Loading...
HomeMy WebLinkAboutNCC216788_Annual Fee Waived Email_20221205Clark, Paul From: laserfiche@ncdenr.gov Sent: Monday, December 05, 2022 9:55 PM To: brianwalker@hhhomes.com Cc: Clark, Paul; Georgoulias, Bethany; Tran, Kieu M; brianwalker@hhhomes.com Subject: Construction SW General Permit Annual Fee Update - NCC216788 Dear Construction General Permit Permittee: This email is to notify you that the 2022 annual fee for Certificate of Coverage (COC) no. NCC216788 has been applied or waived. No future fees will be required, as this permit is no longer active. This COC is for The Highlands at Bedford, Phase 4 and The Midlands at Bedford, Phase 3, Part Two in Hoke County, issued to H&H Constructors of Fayetteville, LLC. This communication is in reference to Invoice no. NCC216788-2022. If you have any questions, please contact the Stormwater Program at (919) 707-3649, or visit hti�ps.//deq.nc.gov/NCGO�L The NC DEMLR Stormwater Program 512 N. Salisbury Street, Archdale Building 6th Floor, 1612 Mail Service Center, Raleigh, NC 27699-1612 This email was automatically generated by Laserfiche. Please do not respond to this email address, as responses are not monitored.