Loading...
HomeMy WebLinkAbout20150076 Ver 1_401 Application_20150115CLEARWATER ENVIRONMENTAL CONSULTANTS, INC. 224 South Grove Street, Suite F Hendersonville, NC 28792 (828) 698 -9800 FAX (828) 698 -9003 Jennifer Burdette NC Division of Water Resources 512 N. Salisbury St. Raleigh, NC 27604 LETTER OF TRANSMITTAL DATE: 1.19.2015 PROJECT: 782 ATTENTION: RE: Sunny View Lane Water Line Polk County, NC 5 WE ARE SENDING YOU ® ATTACHED ❑ UNDER SEPARATE COVER VIA THE FOLLOWING ITEMS COPIES DATE NO. DESCRIPTION 5 1 192015 Application for 401 Certification THESE ARE TRANSMITTED AS CHECK BELOW ® For approval ❑ For your use ❑ As requested ❑ For review and comment REMARKS ❑ Approved as submitted ❑ Approved as noted ❑ Returned for corrections ❑ Materials returned after loan to us ❑ Resubmit copies for approval ❑ Submit copies for distribution ❑ Return corrected prints El Enclosed are five copies of our application We sent a courtesy copy to Andrew Moore in the Swannanoa office on December 15, 2014 However, upon further review this project will require a 401 Certification Please do not hesitate to contact Clement at (828) 698 -9800 if you have any questions. COPY TO SIGNED �= CLEARWATER ENVIRONMENTAL CONSULTANTS, INC J CL rWaLer Department of the Army NCDENR Wilrrungton District, Corps of Engineers NC DWR, Webscape Unit Attn: Scott McLendon, Chief Regulatory Division Attn: Karen Higgins PO Box 1890 512 North Salisbury Street Wilmington, NC 28402 -1890 Raleigh, North Carolina 27604 I, the current landowner /managing partner of the property identified below, hereby authorize ClearWater Environmental Consultants, Inc. (CEC) to act on my behalf as my agent during the processing of jurisdictional determination requests and permits to impact Wetlands and Water of the US subject to Federal jurisdiction under Section 404 of the Clean Water Act and /or Section 10 of the Rivers and Harbors Act of 1899. CEC is authorized to provide supplemental information as needed at the request of the USACE or DWR. Additionally, I authorize representatives of the Wilmington District, US Army Corps of Engineers to enter upon the property herein described for the purposes of conducting on- site investigations and issuing a determination associated with Wetlands and Waters of the US subject to Federal jurisdiction under Section 404 of the Clean Water Act and /or Section 10 of the Rivers and Harbors Act of 1899. Property Owner of Record: Property Owner of Address: q0 O(RArY 6A Sf. S -` e�� Phone Number: Property Location: 4w N6 6 r-,� Owner/Managing Partner ,�J_, Printed Name: j' t ! Owner/Managing Partner Signature: Date, 224 South Grove Street, Suite F Hendersonville, NC 28792 Phone: 828 - 698 -9800 www cwenv.com C1earWater Environmental Consultants, Inc. www.cwenv.com December 15, 2014 Mr. David Brown US Army Corps of Engineers Asheville Regulatory Field Office 151 Patton Avenue, Room 208 Asheville, North Carolina 28801 -2638 RE: Sunnyview Elementary Water Line ( +/ -5.9 miles) Polk County, North Carolina Dear Mr. Brown, The attached Pre - Construction Notification (PCN) is being submitted on behalf of Polk County represented by Mr. Marche Pittman. The proposed water line is located along NC Highway 9 between Big Level Road and NC Highway 108 in Mill Spring, Polk County, North Carolina. The county is seeking a Nationwide Permit 12 for installation of the proposed water line. A copy of this package has been sent to Ms. Andrea Leslie of the NC Wildlife Resources Commission for review. A courtesy copy of this application has also been submitted to Mr. Tim Fox of the NC Division of Water Resources, Asheville Regional Office. Please do not hesitate to contact me at 828 - 698 -9800 if you have any questions or comments. Respectfully, Kevin Mitchell Biologist Copy Furnished: NC Division of Water Resources, Asheville — Tim Fox NC Wildlife Resources Commission — Andrea Leslie 224 South Grove Street, Suite F Hendersonville, NC 28792 828 -698 -9800 Tel 828 - 698 -9003 Fax /� a l6 9 R. Clement Riddle, P.W.S Principal Corps Submittal Cover Sheet Please provide the following info: 1. Project Name: Sunny View Elementary Water Line 2. Name of Property Owner /Applicant: Polk County; Mr. Marche Pittman 3. Name of Consultant/Agent: ClearWater Environmental Consultants, Inc. *Agent authorization needs to be attached. 