ❑X No 2b. If yes, mitigation is required by (check all that apply): ❑ DWQ ❑ Corps 2c. If yes, which mitigation option will be used for this project? ❑ Mitigation bank El Payment to in -lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type: Choose one Type: Choose one Type: Choose one Quantity: Quantity: Quantity: 3c. Comments: 4. Complete if Making a Payment to In -lieu Fee Program 4a. Approval letter from in -lieu fee program is attached. ❑ Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: Choose one 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non - riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 6 of 10 PCN Form — Version 1.4 January 2009 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires Yes X No buffer mitigation? 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. 6c. 6d. 6e. Zone Reason for impact Total impact Multiplier Required mitigation (square feet) (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund). 6h. Comments: Page 7 of 10 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified ❑X Yes ❑ No within one of the NC Riparian Buffer Protection Rules? 1b. If yes, then is a diffuse flow plan included? If no, explain why. Project involves repair of existing structures and stabilization of eroded surfaces only ❑ Yes ❑X No 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? 2b. Does this project require a Stormwater Management Plan? ❑ Yes ❑X No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: The project itself is maintenance of components of the PTIA stormwater management plan 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: 2e. Who will be responsible for the review of the Stormwater Management Plan? 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? ❑ Phase II ❑ NSW 3b. Which of the following locally - implemented stormwater management programs ❑ USMP apply (check all that apply): ❑ Water Supply Watershed ❑ Other: 3c. Has the approved Stormwater Management Plan with proof of approval been El Yes ❑ No attached? 4. DWQ Stormwater Program Review ❑Coastal counties ❑ HQW 4a. Which of the following state - implemented stormwater management programs apply ❑ORW (check all that apply): E] Session Law 2006 -246 ❑ Other: 4b. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 8 of 10 PCN Form — Version 1.4 January 2009 F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1a. Does the project involve an expenditure of public (federal /state /local) funds or the 0 Yes ❑ No use of public (federal /state) land? 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State El Yes 0 No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval ❑ Yes ❑ No letter.) FAA has approved project exclusive of additional NEPA documentation Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, E] Yes 0 No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after - the -fact permit application? El Yes 0 No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in El Yes 0 No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. SDO and erosion repair only 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non- discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. N/A Page 9 of 10 PCN Form — Version 1.4 January 2009 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or E] Yes M No habitat? 5b Have you checked with the USFWS concerning Endangered Species Act El Yes No impacts? i 5c. If yes, indicate the USFWS Field Office you have contacted. Raleigh 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? �i http: / /www.fws. gov/ ral eighlspecies /cntylistiguilford.htmi fford. htmi i I http:,I!portal.ncdenr.orgiwebi'nhp/home 6, Essential Fish Habitat (Corps Requirement) 6a Will this project occur in or near an area designated as essential fish habitat? El Yes No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? htlp:i',Iwmi.habitat.noaa.gov/proteclion/efh.lhabitatmapper.htmi 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation E] Yes Z No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? http://gis.ncdcr.gov/hpoweb/ 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? =E] Yes No 8b. if yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination? http:l/www. ncfl ood maps. comf J. Alex Rosser, PIE -A Deputy Executive Director Applicant/Agent's Printed Name Applicant/Agent's Signature Date (Agent's signature is valid only if an authorization letter from the applicant is provided.) 1 4 1 a INDEX Of DRAWINGS DESCRIPTION DRAWING No. COVER SHEET .... - GENERAL NOTES . ... GN -1 SUMMARY OF QUANTITIES ....... Q-1 PROJECT LAYOUT& SAFETY PLAN„ .................... I PL -1 STREAM & BUFFER IMPACTS PLAN ......... . . 1 SB -1 to SB -33 GEOMETRIC LAYOUT & GRADING PLAN .. GL -1 to GL -6 PROFILES. .. ... ..... .. P -1 to P -2 EROSION CONTROL DETAILS ........................... EC-1 to EC -2 NATURAL CREEK DETAILS........ CD -1 to CD -2 PIEDMONT TRIAD INTERNATIONAL AIRPORT KGSO) GREENSBORO, NORTH CAROLINA JANUARY 2015 wn.mbAercorp.com MICNAEI BAKER ENGINEERING, INC. 1800 Airport Center Drive Suite 100 Greensboro, NC 21409 336.931.1500 (Office) 33641,1501 (Fax North Carolina License No. HUH \ pp p9ppppp �/ p , t\ p o \ p \ e I a (1 p f ' o SEAS p 02742) p ' p p // pp opppppp \\ SET No. PIEDMONT TRIAD IN7'\JION41 AIRPF (KGSO) Imi,,yEr'y l �'pOi JANURRY 2015 PROJECT DESCRIPTION THE PROJECT CONSISTS OF SIX SEPARATE WORK AREAS FO; DRAINAGE REDAIR AND IM'ROVEM1TS. HAUL ROUTES, STAGING AREAS & CONSTRUCTION ACTIVITIES 1, EXCEPT WHERE DESIGNATE) ON PLANS OR AS AUTHORIZED BY ENGINEER, CONTRACTOR WILL NOT BE ALLOWED TO LSE ANY OF THE EXISTNG RUNWAYS OR TAXIWAYS AS PART OF THE HAUL ROAD. 2. CONTRACTOR SHALL MAINTAIN ALL AIRFIELD SAFETY DEVICES SUCH AS STAKED LIMIT LINES, FOR THE DURATION OF THE PROJECT AS REQUIREO, OAVACED STAKES OR FAGGING SHALL BE REPLACED IMMEDIATELY, CONTRACTOR TO SUBMIT PLAN SHOWING LOCATION OF LIMIT LINES FOR EACH PHASE AND FOR PROJECT DURATION TO THE ENGINEER FOR ADPROVAL 3. THE CONTRACTOR'S STAGING AREAS', AND HAuL ROUTES SHOWN ON THE PLANS ARE GENERAL AND FOR INFORMATON PURPOSES ONLY, THE ACTUAL SIZE AND LCCATON OF STAGING AREAS AND HAUL ROUTES WILL BE APPROVED BY OWNER PRIOR TO CONSTRUCTION, 4, ALL EXISTING GRASSED AREAS WHICH ARE DISTURBED AS PART OF THE CONTRACTOR'S ACCESS ROAD, CONTRACTOR'S STACING AREA, AND HAUL ROUTES SHALL BE FESTOFED TO THEIR ORIGINAL CONDITION AFTER COVPZION Or THE PROJECT, IN ADDITION, ALL EXISTING ROADS, THAT WILL BE USE] AS THE CONTRACTOR'S HA,L ROUTE SHALL BE MAINTAINED DURING CONSTRJCTION AND RESTORED TO THEIR PRE — CONSTRUCTION CONDITION, CONTRACTOR SHALL PROTECT NEWLY INSTALLED PAVEMENTS DURING POST— CONSTR,CTION REMOVAL OF EROSION CONTROL MEASURES WITH STEEL PLATES AND/OR LIGHTLY LOADED EQUIPMENT NO SEPARATE MEASUREMENT OR PAYMENT WILL BE MADE FOR THIS ITEM. 5. ALL EQUIFMENT MST BE RETURNED TO THE APPROPRIATE STAGING AREA (TRACK VERSUS NON —TRACK VEHICLES) AT THE END OF EACH WORK DAY AND WHEN NOT ENGAGED IN THE CONSTRJCTION DURING RCN— WORKING GAYS AND NIGHTS, OWHER WILL DESICNATE AFEAS FOR CONTRACTOR'S EMPLOYEES AUTO DARKING. 6, THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING AND PROVIDING ALL PERMANENT AND TEMPORARY ,TILITY CONNECTIONS FOR THE PROJECT. 7, CONTPACTOR TO FIELD VERIFY EXISTING CONDITIONS PRIOR TO �BEGINNIIG CONSTR,CTION A1D REPORT TO ENGINEER ANY VARIATIONS FFOV THE NFCRMATION SHOWN ON COKSTROCTIM PLANS, 8, THE'ROVISON AID MAINTENANCE OF HAUL FOADS, HAIL ROAD STONE, TEMPORARY HAUL SLABS AND STEEL PLATES SHALL BE CONSIDERED INCIDENTAL TO PROJECT. 9. 00ITFACTOR SHALL PROVIDE STONE FOR CONSTRUCTOR EN �RANCE PADS AND PERFORM MAINTENANCE AS NECESSARY OR AS FEQUIFED BY THE ENGINEER, 1 CONTRACTOF SHALL BE RESPONSIBLE FOR THE LOCATON, IDENTIFICATION, AND PROTECTION OF ALL EXISTING UTLITIES AND NAVAIDS IN CONSTRUCTION AREA, ANY DAMAGES TO EXSTNG UTLITIES,'IPELINES AND NAVAIDS ON OR OFF AIRPORT PROPERTY SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. NO REIMBURSEMENT WILL BE ALLOWED FOR UTILITY PIPELINES/NAVAID LOCATION, REPAIR, OR REPLACEMENT. 11. ALL PAVEMENT SHALL BE KEPT FREE OF ALL DEBRIS, DIRT, ETC., AT ALL TIMES, ANY SPILLAGE OF EXCAVATION OR OTHER MATERIALS SHALL BE CLEANED UP IMMEDIATELY BY THE CONTRACTOR WITH A MOTOR RIVEN SWEEPER, A PROGRAM OF REGULAR INSPECTION WIL_ BE PLWED BY THE CONTRACTOR, 12. BURNING OF DEBRIS WILL NOT BE ALLOWED ON AIRPORT PROPERTY, 13. CONSTRUCTION STAKE —OUT SHALL BE PERFORMED BY CONTRACTOR IV ACCORDANCE WITH ARTICLE 50 -06 OF THE GENERAL PROVISIONS, 14. NOTICE TO AIRMEN (NOTAV) — THE CONTRACTOR WILL PROVIDE THE NECESSARY INFORMATION ON CONSTRUCTION CONDITIONS TO THE OWNER IN ORDER FOR MAYS TO BE ISSUE" IN ACCORDANCE WITH ESTABLISHED CRITERIA, THE OWNER SHALL BE GIVEN A NOTICE OF CONDITION CHANGES IN ACCORDANCE WITH THE GUIDELINES PROVIDED IN THE PROJECT MANUAL 15. CONTRACTOR STAGING OF TRACK EQUIPMENT SHALL REMAIN OFF OF EXISTING PAVED SURFACES AND OUTSIDE OF TAXIWAY OBJECT FREE AREAS, EXISTING CONDITIONSIUNDERGROUND & CONCEALED FACILITIES 16. FAA CABLES WILL BE LOCATED AN] MARKED BY FAA PRIOR TC CONSTRUCTION, CONTRACTOR IS TO NOTIFY FAA 30 DAYS IN ADVANCE SO THAT FAA CAN SCHEDULE THE REOLIRED MARKING TO PROTECT CABLES DURING CONSTRUCTION. ANY CABLES DAMAGE" DURING CONSTRUCTION WILL BE REPLACED BY CONTRACTOR, CONTRACTOR SHALL PAY ALL COSTS ASSOCIATED WITH THE REPAIR OF DAMAGED CABLES AT NO COST TO OWNER, 17, CONTRACTOR SHALL BE RESPONSIBLE FOR THE LOCATION AND IDENTIFICATION OF ALL EXISTING UTILITIES AND PIPELINES IN THE CONSTRUCTION AREA, ANY DAMAGE TO EXISTING UTILITIES OR PIPELINES 'ON OR OFF AIRPORT PROPERTY) DAMAGED BY CONTRACTOR SHALL BE THE RES'ONSIBILITY OF THE CONTRACTOR. CONTRACTOR SHAD REPAIR ALL JTI_ITYPIPELINE DAMAGED BY CONTRACTOR AT NO ADDITIONAL COST TO OWNER, 18, CONTRACTOR SHALL MAINTAIN Al STATIONARY AND MOBILE EQUIPMENT AGAINST SPILLS AND LID LEAKAGE, CONTRACTOR SHALL DIAPER Al LEAKING EQUIPMENT OPERATE] WITHIN 150 FEET OF ANY STREAV, WATER BOGY OR WETLAND, UNLESS SUITABLE CONTAINMENT IS PROVIDED TO PREVENT POTENTIAL SPILLS FROM ENTERING ANY STREAM OR WATER BODY, 19, CONTRACTOR SHALL FROTECT EXISTING RUNWAY AND TAXIWAY LIGHTING SYSTEMS AND APPROACH LIGHTING SYSTEMS, 20 ANY UNPLANNED, JNAPPROVED OR ACCIDENTAL SHUTDOWN OR INTERFU'TON OF SERVICE TO ANY MINTING CIRCUIT OR NAVIGATIONAL AID FECuIRES IMMEDIATE NOTIFICATION OF AIRPORT OPERATIONS AND ENGINEER BY THE CONTRACTOR. ALL NECESSARY REPAIPS NULL BE AT CONTRACTORS EXPENSE 21, THE CONTRACTOR WILL BE RESPONSIBLE FOR STAKING AND GRADE CONTROL OF ALL ELEMENTS OF THE CONSTRUCTION FOR THE DURATION OF THE PROJECT 22, CONTRACTOR SHALL FIELD VERIFY EXISTING SOIL CONDITONS, SOIL VOISTURE CONTENT, SOIL TYPE PRIOR TO "CNSTFJCTION. ALL COSTS FOR VERRIFYING EXISTING SOIL CONDITION SHALL BE INCI]ENTAL TO THE PROJECT. a TEMPORARY MARKINGS, BARRICADES, TRAFFIC CONTROL 23. SEE SPECIFICATION SECTION 01030 AND 0151 r� c> SAFETY & SECURITY NOTES 1. IH ORDER TO CONSTRUCT THIS PROJECT WITH MIKIMAL INTERFERENCE TO AIRPORT OPERATIONS, THE CONTRACTOR SHALL CONDUCT HIS CONSTRUCTION OPERATORS AS SHO''WN ON THE PROJECT LAYOUT AND SAFETY PLAN, AND HIS APPROVED CONSTRUCTION PROGRESS SCHEDULE THE CONTRACTOR SHALL COORDINATE ALL CONSTRUCTION ACTIVITIES WITH THE ENGINEER TO MINIMIZE DISRUPTION TO AIRPORT OPERATIONS, IT IS THE CONTRACTOR'S RESPONSIBILITY TO ENSURE COMPUANCE WITH SAFETY REQUIREVENTS AND TO MINIMIZE INTERFERENCE TO AIRPORT OPERATORS DURING CONSTRUCTOR, 2, CONTRACTOR SHALL OBTAIN, HAVE KNOWLEDGE OF, AND INCOR'ORATE THE FOLLOWING SAFETY PROVISIONS INTO THE CONSTRUCTION PROJECT, OPERATIONAL SAFETY ON AIPPORTS DURING CONSTRUCTION — AC 15o/537G -2F. AIRPORT SAFETY SELF — INSPECTION — AC 15G�52C0 -18C. SAFETY REQUIREMENTS OF THE SPECIFICATIONS SECURITY REQLIREMENTS OF THE SPECIFICATIOKS, 3, Al VEHICLES USED ON THE AIRFIELD SHALL MEET AIRPORT REQUIREMENTS FOR MARKING AND LIGHTING, 5. CONSTRLCTI01 ACTIVITIES ARE SCHEDULED TO BE CONDUCTE) IN AREAS WHICH WILL AFFECT THE AIRPORT OPERATORS AREA (AOA), THEREFORE, THIS PROJECT MUST BE CONSTRUCTED WITH MINIMAL INTERFERENCE TC AIRCRAFT AN) SERVICE VEHICLE OPERATIONS, CLOSURES OF THE AOA SHALL BE COMPLETE) IN ACCORDANCE WITH THE CONSTRUCTION SEQJENCES WITHIN THIS PLAN SET OR AS ORDERED BY THE ENGINEER. 