Loading...
HomeMy WebLinkAbout20221725 Ver 1_CedarMillTownhomes_Letter of Transmittal_NC - Google Docs_20221205CAROLINA WETLAND SERVICES, INC. 550 E. Westinghouse Blvd. Charlotte, NC 28273 704-527-1177 (office) 704-527-1133 (fax) To: Mr. Bryan Roden -Reynolds Charlotte Regulatory Office U.S. Army Corps of Engineers Mr. Alan Johnson NCDWR, 401 & Buffer Permitting Unit 512 N. Salisbury St., 9th Floor Raleigh, NC 27604 Date: December 5, 2022 Subject: Pre -Construction Notification Pursuant to Nationwide Permit No. 29 Cedar Mill Townhomes (AKA Mt. Holly Townhomes (SAW-2021-00108) Charlotte, North Carolina CWS Project No. 2022-0132 Dear Mr. Roden -Reynolds and Mr. Johnson, The Cedar Mill Townhomes site (Mecklenburg County Tax Parcel Nos. 03105282 and 03105276 (partial) is approximately 9 acres in extent and is located north of the Rhyne Road and Mt. Holly Rd intersection in Mecklenburg County, North Carolina (Figures 1 and 2, Attachment A). Cedarmill Townhomes LLC, has contracted Carolina Wetland Services, Inc. (CWS) to provide Section 404/401 permitting services for this project. An executed Agent Authorization Form is attached (Attachment B). On behalf of Cedarmill Townhomes LLC, CWS is submitting a Pre -Construction Notification pursuant to Nationwide Permit No. 29 to the U.S. Army Corps of Engineers and a Records Only (Non -Notifying) Water Quality Certification No. 4256 for the North Carolina Division of Environmental Quality (NCDEQ) for proposed impacts to jurisdictional waters of the U.S. associated with the development of townhomes. ATTACHMENTS INCLUDED: DESCRIPTION Attachment A - Figures 1-8 Attachment B - Agent Authorization Form Attachment C - Preliminary Jurisdictional Determination for Mt. Holly Townhomes SAW-2021-00108 Attachment D - Impact Drawings Attachment E - Photo a e for Cedar Mill Townhomes (Photographs 1-4 Attachment F - Protected Species Habitat Assessment Report for Cedar Mill Townhomes Attachment G - SHPO Ma Please do not hesitate to contact Megan Bollero at 757-576-6433 or megan@cws-inc.net should you have any questions or comments regarding this request. Sincerely, lt;9r�' PI&J-ZO Megan Bollero, WPIT Project Scientist Aliisa Harjuniemi, PWS Senior Project Manager