HomeMy WebLinkAboutNCC223869_ESC Approval Submitted (2)_20221207ROY COOPER
Governor
ELIZABETH S. BISER
Secretary
BRIAN WRENN
Director
Greenfield Serenity, LLC
Attn: Yang Song, Manager
8601 Six Forks Road, Suite 270
Raleigh, NC 27615
NORTH CAROLINA
Environmental Quality
August 23, 2022
LETTER OF APPROVAL
RE: Project Name: Serenity Phases 1 D, I E, 2C, 2D, 2F, 2G, 6A, 6B, 6C, 6D, 6E, 6F & 6G
Acres Approved: 93
Project ID: HARNE-2022-130
County: Harnett, City: Hector's Creek, Address: Serenity Walk Parkway
River Basin: Cape Fear
Stream Classification: HQW
Submitted By: WithersRavenel
Date Received by LQS: August 17, 2022
Plan Type: Revised
Dear Mr. Song:
This office has reviewed the subject erosion and sedimentation control plan and hereby issues this Letter
of Approval. This plan approval shall expire three (3) years following the date of approval, if no land -
disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. Should the plan not
perform adequately, a revised plan will be required (G.S. 113A-54.1)(b).
As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice
of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction
General Permit. After the form is reviewed and found to be complete, you will receive a link with payment
instructions for the $100 annual permit fee. After the fee is processed, you will receive the COC via
email. As the Financially Responsible Party shown on the FRO form submitted for this project, you MUST
obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be
accessed at deq.nc.Rov/NCG01. Please direct questions about the NOI form to Annette Lucas at
dann .sy mith@ncdenr.gov or Paul Clark at Paul.clark�7ao,ncdenr.gov. After you submit a complete and
correct NOI Form, a COC will be emaiied to you within three business days. A $100 fee will be charged
annually until a Notice of Termination is issued. This fee is to be sent to the DEMLR Stormwater Central
Office staff in Raleigh. If the owner/operator of this project changes in the future, the new responsible
party must obtain a new COC.
Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on
file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCGO1 permit and the COC, once it is received.
North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
Fayetteville Regional Office 1 225 Green Street, Suite 7141 Fayetteville, North Carolina 28301
°e�^"nenemi�mm�amur� ,p� 910.433.3300