6, SINCE THE AIRPORT USERS SHAD BE WITHIN 'ROXIMITY OF THE PPO,ECT LIMITS THROUGHOUT THE DURATION OF THIS PROJECT, A COORDINATED EFFORT IN RESPECT TO SECJRTY, SAFETY, AND CONSTRUCTOR IS ESSENTIAL NUMEROUS CONSIDERATIONS MUST BE ADDRESSEt) IN THE CONTRACTORS WORK AND SCHEDULE INCLUDING BUT NOT LIMITED TO THE FOLLOWING, CONSTRUCTOR SEQUENCE SECJRITY CHECK POINTS PROJECT CONSTUCTIOK TRAFFIC CONTRACTOR'S STAGING AREA AREAS UTILIZED BY AIRPORT USERS ADJACENT CONSTRJCTION EY OTHERS 7, CONTRACTOR WILL MAINTAIN SECURITY WITHIN THE PROJECT SITE AT ALL TIMES, NO JNAUTHORIZED'ERSONNEL SHALL BE ALLOWED ON THE SITE. 8, ALL CONSTRICTION TRAFFIC SHALL ENTER AND EXIT THE PROJECT SITE ONLY THROUGH CONSTRUCTION ENTRANCE LOCATIONS DESIGNATED BY THE ENGINEER, CONTRACTOP WALL BE RESPONSIBLE FOR SEC3TY OF DESIGNATE) ENTRANCE GATES AND MUST ENSJRE THAT THE GATES ARE MARKED AT ALL TIMES WHILE UNLOCKED. 9. CON- RACTOR SHALL 'RUDE FLAGMEN AT ACCESS/HAJL WES ON OR ADJACENT TO RUIiWAYS OR TAXIWAYS OR AS DIRECTED BY THE ENGINEER TO ENSJRE THAT TRAFFIC S MAINTAINE) ON THE DESIGNATED ROJTE. 10, AREAS OUTSIDE THE PROJECT LIMITS ARE DESIGNATED AS RESTRICTED AREAS, THE CONTRACTOR'S FORCES ARE PROHIBITED FROM ENTERING RESTRICTED AREAS AT ANY TIME, JNLESS SPECIFICALLY AUTHORIZED BY THE ENGINEER OR AIR'ORT MANAGEMENT, 11. CONTRACTOR SHALL OBSCURE Al TAXIWAY EDGE LIGHTS LOCATED ON PORTIONS OF TAXIWAYS SCHEDULED TO BE CLOSED DURING THE PROJECT. ALL COST FOR OBSCURING TAXIWAY EDGE LIGHTS IS INCIDENTAL TO PROJECT. 12. CONTRACTOP SHALL REMOVE ALL FOREIGN 0EJECT DEBRIS (FC5) CONTINUOUSLY ON ALL HAJL ROUTES THAT CROSS AIRCRAFT MOVEMENT AREAS, 13, EACH CONTRACTOR VEHICLE DRIVER WITHIN THE AIRPORT SECJRITY FENCE MUST HAVE COMPLETED OR BE ESCORTED BY A CONTRACTOR VEHICLE DRIVER THAT HAS COMPLETED THE AIRPORTS GROJND VEHICLE DRIVER TRAINING PROGRAM. 1 THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PENALTIES ASSOCIATED WITH CONTRACTOR AND SUBCONTRACTOR FORCES THAT ARE INVOLVED IN A VEHICLE DEVIATION /RUNWAY INCURSION. 15. Al CONTRACTOR AN) SUBCONTRACTOR EMPLOYEES SHALL ENTER THE AIRPORT WITHIN CONTRACTOR VEHICLES, CONTRACTOR EMPLOYEE PARKING SHALL NOT BE INSIDE THE AIRPORT OPERATIONS AREA, il} T1 PIEDMONT TRIAD AIRPORT AUTHORITY PIEDMONT TRIAD AIRPORT AUTHORITY GUILFORD COUNTY, NR CAROUNA www,mboOrcolp.com MICHAEL BAKER ENGINEERING, INC. 7800 AlToO CkF Drive Suile 100 Greensboro, NC 27409 336.931,1500 (Office) 336.931.1501 (Fax) North Carolina License No, E -1084 Oesigrer: DCT \ � tltlp000ptltl � // Techricicr. tl �tl DCT 1( , tl7 = SEAL a = Checked hy: = a 027429 1 0 0 LJA o a � G � I-p1I � o ti /��tl000�J�I�G�tlCO \\ Project No: A tl0ctlootl °tl (�\ m 0 a L U J 0 0 z Project Name: STORMWATER OUTFALL REPAIR Drawing Name, GENERAL NOTES PIEDMONT TRIAD INTERNATIONAL AIRPORT Aufccad Drowing Reference; le, 02 — Gsiero Noles,5wa Sa c, C.0 03, 2014 —1, 41pm h9 Jvrss otls9:.�� 21,1715— 'I:Hcm Date; Drowirg Number: JAIIUAR'r 2 ('1 Bueinesu Unit: G� -1 (SECTION 4. FOR ADDITIONAL SAFETY AND SECURITY REQUIREMENTS, SEE SPECIFICATIONS 01 0,30)). 5. CONSTRLCTI01 ACTIVITIES ARE SCHEDULED TO BE CONDUCTE) IN AREAS WHICH WILL AFFECT THE AIRPORT OPERATORS AREA (AOA), THEREFORE, THIS PROJECT MUST BE CONSTRUCTED WITH MINIMAL INTERFERENCE TC AIRCRAFT AN) SERVICE VEHICLE OPERATIONS, CLOSURES OF THE AOA SHALL BE COMPLETE) IN ACCORDANCE WITH THE CONSTRUCTION SEQJENCES WITHIN THIS PLAN SET OR AS ORDERED BY THE ENGINEER. 6, SINCE THE AIRPORT USERS SHAD BE WITHIN 'ROXIMITY OF THE PPO,ECT LIMITS THROUGHOUT THE DURATION OF THIS PROJECT, A COORDINATED EFFORT IN RESPECT TO SECJRTY, SAFETY, AND CONSTRUCTOR IS ESSENTIAL NUMEROUS CONSIDERATIONS MUST BE ADDRESSEt) IN THE CONTRACTORS WORK AND SCHEDULE INCLUDING BUT NOT LIMITED TO THE FOLLOWING, CONSTRUCTOR SEQUENCE SECJRITY CHECK POINTS PROJECT CONSTUCTIOK TRAFFIC CONTRACTOR'S STAGING AREA AREAS UTILIZED BY AIRPORT USERS ADJACENT CONSTRJCTION EY OTHERS 7, CONTRACTOR WILL MAINTAIN SECURITY WITHIN THE PROJECT SITE AT ALL TIMES, NO JNAUTHORIZED'ERSONNEL SHALL BE ALLOWED ON THE SITE. 8, ALL CONSTRICTION TRAFFIC SHALL ENTER AND EXIT THE PROJECT SITE ONLY THROUGH CONSTRUCTION ENTRANCE LOCATIONS DESIGNATED BY THE ENGINEER, CONTRACTOP WALL BE RESPONSIBLE FOR SEC3TY OF DESIGNATE) ENTRANCE GATES AND MUST ENSJRE THAT THE GATES ARE MARKED AT ALL TIMES WHILE UNLOCKED. 9. CON- RACTOR SHALL 'RUDE FLAGMEN AT ACCESS/HAJL WES ON OR ADJACENT TO RUIiWAYS OR TAXIWAYS OR AS DIRECTED BY THE ENGINEER TO ENSJRE THAT TRAFFIC S MAINTAINE) ON THE DESIGNATED ROJTE. 10, AREAS OUTSIDE THE PROJECT LIMITS ARE DESIGNATED AS RESTRICTED AREAS, THE CONTRACTOR'S FORCES ARE PROHIBITED FROM ENTERING RESTRICTED AREAS AT ANY TIME, JNLESS SPECIFICALLY AUTHORIZED BY THE ENGINEER OR AIR'ORT MANAGEMENT, 11. CONTRACTOR SHALL OBSCURE Al TAXIWAY EDGE LIGHTS LOCATED ON PORTIONS OF TAXIWAYS SCHEDULED TO BE CLOSED DURING THE PROJECT. ALL COST FOR OBSCURING TAXIWAY EDGE LIGHTS IS INCIDENTAL TO PROJECT. 12. CONTRACTOP SHALL REMOVE ALL FOREIGN 0EJECT DEBRIS (FC5) CONTINUOUSLY ON ALL HAJL ROUTES THAT CROSS AIRCRAFT MOVEMENT AREAS, 13, EACH CONTRACTOR VEHICLE DRIVER WITHIN THE AIRPORT SECJRITY FENCE MUST HAVE COMPLETED OR BE ESCORTED BY A CONTRACTOR VEHICLE DRIVER THAT HAS COMPLETED THE AIRPORTS GROJND VEHICLE DRIVER TRAINING PROGRAM. 1 THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PENALTIES ASSOCIATED WITH CONTRACTOR AND SUBCONTRACTOR FORCES THAT ARE INVOLVED IN A VEHICLE DEVIATION /RUNWAY INCURSION. 15. Al CONTRACTOR AN) SUBCONTRACTOR EMPLOYEES SHALL ENTER THE AIRPORT WITHIN CONTRACTOR VEHICLES, CONTRACTOR EMPLOYEE PARKING SHALL NOT BE INSIDE THE AIRPORT OPERATIONS AREA, il} T1 PIEDMONT TRIAD AIRPORT AUTHORITY PIEDMONT TRIAD AIRPORT AUTHORITY GUILFORD COUNTY, NR CAROUNA www,mboOrcolp.com MICHAEL BAKER ENGINEERING, INC. 7800 AlToO CkF Drive Suile 100 Greensboro, NC 27409 336.931,1500 (Office) 336.931.1501 (Fax) North Carolina License No, E -1084 Oesigrer: DCT \ � tltlp000ptltl � // Techricicr. tl �tl DCT 1( , tl7 = SEAL a = Checked hy: = a 027429 1 0 0 LJA o a � G � I-p1I � o ti /��tl000�J�I�G�tlCO \\ Project No: A tl0ctlootl °tl (�\ m 0 a L U J 0 0 z Project Name: STORMWATER OUTFALL REPAIR Drawing Name, GENERAL NOTES PIEDMONT TRIAD INTERNATIONAL AIRPORT Aufccad Drowing Reference; le, 02 — Gsiero Noles,5wa Sa c, C.0 03, 2014 —1, 41pm h9 Jvrss otls9:.�� 21,1715— 'I:Hcm Date; Drowirg Number: JAIIUAR'r 2 ('1 Bueinesu Unit: G� -1 SUMMARY OF QUANTITIES ITEM NO. SPEC NO. DESCRIPTION QTY. UNIT 1 01000 Mobilization 1 LS 2 S- 101 -3.1 Construction Staking and Survey 1 LS 3 S- 102 -3.1 Maintenance and Protection of Traffic 1 LS 4 S- 103 -3.1 Site 3 Stream Diversion 1 LS 5 S-140-3.1a Remove Existing Drainage Structure 2 EA 6 S- 140 -3.1 b Remove Concrete Pipe 60 LF 7 S- 140 -3.1 c Remove Existing Concrete Flume 550 SY 8 P- 151 -4.1 Clearing And Grubbing 2 Acre 9 P- 152 -4.1 Compacted Embankment in Place 6,000 CY 10 P- 152 -4.2 Unsuitable Excavation 3,600 CY 11 P- 152 -4.3 Borrow Excavation 1,500 CY 12 P- 152 -4.4 Temporary Diversion Ditch 1,100 CY 13 P- 152 -4.5 Silt Excavation 500 CY 14 D- 701 -5.1a 24 -inch Reinforced Concrete Pipe Class IV 40 LF 15 D- 701 -5.1b 42 -inch Reinforced Concrete Pipe Class IV 12 LF 16 D- 701 -5.1 c 48 -inch Corrugated Steel Pipe 18 LF 17 D- 751 -5.1a Precast Junction Box (NCDOT Std 840.31) 1 EA 18 D- 751 -5.1b Precast Manhole 5 -foot Diameter (NCDOT Std 840.52) 1 EA 19 D- 751 -5.1c Manhole Top Section (NCDOT Std 840.52) 1 EA 20 D- 751 -5.1 d Manhole Frame and Cover (NCDOT Std 840.54) 2 EA 21 D- 751 -5.1e Joint Sealing of Manhole and Culverts 200 LF 22 D- 752 -5.1 a Reinforced Endwalls, 18 -inch 1 EA 23 D- 752 -5.1 b Reinforced Endwalls, 42 -inch 1 EA 24 D- 752 -5.1 c Reinforced Endwalls, 48 -inch 1 EA 25 D- 753 -5.1 a Rip -Rap - Class A 650 Ton 26 D- 753 -5.1 b Rip -Rap - Class B 550 Ton 27 D- 753 -5.1 c Rip -Rap - Class 1 2,850 Ton 28 D- 753 -5.1 d Rip -Rap - Class 11 1,200 Ton 29 D- 753 -5.1 e Boulder 350 Ton 30 D- 753 -5.1 f Washed No. 57 Rock 350 Ton 31 D- 753 -5.1 g Rip Rap Filter Fabric 3,000 SY 32 D- 754 -5.1 Concrete Expressway Gutter (NCDOT Std 846.01) 40 LF 33 E- 891 -5.1 Inlet Protection 3 EA 34 E- 893 -5.2 Temporary Silt Fence 1,500 LF 35 E- 893 -5.3a Maintain and Remove Existing 4 Foot Orange HDPE Barrier Fencing 80 LF 36 E- 893 -5.3b 4 Foot Orange HDPE Barrier Fencing 160 LF 37 E- 895 -5.1 a Coir Fiber Matting 1,720 SY 38 E- 895 -5.1 b Excelsior Fiber Matting 6,785 SY 39 E- 895 -5.2 Wattle 600 LF 40 T- 901 -5.1 a Temporary Seeding 2 Acre 41 T- 901 -5.1 b Permanent Seeding 2 Acre 42 T- 901 -5.1c Permanent Non - Riparian Seeding 0.10 Acre 43 T- 901 -5.1d Permanent Riparian Seeding 0.12 Acre 44 T- 903 -5.2 Live Stakes 1,900 EA 45 T- 903 -5.3 Vegetated Geolifts 17 SY 46 T- 903 -5.4 Amended Soil Mix 30 CY 47 T- 908 -5.1 Mulching 2 Acre 48 1607 -4.1 Gravel Construction Entrance 4 EA STREAM &BUFFER IMPACTS IMPACT SUMMARY STREAM IMPACT BUFFER IMPACT Intermittent (Liner Feet) Perennial (Liner Feet) Zone 1 (Square Feet) Zone 2 (Square Feet) a° e � Permanent 0 0 0 580 Site 1 Temporary 0 0 1060 1947 Permanent 0 0 496 675 Site 2 Temporary 0 0 441 785 Site 3 Permanent 49 0 2923 211 NP18 Temporary 0 0 820 895 Site 3 Permanent 315 0 13755 798 NP13 Temporary 0 0 5519 10702 Permanent 0 0 0 0 Site 4 Temporary 0 0 0 0 Permanent 0 0 0 0 Site 5 Temporary 0 0 0 0 Permanent 0 0 0 0 Site 6 Temporary 0 0 1 0 0 Permanent 364 0 17174 2264 Total Temporary 0 0 7840 14329 T1 PIEDMONT TRIAD AIRPORT AUTHORITY PIEDMONT TRIAD AIRPORT AUTHORITY GUILFORD COUNTY, NORTH CAROLINA a r www.mbakercorp.com MICHAEL BAKER ENGINEERING, INC. 7800 Airport Center Drive Suite 100 Greensboro, NC 27409 336.931.1500 (Office) 336.931.1501 (Fax) North Carolina License No. F -1084 Designer: DCT N° C R�� Technician: "q- °A = e�F ESS/0 ° 1 DCT a° e � - SEAL -_ Checked by: = 027429 - LJA Project No: CRY J. 138535 10 .. a 0 Z 0 cn LL O a L U W Q) 0 z Project Name: STORMWATER OUTFALL REPAIR Drawing Name: SUMMARY OF QUANTITIES PIEDMONT TRIAD INTERNATIONAL AIRPORT Autocad Drawing Reference Date: JANUARY 2015 Business Unit: GREENSBORO Drawing Number: Q -1 WORK SUMMARY SITE #1: Reparation of failed drainage pipe system via removing /replacing damaged pipe sections and manhole structure as shown on plans. Backfilling of washed out terrain and fine grading for positive drainage shall also be accomplished at this location. SITE #2: Improve drainage conditions via of removing and replacing existing concrete flume system with proposed rip -rap lined channel to line and grades shown on the plans. SITE #3: Improve drainage conditions via adding manhole, outfall pipe and outfall protection. Re- alignment, re- grading and stabilizing existing drainage channel to proposed lines and grades shown on the plans. SITE #4: Reparation of failed drainage outfall via installing proposed drainage structure and new outfall protection to lines and grades shown on the plans. RUNWAY 5L -23R X X r k S #1 a 0 0 �E I� �N a.. �N N oN o� a� o� 3 a � T N E a o � I M � N O � N � o a o WORK SUMMARY SITE #5: Repair existing drainage structure leaks and re -grade and stabilize adjacent taxiway side slope as shown on the plans. SITE #6: Improve drainage conditions via modifying, re- grading and stabilizing existing rip -rap drainage channel to proposed lines and grades shown on the plans. I.D. NORTHING EASTING ELEVATION DESCRIPTION T.B.M. 1 T.B.M. 2 858651.21 1 861084.95 1721203.65 1 1725020.34 826.32 1 832.06 Center, top of existing sanitary manhole cover Invert at outfall of