Loading...
HomeMy WebLinkAboutSTIP U-5850 SR 1007 (Randleman Road) Widening - 12/6/2022DWR IDIOM— of Water Resources Pre -Construction Notification (PCN) Form For Nationwide Permits and Regional General Permits (along with corresponding Water Quality Certifications) April 13, 2022 Ver 4.3 1a. Name of project: STIP U-5850 SR 1007 (Randleman Road) Widening la. Who is the Primary Contact? Jerry Parker 1 b. Primary Contact Email: 1c. Primary Contact Phone: japarker3@ncdot.gov (336)451-6629 Site Coordinates Latitude: Longitude: 36.005655 79.806055 A. Processing Information Pre -Filing Meeting Date Request was submitted on: 3/11/2021 County (or Counties) where the project is located: Guilford Nearest Body of Water Is this a NCDMS Project" v Yes v No Is this project a public transportation project? v Yes v No Is this a NCDOT Project? v Yes u No (NCDOT only) T.I.P. or state project number: U-5850 WBS # (?) 50239.1.1 1 a. Type(s) of approval sought from the Corps: Le Section 404 Permit (wetlands, streams and waters, Clean Water Act) L Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) Has this PCN previously been submitted?" Yes • No 1 b. What type(s) of permit(s) do you wish to seek authorization? Nationwide Permit (NWP) Regional General Permit (RGP) Standard (IP) 1c. Has the NWP or GP number been verified by the Corps? O Yes No Regional General Permit (RGP) Number: 201902350 - Work associated with bridge construction, widening, replacement, and interchanges RGP Numbers (for multiple RGPS): 1d. Type(s) of approval sought from the DWR: 401 Water Quality Certification - Regular Non-404 Jurisdictional General Permit Individual 401 Water Quality Certification le. Is this notification solely for the record because written approval is not required? For the record only for DWR 401 Certification: For the record only for Corps Permit: 1f. Is this an after -the -fact permit application? O Yes D No 1 401 Water Quality Certification - Express Yi Riparian Buffer Authorization 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? Yes u No 1 h. Is the project located in any of NC's twenty coastal counties? Yes No 1j. Is the project located in a designated trout watershed? Yes ) No B. Applicant Information 1d. Who is applying for the permit? Owner Applicant (other than owner) le. Is there an AgenNConsultant forthis project?" • Yes No 2. Owner Information 2a. Name(s) on recorded deed: NCDOT Division 7 2b. Deed book and page no.: 2c. Contact Person: 2d.Address Street Address 1584 Yanceyville St. Address Line 2 PO Box14996 City State / Province / Region Greensboro NC Postal /Zip Code Country 27415-4996 USA 2e. Telephone Number: 2f. Fax Number: (336)256-2063 2g. Email Address:" warcher@ncdot.gov 4. Agent/Consultant (if applicable) 4a. Name: Joshua Kotheimer 4b. Business Name: STV Incorporated 4c. Address Street Address 900 West Trade Street Suite 715 Address Line 2 City State / Province / Region Charlotte NC Postal /Zip Code Country 28202-1144 USA Yes ) No Yes ) No 4d. Telephone Number: 4e. Fax Number: (704)816-2519 4f. Email Address:" joshua.kotheimer@stvinc.com C. Project Information and Prior Project History 1. Project Information 1b. Subdivision name: (if appropriate) 1c. Nearest municipality/town: Greensboro 2. Project Identification 2a. Property Identification Number: 2c. Project Address Street Address SR 1007 Randleman Road in vicinity of Shoffner Court intersection Address Line 2 City Greensoboro Postal /Zip Code 27406 3. Surface Waters 3a. Name of the nearest body of water to proposed project: Ryan Creek 3b. Water Resources Classification of nearest receiving water:" WS-V, NSW 3d. Please provide the 12-digit HUC in which the project is located. 030300020104 3c. What river basin(s) is your project located in?" Cape Fear 4. Project Description and History 2b. Property size: 10 Acres State / Province / Region NC Country USA 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:" SR 1007 (Randleman Road) is currently a three -lane roadway with two 12-foot through lanes and a 12-foot center turn lane between Glendale Drive and West Elmsley Drive. North of Glendale Drive, SR 1007 (Randleman Road) is five lanes with four 11-foot wide through lanes and an 11-foot wide center turn lane. SR 1007 (Randleman Road) is functionally classified as a minor arterial and had a 2020 Average Daily Traffic (ADT) of 15,600 vehicles -per -day (vpd). Existing sidewalks extend approximately 500 feet north of the W. Elmsley Drive intersection and approximately 300 feet south of the Glendale Drive intersection on the east side of SR 1007 (Randleman Road). The posted speed limit along SR 1007 (Randleman Road) varies between 35 miles per hour (mph) and 45 mph within the Project Study Area (PSA). Existing right-of-way width in the project corridor varies between approximately 60 feet to 70 feet. The surrounding area consists of commercial development and forested land, please see figures in Attachment A, including vicinity map, USGS and soils maps, and map of USACE and DWR field -verified delineated stream and wetland boundaries. 