FYI…I am sure this will not be the end of the discussion with the contractor but wanted to keep you
all updated.
Sean Farrell
Division Environmental Officer
Division 3
NCDOT- Division of Highways
910-341-2033 office
910-599-1184 mobile
scfarrell@ncdot.gov
5501 Barbados Blvd
Castle Hayne, NC 28429
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
From: Farrell, Sean C
Sent: Monday, December 5, 2022 2:00 PM
To: Meyer, Benjamin C <ext-bcmeyer1@ncdot.gov>
Cc: Westphal, Anneliese <awestphal@ncdot.gov>; Gingrich, Sophia E <segingrich@ncdot.gov>;
Waugh, Daniel G <dgwaugh1@ncdot.gov>; Jackson Provost, PE, PLS
<Jackson.Provost@summitde.com>; Brandon Helms <brandon.helms@summitde.com>; Jim L. Haga
<jhaga@rkk.com>; Herndon, T. Mason <tmherndon@ncdot.gov>
Subject: RE: C204553 (R-3300B) Pipe Crossings _ Parcel 82&87 Reclamation Plan
Ben,
I appreciated being able to meet out onsite last week to discuss this proposal from the contractor.
After our discussions out onsite with the agencies and further discussion with Mason, we have
concluded that it is necessary to remain consistent in not allowing for additional project impacts
from borrow sites. Ensuring we do not have additional impacts from borrow/waste/staging sites is
not only important for maintaining compliance with our permits (see attached permit condition No.
8 from our Individual Permit) but also for remaining consistent with the precedence that has been
set and maintained in the design, permitting and construction of previous and future projects.
Please let me know if I need to provide any further clarification on this.
Thanks,
Sean Farrell
Division Environmental Officer
Division 3
NCDOT- Division of Highways
910-341-2033 office
910-599-1184 mobile
scfarrell@ncdot.gov
5501 Barbados Blvd
Castle Hayne, NC 28429
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
From: Meyer, Benjamin C <ext-bcmeyer1@ncdot.gov>
Sent: Tuesday, November 29, 2022 11:37 AM
To: Farrell, Sean C <scfarrell@ncdot.gov>
Cc: Westphal, Anneliese <awestphal@ncdot.gov>; Gingrich, Sophia E <segingrich@ncdot.gov>;
Waugh, Daniel G <dgwaugh1@ncdot.gov>; Jackson Provost, PE, PLS
<Jackson.Provost@summitde.com>; Brandon Helms <brandon.helms@summitde.com>; Jim L. Haga
<jhaga@rkk.com>
Subject: C204553 (R-3300B) Pipe Crossings _ Parcel 82&87 Reclamation Plan
Sean,
Conti has asked if they could extend or add additional pipe crossings for the relatively permanent
water ditches within the Pit D area. We have already replaced the one existing pipe crossing as
noted. The approved 82&87 reclamation plan detailed creating small bridges to span the RPWs. I am
sure this will be brought up at the ride-through on Thursday, which would be a good opportunity to
review and discuss with the agencies. Let me know if you have any questions.
Cheers,
Ben
Ben Meyer, PE, CCM
Assistant Resident Engineer
Hampstead Bypass
Cell: 910-617-1902
Ext-bcmeyer1@ncdot.gov
bmeyer@rkk.com
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.