existing 3011 cmp X X X X X X X J X S x T. B. M. ' TED JOHNSON PARKWALY X -__ X 1 -- - X SITE #2 - �- 000000 / 0 \ 00 00 UJ o -- 0 PTI DRIVE - X 0000 00� °000000 000 0 0 000 00 C \ 0000c 0000 000000 _ _______________________________ _______________________________ TERMINAL o SITE #6 I X X I X I �° USNGS BENCHMARKS - --------- �x 0 SITE #3 1. D. NORTHING FASTING ELEVATION DESCRIPTION DE 9347 864199.42 1725510.57 833.9 Survey Disk DE 9462 859114.43 1718500.41 875.5 Survey Disk DE 9461 1 855418.13 1718202.25 907.0 Survey Disk SITE #4 13 0 0 0 __J� CONTRACTOR STAGING AREA 400 200 0 200 400 800 GRAPHIC SCALE BAR cn Z 0 w c 0 _Q •L U 1n N 0 O Z Project Name: STORMWATER OUTFALL REPAIR Drawing Name: PROJECT LAYOUT AND SAFETY PLAN PIEDMONT TRIAD INTERNATIONAL AIRPORT 4utocad Drawing Reference: File: 04 — Project Layout & Safety Plan.dwg Saved: Dec 03, 2014 — 1:50pm by dtorres Plotted: Jon 27, 2015 — 11: 27am )ate: Drawing Number: JANUARY 2015 Business Unit: PL -1 GREENSBORO T1 PIEDMONT TRIAD AIRPORT AUTHORITY PIEDMONT TRIAD AIRPORT AUTHORITY ol LEGENDOMFOW COUNTY, IIVORM CAR=A X EXISTING FENCE STREAM CENTERLINE — WETLANDS www.mbakercorp.com MICHAEL BAKER ENGINEERING, INC. 7800 Airport Center Drive PROJECT LIMITS Suite 100 Greensboro, NC 27409 336.931.1500 (Office) 336.931.1501 (Fax) STAGING AREA North Carolina license No. F -1084 Designer: \1111111111 / /// DCT N C A RO��' %, HAUL /ACCESS ROUTE Technician: ���`��� ��OF ESS /O* ° °C�iL�� DCT TEMPORARY BENCHMARK SEAL _ 027429 Checked by. LJA <1 ° FN ° GINE 0 o PROPOSED WORK AREA Project No: ,�� �R y ° i ° ;�`��\ 138535 '//111,1,1,1111`\ 13 0 0 0 __J� CONTRACTOR STAGING AREA 400 200 0 200 400 800 GRAPHIC SCALE BAR cn Z 0 w c 0 _Q •L U 1n N 0 O Z Project Name: STORMWATER OUTFALL REPAIR Drawing Name: PROJECT LAYOUT AND SAFETY PLAN PIEDMONT TRIAD INTERNATIONAL AIRPORT 4utocad Drawing Reference: File: 04 — Project Layout & Safety Plan.dwg Saved: Dec 03, 2014 — 1:50pm by dtorres Plotted: Jon 27, 2015 — 11: 27am )ate: Drawing Number: JANUARY 2015 Business Unit: PL -1 GREENSBORO 3 H N E E a �E of oN �o o a a� 3 a E T N E Q� a N � I M � N O � N � o a o NOTE T1 1. CONTRACTOR SHALL LOCATE EXISTING PIPES AND INVERTS IN THE FIELD AND - - -� LEGEND PIEDMONT TRIAD AIRPORT AUTHORITY PROVIDE VERIFIED INFORMATION TO ENGINEER PRIOR TO INSTALLING ANY EXISTING FENCE CLRFORD COUNTY, NORTH CAROLINA D PROPOSED REPAIRS. cry P EXISTING POWER LINE STREAM CENTERLINE I EXISTING PIPE www.mbakercorp.com MICHAEL BAKER ENGINEERING, INC. 2. CONTRACTOR SHALL VIDEO THE REMAINING 24" RCP PIPES AND JOINTS, THEN 7800 Airport Center Drive Suite 100 Greensboro, NC 27409 GRADING /CONSTRUCTION LIMIT 336.931.1500 (Office) PROVIDE VIDEO TO THE ENGINEER PRIOR TO COMMENCEMENT OF WORK. 336.931.1501 (Fax) PROPOSED PIPE North Carolina license No. F -1084 3. CONTRACTOR SHALL LOCATE AND REMOVE BROKEN PIPE SECTIONS FROM EXISTING MINOR CONTOUR � .�`�� N CAR" PROPOSED MAJOR CONTOUR CONSTRUCTION AREA AS DIRECTED BY THE ENGINEER. ESS /p ° ° ° Technician: �» 4. CONTRACTOR SHALL CLEAR THIS AREA OF ALL TREES, BUSHES, ETC. AND REMOVE DCT < �7 _ , SEAL -_ EXISTING KNOLLED TERRAIN AS DIRECTED BY THE ENGINEER. UPON COMPLETION W = 0 027429 - -" SILT FENCE OF THE AFOREMENTIONED TASKS, THIS AREA SHALL BE FINISHED GRADED TO LJA = °° to Y ° �. PROVIDE POSITIVE DRAINAGE TO ADJACENT INLETS AND /OR AWAY FROM 138535 6 INLET PROTECTION ROADWAY. x 5. LOCATING ALL EXISTING UNDERGROUND UTILITIES WITHIN THE PROJECT WORKy„ AREA SHALL BE THE CONTRACTOR'S RESPONSIBILTY. 6. EXCELCIOR EROSION CONTROL MATTING SHALL BE PLACED ON ALL DISTURBED > SLOPED AREA. > U) 7. ALL DISTURBED AREAS SHALL BE SEEDED AND MULCHED WITH PERMANENT UPON COMPLETION OF WORK. Q D RETAIN EXISTING PIPES Q CA c� J �w �v C1 ( In PROPOSED MANHOLE AND PIPE REPAIRS. (SEE SHEET GL -1) C/) >>'0 , PROPOSED BACKFILL AREA (SEE SHEET GL -1) D D'. c� � �D l 0.1 X01 a h f � Ut 4 Llul 1 CONSTRUCTION EC -1 ENTRANCE EXISTING 24" RCP (SEE NOTES 1 & 2) PIPELINE UTILITIES SHALL BE PROTECTED DD D C1\J _ FROM CONSTRUCTION TRAFFIC BY USING TIMBER MATTING OR OTHER METHOD DDDD APPROVED BY THE UTILITY COMPANIES. D D ^ X X X X co X co X X X i JORDAN BUFFER (20' Zone 2) Permanent Impact = 580 s.f. X LIMIT OF CONSTRUCTION (SEE SHEET GL -1) SILT FENCE I l2 (TYP) '"EC-1 INLET PROTECTION 3 (TYP) k EC -1 m TEMPORARY STREAM IMPACT JORDAN BUFFER (30' ZONE 1) 888M TEMPORARY STREAM IMPACT JORDAN BUFFER (20' ZONE 2) P RMANENT STREAM IMPACT 0 00 C? X 0 0 D� ` <" X� JORDAN BUFFER (0 ZONE 1) on Ors PERMANENT STREAM IMPACT JORDAN BUFFER (20' ZONE 2) TOTAL DISTURBED AREA = 0.25 AC. .SITE LOCATION 1 01S D Cd cn z 0 w c 0 _Q •L U U) N 0 O z Project Name: STORMWATER OUTFALL REPAIR Drawing Name: SITE 1 STREAM & BUFFER IMPACTS PLAN PIEDMONT TRIAD INTERNATIONAL AIRPORT 4utocad Drawing Reference: File: 05a — Stream Impact Plans ST -1 to ST- 8>.dwg Saved: Dec 03, 2014 — 12:19pm by dtorres Plotted: Jan 27, 2015 — 11:19am )ate: Drawing Number: JANUARY 2015 Business Unit: SB_1 GREENSBORO T1 PIEDMONT TRIAD AIRPORT AUTHORITY - - -� LEGEND PIEDMONT TRIAD AIRPORT AUTHORITY EXISTING FENCE CLRFORD COUNTY, NORTH CAROLINA D GAS EXISTING GAS LINE P EXISTING POWER LINE STREAM CENTERLINE I EXISTING PIPE www.mbakercorp.com MICHAEL BAKER ENGINEERING, INC. BACKFILL GRADING LIMIT 7800 Airport Center Drive Suite 100 Greensboro, NC 27409 GRADING /CONSTRUCTION LIMIT 336.931.1500 (Office) 336.931.1501 (Fax) PROPOSED PIPE North Carolina license No. F -1084 EXISTING MAJOR CONTOUR Designer: EXISTING MINOR CONTOUR DCT .�`�� N CAR" PROPOSED MAJOR CONTOUR ESS /p ° ° ° Technician: 870 PROPOSED MINOR CONTOUR DCT < �7 _ SEAL -_ Checked by. = 0 027429 - -" SILT FENCE _ LJA = °° ORANGE SAFETY FENCE Y ° �. Project No: 138535 J INLET PROTECTION SILT FENCE I l2 (TYP) '"EC-1 INLET PROTECTION 3 (TYP) k EC -1 m TEMPORARY STREAM IMPACT JORDAN BUFFER (30' ZONE 1) 888M TEMPORARY STREAM IMPACT JORDAN BUFFER (20' ZONE 2) P RMANENT STREAM IMPACT 0 00 C? X 0 0 D� ` <" X� JORDAN BUFFER (0 ZONE 1) on Ors PERMANENT STREAM IMPACT JORDAN BUFFER (20' ZONE 2) TOTAL DISTURBED AREA = 0.25 AC. .SITE LOCATION 1 01S D Cd cn z 0 w c 0 _Q •L U U) N 0 O z Project Name: STORMWATER OUTFALL REPAIR Drawing Name: SITE 1 STREAM & BUFFER IMPACTS PLAN PIEDMONT TRIAD INTERNATIONAL AIRPORT 4utocad Drawing Reference: File: 05a — Stream Impact Plans ST -1 to ST- 8>.dwg Saved: Dec 03, 2014 — 12:19pm by dtorres Plotted: Jan 27, 2015 — 11:19am )ate: Drawing Number: JANUARY 2015 Business Unit: SB_1 GREENSBORO N E E a �o �N �I 0 oN �o o a a� 3 a ET N E Q� a N � I M � N O � N � o a o EXISTING BOX CULVERT �F NOTE 1. ALL CLEARING, REMOVAL OF EXISTING CONCRETE FEATURES AND /OR INSTALLATION OF PROPOSED CHANNEL SHALL PROGRESS IN AN UPSTREAM MANNER AS INDICATED ON THE PLAN - BEGINNING WITH CONSTRUCTION OF ZONE 1 AND TERMINATING WITH CONSTRUCTION OF ZONE 3. 2. CONTRACTOR SHALL DEMOLISH THE EXISTING FLUME, RE -GRADE THE DISTURBED AREA, PLACE NEW RIP -RAP CHANNEL, AND INSTALL EROSION CONTROL MATTING IN SEGMENTS OF WORK THAT CAN BE COMPLETED IN ONE DAY. AT THE END OF EACH WORKDAY, THE NEW RIP -RAP CHANNEL SHALL BE CONSTRUCTED UP TO THE END OF THE EXISTING CONCRETE FLUME. 3. CONTRACTOR SHALL SCHEDULE ALL WORK TO BE PERFORMED DURING DRY WEATHER CONDITIONS AND COMPLETED BEFORE THE NEXT FORECASTED RAIN EVENT. WORK ZONES SHOWN ON THE PLAN ARE FOR GENERAL REFERENCE AND MAY BE ADJUSTED AS NECESSARY WITH APPROVAL OF THE ENGINEER. 4. GRADED SIDE SLOPES SHALL BE SEEDED, MULCHED AND STABILIZED USING EXCELCIOR EROSION CONTROL MATTING. 5. IMPACTS INSIDE THE 50' JORDAN BUFFER = 0.00 s.f., AS THE WORK IS BEING PERFORMED IS REPLACING AN EXISTING FACILITY. 6. PIPELINE UTILITIES SHALL BE PROTECTED FROM CONSTRUCTION TRAFFIC BY USING TIMBER MATTING OR OTHER METHOD APPROVED BY THE UTILITY COMPANIES. 7. EXCELCIOR EROSION CONTROL MATTING SHALL BE PLACED ON ALL DISTURBED SLOPE AREAS. 8. ALL DISTURBED AREAS SHALL BE SEEDED AND MULCHED WITH PERMANENT SEEDING UPON COMPLETION OF WORK. bh rz Yrp Q" !I n S „"v , J C'S POE 14 +46.77 N 858662.3137 E 1721166.8724 JORDAN BUFFER (30' Zone 1) Permanent Impact = 496 s.f. o� P� �J y �C� 14+ SS JORDAN BUFFER (20' Zone 2) Permanent Impact = 675 s.f. TOTAL DISTURBED AREA = 0.55 AC. SITE LOCATIOIIIIIIII4 2 13 +00 PROPOSED RIP RAP CHANNEL (SEE SHEET GL -2) 12 +00 tis PT 11 +75.34 N 858469.3753 E 1721357.7778 EXI TING 18" RCP TAT ` M r� W Z 01 �s Pte' T Ca �- 7,,, JORDAN BUFFER (20' Zone 2) % Temporary Impact = 785 s.f. of ' LIMIT OF CONSTRUCTION i t >_ LIMIT OF PROPOSED GRADING (SEE SHEET GL -2) F- CONSTRUCTION 1 ENTRANCE EC -1 OL U TIL. BLO�., POB 10 +00.00 N 858398.1585 E 1721516.3884 Y \ `i SS PC 11 +31.69, 80' R or, N 858448.0335 d E 1721395.2365 - - - - - -- S S PT 10 +94.44 N 858438.9968 E 1721431.3718 — PC 10 +76.53, 80' R N 858432.7489 E 1721448.1220 � 1 �n BASELINE - B SEE SHEET P -2 • 1� SS LEGEND TEMPORARY STREAM IMPACT JORDAN BUFFER (20' ZONE 2) 0 0 0 PERMANENT STREAM IMPACT 000000 00 TT 0 JORDAN BUFFER (30' ZONE 1) PERMANENT STREAM IMPACT JORDAN BUFFER (20' ZONE 2) , J t iM1,,,.sf („ n° i t t To G (: „ O i IY1 l o � �J T1 PIEDMONT TRIAD AIRPORT AUTHORITY PIEDMONT TRIAD AIRPORT AUTHORITY OMFOW COUNTY, IVOR'lli CAR= A � I www.mbakercorp.com MICHAEL BAKER ENGINEERING, INC. EXISTING FENCE GAS EXISTING GAS LINE SS EXISTING SANITARY SEWER LINE North Carolina license No. F -1084 STREAM CENTERLINE EXISTING PIPE N° C A GRADING /CONSTRUCTION LIMIT : \_ � ESS /o� EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR 870 PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR Checked by. SILT FENCE J TEMPORARY STREAM IMPACT 138535 JORDAN BUFFER (30' ZONE 1) TEMPORARY STREAM IMPACT JORDAN BUFFER (20' ZONE 2) 0 0 0 PERMANENT STREAM IMPACT 000000 00 TT 0 JORDAN BUFFER (30' ZONE 1) PERMANENT STREAM IMPACT JORDAN BUFFER (20' ZONE 2) , J t iM1,,,.sf („ n° i t t To G (: „ O i IY1 l o � �J T1 PIEDMONT TRIAD AIRPORT AUTHORITY PIEDMONT TRIAD AIRPORT AUTHORITY OMFOW COUNTY, IVOR'lli CAR= A � I www.mbakercorp.com MICHAEL BAKER ENGINEERING, INC. 7800 Airport Center Drive Suite 100 Greensboro, NC 27409 336.931.1500 (Office) 336.931.1501 (Fax) North Carolina license No. F -1084 Designer: DCT N° C A : \_ � ESS /o� Technician: DCT = SEAL 1 = = 027429 = Checked by. LJA J Project No: 138535 0 D cn z 0 w c 0 Q U U) a� D 0 z Project Name: STORMWATER OUTFALL REPAIR Drawing Name: SITE 2 STREAM & BUFFER IMPACTS PLAN PIEDMONT TRIAD INTERNATIONAL AIRPORT 4utocad Drawing Reference: File: osa — stveam Impa�e clans sr —, m sr— e).dwg Saved: Dec 03, 2014 — 72:19pm by dtorres Plotted: Jan 27, 2075 — 11: 27am date: Drawing Number: JANUARY 2015 3usiness Unit: SB-2 GREENSBORO LEGEND — — — — — LIMIT OF CONSTRUCTION EXISTING CONTOUR 835 PROPOSED CONTOUR 0 00 , GRAVEL CONSTR. ENTRANCE 00 SILT FENCE DIVERSION CHANNEL DIRE OF FLOW STRAW WATTLE x x X TEMPORARY STREAM IMPACT X X X X JORDAN BUFFER (30' ZONE 1) X X X TOTAL IMPACT = 5,519 s.f. s.f. SUB -AREA MEASUREMENT TZ1 TEMPORARY STREAM IMPACT JORDAN BUFFER (30' ZONE 1) TEMPORARY STREAM IMPACT JORDAN BUFFER (20' ZONE 2) TOTAL IMPACT = 10,702 s.f. s.f. SUB -AREA MEASUREMENT TZ2 TEMPORARY STREAM IMPACT JORDAN BUFFER (20' ZONE 2) PERMANENT STREAM IMPACT 7fofofo� JORDAN BUFFER (30' ZONE 1) TOTAL IMPACT = 13,755 s.f. s.f. SUB -AREA MEASUREMENT PZ1 PERMANENT STREAM IMPACT JORDAN BUFFER (30' ZONE 1) PERMANENT STREAM IMPACT JORDAN BUFFER (20' ZONE 2) total impact = 798 S.F. s.f. SUB -AREA MEASUREMENT PZ2 PERMANENT STREAM IMPACT JORDAN BUFFER (20' ZONE 2) BEGIN WORK STA 10 +51.30 N 861219.0755 E 1724984.3356 �J 1_ X 7_1_ e j " _ 4- f PROPOSED LIMIT OF GRADING (TYP) PHASE 1 CONSTRUCTION SEQUENCE: T1 1. INSTALL EROSION CONTROL PERIMETER MEASURES AND SILT FENCE PER PLAN. PIEDMONT TRIAD AIRPORT AUTHORITY 2. AREA PREPARATION: PIEDMONT TRIAD AIRPORT AUTHORITY a) DRY WORK AREA USING SANDBAG DIKES WITH PLASTIC BARRIER LINERS AT UPSTREAM AND DOWNSTREAM LOCATIONS AS SHOWN. GUILFORD COUNTY, NORTH CAROLINA b) PUMP WATER AROUND WORK AREA UNTIL AREA IS DRY ENOUGH FOR CONSTRUCTION. c) WATER FROM DISTURBED AREA SHALL BE PUMPED THROUGH AN ACCEPTABLE EROSION CONTROL DEVICE (SILT BAGS, SEDIMENT TRAP, ETC.) 3. CONSTRUCT PROPOSED CHANNEL IMPROVEMENT BETWEEN SANDBAG DIKES 1 AND 2. www'mbakereorp.com MICHAEL BAKER ENGINEERING, INC. 4. SEED AND MAT NEW SLOPES, EMBANKMENTS, ETC AND STABILIZE AREA. 7800 Airport Center Drive Suite 100 Greensboro, NC 27409 336.931.1500 (Office) 336.931.1501 (Fax) North Carolina License No. F -1084 Designer: DCT \\\� N C A R 0 " "," Technician: .