4. Related/previous Action ID numbers(s): 5. Site Address: NC -9 between NC -108 and Big Level Rd. 6. Subdivision Name: n/a 7. City: Mill Spring 8. County: Polk 9. Lat: 35.331260N Long: - 82.185564W (Decimal Degrees Please 10. Quadrangle Name: Mill Spring 11. Waterway: Walnut Creek, Green River, Little White Oak, Canal Creek, and unnamed tributaries 12. Watershed: Broad 03050105 13. Requested Action: X Nationwide Penmit # 12 General Permit # Jurisdictional Determination Request Pre - Application Request The following information will be completed by the Corps office: AID: Prepare File Folder Assign number in ORM Begin Date Authorization: Section 10 Section 404 Project Description/Nature of Activity/Project Purpose: Site/Waters Name: Keywords: o�0F w A rF9 h r a()IS,I)o7l-67 Office Use Only- Corps action ID no DWQ project no. ForTJVersio"�n 1f3 Dec 10 2008 Pre - Construction Notification (PCN)'Form__ — A. Applicant Information 1. Processing 1a Type(s) of approval sought from the Corps ®Section 404 Permit ❑Section 10 Permit 1b Specify Nationwide Permit (NWP) number 12 or General Permit (GP) number. 1c. Has the NWP or GP number been verified by the Corps? ❑ Yes ® No 1d. Type(s) of approval sought from the DWQ (check all that apply). ® 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization 1e Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification ❑ Yes ® No For the record only for Corps Permit: ❑ Yes ® No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. ❑Yes ® No 1g Is the project located in any of NC's twenty coastal counties. If yes, answer 1h below. ❑ Yes ® No 1h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ® No 2. Project Information 2a Name of project- Sunny View Elementary Water Line 2b. County: Polk 2c. Nearest municipality / town: Mill Spring 2d. Subdivision name: n/a 2e. NCDOT only, T.I.P. or state project no: n/a 3. Owner Information 3a. Name(s) on Recorded Deed: See attached list (Attachment A). 3b. Deed Book and Page No. 3c Responsible Party (for LLC if applicable): 3d. Street address: 3e City, state, zip: 3f Telephone no.. 3g. Fax no.: II J IN 2 - 3h Email address: aot 8 8 FFER PERMITTING Page 1 of 11 PCN Form — Version 1 3 December 10, 2008 Version 4. Applicant Information (if different from owner) 4a Applicant ►s: ❑ Agent ® Other, specify- Polk County, utility easement holder 4b. Name Mr Marche Pittman 4c. Business name (if applicable)- Polk County 4d. Street address: 40 Courthouse Street 4e. City, state, zip. Columbus, NC 28722 4f. Telephone no.: 828 - 894 -3301 4g Fax no.- 4h. Email address: mpittman @polknc org 5. Agent/Consultant Information (if applicable) 5a. Name: Mr Clement Riddle 5b. Business name (if applicable): ClearWater Environmental Consultants, Inc. 5c. Street address- 224 South Grove Street, Suite F 5d. City, state, zip: Hendersonville, North Carolina 28792 5e. Telephone no.: 828 -698 -9800 5f Fax no.- n/a 5g. Email address. Clement @cwenv.com Page 2 of 11 PCN Form — Version 1 3 December 10, 2008 Version B. Project Information and Prior Project History 1. Property Identification la Property identification no (tax PIN or parcel ID) See attached list (Attachment A) 1b. Site coordinates (in decimal degrees) Attachment C Latitude. 35.331260 Longitude - 82.185564 (DD DDDDDD) ( -DD DDDDDD) 1c. Property size: +/ -3 5 acres 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc ) to Canal Creek, Little White Oak, Green River, Walnut proposed project: Creek, and unnamed tributaries. 2b. Water Quality Classification of nearest receiving water. All receiving waters are class "C ". 2c. River basin Broad 03050105 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Residential and commercial dwellings, as well as, agricultural fields are included in the vicinity of the proposed water line. 3b. List the total estimated acreage of all existing wetlands on the property: 0 acres 3c List the total estimated linear feet of all existing streams (intermittent and perennial) on the property. 