HomeMy WebLinkAbout20221160 Ver 1_Culvert Calculations_20221026PROJECT NAME
PROJECT NUMBER
CULVERT DESIGN CALCULATIONS DESIGNER
10/27/2022
10yr 25yr 100yr
Subbasin 193.24 230.21 290.61 cfs
SCM X cfs
SCM XX cfs
Total 161.84 192.79 243.27 cfs
CULVERT #1 DESIGN CALCULATIONS
Q10, Peak =161.84 cfs
Q25, Peak =192.79 cfs
Q100, Peak =243.27 cfs
10-Year Storm
Culvert Size =5.0 ft
Number of Barrels =2
US Pipe Invert =492.45 ft
Embedment =1.00 ft
10-Year WS =497.62 ft
Hw/D = 1.0
Road Crest =505.25 ft
Freeboard = 7.63 ft
25-Year Storm
Culvert Size =5.0 ft
Number of Barrels =2
US Pipe Invert =492.45 ft
Embedment =1.00 ft
25-Year WS =498.23 ft
Hw/D = 1.2
Road Crest =505.25 ft
Freeboard = 7.02 ft
100-Year Storm
Culvert Size =5.0 ft
Number of Barrels =2
Pipe Invert =492.45 ft
Embedment =1.00 ft
100-Year WS =500.12 ft
Hw/D = 1.7
Road Crest =505.25 ft
Freeboard = 5.13 ft
Velocity Dissipator Dimensions
Length =22.46 ft
Width =19.97 ft
Thickness=9 in
Classification=Class I
Barrel Information
Length =92.99 ft
Invert Out =492.04 ft
Slope = 0.44%
Culvert #4
PROJECT NAME
PROJECT NUMBER
CULVERT DESIGN CALCULATIONS DESIGNER
10/27/2022
PROJECT NAME
PROJECT NUMBER
CULVERT DESIGN CALCULATIONS DESIGNER
10/27/2022