� ° ° °F ESS /0 �� \ moo` DCT Quo — SEAL —_ Checked by: = 027429 — LJA ° ° ° F �� o ° NG Project No: I NE ' 9R ° ° ° ° ° °° °° ° °��?\; RY P� 138535 J. r7nNE 1) x 10' SILT BAG OR 'ROVED MEASURE 1)_ I M BUFFER ZONE 2) 0 0 U) z 0 Cn w D' C 0 Q L U U) N z Project Name: STORMWATER OUTFALL REPAIR Drawing Name: SITE 3 STREAM & BUFFER IMPACTS PLAN (PHASE 1) PIEDMONT TRIAD INTERNATIONAL AIRPORT lAutocad Drawing Reference: Date: Drawing Number: 20 10 0 20 JANUARY 2015 SCALE IN FEET Business Unit: SB-3.1 GREENSBORO LEGEND — — — — — LIMIT OF CONSTRUCTION EXISTING CONTOUR PHASE 2 CONSTRUCTION SEQUENCE: T1 1. RELOCATE SANDBAG DIKE #1 TO STATION 11 +00 ( + / -). PIEDMONT TRIAD AIRPORT AUTHORITY 2. INSTALL PROPOSED MANHOLE, DRAINAGE PIPE AND ENDWALL PER PLAN. PIEDMONT TRIAD AIRPORT AUTHORITY 3. TEMPORARILY CLOSE OFF MANHOLE OUTLET VIA INSTALLING AN INFLATABLE PIPE PLUG OR AN APPROVED MEASURE. GUILFORD COUNTY, NORTH CAROLINA 4. RELOCATE PUMP AND HOSE AS SHOWN OR AS DIRECTED. 835 PROPOSED CONTOUR / 5. PUMP WATER FROM MANHOLE AROUND WORK AREA AS SHOWN. WATER FROM rl. DISTURBED AREA SHALL BE PUMPED THROUGH AN ACCEPTABLE EROSION CONTROL DEVICE (SILT BAGS, SEDIMENT TRAP, ETC.) oo °000 GRAVEL CONSTR. ENTRANCE www.mbakercorp.com TOTAL DISTURBED AREA = 1.3 Ac. r' 6. BACKFILL AREA BETWEEN MANHOLE AND ENDWALL AS DIRECTED. MICHAEL BAKER ENGINEERING, INC. 7800 Airport Center Drive SITE LOCATION 3 { ` 7. DRY AREA BETWEEN SANDBAG DIKES 1 & 2 IN PREPARATION FOR PHASE #3. suite NC SILT FENCE `� _ T 336.93b 1500 (Office) r� 336.931.1501 (Fax) \ North Carolina License No. F -1084 DIVERSION CHANNEL DIRE OF FLOW STRAW WATTLE x X X TEMPORARY STREAM IMPACT X X X X JORDAN BUFFER (30' ZONE 1) X X X TOTAL IMPACT = 820 s.f. s.f. SUB -AREA MEASUREMENT TZ1 TEMPORARY STREAM IMPACT JORDAN BUFFER (30' ZONE 1) TEMPORARY STREAM IMPACT JORDAN BUFFER (20' ZONE 2) TOTAL IMPACT = 895 s.f. s.f. SUB -AREA MEASUREMENT TZ2 TEMPORARY STREAM IMPACT JORDAN BUFFER (20' ZONE 2) PERMANENT STREAM IMPACT 7fofofo� JORDAN BUFFER (30' ZONE 1) TOTAL IMPACT = 2,923 s.f. s.f. SUB -AREA MEASUREMENT PZ1 PERMANENT STREAM IMPACT JORDAN BUFFER (30' ZONE 1) ti PERMANENT STREAM IMPACT JORDAN BUFFER (20' ZONE 2) TOTAL IMPACT = 211 S.F. s.f. SUB -AREA MEASUREMENT PZ2 PERMANENT STREAM IMPACT JORDAN BUFFER (20' ZONE 2) �v r '�J BEGIN WORK STA 10 +51.0 N 8612195 - E 1724984.3356 ' r / / I TZ1 820 s.f. r7nNE 1) 2) Designer: DCT .�\\\�\A CARS/ �� ° ° °F ESS /0 Technician: \ moo` DCT Quo — SEAL —_ = 027429 — Checked by: LJA ° ° ° F �� o ° NC I NE '' 9R ° ° ° ° ° °° ° ° ° °��?\; R Y Project No: 138535 J. 0 0 U) z 0 Cn w D' C 0 Q L U U) N Z Project Name: STORMWATER OUTFALL REPAIR Drawing Name: SITE 3 STREAM & BUFFER IMPACTS PLAN (PHASE 2) PIEDMONT TRIAD INTERNATIONAL AIRPORT lAutocad Drawing Reference: Date: Drawing Number: 20 10 0 20 JANUARY 2015 SCALE IN FEET Business Unit: SB-3.2 GREENSBORO LEGEND — — — — — LIMIT OF CONSTRUCTION EXISTING CONTOUR 835 PROPOSED CONTOUR 0 00 GRAVEL CONSTR. ENTRANCE 00 SILT FENCE DIVERSION CHANNEL DIRE OF FLOW STRAW WATTLE 1 r '�J BEGIN WORD STA 10+51/.30 N 8612195 E 1724984.3356 / .- .- ._._._ .._.__ e l i ire PHASE 3 CONSTRUCTION SEQUENCE: T1 1. REMOVE SANDBAG DIKES AS DIRECTED BY THE ENGINEER. PIEDMONT TRIAD AIRPORT AUTHORITY 2. COMPLETE CONSTRUCTION OF OUTFALL APRON AND CHANNEL PER PLAN. PIEDMONT TRIAD AIRPORT AUTHORITY 3. SEED AND MAT NEW SLOPES, EMBANKMENTS, ETC. AND STABILZE AREA. GUILFORD COUNTY, NORTH CAROLINA 4. STRAW WATTLES SHALL REMAIN IN PLACE UNTIL HERBACEOUS VEGETATION BECOMES ESTABLISHED. 5. REMOVE PUMP AND HOSE DEVICES AS DIRECTED BY THE ENGINEER. 6. REMOVE AND /OR RETAIN EXISTING EROSION CONTROL MEASURES (I.E. SILT FENCE, DIVERSION DITCHES, ETC) ADJACENT TO FINISHED CONSTRUCTION www.mbakereorp.com AS DIRECTED BY THE ENGINEER. MICHAEL BAKER ENGINEERING, INC. 7800 Airport Center Drive Suite 100 7. CONTRACTOR SHALL RESTORE ALL TEMPORARY AREAS TO PRE - CONSTRUCTION Greensboro, NC 27409 CONDITIONS PRIOR TO COMPLETION OF THE PROJECT. 336.931.1500 (office) 336.931.1501 (Fax) North Carolina License No. F -1084 r7nNE 1) 2) Designer: DCT \\\� N C A R 0 " "," Technician: .� ° ° °F ESS /0 �� \ moo` DCT Quo — SEAL —_ Checked by: = 027429 — LJA ° ° ° F �� o ° NG Project No: I NE ' 9R ° ° ° ° ° °° °° ° °��?\; RY P� 138535 J. U) z 0 Cn w D' C 0 Q L U U) N Z Project Name: STORMWATER OUTFALL REPAIR Drawing Name: SITE 3 STREAM & BUFFER IMPACTS PLAN (PHASE 3) PIEDMONT TRIAD INTERNATIONAL AIRPORT lAutocad Drawing Reference: Date: Drawing Number: 20 10 0 20 JANUARY 2015 SCALE IN FEET Business Unit: SB-3.3 GREENSBORO tY 5 3 H N O 7 E E a i E �N of oN �o o a a� 3 a E T N E a a N � I M � N O � N � o t IN %' 'J1a� a{ 4 WETLAND P PROPOSED DRAINAGE AND OUTFALL CONSTRUCTION (SEE SHEET GL -4) 1 cni i 5 0 1 j N SERVATION A CONSTRUCTION SHALL NOT INTRUDE WETLAND PRESERVATION AREA (TYP) 87 L.F. OF EXISTING STREAM TO BE IMPACTED DURING CONSTRUCTION 1 - T SILT FENCE 2 (TYP) EC -1 is J \ � PROPOSED LIMIT OF GRADING (SEE SHEET GL -4) 8 EXISTING RISER DO NOT DISTURB SEE NOTE 1 NOTE 1. CONTRACTOR SHALL LOWER THE WATER LEVEL WITHIN THE EXISTING POND TO 2FT BELOW THE TOP OF THE RISER ELEVATION. ALL WORK IN THIS AREA SHALL BE PERFORMED UNDER DRY CONDITIONS. 2. GRADED SIDE SLOPES SHALL BE SEEDED, MULCHED AND STABILIZED USING EXCELCIOR EROSION CONTROL MATTING. 3. EXCELCIOR EROSION CONTROL MATTING SHALL BE PLACED ON ALL DISTURBED SLOPE AREAS. 4. ALL DISTURBED AREAS SHALL BE SEEDED AND MULCHED WITH PERMANENT SEEDING UPON COMPLETION OF WORK. TOTAL DISTURBED AREA = 0.25 AC. SITE LOCATION 4 1 1 1 1 1 •1 LEGEND 870 11 �� i qP STREAM CENTERLINE EXISTING PIPE GRADING /CONSTRUCTION LIMIT EXISTING MINOR CONTOUR EXISTING MAJOR CONTOUR PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR SILT FENCE ORANGE SAFETY FENCE PROPOSED RIP RAP CHANNEL PROPOSED CONCRETE CURB `C TURF MATTING (TYPE C 125) W " it itii�r► l l► :.•IMF www.mbakercorp.com MICHAEL BAKER ENGINEERING, INC. 7800 Airport Center Drive Suite 100 Greensboro, NC 27409 336.931.1500 (Office) 336.931.1501 (Fax) North Carolina license No. F -1084 Designer: DCT �.�� N° CA R0'' %, Technician: :_ ' ESS /O� . DCT – SEAL = Checked by. = 027429 = LJA Project No: \r. ° J 138535 /1I1II .. a) 41 0 0 V) I O w n, c 0 _Q •L U U) a) 0 Z Project Name: STORMWATER OUTFALL REPAIR Drawing Name: SITE 4 STREAM & BUFFER IMPACTS PLAN PIEDMONT TRIAD INTERNATIONAL AIRPORT Autocad Drawing Reference: File: 05. — Stream Impact Plans ST -1 to ST- 6).dwg Saved: Dec 03, 2014 — 12:19pm by dtorres Plotted: Jan 27, 2015 — 11:22am Date: Drawing Number: JANUARY 2015 isiness Unit: SB_4 GREENSBORO NOTE 1. CONTRACTOR SHALL LOCATE EXISTING PIPES AND INVERTS IN THE FIELD AND PROVIDE VERIFIED INFORMATION TO ENGINEER PRIOR TO INSTALLING ANY PROPOSED REPAIRS. 2. CONTRACTOR SHALL VIDEO THE REMAINING 24" RCP PIPES AND JOINTS, THEN PROVIDE VIDEO TO THE ENGINEER PRIOR TO COMMENCEMENT OF WORK. 3. CONTRACTOR SHALL LOCATE AND REMOVE BROKEN PIPE SECTIONS FROM CONSTRUCTION AREA AS DIRECTED BY THE ENGINEER. 4. CONTRACTOR SHALL CLEAR THIS AREA OF ALL TREES, BUSHES, ETC. AND REMOVE EXISTING KNOLLED TERRAIN AS DIRECTED BY THE ENGINEER. UPON COMPLETION OF THE AFOREMENTIONED TASKS, THIS AREA SHALL BE FINISHED GRADED TO PROVIDE POSITIVE DRAINAGE TO ADJACENT INLETS AND /OR AWAY FROM ROADWAY. 5. LOCATING ALL EXISTING UNDERGROUND UTILITIES WITHIN THE PROJECT WORK AREA SHALL BE THE CONTRACTOR'S RESPONSIBILTY. 6. EXCELCIOR EROSION CONTROL MATTING SHALL BE PLACED ON ALL DISTURBED SLOPED AREA. 7. ALL DISTURBED AREAS SHALL BE SEEDED AND MULCHED WITH PERMANENT UPON COMPLETION OF WORK. 2f Q Z 1= W d 0 E 0 E I� a L � N 2 O 0 O � a� 3 � E N E Q o � I M U N . O M N / r H N a o 3> cry ku�RR`t t b,A i 4i „>_ � m a' A e a PIPELINE UTILITIES SHALL BE PROTECTED FROM CONSTRUCTION TRAFFIC BY USING TIMBER MATTING OR OTHER METHOD CIi Q ° 0 Q Cl) c� z F= cry X w Cn c� APPROVED BY THE UTILITY COMPANIES. 0 U) DO NOT DISTURB EXISTING GAS LINE. tt r �Z„'., 0 N Q� J 470f 0 4 r4 RETAIN EXISTING PIPE txt \ Q. 00 RETAIN EXISTING PIPE �v LOCATION TO BE VERIFIED IN THE FIELD. 4A CONSTRUCTION �—i ENTRANCE PIPELINE UTILITIES SHALL BE PROTECTED FROM CONSTRUCTION TRAFFIC BY USING TIMBER MATTING OR OTHER METHOD APPROVED BY THE UTILITY COMPANIES. U rn___j W E— W J co IX W V :r -mmmm I EXISTING 24" RCP (SEE NOTES 1 & 2) 0 c� J r k i I\ STORAGE EXCAV "A" D.A. =0.40 Ac., 10 YR Q =1.37 ds DISTURBED AREA =0.25 Ac. REQ'D STORAGE VOLUME =900 CF DESIGN STORAGE VOLUME= 1300.76 CF REQ'D SURFACE AREA =595.9 SF DESIGN SURFACE AREA =874 SF DIMENSIONS =30' L x 15'W x 2'D 1 +79.85, EXISTING MANHOLE REMOVE AND REPLACE EXISTING TOP SECTION. INTAKE INVERT TO BE SET IN THE FIELD. PROPOSED 24" RCP, APPROXIMATELY 35 LF TIE TO PROPOSED MANHOLE TOP SECTION. (SEE NOTE 3) CONNECT PROPOSED 24" RCP TO EXISTING PIPE WITH CONCRETE COLLAR ,t. LIMIT OF BACKFILL GRADING. SLOPES SHALL BE 3:1 MAX. GRADE AS DIRECTED BY THE ENGINEER. LIMIT OF CONSTRUCTION N � TYP SILT FENCE , %2 (TYP) ' EC -1 MAINTAIN 3 FEET COVER OVER EXISTING GAS MAIN INLET PROTECTION 3 (TYP) k EC -1 m LEGEND EXISTING FENCE GAS EXISTING GAS LINE P EXISTING POWER LINE STREAM CENTERLINE EXISTING PIPE BACKFILL GRADING LIMIT GRADING /CONSTRUCTION LIMIT PROPOSED PIPE EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR 870 PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR SILT FENCE ORANGE SAFETY FENCE INLET PROTECTION 20 10 0 20 40 60 GRAPHIC SCALE BAR TOTAL DISTURBED AREA = 0.25 AC. 1�TE LOCATION 1 �r� 1 DO NOT DISTURB EXISTING U.G. POWER. LOCATION TO BE VERIFIED IN THE FIELD. T T1 PIEDMONT TRIAD AIRPORT AUTHORITY PIEDMONT TRIAD AIRPORT AUTHORITY G EX-OW COUNTY, NORTH CMMM � I www.mbakercorp.com MICHAEL BAKER ENGINEERING, INC. 7800 Airport Center Drive Suite 100 Greensboro, NC 27409 336.931.1500 (Office) 336.931.1501 (Fax) North Carolina license No. F -1084 Designer: DCT �.�� \A CAR o'� %, Technician: :_ ��OF ESS /O� DCT = Q < �� SEAL =_ Checked by — 027429 — LJA Project No: \r. ° J 138535 cn z 0 w c 0 _Q •L U U) N 0 O z Project Name: STORMWATER OUTFALL REPAIR Drawing Name: GEOMETRIC LAYOUT GRADING PLAN PIEDMONT TRIAD INTERNATIONAL AIRPORT 4utocad Drawing Reference: File: 05 — Geometric Layout & Grading Plan (GL -1 to GL- 6).dwg Saved: Jan 27, 2015 — 11:33a1 by dtorraa Plotted: Jan 27, 2015 — 11:58am )ate: Drawing Number: JANUARY 2015 Business Unit: GL -1 GREENSBORO d 0 0 E e E Im O L � N 2 O oa a� 3 � E N E Q o � I M U N � O M N / r H N a o 5' MIN. /TVn\ SECTION A -A NOT TO SCALE �S NOTE 1. ALL CLEARING, REMOVAL OF EXISTING CONCRETE FEATURES AND /OR INSTALLATION OF PROPOSED CHANNEL SHALL PROGRESS IN AN UPSTREAM MANNER AS INDICATED ON THE PLAN - BEGINNING WITH CONSTRUCTION OF ZONE 1 AND TERMINATING WITH CONSTRUCTION OF ZONE 3. 2. CONTRACTOR SHALL DEMOLISH THE EXISTING FLUME, RE -GRADE THE DISTURBED AREA, PLACE NEW RIP -RAP CHANNEL, AND INSTALL EROSION CONTROL MATTING IN SEGMENTS OF WORK THAT CAN BE COMPLETED IN ONE DAY. AT THE END OF EACH WORKDAY, THE NEW RIP -RAP CHANNEL SHALL BE CONSTRUCTED UP TO THE END OF THE EXISTING CONCRETE FLUME. 3. CONTRACTOR SHALL SCHEDULE ALL WORK TO BE PERFORMED DURING DRY WEATHER CONDITIONS AND COMPLETED BEFORE THE NEXT FORECASTED RAIN EVENT. WORK ZONES SHOWN ON THE PLAN ARE FOR GENERAL REFERENCE AND MAY BE ADJUSTED AS NECESSARY WITH APPROVAL OF THE ENGINEER. 