100 linear feet 3d. Explain the purpose of the proposed project: The purpose of this project is to provide drinking water to residents and businesses along NC Highway 9. 3e. Describe the overall project in detail, including the type of equipment to be used' The project includes the installation of a new water line from the town of Mill Spring to Big Level Road along NC Highway 9 The project will include nine stream crossings (Figure 3) Stream Crossings — The proposed water line will be installed using the trench -cut method. The trench -cut method involves dewatering the work area and excavating a trench in which the water line is laid. The water line is then covered with the native materials removed from the trench and the contours are returned to pre - existing conditions. In this method, stream impacts are temporary Typical details for stream crossings are included for review (Attachment B). 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the past? ❑ Yes ® No ❑ Unknown Comments: 4b. If the Corps made the jurisdictional determination, what type ❑ Preliminary ❑ Final of determination was made? 4c. If yes, who delineated the jurisdictional areas? Agency /Consultant Company Name (if known): Other. 4d If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 5a. Have permits or certifications been requested or obtained for ❑ Yes ® No El Unknown this project (including all prior phases) in the past? 5b If yes, explain in detail according to "help file" instructions Page 3 of 11 PCN Form — Version 1 3 December 10, 2008 Version 6. Future Project Plans 6a. Is this a phased project? ❑ Yes ® No 6b If yes, explain C Proposed Impacts Inventory 1 Impacts Summary 1a Which sections were completed below for your project (check all that apply)- ❑ Wetlands ® Streams - tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction Page 4 of 11 PCN Form — Version 1 3 December 10, 2008 Version 2 Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted 2a 2b 2c 2d. 2e 2f Wetland impact Type of jurisdiction number — Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWO — non -404, other) (acres) Temporary T W1 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W2 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W3 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W4 ❑ PDT ❑ Yes ❑ Corps ❑ No ❑ DWQ W5 ❑ P [:IT ❑ Yes ❑ Corps ❑ No ❑ DWQ W6 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWO 2g. Total wetland impacts 2h. Comments: See attached table. 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a 3b 3c 3d. 3e 3f. 3g Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) or intermittent DWO — non -404, width (linear Temporary (T) (INT)? other) (feet) feet) S1 ❑ P ® T Impact S1 - Utility Canal Creek ® PER ® Corps 10 10 Crossing ❑ INT ® DWQ S2 ❑ P ®T Impact S2 - Utility Little White Oak ® PER ® Corps 8 10 Crossing Creek ❑ INT ® DWQ S3 ❑ P ® T Impact S3 - Utility UT Little White ® PER ® Corps 5 10 Crossing Oak Creek ❑ INT ® DWQ S4 ❑ P ®T Impact S4 - Utility UT Little White ® PER ® Corps 4 10 Crossing Oak Creek ❑ INT ® DWQ S5 ❑ P ®T Impact S5 - Utility Crossing UT Green River ® PER ❑ INT ® Corps ® DWQ 12 10 S6 ❑ P ®T Impact S6- Utility UT Green River ® PER ® Corps 4 10 Crossing ❑ INT ® DWQ S7 ❑ P ®T Impact S7- Utility Crossing Green River ® PER ❑ INT ® Corps ® DWQ 120 20 S8 ❑ P ® T Impact Se- Utility UT Green River ® PER ® Corps 4 10 Crossing ❑ INT ® DWQ S9 ❑ P ®T Impact S9- Utility UT Walnut Creek ® PER ® Corps 10 10 Crossing ❑ INT ® DWO 3h. Total stream and tributary impacts 100 3i. Comments: Page 5 of 11 PCN Form — Version 1 3 December 10, 2008 Version 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S then individually list all open water impacts below. 4a 4b 4c 4d. 4e Open water Name of waterbody impact number — (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or Temporary T 01 ❑P 02 ❑P 03 ❑PEI 04 ❑P ❑T 4f. Total open water impacts 4g. Comments* 5. Pond or Lake Construction If pond or lake construction proposed, then complete the chart below. 