4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?" O Yes O No O Unknown 4f. List the total estimated acreage of all existing wetlands on the property: 0.47 4g. List the total estimated linear feet of all existing streams on the property: 506 4h. Explain the purpose of the proposed project:" The purpose of project is to relieve traffic congestion, improve safety and provide improved pedestrian access through the area. 4i. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:" The project proposes to widen SR 1007 (Randleman Road) to two 11-foot wide travel lanes in each direction and a continuous 11-foot wide center turn lane with curb and gutter. Pending a municipal agreement with the City of Greensboro, the project proposes the construction of contiguous 5-foot to 6-foot wide sidewalks on both sides of the roadway. The project includes the construction of an approximately 200-foot long retaining wall along the frontage of New Goshen United Methodist Church on the west side of SR 1007 (Randleman Road). The project also requires tie-ins at the intersections of Glendale Avenue, Shoffner Court, and Nestleway DriveNV. Elmsley Drive. The tie-in at Nestleway DriveNV. Elmsley Drive will extend approximately 250 feet west of the intersection on Nestleway Drive and will extend approximately 475 feet east of the intersection on W. Elmsley Drive. Additional improvements include tie-ins to eight existing driveways along the project corridor, further coordination may be required with property owners to ensure property access during the construction phase. The project will temporarily impact 53 linear feet and permanently impact 29 linear feet of Stream B for drainage improvements associated with the road widening. There will be 0.03 acre of temporary impacts to Wetland A for hand clearing and 0.13 acre of temporary impacts to Wetland B for hand clearing within an overhead utility easement. There will be 0.08 acre of permanent fill impacts to Wetland B for roadway widening. There will be an additional 0.03 acre temporary impacts and less than 0.01 acre of permanent fill impacts to Wetland B for drainage improvements associated with the roadway widening. There are 6,991 sq. ft. of mitigable riparian buffer impacts (including 6,339 sq. ft. in Zone 1 and 652 sq. ft. in Zone 2). There is 584 sq. ft. of wetland fill impacts which overlap with mitigable Zone 2 impacts which will be subtracted from mitigation totals. Heavy equipment will work from upland areas to complete work. 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or proposed impact areas?" • Yes No Comments: A site visit with a representative from both the USACE (David Bailey) and NCDWR (April Norton) was conducted February 26, 2019. 5b. If the Corps made a jurisdictional determination, what type of determination was made?" Preliminary Approved Not Verified Unknown N/A Corps AID Number: 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Josh Kotheimer, PWS Agency/Consultant Company: STV Engineers, Inc. Other: 6. Future Project Plans 6a. Is this a phased project?" v Yes No O Unknown Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed projector related activity? No D. Proposed Impacts Inventory 1. Impacts Summary la. Where are the impacts associated with your project? (check all that apply): Wetlands Streams -tributaries Buffers Open Waters Pond Construction 2. Wetland Impacts 2a1 Reason"(?) 2b. Impact type*(?) 2c. Type of W.* 2d. W. name" 2e. Forested" 2f. Type of Jurisdicition" (?) 29 Impact area" Hand Clearing T Headwater Forest Wetland A Yes Both 0.030 Fill P Headwater Forest Wetland B Yes Both (acres) 0.082 Hand Clearing ��T Headwater Forest Wetland B Yes Both (acres) 0.130 (acres) Fill P Headwater Forest _1 Wetland B Yes Both J 0.003 (acres) Hand Clearing T Headwater Forest ::]Wetland B JYes Both 0.032 (acres) 2g. Total Temporary Wetland Impact 0.192 2g. Total Wetland Impact 0.277 2g. Total Permanent Wetland Impact 0.085 2e. Comments: Permit drawings are included in Attachment E. 3. Stream Impacts S1 3a. Reason for im pact" (?) Site 3 (Road Widening) 3b.lmpact type" Permanent 3c. Type of impact" Culvert 3d. S. name" Stream B 3e. Stream Type" (?) Intermittent 3f. Type of Jurisdiction* Both width" 3 Average (feet) 3h. Impact length" 29 (linear feet) S2 Site 3 (Road Widening) Temporary Dewatering Stream B Intermittent Both Average (feet) 53 (linear feet) 3i. Total jurisdictional ditch impact in square feet: 0 3i. Total permanent stream impacts: 3i. Total temporary stream impacts: 29 53 3i. Total stream and ditch impacts: 82 3j. Comments: Permit drawings are included in Attachment E. 6. Buffer Impacts (for DWR) 6a. Project is in which protect basin(s)? Check all that apply. Neuse O Tar -Pamlico Catawba ❑ Randleman Goose Creek Jordan Lake Other 6b. Impact Type 6c. Per or Temp 6d. Stream name 6e. Buffer mitigation required? 