4. GRADED SIDE SLOPES SHALL BE SEEDED, MULCHED AND STABILIZED USING EXCELCIOR EROSION CONTROL MATTING. 5. IMPACTS INSIDE THE 50' JORDAN BUFFER = 0.00 s.f., AS THE WORK IS BEING PERFORMED IS REPLACING AN EXISTING FACILITY. 6. PIPELINE UTILITIES SHALL BE PROTECTED FROM CONSTRUCTION TRAFFIC BY USING TIMBER MATTING OR OTHER METHOD APPROVED BY THE UTILITY COMPANIES. 7. EXCELCIOR EROSION CONTROL MATTING SHALL BE PLACED ON ALL DISTURBED SLOPE AREAS. 8. ALL DISTURBED AREAS SHALL BE SEEDED AND MULCHED WITH PERMANENT SEEDING UPON COMPLETION OF WORK. L VER T �O JP �Q0 S C S J POE 14 +46.77 N 858662.3137 E 1721166.8724 SEE NOTE 3 J 14± DO NOT DISTURB f � ", EXISTING SANITARY O LIMIT OF CONSTRUCTION - SEWER LINES (TYP) Oo ,' _ r cn INSTALL CHECK p F, n.da �-2DAM AT BUFFER = LIMIT OF GRADING ,f aT SS, 6 HT = 18 ") �} 0, f S� CD� 13 +08 13 +00 f o TOTAL DISTURBED AREA = 0.55 AC. — PROPOSED RIP RAP LINED CHANNEL SITE LOCATIO 2 o .x A CONSTRUCTION 1 O ENTRANCE EC -1 O ' s N REMOVE EXISTING CONCRETE FLUME (TYP) a.r frzh� SEE NOTE 2 OQ O - a O SEE NOTE 6 <, � a a 00 ° _ 12 +00 UT/ . FS , OO BL D` -- -- S S - -- - -- c S - - - -- = 11+83 F O " �a — �C PT 11 +75.34 I'd N 858469.3753 E 1721357.7778 PC 11 +31.69, 80' R O r N 858448.0335 EXI TING 1 B" RCP �� E 1721395.2365 oO 0,r REMOVE CONCRETE FLUME O PT 10 +94.44 CD N 858438.9968 (� REMOVE 18" RCP AS DIRECTED AND E 1721431.3718 INSTALL NCDOT STD 838.01 ENDWALL INSTALL RIP -RAP SWALE TO NEW CHANNEL PC 10 +76.53, 80' R a � - N 858432.7489 rr r,1 k E 1721448.1220 S 10 +50 J> BASELINE - B rl� SEE PROFILE SHEET P -2 zz REMOVE CONRETE FLUME AND INSTALL RIP -RAP SWALE TO NEW CHANNEL ,' 7 °' y: POB 10 +00.00 N 858398.1585 E 1721516.3884 SS 30 15 0 30 60 90 GRAPHIC SCALE BAR LEGEND r % I Y% ` r r. 1� L T1 PIEDMONT TRIAD AIRPORT AUTHORITY PIEDMONT TRIAD AIRPORT AUTHORITY GLEX-OW COUNTY, NORTH CAROL M AM www.mbakercorp.com MICHAEL BAKER ENGINEERING, INC. EXISTING FENCE GAS EXISTING GAS LINE SS EXISTING SANITARY SEWER LINE North Carolina license No. F -1084 STREAM CENTERLINE \ \\ \1111111 / / /// EXISTING PIPE \ \A C A R�'' %, GRADING /CONSTRUCTION LIMIT :�� EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR 870 PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR Checked by. SILT FENCE O O O PROPOSED RIP RAP CHANNEL r % I Y% ` r r. 1� L T1 PIEDMONT TRIAD AIRPORT AUTHORITY PIEDMONT TRIAD AIRPORT AUTHORITY GLEX-OW COUNTY, NORTH CAROL M AM www.mbakercorp.com MICHAEL BAKER ENGINEERING, INC. 7800 Airport Center Drive Suite 100 Greensboro, NC 27409 336.931.1500 (Office) 336.931.1501 (Fax) North Carolina license No. F -1084 Designer: \ \\ \1111111 / / /// DCT \ \A C A R�'' %, �.�� : \_ � ESS /0� Technician: DCT - SEAL - = 027429 = Checked by. LJA J Project No: 138535 cn z 0 w 0 Q U 0 6 z Project Name: STORMWATER OUTFALL REPAIR Drawing Name: GEOMETRIC LAYOUT GRADING PLAN PIEDMONT TRIAD INTERNATIONAL AIRPORT 4utocad Drawing Reference: File: 05 — Geometric Layout & Grading Plan (GL -1 to GL- 6).dwg Saved: Jan 27, 2015 — 11: 33am by dtorraa Plotted: Jan 27, 2015 — 11:59am )ate: Drawing Number: JANUARY 2015 Business Unit: GL-2 GREENSBORO SEED AND MULCH s? / EXISTING GRAVEL ROAD UPON COMPLETION OF WORK ` J / S1 BEGIN WORK - STA 10 +51.30 INSTALL PRECAST MANHOLE (5' DIA.) PROPOSED STREAM CONSTRUQf ION NCDOT STD 840.52 (SEE NOTE 1) N 861219.0755 E 1724984.3356 24" INV IN: 827.3 ( + / -) LIMIT 48" INV OUT: 818.28 j ROCK CROSS VANE (TYP) (SEE NOTE 4) GEOLIFT (TYP) ® ®� (SEE NOTE4) r_ I 0 ^\\ - - - -- r. X c.. , ... -- - k L f r 4 y BASELINE "C" v,,ufz'c,c �fFur' ,� cxti ji�YJr� :.:::. >�-.�i`- �Y-," ✓"- ,-� -. t Jf �,^ r 48" CMP 18 L.F. s._ PRECAST CONCRETE ENDWALL NCDOT STD 838.80 ° o C 1 f q\ ' OUTFALL PROTECTION C3 GL -3A 16'W x 31'L (15" DEPTH) J -HOOK VANE CLASS 1 RIP -RAP (29 TONS) Z' (SEE NOTE 4) FILTER FABRIC (50 S.Y.) STA 11 +06 _ ®_ ®_ ®_ d __�® _ _ l END CLASS 1 RIP -RAP APRON \ RIFFLE 2 4r / 1 (77) GL -3A -- TOP OF TERRACE Exist. Ground /" °° °®� . Exist. Ground (SEE NOTE 3) (TYP) (TYP) 10' MIN. 11.8' 10' MIN. FILTER FABRIC CLASS 1 PROPOSED GRADE RIP -RAP BANKFULL ELEV. 1Y2:1 MAX. (TYP) (SEE PROFILE) 5 PROPOSED GRADE MAX. � ,i` <�� } �� �� �� � 15.. NOTE: 2:1 MAX. (TYP) SEE SHEETS CD1 THRU CD2 FOR 16' STREAM CONSTRUCTION DETAILS 7 7 OUTFALL RIFFLE CROSS SECTION 1 PROTECTION 2 STA 11 +06 - 13 +37.62 GL -3A NOT TO SCALE GL -3A NOT TO SCALE a/ 835 : • 825 : • Exist. Ground (TYP) 5' MIN. BANKFULL ELEV. (SEE PROFILE) 5� OR 1 .r)c,AN g_UF FER (ZON___----- 15' 3' /< TOP OF TERRACE (SEE NOTE 3) 5' MIN. "- PROPOSED GRADE NOTE: 2:1 MAX. (TYP) SEE SHEETS CD1 THRU CD2 FOR STREAM CONSTRUCTION DETAILS 3' POOL CROSS SECTION 3 STA 11 +06 - 13 +37.62 NOT TO SCALE $ e 11+00 12 +00 BASELINE'C' PROFILE 13 +00 ME 835 : • 825 WIN : • 1 CURVE DATA I.D. Station Northing Easting Arc PC 10 +91.52 861259.1344 1724980.684 R = 18' C� PI 10 +95.86 861263.4541 1724980.29 L = 8.51' PT 11 +00.04 861267.1204 1724977.972 T = 4.34' Technician: PC 11 +08.12 861273.9507 1724973.653 R = 100' C2 PI 11 +29.32 861291.8691 1724962.323 L = 41.78' LJA PT 11 +49.90 861312.8436 1724959.238 T = 21.2' ' ///��y J, 11IIII101 \\ PC 11 +80.09 861342.71 1724954.845 R - 25' C3 PI 11 +92.38 861354.869 1724953.056 L = 22.84' PT 12 +02.93 861360.8789 1724942.336 T = 12.29' PC 12 +09,49 861364.0885 1724936,611 R = 25' C4 PI 12 +18.22 861368.3571 1724928.997 L = 16.8' PT 12 +26.29 861376.4375 1724925.695 T = 8.73' PC 12 +41.52 861390.5365 1724919.933 R - 25' C5 PI 12 +46.28 861394.9423 1724918.132 L = 9.41' PT 12 +50.93 861398.3783 1724914.838 T = 4.76' PC 12 +61,12 861405.7346 1724907,787 R - 50' C6 PI 12 +69.13 861411.5169 1724902.244 L = 15.88' PT 12 +77.00 861418.7414 1724898.785 T = 8.01' PC 13 +17.55 861455.3111 1724881.276 R = 50' C7 O PI 13 +27.72 861464.4887 1724876.882 L = 20.08' PT 13 +37.62 861474.6537 1724876.424 T = 10.18 83 20 10 0 20 SCALE IN FEET NOTES: 1. LAYOUT AN GRADING INFORMATION SHOWN ARE FOR GENERAL REFERENCE ONLY. FINAL CONSTRUCTION LINES AND GRADES MAY VARY DUE TO FIELD CONDITIONS AND WILL BE AS DIRECTED BY THE ENGINEER IN THE FIELD. 2. EXISTING TREES THAT ARE ADJACENT TO PROPOSED WORK AREA SHALL ONLY BE REMOVED IF NECESSARY FOR THE PURPOSE OF MEETING GRADING REQUIREMENTS. ALL TREE REMOVALS WILL BE AS APPROVED BY THE ENGINEER. 3. STREAM BANKS AND TERRACE SLOPES SHALL BE LIVE STAKED AND /OR MATTED USING TURF ENFORCEMENT BLANKKETS (TYPE C -125) FROM NORTH AMERICAN GREEN OR APPROVED EQUIVALENT. 4. SEE SHEETS CD -1 THRU CD -2 FOR STREAM CONSTRUCTION DETAILS. 5. ALL DISTURBED AREAS SHALL BE SEEDED AND MULCHED WITH PERMANENT SEEDING UPON COMPLETION OF WORK. PIEDMONT TRIAD AIRPORT AUTHORI',TY PIEDMONT TRIAD AIRPORT AUTHORITY GUILFORD COUNTY, NORTH CAROLINA T M N Cn z 0 Cn w c 0 Q U U) Q) 0 0 z Project Name: STORMWATER OUTFALL REPAIR Drawing Name: PIEDMONT TRIAD INTERNATIONAL AIRPORT Autocad Drawing Reference: ate: Drawing Number: JANUARY 2015 GL-3A usiness Unit: GREENSBORO www'mbakercorp.com MICHAEL BAKER ENGINEERING, INC. 7800 Airport Center Drive Suite 100 Greensboro, NC 27409 336.931.1500 (Office) 336.931.1501 (Fax) North Carolina License No. F -1084 Designer: II `CIII DCT , ``\ Technician: ° ESS /0 � _ ,F '4G DCT SEAL =_ Checked by: = 027429 - LJA NGINE° ° Project No: ........... ' 9j� R P� 138535 ' ///��y J, 11IIII101 \\ T M N Cn z 0 Cn w c 0 Q U U) Q) 0 0 z Project Name: STORMWATER OUTFALL REPAIR Drawing Name: PIEDMONT TRIAD INTERNATIONAL AIRPORT Autocad Drawing Reference: ate: Drawing Number: JANUARY 2015 GL-3A usiness Unit: GREENSBORO PHASE 1 CONSTRUCTION SEQUENCE: z "t f LEGEND 4 P T 1. INSTALL EROSION CONTROL PERIMETER MEASURES AND SILT FENCE PER PLAN. PIEDMONT TRIAD AIRPORT AUTHORITY — — — — — LIMIT OF CONSTRUCTION `� " 2. AREA PREPARATION: PIEDMONT TRIAD a) DRY WORK AREA USING SANDBAG DIKES WITH PLASTIC BARRIER LINERS AT UPSTREAM AIRPORT AUTHORITY YqO AND DOWNSTREAM LOCATIONS AS SHOWN. GUILFORD COUNTY, NORTH CAROLINA EXISTING CONTOUR / r b) PUMP WATER AROUND WORK AREA UNTIL AREA IS DRY ENOUGH FOR CONSTRUCTION. 835 PROPOSED CONTOUR c) WATER FROM DISTURBED AREA SHALL BE PUMPED THROUGH AN ACCEPTABLE rl. EROSION CONTROL DEVICE (SILT BAGS, SEDIMENT TRAP, ETC.) °00 GRAVEL CONSTR. ENTRANCE ? 3. CONSTRUCT PROPOSED CHANNEL IMPROVEMENT BETWEEN SANDBAG DIKES 1 AND 2. O o r www.mbakercorp.com 00 TOTAL DISTURBED AREA = 1.3 AC. r' MICHAEL BAKER ENGINEERING, INC. 4. SEED AND MAT NEW SLOPES, EMBANKMENTS, ETC AND STABILIZE AREA. 7800 Airport Center Drive SITE LOCATION 3 Suite 100 SILT FENCE ♦ � _ _ % �, � 336.931.1500 (Office) T ,, Greensboro, NC 27409 r 336.931.1501 (Fax) r / North Carolina License No. F -1084 DIVERSION CHANNEL Designer: DIRECTION DCT ` N° CAR'/'/, OF FLOW Q�� F ESS /� OCR O y Technician: ,° 0 ° r 00 OO DCT e < a STRAW WATTLE _ O O°�o 00 `� checked b SEAL O x = e 027429 e = 1J 00 ° Oo 0( o Oo -;r> LJA ° FtiCiNE�� ° 00 CHECK DAM O o7= r' Ry P� OOOO O 000 Project No: ' 9R ° ° ° ° ° ° ° ° ° O) r `. 138535 1 r '�J BEGIN WORK STA 10 +51.30 N 861219.0755 E 1724984.3356 O � — /P e � 11 `f I � -1 PROPOSED LIMIT OF GRADING :f� (TYP) r7nNE 1) D MEASURE =ER (_ZONE._ 1) M 2) Q) 0 0 U) z 0 Cn w ry C O Q L U U) N Z Project Name: STORMWATER OUTFALL REPAIR Drawing Name: PHASE 1 CONSTRUCTION PLAN PIEDMONT TRIAD INTERNATIONAL AIRPORT Autocad Drawing Reference: Date: Drawing Number: 20 10 0 20 JANUARY 2015 SCALE IN FEET Business Unit: GL -3B GREENSBORO LEGEND — — — — — LIMIT OF CONSTRUCTION EXISTING CONTOUR PHASE 2 CONSTRUCTION SEQUENCE: T1 1. RELOCATE SANDBAG DIKE #1 TO STATION 11 +00 ( + / -). PIEDMONT TRIAD AIRPORT AUTHORITY 2. INSTALL PROPOSED MANHOLE, DRAINAGE PIPE AND ENDWALL PER PLAN. PIEDMONT TRIAD AIRPORT AUTHORITY 3. TEMPORARILY CLOSE OFF MANHOLE OUTLET VIA INSTALLING AN INFLATABLE PIPE PLUG OR AN APPROVED MEASURE. GUILFORD COUNTY, NORTH CAROLINA 4. RELOCATE PUMP AND HOSE AS SHOWN OR AS DIRECTED. 835 PROPOSED CONTOUR D 5. PUMP WATER FROM MANHOLE AROUND WORK AREA AS SHOWN. WATER FROM rl. DISTURBED AREA SHALL BE PUMPED THROUGH AN ACCEPTABLE EROSION CONTROL DEVICE (SILT BAGS, SEDIMENT TRAP, ETC.) 000 °00� GRAVEL CONSTR. ENTRANCE , www.mbakercorp.com TOTAL DISTURBED AREA = 1.3 Ac. r' 6. BACKFILL AREA BETWEEN MANHOLE AND ENDWALL AS DIRECTED. MICHAEL BAKER ENGINEERING, INC. 7800 Airport Center Drive SITE LOCATION 3 { ` 7. DRY AREA BETWEEN SANDBAG DIKES 1 & 2 IN PREPARATION FOR PHASE #3. suite NC SILT FENCE `� _ T 336.93b 1500 (Office) r� 336.931.1501 (Fax) \ North Carolina License No. F -1084 DIVERSION CHANNEL DIRE OF FLOW STRAW WATTLE 0, 1 r '�J BEGIN WORK STA 10 +51.30 N 861219.0755 - E 1724984.3356 ' D D ACTUAL PUMP AND HOSE LOCATION SHALL BE DETERMINED IN THE FIELD r7nNE 1) 2) Designer: DCT .�\\\�\A CARS/ �� ° ° °F ESS /0 Technician: \ moo` DCT Quo — SEAL —_ = 027429 — Checked by: LJA ° ° ° F �� o ° NC I NE '' 9R ° ° ° ° ° °° °° ° °��?\; RY P� Project No: 138535 J. 0 0 U) z 0 Cn w D' C 0 Q L U U) N Z Project Name: STORMWATER OUTFALL REPAIR Drawing Name: PHASE 2 CONSTRUCTION PLAN PIEDMONT TRIAD INTERNATIONAL AIRPORT lAutocad Drawing Reference: Date: Drawing Number: 20 10 0 20 JANUARY 2015 SCALE IN FEET Business Unit: GL -3C GREENSBORO LEGEND — — — — — LIMIT OF CONSTRUCTION EXISTING CONTOUR 835 PROPOSED CONTOUR 0 00 GRAVEL CONSTR. ENTRANCE 00 SILT FENCE DIVERSION CHANNEL DIRE OF FLOW STRAW WATTLE PHASE 3 CONSTRUCTION SEQUENCE: T1 1. REMOVE SANDBAG DIKES AS DIRECTED BY THE ENGINEER. PIEDMONT TRIAD AIRPORT AUTHORITY 2. COMPLETE CONSTRUCTION OF OUTFALL APRON AND CHANNEL PER PLAN. PIEDMONT TRIAD AIRPORT AUTHORITY 3. SEED AND MAT NEW SLOPES, EMBANKMENTS, ETC. AND STABILZE AREA. GUILFORD COUNTY, NORTH CAROLINA 4. STRAW WATTLES SHALL REMAIN IN PLACE UNTIL HERBACEOUS VEGETATION BECOMES ESTABLISHED. 5. REMOVE PUMP AND HOSE DEVICES AS DIRECTED BY THE ENGINEER. 