5a. 5b 5c 5d. 5e. Pond ID Proposed use or purpose Welland Impacts (acres) Stream Impacts (feet) Upland number of pond (acres) Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 5f. Total 5g. Comments: 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no. 5i. Expected pond surface area (acres): 5j Size of pond watershed (acres): 5k Method of construction. 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. ❑ Neuse ❑ Tar - Pamlico ❑ Other. Project is in which protected basin? ❑ Catawba ❑ Randleman 6b. 6c. 6d 6e. 6f. 6g. Buffer impact number — Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) or for Stream name mitigation (square feet) (square feet) Temporary T impact required? B1 ❑P ❑T El Yes ❑ No B2 ❑P ❑T ❑Yes ❑ No 133 ❑P ❑T El Yes ❑ No 6h. Total buffer impacts 61 Comments: Page 6 of 11 PCN Form — Version 1 3 December 10, 2008 Version D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a Specifically describe measures taken to avoid or minimize the proposed impacts in designing project The water line will be placed beneath the stream The line will be trenched in and stream contours will be returned to preexisting conditions Stream impacts are limited to the amount necessary to install the line 1b Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques Construction equipment will be operated from high ground during construction Coffer dams will be constructed in the stream to allow the work to be performed in the dry Silt fencing will be installed along the entire length of the stream Coconut fiber matting will be utilized to stabilize the stream banks The installation of the proposed water line crossing should take less than one day to install at each crossing 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a Does the project require Compensatory Mitigation for impacts to Waters of the U.S or Waters of the State? ❑ Yes ® No 2b If yes, mitigation is required by (check all that apply): ❑ DWQ ❑ Corps 2c If yes, which mitigation option will be used for this projects ❑ Mitigation bank ❑Payment to in -lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) --[Type Quantity 3c. Comments: 4. Complete if Making a Payment to In -lieu Fee Program 4a. Approval letter from in -lieu fee program is attached. ❑ 4b. Stream mitigation requested: 0 linear feet 4c If using stream mitigation, stream temperature- ❑ warm ❑ cool ❑cold 4d Buffer mitigation requested (DWQ only)- 0 square feet 4e. Riparian wetland mitigation requested- 0 acres 4f. Non - riparian wetland mitigation requested: 0 acres 4g. Coastal (tidal) wetland mitigation requested: 0 acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 7 of 11 PCN Form — Version 1 3 December 10, 2008 Version 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ❑ Yes ® No 6b If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c Reason for impact 6d. Total impact (square feet) Multiplier 6e Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g If buffer mitigation is required, discuss what type of mitigation is proposed (e.g , payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved In -lieu fee fund). 6h. Comments: Page 8 of 11 PCN Form — Version 1 3 December 10, 2008 Version E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1a Does the project include or is it adjacent to protected riparian buffers identified ❑ Yes ® No within one of the NC Riparian Buffer Protection Rules? lb If yes, then is a diffuse flow plan included? If no, explain why ❑ Yes El No Comments 2. Stormwater Management Plan 2a What is the overall percent imperviousness of this project? 0% 2b. Does this project require a Stormwater Management Plan? ❑ Yes ® No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why. The project includes installation of a water line and will not increase impervious surface area at the site 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan- ❑ Certified Local Government 2e Who will be responsible for the review of the Stormwater Management Plan? ❑ DWO Stormwater Program ❑ DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a. In which local government's lunsdiction is this project? City of Hendersonville ❑ Phase II 3b. Which of the following locally- implemented stormwater management programs ❑ NSW ❑ USMP apply (check all that apply): ❑ Water Supply Watershed ❑ Other. 