6f. Zone 1 impact 11 6g. Zone 2 impact Site 1 - Allowable With Mitigation P Stream A I Yes 5,304 0 Site 2 - Allowable P Stream A No 0 4,030 Site 2 - Allowable With Mitigation P Stream A Yes 1,035 652 6h. Total buffer impacts: Zone 1 Zone 2 Total Temporary impacts: 0.00 0.00 Zone 1 Zone 2 Total Permanent impacts: 6,339.00 4,682.00 Zone 1 Zone 2 Total combined buffer impacts: 6,339.00 4,682.00 6i. Comments: There is 584 sq. ft. of wetland fill impacts which overlap with mitigable Zone 2 impacts which will be subtracted from mitigation totals. Numbers reported in section 6b. above have not been reduced by the overlapping area. E. Impact Justification and Mitigation 1. Avoidance and Minimization la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: Fill slopes for the road widening have been designed at 2:1 slopes. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: NCDOT Best Management Practices for Construction and Maintenance Activities will be employed. Wetlands will be hand cleared instead of cleared with mechanized equipment. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? Yes O No 2c. If yes, mitigation is required by (check all that apply): DWR a Corps 2d. If yes, which mitigation option(s) will be used for this project? Mitigation bank u Payment to in -lieu fee program Permittee Responsible Mitigation 4. Complete if Making a Payment to In -lieu Fee Program 4a. Approval letter from in -lieu fee program is attached. Yes No 4b. Stream mitigation requested: (linear feet) 29 4d. Buffer mitigation requested (DWR only): (square fee) 19119 4f. Non -riparian wetland mitigation requested 0 4h. Comments 4c. If using stream mitigation, what is the stream temperature: swarm 4e. Riparian wetland mitigation requested: (acres) 0.09 4g. Coastal (tidal) wetland mitigation requested: (acres) 0 F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan la. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? • Yes � No What type of SCM are you providing? Level Spreader Vegetated Conveyance (lower SHWT) Wetland Swale (higher SHWT) Other SCM that removes minimum 30% nitrogen Proposed project will not create concentrated stormwater flow through the buffer 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?" • Yes No Comments: Please see Stormwater Management Plan - Attachment E G. Supplementary Information 1. Environmental Documentation 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?" Yes No 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental Policy Act (NEPA/SEPA)?" u Yes No Comments:" A Minimum Criteria Determination Checklist was completed for the project, please see attached signed MCDC and Project Commitments - Attachment C 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)?" Yes No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project result in additional development, which could impact nearby downstream water quality?" Yes o No 3b. If you answered "no," provide a short narrative description. The project is already located in a highly developed area. Widening of the road will add better pedestrian access and help alleviate congestion. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project?" Yes •1 No ( N/A 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat?" v Yes G No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?" • Yes O No 5c. If yes, indicate the USFWS Field Office you have contacted. Raleigh 5d. Is another Federal agency involved?" Yes O No 5e. Is this a DOT project located within Division's 1-8? O Yes O No O Unknown 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat?" USFWS IPaC and NCNHP data and site -specific surveys, supplemental information regarding findings of literature and field reviews is included in Attachment G. 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?" Yes oi No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?" NOAA EFH Mapper 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?" Yes No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?" See Attachment F - "No Archaeological Survey Required Form" and "Historic Architecture and Landscapes Assessment of Effects Form" 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-yearfloodplain?" Yes No 8c. What source(s) did you use to make the floodplain determination?" FEMA FIRM mapping - see exhibit included in Attachment D. Miscellaneous Please use the space below to attach all required documentation or any additional information you feel is helpful for application review. Documents should be combined into one file when possible, with a Cover Letter, Table of Contents, and a Cover Sheet for each Section preferred. Click the upload button or drag and drop files here to attach document U-5850_Supplemental_lnfO_With_Cover_Letter (2).pdf 43.74MB U-5850 Summary Sheets. pdf 271.32KB U-5850 Plant Surveys. pdf 1.97MB U-5850 SWP No Effect Email. pdf 55.99KB File must be PDF or KMZ Comments Signature By checking the box and signing below, I certify that: The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief', and • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. • I have given true, accurate, and complete information on this form, • agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"), • agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"), • understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature, AND • intend to electronically sign and submit the PCN form. Full Name:" W. R. Archer III, PE Signature Date 12/6/2022