6. REMOVE AND /OR RETAIN EXISTING EROSION CONTROL MEASURES (I.E. SILT FENCE, DIVERSION DITCHES, ETC) ADJACENT TO FINISHED CONSTRUCTION www.mbakereorp.com AS DIRECTED BY THE ENGINEER. MICHAEL BAKER ENGINEERING, INC. 7800 Airport Center Drive Suite 100 7. CONTRACTOR SHALL RESTORE ALL TEMPORARY AREAS TO PRE - CONSTRUCTION Greensboro, NC 27409 CONDITIONS PRIOR TO COMPLETION OF THE PROJECT. 336.931.1500 (office) 336.931.1501 (Fax) North Carolina License No. F -1084 r7nNE 1) 2) Designer: DCT \\\� N C A R 0 " "," Technician: .� ° ° °F ESS /0 �� \ moo` DCT Quo — SEAL —_ Checked by: = 027429 — LJA ° ° ° F �� o ° NG Project No: I NE ' 9R ° ° ° ° ° °° °° ° °��?\; RY P� 138535 J. 0 0 U) z 0 Cn w D' C 0 Q L U U) N Z Project Name: STORMWATER OUTFALL REPAIR Drawing Name: PHASE 3 CONSTRUCTION PLAN PIEDMONT TRIAD INTERNATIONAL AIRPORT lAutocad Drawing Reference: Date: Drawing Number: 20 10 0 20 JANUARY 2015 SCALE IN FEET Business Unit: GL -3D GREENSBORO � J �j .,PRECAST MANHOLE (5' DIA.) STA 10 +51.30 r ° S I I r 48 CMP � \ d PRECAST CONCRETE ENDWALL NCDOT STD 838.80 ' RI A.RR 1 -RIP -RAP AP0Y PERMANENT NON - RIPARIAN SEED / RIFFLE (TYP) ROCI\VANE OSED TOP OF BANK / =UL El_ `NATION (TYP) PROPOSED GRADING AND PLANTING PLAN PERMANENT RIPARIAN SEED Permanent seed mixtures for the project site shall be planted throughout the floodplain and riparian buffer areas. Permanent seed mixtures shall be applied with temporary seed, as defined in the construction specifications. Common Name Scientific Name Percentage of Total Density (Ibs /ac) Tall Fescue Festuca arundinacea 72% 200 Kentucky Bluegrass Poa pratensis 14% 40 Red (fine) Fescue Festuca rubra 14% 40 Panicum virgatum Total 100% 280 / RIFFLE (TYP) ROCI\VANE OSED TOP OF BANK / =UL El_ `NATION (TYP) PROPOSED GRADING AND PLANTING PLAN PERMANENT RIPARIAN SEED Permanent seed mixtures for the project site shall be planted throughout the floodplain and riparian buffer areas. Permanent seed mixtures shall be applied with temporary seed, as defined in the construction specifications. Common Name Scientific Name Percent of Mixture Seeding Density (Ibs /acre) Wetness Tolerance Redtop Agrostls alba 10% 1.5 FACW F (Z E Elymus virg/nicus 15% 2.25 ER RDPN Switchgrass Panicum virgatum 15% 2.25 FAC+ \ PROPOSED LIMIT OF GRADING 5% 0.75 LIMIT OF BtNCHING (TYP) n FER (ZONE - i� 30?-'Dl ROCK CROSS VANE (TYP) (TYP) \\ 0.75 / O/ x 5% 0.75 FACU Soft Rush Juncus effusus 5% d FACW+ Beggars Tick 'MATCH EXISTING FLOWLINE 5% 0.75 FACW STA 13 +37.62 Coreopsls lanceolate 10% 1.5 FAC Tioga Deer Tongue Dlchanthelium clandestinum OH5r:C 2.25 / RIFFLE (TYP) ROCI\VANE OSED TOP OF BANK / =UL El_ `NATION (TYP) PROPOSED GRADING AND PLANTING PLAN PERMANENT RIPARIAN SEED Permanent seed mixtures for the project site shall be planted throughout the floodplain and riparian buffer areas. Permanent seed mixtures shall be applied with temporary seed, as defined in the construction specifications. Common Name Scientific Name Percent of Mixture Seeding Density (Ibs /acre) Wetness Tolerance Redtop Agrostls alba 10% 1.5 FACW Virginia Wildrye Elymus virg/nicus 15% 2.25 FAC Switchgrass Panicum virgatum 15% 2.25 FAC+ Eastern Gamma Grass Tripsacum dactyloides 5% 0.75 FAC+ Pennsylvania Smartweed Polygonum pennsylvanicum 5% 0.75 FACW Little Blue Stem Schizachyrium scoparium 5% 0.75 FACU Soft Rush Juncus effusus 5% 0.75 FACW+ Beggars Tick Bidens frondosa (or aristosa) 5% 0.75 FACW Lance - Leaved Tick Seed Coreopsls lanceolate 10% 1.5 FAC Tioga Deer Tongue Dlchanthelium clandestinum 15% 2.25 FACW Big Blue Stem Andropogon gerardii 5% 0.75 FAC Indian Grass Sorgastrum nutans 5% 0.75 FACU III 1114 t i • : _ �j 20 10 0 SCALE IN FE 20 OZONE .N g�1FF, (ZONE The following table lists temporary seed species for the projec site. All disturbed areas will be stabilized using mulch and temporary seed. Common Name Rate Dates CEREAL RYE 130 LBS /ACRE SEPTEMBER TO MARCH BROWNTOP MILLET 40 LBS /ACRE APRIL TO AUGUST LIVE STAKING /CUTTINGS Live staking and live cuttings will be applied to all restored streambanks and within the geolift structure following the details in this plan set and according to the construction specifications. Common Name Scientific Name Percentage of Total Wetness Tolerance Elderberry Sambucus canadensis 20% FACW - Silky Dogwood Corpus amonum 25% FACW+ Silky Willow Salix sericea 25% OBL Black Willow Salix nigra 10% OBL Ninebark Physocarpus opulifolius 20% FAC- LEGEND EXISTING CONTOUR 835 1 PROPOSED CONTOUR GEOLIFT ZONE (17 S.Y.) RIPARIAN SEEDING ZONE (0.10 Ac.) X X X X X X X X x x x x x x x x x x LIVE STAKING ZONE (0.14 Ac.) X X X X X X ImNON - RIPARIAN SEEDING ZONE (0.08 Ac.) T1 PIEDMONT TRIAD AIRPORT AUTHORI',TY PIEDMONT TRIAD AIRPORT AUTHORITY GUILFORD COUNTY, NORTH CAROLINA www'mbakercorp.com MICHAEL BAKER ENGINEERING, INC. 7800 Airport Center Drive Suite 100 Greensboro, NC 27409 336.931.1500 (Office) 336.931.1501 (Fax) North Carolina License No. F -1084 Designer: DCT 0\`­\A` �N Technician: °� °ARC ESS /0 _ ,�0� �� DCT e° Q e 7 SEAL =_ Checked by: = 027429 - LJA Project No: R y ° P� 138535 J, T M N V) Z 0 U) w o' 0 Q U U) Q) 0 0 TT—r z Project Name: STORMWATER OUTFALL REPAIR Drawing Name: GRADING AND PLANTING PLAN PIEDMONT TRIAD INTERNATIONAL AIRPORT utocad Drawing Reference: ate: Drawing Number: DECEMBER 2014 usiness Unit: GL -3E GREENSBORO E o o 0 N O N � N 2 O 0 O � O � 3 E N E Q o .0 .o M / r H N a o T1 PIEDMONT TRIAD AIRPORT AUTHORITY EXISTING PIEDMONT TRIAD GROUND CONCRETE JUNCTION BOX (42" DIA.) WITH AIRPORT AUTHORITY TYP COVER AND FRAME (NCDOT STD 840.31) 5 MIN. ��,, �i CAROUNA _I TOP ELEV : 812.50' (TYP) I I PROPOSED GRADE � EXISTING GROUND (TYP) � (SLOPE VARIES) 2:1 MAX. (TYP) '' . III I I SEE NOTE 2 r l III www.mbakercorp.com PRECAST CONCRETE HEADWALL CLASS I RIP RAP I I- I MICHAEL BAKER ENGINEERING, INC. 7800 Airport erDrive EXISTING 42" RCP (d50 = 12�� ) Suite 1oo (NCDOT STD 838.80) Greensboro, NC 27409 TOP ELEV : 804.50' 3:1 50(Office) 36.931.101 CONCRETE EXPRESSWAY GUTTER (TYP) x) 3 INV. ELEV 807.00 (NCDOT STD 846.01) O North Carolina Incense No. F -1084 Designer: : 2' MIN. i MATCH EXISTING O O 4' MIN. DCT \\ C A 0 PROPOSED GRADE GROUND O O O O OT OTC o \ \:= Q�.FESS /p ° Technician: T� g DCT = INV. ELEV : 799.60' ELEV : 799.10' - SEAL Checked by. PROPOSED 42" RCP (TYP) _ 027429 = -1 % --- SLOP E CARIES FILTER FABRIC LJA °J Project No: , _ LiI7LJ�C) Y INV. ELEV: 796.71' —� _ I� I�� _......,..° III 38535 INV. ELEV :799.71' III ' ' I _III III III III I ' - WIDTH VARIES — 13.25' M I N. TO 40' MAX. 1 SECTION B-B 5' 10.5' 50.5' 4' 14.5' MIN (I•D) OUTFALL PROTECTION SECTION A -A NOT TO SCALE NOT TO SCALE NOTE 1. CONTRACTOR SHALL LOWER THE WATER LEVEL WITHIN THE EXISTING POND TO 2FT BELOW THE TOP OF THE RISER ELEVATION. ALL WORK IN THIS AREA SHALL BE LEGEND PERFORMED UNDER DRY CONDITIONS. WETLAND P SERVATION A /q 2. GRADED SIDE SLOPES SHALL BE SEEDED, MULCHED AND STREAM CENTERLINE STABILIZED USING EXCELCIOR EROSION CONTROL MATTING. EXISTING PIPE 3. EXCELCIOR EROSION CONTROL MATTING SHALL BE GRADING /CONSTRUCTION LIMIT PLACED ON ALL DISTURBED SLOPE AREAS. EXISTING MINOR CONTOUR 4. ALL DISTURBED AREAS SHALL BE SEEDED AND MULCHED WITH PERMANENT SEEDING UPON COMPLETION OF WORK. EXISTING MAJOR CONTOUR CONSTRUCTION SHALL 870 PROPOSED MAJOR CONTOUR NOT INTRUDE WETLAND PRESERVATION AREA INSTALL CHECK DAM AT 1 PROPOSED MINOR CONTOUR �. (TYP) PRESERVATION LIMIT EC -2 �� SILT FENCE (MIN. HT = 2') 0 0 ORANGE SAFETY FENCE 40 L.F. CONRETE EXPRESSWAY GUTTER (NCDOT STD 846.01) ° ti O O O PROPOSED RIP RAP CHANNEL m ti _. PROPOSED CONCRETE CURB 1 1r „ � 42 CONCRETE HEADWALL ..... ... .... TURF MATTING (TYPE C 125) 00 _ = SILT FENCE 2 (I 10 L.F. 42" RCP O O (TYP) EC-1 O _ O o o O - ---- - - - -_- -----_- - - -- TOTAL DISTURBED AREA = 0.25 AC. - -- -- z REMOVE EXISTING HEADWALL. REPLACE WITH 42" JUNCTION BOX. SITE LO CAT I O N 4 O w 1`315 -�� LIMIT OF GRADING - o — LIMIT OF CONSTRUCTION `°. PROPOSED OUTFALL - -- CHANNEL `. o -,, (t0 rr�r Vs r, Project Name: ifs' -- U STORMWATER q OUTFALL N REPAIR O� Drawing Name: / GEOMETRIC LAYOUT EXISTING RISER DO NOT DISTURB �° � �� R GRADING PLAN SEE NOTE 1 �- PIEDMONT TRIAD 1;, AAtizxeni S� [0111 tf} tIf 1SAix. T INTERNATIONAL AIRPORT mruKF lr" silv,;9uVS 20 10 0 20 40 60 Autocad Drawing Reference: File: 05 — Geometric Layout & Grading Plan (GL -1 to GL- 6).dwg Saved: Jan 27, 2015 — 11: 33am by dtorraa Plotted: Jan 27, 2015 — 12:00pm GRAPHIC CALE BAR Date: Drawing Number: JANUARY 2015 GL-4 Business Unit: GREENSBORO 3 C7 E 0 E c� E I� Q N L' a N � N 2 O 0 O � ac 3 � E N E a rte^ � I M U N .0 �N W " it i�•► r •�I AM www.mbakercorp.com MICHAEL BAKER ENGINEERING, INC. 7800 Airport Center Drive Suite 100 Greensboro, NC 27409 336.931.1500 (Office) 336.931.1501 (Fax) North Carolina license No. F -1084 Designer: DCT \ �.�� N° C A R' -) Technician: :_ ��0� ESS /0� DCT — SEAL — Checked by. = 027429 = LJA <1 Project No: \r. ° J 138535 .. a) 41 0 0 Cn I O w n, c 0 _Q �L U U) a) D N Project Name: STORMWATER OUTFALL REPAIR Drawing Name: GEOMETRIC LAYOUT GRADING PLAN PIEDMONT TRIAD INTERNATIONAL AIRPORT 4utocad Drawing Reference: File: 05 — Geometric Layout & Grading Plan (GL -1 to GL- 6).dwg Saved: Jan 27, 2015 — 11:33— by dtorraa Plotted: Jan 27, 2015 — 12:01pro )ate: Drawing Number: JANUARY 2015 isiness Unit: GL -5 GREENSBORO 3 C7 E 0 E �E N Io Q N L N � N 2 O 0 O � ac 3 � E N E a rte^ � I M U N .0 M N / r H N W " it i�•► r •�I AM www.mbakercorp.com MICHAEL BAKER ENGINEERING, INC. 7800 Airport Center Drive Suite 100 Greensboro, NC 27409 336.931.1500 (Office) 336.931.1501 (Fax) North Carolina license No. F -1084 Designer: DCT \ N° C A R' -) �.�� :_ ��0� ESS /0� Technician: DCT — SEAL — = 027429 = Checked by. LJA <1 \r. ° J Project No: 138535 .. a) 41 0 0 Cn I O w n, c 0 _Q �L U U) a) D N Project Name: STORMWATER OUTFALL REPAIR Drawing Name: GEOMETRIC LAYOUT GRADING PLAN PIEDMONT TRIAD INTERNATIONAL AIRPORT 4utocad Drawing Reference: File: 05 — Geometric Layout & Grading Plan (GL -1 to GL- 6).dwg Saved: Jan 27, 2015 — 11: 33am by dtorraa Plotted: Jan 27, 2015 — 12:02pm )ate: I Drawing Number: JANUARY 2015 isiness Unit: GL-6 GREENSBORO 905 '•1 • ..1 875 • m 0 of q �E a� oN o� a� o� 3 a � T N E aN � l M � N O � N � o a o EXISTING GRADE EXISTING GAS LINES (DEPTHS UNKNOWN) 0 +50 ;lt EXISTING EXISTING ELEVATION TO BE LOCATED IN THE FIELD. 1+00 1+50 ..•.• 9 PROPOSED 24" RCP AND COLLAR. MATCH GRADE OF EXISTING 24" RCP. PROPOSED MANHOLE - TOP ELEV. AND INTAKE INVERT TO BE SET IN THE FIELD REMOVE EXISTING MANHOLE SECTIONS AS DIRECTED XlS7lVG..24. 2 +00 2 +50 905 F6161 �*R '•1 • ..1 Eou . J • 1 860 3 +00 5 0 2. 5 VERTICAL SCALE BAR 1 10 1 20 41 61 1110 =W PIEDMONT TRIAD AIRPORT AUTHORITY CIAFOW COUNTY, NOFiiH CMMM AM www.mbakercorp.com MICHAEL BAKER ENGINEERING, INC. 7800 Airport Center Drive Suite 100 Greensboro, NC 27409 336.931.1500 (Office) 336.931.1501 (Fax) North Carolina license No. F -1084 Designer: \ \\ \1111111 / / /// DCT \ �.�� N° C A Technician: : \_ � ESS /0� DCT — SEAL — Checked by. = 027429 = LJA F �� °° N GINS Project No: ° . R Y 138535 / 111111 \ \ N 41 0 0 cn I O w l O 41 Q �L U U) N D zl Project Name: STORMWATER OUTFALL REPAIR Drawing Name: PROFILES PIEDMONT TRIAD INTERNATIONAL AIRPORT 4utocad Drawing Reference: Flle: 06 — Profiles (P -1 to P- 2).dwg Saved: Dec 03, 2014 — 1: 55pm by dtorres Plotted: Jan 27, 2015 — 11:33am )ate: Drawing Number: JANUARY 2015 Business Unit: P -1 GREENSBORO • %16 m 855 • • 835 1 E'M• • i q �E a� oN o� a� o� 3 a � T N E aN � l M � N O � N � o a o PROFILE BASELINE B 1 11 1 1 11+00 11+50 12 +00 12 +50 11 13 +50 14 +00 14 +50 6 • •• •s 855 • .� • 015 us 835 • • 15 +00 1 0 2.5 5 3 VERTICAL SCALE BAR 20 10 0 20 40 60 HORIZONTAL SCALE BAR # r < at `ifr?ti4j3��i���'l���i7t'�iS2{t? { T1 I I PIEDMONT TRIAD AIRPORT AUTHORITY CIAFOW COUNTY, NOFiiH CMMM AM www.mbakercorp.com MICHAEL BAKER ENGINEERING, INC. 7800 Airport Center Drive Suite 100 Greensboro, NC 27409 336.931.1500 (Office) 336.931.1501 (Fax) North Carolina license No. F -1084 Designer: \1111111 / / /// BEGIN PGL = 10+50.76 \\\\ �.�� \A C A R�'' %, Technician: : \_ � ESS /o� DCT - SEAL - Checked by. = 027429 = ELEV = 854.650 <` � ° F. ° 0 °!IGINE 138535 J. I� ao I I 0 o — - — EXl S T �8 RCP W � d-. o � .. .. .. .. .. .. .. .. ... — —1 : 7 0 — CO W, I + . Q Wl J. ... .. � W. 'Q �� .... TA: 1 + .1 PVI 4 S 0 8 d 0 o ELEV• 85 . -- 4. 08 EXISTING GRADE w N VC: 25.00 CO o0 o W II � W J 10 . ... .. .. C� W .. .. .. .. .. .. .. .. .. .. ... �o . X-1 .. . . PROPOSED GRADE 0% . ELEV.-823-19 VC: 25.00 . . 10 1 p0 END PGL = 14+25.58 . . ELEV = 820.63 MATCH EXISTING • st V o 1 11 1 1 11+00 11+50 12 +00 12 +50 11 13 +50 14 +00 14 +50 6 • •• •s 855 • .� • 015 us 835 • • 15 +00 1 0 2.5 5 3 VERTICAL SCALE BAR 20 10 0 20 40 60 HORIZONTAL SCALE BAR # r < at `ifr?ti4j3��i���'l���i7t'�iS2{t? { T1 I I PIEDMONT TRIAD AIRPORT AUTHORITY CIAFOW COUNTY, NOFiiH CMMM AM www.mbakercorp.com MICHAEL BAKER ENGINEERING, INC. 7800 Airport Center Drive Suite 100 Greensboro, NC 27409 336.931.1500 (Office) 336.931.1501 (Fax) North Carolina license No. F -1084 Designer: \1111111 / / /// DCT \\\\ �.�� \A C A R�'' %, Technician: : \_ � ESS /o� DCT - SEAL - Checked by. = 027429 = LJ A <` � ° F. ° Project No: °!IGINE 138535 J. Cn Z 0 w 0 Q �L U U) N 0 O Z Project Name: STORMWATER OUTFALL REPAIR Drawing Name: PROFILES PIEDMONT TRIAD INTERNATIONAL AIRPORT 4utocad Drawing Reference: Flle: 06 — Profiles (P -1 to P- 2).dwg Saved: Dec 03, 2014 — 1: 55pm by dtorres Plotted: Jan 27, 2015 — 11:32am )ate: Drawing Number: JANUARY 2015 Business Unit: P_2 GREENSBORO ■ w� IM a.: �N o� o� a� o� 3 a � T N E Q _a a � I M � N O � o a o f t y i _�� :1 a DA .7 Eel ► i a INSTALL FILTER FABRIC PRIOR TO WASHED STONE. MIRAFI 180 —N OR APPROVED EQUIVALENT. NOTES: 1. AGGREGATE SIZE — USE 2 -3 INCH WASHED STONE 2. DIMENSIONS OF GRAVEL PAD — THICKNESS: 6 INCHES MINIMUM WIDTH: 12 FOOT MINIMUM OR FULL WIDTH AT ALL POINTS OF THE VEHICULAR ENTRANCE & EXIT AREA; WHICHEVER IS GREATER. LENGTH: 50 FOOT MINIMUM 3. LOCATION: LOCATE CONSTRUCTION ENTRANCES & EXITS TO LIMIT SEDIMENT FROM LEAVING THE SITE & TO PROVIDE FOR MAXIMUM UTILITY BY ALL CONSTRUCTION VEHICLES. 4. AVOID STEEP GRADES & ENTRANCES AT CURVES. 5. NO SEPARATE MEASUREMENT OR PAYMENT WILL BE MADE FOR THIS ITEM. 6. INSPECT THE SURFACE & TOP DRESS THE SURFACE AS NEEDED WITH GRAVEL. 6" MIN. TEMPORARY CONSTRUCTION ENTRANCE PAD NOT TO SCALE EROSION CONTROL CONSTRUCTION SEQUENCE NOTES: GENERAL THE CONTRACTOR SHALL SUBMIT TO THE ENGINEER AND OWNER A DETAILED CONSTRUCTION PROGRESS SCHEDULE. THESE PLANS AND SPECIFICATIONS PROVIDE GENERAL CONSTRUCTION SEQUENCE AND SAFETY PARAMETERS WHICH MUST BE INCORPORATED INTO THE APPROVED SCHEDULE. THE CONTRACTOR'S APPROVED EROSION CONTROL PLAN SHALL BE INCORPORATED INTO THE CONSTRUCTION SEQUENCE PLAN. THE CONSTRUCTION OF THE PROJECT MUST BE COMPLETED IN SEQUENTIAL ORDER AS LISTED BELOW: * MOBILIZATION * EROSION CONTROL * CONSTRUCT WORK ELEMENTS * SEEDING AND MULCHING PLANNED TEMPORARY EROSION CONTROL FEATURES 1. TEMPORARY CONSTRUCTION ENTRANCE PAD 2. DROP INLET PROTECTION 3. EROSION CONTROL MATTING ALL DISTURBED AREAS ARE TO BE SEEDED AND MULCHED IN ACCORDANCE WITH ITEMS T -901 AND T -908 OF THE SPECIFICATIONS, WITHIN 14 DAYS FOLLOWING COMPLETION OF ANY PHASE OF GRADING. PERMANENT GROUND COVER SHALL BE OBTAINED WITHIN 15 WORK DAYS OR 90 CALENDAR DAYS (WHICHEVER IS SHORTER) FOLLOWING COMPLETION OF THE PROJECT. ANY FINES, PENALTIES, OR OTHER COSTS ASSESSED BY STATE, LOCAL OR THE GOVERNMENTAL AGENCIES FOR NON— PERFORMANCE OF THE EROSION CONTROL REQUIREMENTS OF THIS PROJECT AGAINST THE OWNER SHALL BECOME THE RESPONSIBILITY OF THE CONTRACTOR, AND ANY SUCH ASSESSMENTS, IF NOT PAID BY THE CONTRACTOR, WILL BE DEDUCTED FROM MONIES DUE AT THE COMPLETION OF THIS PROJECT. PHASING 1. ATTEND PRECONSTRUCTION CONFERENCE 2. INSTALL EROSION CONTROL MEASURES 3. PERFORM CONSTRUCTION OPERATIONS 4. SEED AND MULCH ANY DISTURBED AREAS 5. ONCE PERMANENT SEEDING HAS BEEN ESTABLISHED, REMOVE ALL TEMPORARY EROSION CONTROL FEATURES. SEED AND MULCH THE AREAS EFFECTED BY THE REMOVAL MAINTENANCE PLAN 1. ALL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE CHECKED FOR STABILITY AND OPERATION FOLLOWING EVERY RUNOFF — PRODUCING RAINFALL BUT IN NO CASE LESS THAN ONCE EVERY WEEK. ANY NEEDED REPAIRS WILL BE MADE IMMEDIATELY TO MAINTAIN ALL PRACTICES AS DESIGNED. 2. SEDIMENT WILL BE REMOVED FROM BEHIND THE SILT FENCE OR INLET PROTECTION WHEN IT BECOMES ABOUT 0.5 FT. DEEP. THE EROSION CONTROL BARRIER WILL BE REPAIRED AS NECESSARY TO MAINTAIN A BARRIER. 3. THE ENGINEER MAY DIRECT THAT ADDITIONAL SILT FENCING OR INLET PROTECTION BE INSTALLED AT ANY TIME PRIOR TO FINAL ACCEPTANCE. 8„ MIN Li NOTE: W = 8' MAX STANDARD STRENGTH FABRIC WITH WIRE FENCE OR 6' MAX. EXTRA STRENGTH FABRIC WITHOUT WIRE FENCE. WIRE W - FENCE THREE PLASTIC OR WIRE TIES ''MIN. 2. ATTACH WIRE FENCING TO STEEL POST 1. SET STEEL POST AND EXCAVATE A 4"x8" TRENCH WITH PLASTIC OR WIRE TIES. UPSLOPE ALONG THE LINE OF POST. 3. ATTACH THE FILTER FABRIC TO THE WIRE FENCE AND EXTEND IT INTO THE TRENCH. 4. BACKFILL AND COMPACT THE EXCAVATED SOIL. SEDIMENT FENCE NOT TO SCALE TEMPORARY SEDIMENT POOL SEDIMENT NO. 57 STONE 2:1 SLOPE, GRAVEL FILTER WIRE SCREEN DROP INLET WITH GRATE G FILTER FABRIC BACKFILL TRENCH & COMPACT THOROUGHLY NATURAL GROUND STEEL POST WIRE 1 FENCE 00 4 "MIN. CROSS - SECTION VIEW EXTENSION OF FABRIC AND WIRE INTO TRENCH N OTE: INSTALL SEDIMENT FENCE WHERE SHOWN ON THE PLANS AND MAINTAIN UNTIL DISTURBED AREA IS COMPLETELY STABILIZED, AND INSPECT THE SILT FENCE WEEKLY AND AFTER RAINFALL. 2 EC -1 2 x 4" ALUMINUM FRAME N OTE: 1. CONTRACTOR HAS OPTION OF WHICH METHOD OF INLET PROTECTION TO USE. 2. CONTRACTOR SHALL MAINTAIN INLET PROTECTION UNTIL DISTURBED AREA IS COMPLETELY STABILIZED AND INSPECT THE TEMPORARY INLET PROTECTION WEEKLY AND AFTER EACH RAINFALL. TEMPORARY INLET PROTECTION NOT TO SCALE I_ 2 _ I (ALL DIR.) 1. TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURERS SPECIFICATIONS. 2. TYPE I MATTING SHALL BE CURLED WOOD EXCELSIOR. ALLOWABLE SHEAR STRESS = 1.55 LB /FTZ. 3. THE MATTING OF SLOPES MUST BE PROVIDED TO THE CLOSEST SEDIMENT TRAP, ROCK DAM, OR SEDIMENT BASIN. MATTING FOR EROSION CONTROL NOT TO SCALE Q = J � � 0 > 0 z � w LINE DIVERSION WITH TY COMPACTED SOIL 2' MIN. 6' TYPICAL 00 z F LOAN TEMPORARY DIVERSION NOT TO SCALE WITH GRATE C�1�J \l�J \7�■ 1 � !I � , GATHER EXCESS AT CORNERS T1 PIEDMONT TRIAD AIRPORT AUTHORITY PIEDMONT TRIAD AIRPORT AUTHORITY GUILFORD COUNTY, NORTH CAROLINA Alft z zi www.mbakercorp.com MICHAEL BAKER ENGINEERING, INC. 7800 Airport Center Drive Suite 100 NOTE: W = 8' MAX STANDARD STRENGTH FABRIC WITH WIRE FENCE OR 6' MAX. EXTRA STRENGTH FABRIC WITHOUT WIRE FENCE. WIRE W - FENCE THREE PLASTIC OR WIRE TIES ''MIN. 2. ATTACH WIRE FENCING TO STEEL POST 1. SET STEEL POST AND EXCAVATE A 4"x8" TRENCH WITH PLASTIC OR WIRE TIES. UPSLOPE ALONG THE LINE OF POST. 3. ATTACH THE FILTER FABRIC TO THE WIRE FENCE AND EXTEND IT INTO THE TRENCH. 4. BACKFILL AND COMPACT THE EXCAVATED SOIL. SEDIMENT FENCE NOT TO SCALE TEMPORARY SEDIMENT POOL SEDIMENT NO. 57 STONE 2:1 SLOPE, GRAVEL FILTER WIRE SCREEN DROP INLET WITH GRATE G FILTER FABRIC BACKFILL TRENCH & COMPACT THOROUGHLY NATURAL GROUND STEEL POST WIRE 1 FENCE 00 4 "MIN. CROSS - SECTION VIEW EXTENSION OF FABRIC AND WIRE INTO TRENCH N OTE: INSTALL SEDIMENT FENCE WHERE SHOWN ON THE PLANS AND MAINTAIN UNTIL DISTURBED AREA IS COMPLETELY STABILIZED, AND INSPECT THE SILT FENCE WEEKLY AND AFTER RAINFALL. 2 EC -1 2 x 4" ALUMINUM FRAME N OTE: 1. CONTRACTOR HAS OPTION OF WHICH METHOD OF INLET PROTECTION TO USE. 2. CONTRACTOR SHALL MAINTAIN INLET PROTECTION UNTIL DISTURBED AREA IS COMPLETELY STABILIZED AND INSPECT THE TEMPORARY INLET PROTECTION WEEKLY AND AFTER EACH RAINFALL. TEMPORARY INLET PROTECTION NOT TO SCALE I_ 2 _ I (ALL DIR.) 1. TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURERS SPECIFICATIONS. 2. TYPE I MATTING SHALL BE CURLED WOOD EXCELSIOR. ALLOWABLE SHEAR STRESS = 1.55 LB /FTZ. 3. THE MATTING OF SLOPES MUST BE PROVIDED TO THE CLOSEST SEDIMENT TRAP, ROCK DAM, OR SEDIMENT BASIN. MATTING FOR EROSION CONTROL NOT TO SCALE Q = J � � 0 > 0 z � w LINE DIVERSION WITH TY COMPACTED SOIL 2' MIN. 6' TYPICAL 00 z F LOAN TEMPORARY DIVERSION NOT TO SCALE WITH GRATE C�1�J \l�J \7�■ 1 � !I � , GATHER EXCESS AT CORNERS T1 PIEDMONT TRIAD AIRPORT AUTHORITY PIEDMONT TRIAD AIRPORT AUTHORITY GUILFORD COUNTY, NORTH CAROLINA Alft z zi www.mbakercorp.com MICHAEL BAKER ENGINEERING, INC. 7800 Airport Center Drive Suite 100 Greensboro, NC 27409 336.931.1500 (Office) 336.931.1501 (Fax) North Carolina license No. F -1084 Designer: \ \\ \1111111///// DCT \ �.�� N° C A RO'' %, Technician: : \_ � E S S i;cI,� DCT = o Q < e� – SEAL – Checked by. = 027429 = LJA <y Project No: X�, / Y ° J 138535 / /�,R 1 B 0 Cn z 0 w c 0 Q •L U N 0 0 z Project Name: STORMWATER OUTFALL REPAIR Drawing Name: EROSION CONTROL DETAILS PIEDMONT TRIAD INTERNATIONAL AIRPORT 4utocad Drawing Reference: File: 07 — Erosion Control Details.dwg Saved: Dec 03, 2014 — 2:01pm by dtorres Plotted: Jon 27, 2015 — 11: 34am )ate: Drawing Number: JANUARY 2015 3usiness Unit: EC�1 GREENSBORO 16141, 1/G E) (--)I I I LLI \4 I— I V I I— IVI UI \--/I\1 FACE 20 MIL THICK 1 F7,' I IL ILI\ I /UI \IV CLASS B EROSION CONTROL STONE A SECTION A -A TOP WIDTH =1.5 MIN. 24" MAX. 2 7 AT CENTER FILTER FABRIC. MIRAFI 180 —N OR APPROVED EQUIVALENT. L = THE DISTANCE SUCH THAT POINTS A & B ARE OF EQUAL ELEVATION L -B TEMPORARY ROCK CHECK DAM NOT TO SCALE POLYETHYLENE MEMBRANE ON w a� �N ,N oN o� a� o� 3 a � T N E a o 10 a � I M � N O � N �o COFFERDAM DETAIL /0-2 NOT TO SCALE EC -2 I OF BANK OR RIP RAP OR APPROVED L (IF USING RIP WN STREAM SLOPE TER THAN 2: 1) TER FABRIC I" x I" x 30" HT. WOODEN STAKE 3' CENTER TO CENTER SPACING (TYP) DRIVE STAKE 15" INTO THE GROUND FLOW 12" DIA WATTLE - - -i- (SEE PLAN FOR LOCATION) PROPOSED GRADE ENSURE TIGHT FIT BETWEEN WATTLE AND MATTING \�X \,X \,X \,X \,X \,X \�� \�\�\ A\\�V�iV� /�, TERRACE MATTING CONSTRUCTED BENCHING SECTION A -A i" V i" V -�n" NT \AinnnP-Ni CTAI-C�- TOP OF BANK (BANKFUL ELEV.) CONSTRUCTED CHANNEL AREA TO BE PROTECTED 1MV141T, WATTLE AT O• OF BANK NOT TO SCALE NOTES: 1. CHECK WATTLES AFTER EACH STORM EVENT. REPAIR WATTLES AND RESET STAKES AS NEEDED. W " . �i,�•► r :•�I r �r Alft www.mbakercorp.com MICHAEL BAKER ENGINEERING, INC. 7800 Airport Center Drive Suite 100 Greensboro, NC 27409 336.931.1500 (Office) 336.931.1501 (Fax) North Carolina license No. F -1084 Designer: \ \\ \1111111 / / /// DCT \ �.�� N° C A Technician: U DCT = SEAL = Checked by. = 027429 = 1-JA <y Project No: Y ° J 138535 01111110\ .. c� z U w m w f- U t- (� cn z z o U C/) w n, c 0 41 _Q �L U N 0 0 z Project Name: STORMWATER OUTFALL REPAIR Drawing Name: EROSION CONTROL DETAILS PIEDMONT TRIAD INTERNATIONAL AIRPORT Autocad Drawing Reference: File: 07 — Erosion Control Details.dwg Saved: Dec 03, 2014 — 2:01pm by dtorres Plotted: Jon 27, 2015 — 11:36 — Date: Drawing Number: JANUARY 2015 Business Unit: EC-2 GREENSBORO 3 0 U 0 0 U zE IM ar �N �a od aN 00 3 � � T N L � c a N M � N O � N � o a o GRADE CONTROL J -HOOK VANE 1/3 BOTTOM _ 1/3 BOTTOM WIDTH OF T� WIDTH OF CHANNEL CHANNEL 200 TO 300 FLOW _ B A W O H U) J J u- Y z < m co a A' i NO GAPS BETWEEN Q BOULDERS c~/) _I Y / \ z Q m SCOUR POOL M I � SCOUR POOL (EXCAVATED) \ PER DIRECTION OF ENGINEER # 57 STONE BACKFILL (ON &TE ALLUVIUM) 1' �- 1' STREAMBED o o o�0. do o o ° °o ono s`o° o CLASS A STONE o o °g� o -�ao�° FILTER FABRIC 1' 10' MINIMUM 3/4 BANKFULL STAGE COVER LOGS FLOW -- -. -� (INSTALL COVER LOGS AS DIRECTED BY THE STREAMBED PLAN VIEW PROJECT ENGINEER) ELEVATION °o°4 BACKFILL WITH ON -SITE STREAM ALLUVIUM (IF AVAILABLE), OTHERWISE R USE A WELL GRADED MIX OF CLASS A, NOTES: CLASS B, AND #57 STONE 1. BOULDERS MUST BE AT LEAST 3'x 2'x 2'. 2. INSTALL FILTER FABRIC FOR DRAINAGE BEGINNING AT THE MIDDLE OF THE HEADER ROCKS AND EXTEND DOWNWARD TO THE DEPTH OF THE BOTTOM FOOTER ROCK, AND THEN UPSTREAM TO A MINIMUM OF TEN FEET. 3. DIG A TRENCH BELOW THE BED FOR FOOTER ROCKS AND PLACE FILL ON UPSTREAM SIDE OF VANE ARMS, BETWEEN THE ARMS AND STREAMBANK. 4. START AT BANK AND PLACE FOOTER ROCKS FIRST AND THEN HEADER (TOP) ROCK. 5. CONTINUE WITH STRUCTURE, FOLLOWING ANGLE AND SLOPE SPECIFICATIONS. 6. AN EXTRA BOULDER CAN BE PLACED IN SCOUR POOL FOR HABITAT IMPROVEMENT. 7. USE CLASS A, CLASS B, AND #57 STONE TO BACKFILL UPSTREAM SIDE OF BOULDERS TO THE ELEVATION OF THE TOP OF THE HEADER ROCK. 8. BOULDER SILL MUST BE A MINIMUM OF 6'. 9. GRAPHICS ARE A REPRESENTATION AND DO NOT INDICATE THE ACTUAL NUMBER OF BOULDERS TO BE USED. SILL W C� H J J u_ Y z Q m M PLAN VIEW Y z < m u_ O W O ROCK CROSS VANE # 57 STONE SECTION A - A' SECTION B - B' BACKFILL (ON -SITE ALLUVIUM) 1' 1' STREAMBED ° °° o. 0008 ° oso °� o CLASS A STONE °88 °0 8 t° FILTER FABRIC 1 X10' MINIMUMS SECTION A - A 3/4 BANKFULL ST F� - SILL J` �� I 6' MIN. NOTES: 1. BOULDERS MUST BE AT LEAST 3'x 2'x 2'. 2. INSTALL FILTER FABRIC FOR DRAINAGE BEGINNING AT THE MIDDLE OF THE HEADER ROCKS AND EXTEND DOWNWARD TO THE DEPTH OF THE BOTTOM FOOTER ROCK, AND THEN UPSTREAM TO A MINIMUM OF TEN FEET. 3. DIG A TRENCH BELOW THE BED FOR FOOTER ROCKS AND PLACE FILL ON UPSTREAM SIDE OF VANE ARMS, BETWEEN THE ARMS AND STREAMBANK. 4. START AT BANK AND PLACE FOOTER ROCKS FIRST AND THEN HEADER (TOP) ROCK. 5. CONTINUE WITH STRUCTURE, FOLLOWING ANGLE AND SLOPE SPECIFICATIONS. 6. AN EXTRA BOULDER CAN BE PLACED IN SCOUR POOL FOR HABITAT IMPROVEMENT. 7. USE CLASS A, CLASS B, AND #57 STONE TO BACKFILL UPSTREAM SIDE OF BOULDERS TO THE ELEVATION OF THE TOP OF THE HEADER ROCK. 8. BOULDER SILL MUST BE A MINIMUM OF 6'. 9. GRAPHICS ARE A REPRESENTATION AND DO NOT INDICATE THE ACTUAL NUMBER OF BOULDERS TO BE USED. FLOW -- RIFFLE R,R io° ° R°' ° FILTER FABI CROSS VANE INVERT /GRADE POINT CLASS B STONE HEADER ROCK FOOTER ROCK SCOUR POOL (EXCAVATED) CLASS B STONE PROFILE VIEW C , C HEADER ROCK STREAM BANK B FOOTER ROCK .ALE # 57 STONE AlR &33- ��i1019 TOP OF BANK D PROFILE VIEW A O r J U_ � ° 8 �o o �o �o 000S O Q)_ 00 0 ° ° �°0 CD o o o o°$� 0 000 °00 8cp- o (90 0 ® ® sorb° �� 8o o O9® 6° _ ° ° 0opQ.� ° °� 00 O jJ C95(9 00 0K)g°® °o°1oObqog 5% C90°60 o°pO�O°,C)9® �0q, 000 0000 0'0°0'0 0v o® °° °� °° o °° ° o0 ° 0� Nco g° ° fig® o� 0. "� o ° o &'S So or,D9® o oo° ®0 °oobV� o A PLAN VIEW SECTION A - A CONSTRUCTED RIFFLE TOE EROSION CONTROL MATTING DEFINE THALWEG IN - CENTER OF CHANNEL HEAD OF RIFFLE INKFULL Qo7 - EROSION CONTROL MATTING SHOULD BE PLACED BENEATH ROCKS 24" NOM. THICKNESS WELL GRADED MIX OF CLASS II, CLASS A, CLASS B, AND #57 STONE. ON -SITE ALLUVIUM SHALL BE INCORPORATED IF AVAILABLE. SECTION B - B' 24" NOM. THICKNESS WELL GRADED MIX OF CLASS II, CLASS A, CLASS B, AND #57 STONE. ON -SITE ALLUVIUM SHALL BE INCORPORATED IF AVAILABLE. R� FLE ° �°o\ °° 0°° PROFILE A - NOTES: A' 1. DIG A TRENCH BELOW THE BED FOR THE BED MATERIAL INSTALLATION. 2. FILL TRENCH WITH WELL GRADED MIX OF CLASS 2, CLASS A, CLASS B, AND #57 STONE. TO THE BED ELEVATION OF THE CHANNEL. ON -SITE ALLUVIUM SHALL BE INCORPORATED IF AVAILABLE 3. DEFINE THALWEG IN CENTER OF CHANNEL. POOL T1 PIEDMONT TRIAD AIRPORT AUTHORITY PIEDMONT TRIAD AIRPORT AUTHORITY 0"OW COUIMY, INOFiili CMMM Mm.mbakercorp.com MICHAEL BAKER ENGINEERING, INC. 7800 Airport Center Drive Suite 100 Greensboro, NC 27409 336.931.1500 (Office) 336.931.1501 (Fax) North Carolina license No. F -1084 Designer: J B N C A R O ° Technician: ��OF ESS /�* ° DCT SEAL =_ Checked by. - 027429 - LJA GIN• ° . Project No: J 138535 cn z O > w c 0 41 Q U N 0 0 z Project Name: STORMWATER OUTFALL REPAIR Drawing Name: NATURAL CREEK DETAILS PIEDMONT TRIAD INTERNATIONAL AIRPORT 4utocad Drawing Reference: File: 08 - Natural Creek Details (CD -1 to CD- 2).dwq Saved: Dec 03, 2014 - 2: 06pm by dtorres Plotted: Jan 27, 2015 - 11: 37cm date: Drawing Number: JANUARY 2015 (� 3usiness Unit: `-'D -� GREENSBORO ROCK VANE 1/3 BOTTOM WIDTH OF CHANNEL W 26 TO 30 ° FLOW NOTES: O 1. BOULDERS MUST BE AT LEAST Tx 2'x 2'. 2. INSTALL FILTER FABRIC FOR DRAINAGE BEGINNING AT THE MIDDLE OF THE HEADER J ROCKS AND EXTEND DOWNWARD TO THE DEPTH OF THE BOTTOM FOOTER ROCK, J AND THEN UPSTREAM TO A MINIMUM OF TEN FEET. LL 3. DIG A TRENCH BELOW THE BED FOR FOOTER ROCKS AND PLACE FILL ON UPSTREAM z q R SIDE OF VANE ARMS, BETWEEN THE ARMS AND STREAMBANK. m �, 4. START AT BANK AND PLACE FOOTER ROCKS FIRST AND THEN HEADER (TOP) ROCK. d 5. CONTINUE WITH STRUCTURE, FOLLOWING ANGLE AND SLOPE SPECIFICATIONS. cc i °�a 6. AN EXTRA BOULDER CAN BE PLACED IN SCOUR POOL FOR HABITAT IMPROVEMENT. A 7. USE CLASS A, CLASS B, AND #57 STONE TO BACKFILL UPSTREAM SIDE OF BOULDERS e ° TO THE ELEVATION OF THE TOP OF THE HEADER ROCK. �a 8. BOULDER SILL MUST BE A MINIMUM OF 6'. 9. GRAPHICS ARE A REPRESENTATION AND DO NOT INDICATE THE ACTUAL NUMBER / OF BOULDERS TO BE USED. ° R SCOUR POOL NO GAPS SCOUR POOL (EXCAVATED) PER BETWEEN DIRECTION OF ENGINEER BOULDERS BOTTOM WIDT PLAN VIEW # 57 STONE AlR &33- ��i1019 TOP OF BANK D PROFILE VIEW A O r J U_ � ° 8 �o o �o �o 000S O Q)_ 00 0 ° ° �°0 CD o o o o°$� 0 000 °00 8cp- o (90 0 ® ® sorb° �� 8o o O9® 6° _ ° ° 0opQ.� ° °� 00 O jJ C95(9 00 0K)g°® °o°1oObqog 5% C90°60 o°pO�O°,C)9® �0q, 000 0000 0'0°0'0 0v o® °° °� °° o °° ° o0 ° 0� Nco g° ° fig® o� 0. "� o ° o &'S So or,D9® o oo° ®0 °oobV� o A PLAN VIEW SECTION A - A CONSTRUCTED RIFFLE TOE EROSION CONTROL MATTING DEFINE THALWEG IN - CENTER OF CHANNEL HEAD OF RIFFLE INKFULL Qo7 - EROSION CONTROL MATTING SHOULD BE PLACED BENEATH ROCKS 24" NOM. THICKNESS WELL GRADED MIX OF CLASS II, CLASS A, CLASS B, AND #57 STONE. ON -SITE ALLUVIUM SHALL BE INCORPORATED IF AVAILABLE. SECTION B - B' 24" NOM. THICKNESS WELL GRADED MIX OF CLASS II, CLASS A, CLASS B, AND #57 STONE. ON -SITE ALLUVIUM SHALL BE INCORPORATED IF AVAILABLE. R� FLE ° �°o\ °° 0°° PROFILE A - NOTES: A' 1. DIG A TRENCH BELOW THE BED FOR THE BED MATERIAL INSTALLATION. 2. FILL TRENCH WITH WELL GRADED MIX OF CLASS 2, CLASS A, CLASS B, AND #57 STONE. TO THE BED ELEVATION OF THE CHANNEL. ON -SITE ALLUVIUM SHALL BE INCORPORATED IF AVAILABLE 3. DEFINE THALWEG IN CENTER OF CHANNEL. POOL T1 PIEDMONT TRIAD AIRPORT AUTHORITY PIEDMONT TRIAD AIRPORT AUTHORITY 0"OW COUIMY, INOFiili CMMM Mm.mbakercorp.com MICHAEL BAKER ENGINEERING, INC. 7800 Airport Center Drive Suite 100 Greensboro, NC 27409 336.931.1500 (Office) 336.931.1501 (Fax) North Carolina license No. F -1084 Designer: J B N C A R O ° Technician: ��OF ESS /�* ° DCT SEAL =_ Checked by. - 027429 - LJA GIN• ° . Project No: J 138535 cn z O > w c 0 41 Q U N 0 0 z Project Name: STORMWATER OUTFALL REPAIR Drawing Name: NATURAL CREEK DETAILS PIEDMONT TRIAD INTERNATIONAL AIRPORT 4utocad Drawing Reference: File: 08 - Natural Creek Details (CD -1 to CD- 2).dwq Saved: Dec 03, 2014 - 2: 06pm by dtorres Plotted: Jan 27, 2015 - 11: 37cm date: Drawing Number: JANUARY 2015 (� 3usiness Unit: `-'D -� GREENSBORO STAKE TOP LAYER OF MATTING IN 6" TRENCH (SEE MATTING DETAIL) 4' DEEP (TYP) GEOLIFT TOP OF BANK / BANKFULL STAGE qY \ � CONTROL MATTING ENCOMPASSES LI LIVE BRANCH CUTTINGS (SEE PLANTING PLAN FOR SPECIES) 00000 Oo0o00000000 OOO� O n 000 00 00 00 n 000 00 n r) 42 r, 2r - WELL GRADED MIX OF CLASS 1 AND CLASS B STONE U 0 0 U zE l� aM �N N �a o� aN �o 3 � �T N Qa � c a N M � �o �N �o a o STONE TOE APPROX. 0.5 FT ABOVE BASEFLOW BASEFLOW n FINISHED BED ELEVATION— STONE TOE APPROX. 1 FT BELOW OoOC FINISHED BED ELEVATION 001— NOTES: 1. NUMBER OF LIFTS WILL BE DETERMINED IN THE FIELD BY THE ENGINEER. F� tis TOP OF STREAMBANK TOE OF BANK LIVE STAKING BOTTOM OF CHANNEL CROSS - SECTION VIEW OF LIVE STAKING SPECIFICATION 2'- 3' TOP OF STREAMBAN �ES SHOULD BE CUT AND INSTALLED ON THE SAME DAY. 2. DO NOT INSTALL STAKES THAT HAVE BEEN SPLIT. 3. STAKES MUST BE INSTALLED WITH BUDS POINTING UPWARDS. 4. STAKES SHOULD BE INSTALLED PERPENDICULAR TO BANK. 5. STAKES SHOULD BE 1/2 TO 2 INCHES IN DIAMETER AND 18" TO 30" LONG. 6. STAKES SHOULD BE INSTALLED LEAVING 1/5 OF STAKE ABOVE GROUND. SQUARE CU BUDS FACING UPW . LIVE CUTTING MIN. 1/2" 1 TRENCH TOP OF STREAMBANK ANGLE CUT 30 - 45 DEGt \L-L-� PLAN VIEW OF LIVE STAKING SPECIFICATION 18" - 30" LENGTH LIVE STAKE DETAIL FIBER MATTING T1 PIEDMONT TRIAD AIRPORT AUTHORITY PIEDMONT TRIAD AIRPORT AUTHORITY G�uFOiFlD COUMY, Noani CAROLNA www.mbakercorp.com MICHAEL BAKER ENGINEERING, INC. 7800 Airport Center Drive 27.94 CM Suite 100 i\ • Greensboro, NC 27409 • 336.931.1500 (Office) 1.02 CM 336.931.1501 (Fax) North Carolina Mcense No. F -1084 Designer: 0.40 IN J13 \ �,�� N° C A R 0'� %� Technician: : \_ ��0� DCT - SEAL - Checked by. = 027429 = LJA <y Project No: Y ° J 138535 01111110\ • + • • PLANT STAKES FROM • • • • . • • • • TOP OF BANK TO TOE OF BANK TOE OF SLOPE •, •, • • • • • TRENCH TOP OF STREAMBANK ANGLE CUT 30 - 45 DEGt \L-L-� PLAN VIEW OF LIVE STAKING SPECIFICATION 18" - 30" LENGTH LIVE STAKE DETAIL FIBER MATTING T1 PIEDMONT TRIAD AIRPORT AUTHORITY PIEDMONT TRIAD AIRPORT AUTHORITY G�uFOiFlD COUMY, Noani CAROLNA www.mbakercorp.com MICHAEL BAKER ENGINEERING, INC. 7800 Airport Center Drive 27.94 CM Suite 100 i\ • Greensboro, NC 27409 • 336.931.1500 (Office) 1.02 CM 336.931.1501 (Fax) North Carolina Mcense No. F -1084 Designer: 0.40 IN J13 \ �,�� N° C A R 0'� %� Technician: : \_ ��0� DCT - SEAL - Checked by. = 027429 = LJA <y Project No: Y ° J 138535 01111110\ PLACE COIR FIBER MATTING IN 6 INCH DEEP m TRENCH, STAKE, BACKFILL, AND COMPACT TOP OF STREAMBANK 41 B 0 LARGEST, TOE OF SLOPE BOTTOM OF CHANNEL PLACE COIR FIBER MATTING AT TOE OF SLOPE. SECURE MATTING WITH LARGE MATTING STAKE CROSS SECTION VIEW NOTES: 1. BANKS SHOULD BE SEEDED AND MULCHED PRIOR TO PLACEMENT OF MATTING. 2. USE COIR FIBER MATTING. 3. LARGE STAKES SHOULD NOT BE SPACED FURTHER THAN 18" APART. 4. PLACE LARGE STAKES ALONG ALL SEAMS, IN THE CENTER OF BANK, AND TOE OF SLOPE. • • • • • • • • • • • • PLAN VIEW - TRENCH TOP OF STREAMBANK - STAKES COIR FIBER MATTING TO BE EXTENDED TO TOE OF SLOPE TYPICAL SMALL MATTING STAKE THE WOOD STAKE SHALL BE THE NORTH AMERICAN GREEN ECO -STAKE OR APPROVED EQUAL WITH THE FOLLOWING DIMENSIONS: LEG LENGTH 11.00 IN 27.94 CM HEAD WIDTH i\ • 3.18 CM • • 1.02 CM LEG WIDTH 0.60 IN 1.52 CM TAPERED TO POINT LEG THICKNESS 0.40 IN 1.02 CM TOTAL LENGTH 12.00 IN (30.48 CM) TOE OF SLOPE BOTTOM OF CHANNEL PLACE COIR FIBER MATTING AT TOE OF SLOPE. SECURE MATTING WITH LARGE MATTING STAKE CROSS SECTION VIEW NOTES: 1. BANKS SHOULD BE SEEDED AND MULCHED PRIOR TO PLACEMENT OF MATTING. 2. USE COIR FIBER MATTING. 3. LARGE STAKES SHOULD NOT BE SPACED FURTHER THAN 18" APART. 4. PLACE LARGE STAKES ALONG ALL SEAMS, IN THE CENTER OF BANK, AND TOE OF SLOPE. • • • • • • • • • • • • PLAN VIEW - TRENCH TOP OF STREAMBANK - STAKES COIR FIBER MATTING TO BE EXTENDED TO TOE OF SLOPE TYPICAL SMALL MATTING STAKE THE WOOD STAKE SHALL BE THE NORTH AMERICAN GREEN ECO -STAKE OR APPROVED EQUAL WITH THE FOLLOWING DIMENSIONS: LEG LENGTH 11.00 IN 27.94 CM HEAD WIDTH 1.25 IN 3.18 CM HEAD THICKNESS 0.40 IN 1.02 CM LEG WIDTH 0.60 IN 1.52 CM TAPERED TO POINT LEG THICKNESS 0.40 IN 1.02 CM TOTAL LENGTH 12.00 IN (30.48 CM) 1[ i I k[ y C 1:10101 a 10 Eel I /_1 I TYPICAL LARGE MATTING STAKE THE WOOD STAKE SHALL BE THE NORTH AMERICAN GREEN ECO -STAKE OR APPROVED EQUAL WITH THE FOLLOWING DIMENSIONS: LEG LENGTH 17.00 IN 43.18 CM TAPERED TO POINT WIDTH 2.00 IN 2.54 CM THICKNESS 2.00 IN (2.54 CM) Un z 0 w n, c 0 _Q �L U N D O z Project Name: STORMWATER OUTFALL REPAIR Drawing Name: 0651 May-Aim PIEDMONT TRIAD INTERNATIONAL AIRPORT 4utocad Drawing Reference: File: 08 — Natural Creek Detalls (C[)_1 to CD- 2).dwq Saved: Dec 03, 2014 — 2: O6pm by dtorree Plotted: Jan 27, 2015 — 11:38am )ate: Drawing Number: JANUARY 2015 (� 3usiness Unit: `-' D -� GREENSBORO