3c Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 4. DWQ Stormwater Program Review ❑ Coastal counties 4a. Which of the following state - implemented stormwater management programs apply ❑ HQW ❑ ORW (check all that apply): ❑ Session Law 2006 -246 ❑ Other - 4b. Has the approved Stormwater Management Plan with proof of approval been attached? ❑ Yes ❑ No S. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 9 of 11 PCN Form — Version 1 3 December 10, 2008 Version F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1a Does the project involve an expenditure of public (federal /state /local) funds or the ® Yes ❑ No use of public (federal /state) land? lb If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ® No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval ❑ Yes ❑ No letter ) Comments 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H 0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑ Yes ® No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after - the -fact permit application? ❑ Yes ® No 2c If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s) 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ❑ Yes ® No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy If you answered "no," provide a short narrative description The water line will serve the existing residents along NC Hwy 9. Additional development in the surrounding area is independent of the project The project will not result in additional development that could impact downstream water quality 4. Sewage Disposal (DWQ Requirement) 4a Clearly detail the ultimate treatment methods and disposition (non - discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. Wastewater will not be generated as a result of this project. Page 10 of 11 PCN Form — Version 1 3 December 10, 2008 Version 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ❑ Yes ® No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ❑ Yes ® No impacts? El Raleigh 5c If yes, indicate the USFWS Field Office you have contacted. ❑ Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? FWS County data and Natural Heritage Program GIS data. 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ® No fib. What data sources did you use to determine whether your site would impact Essential Fish Habitat? South Atlantic Habitat and Ecosystem IMS. Impact will not occur in a marine system 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ❑ Yes ® No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? National Register of Historic Places records maintained by the NC State Historic Preservation Office (SHPO) and available on SHPO's HPOWEB GIS service There are two historic sites within two miles of the site. The Reverend Joshua D. Jones house (HPO Site ID PL0010) is 0.5 miles from the project. The Stony Knoll Library (HPO Site ID PL0051) is 0.7 miles from the project. It is the opinion of CEC, that the proposed activity is not likely to threaten the integrity of these sites. 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA- designated 100 -year floodplain? ® Yes ❑ No 8b. If yes, explain how project meets FEMA requirements, The water line will be sub - surface and upon completion of construction, contours will be returned to pre - existing conditions throughout the length of the floodplain. Installation of the line will not result in a rise to the floodplain elevation 8c What source(s) did you use to make the floodplain determination? FEMA Map Service Center Map Panel 3710055700J, 3710055800J, 3710055900J, and 3710065000J (effective date 09/0312008) K C �-Mt:A Q--Me- Applicant/Agent's Printed Name A licant/A ent's Si nature PP 9 9 Date (Agent's signature is valid only if an authorization letter from the applicant is provided Page 1 l of 11 PCN Form — Version 1 3 December 10, 2008 Version Sunny View Elementary Water Line ( +/- 5.9 miles) �d v - z f �s� € as E Mcopn R 9 �4 Cy Pkl, o a I 't G Gat; IIAOtin wz�ker p 511 er COO, RE J f Legend - Proposed Water Line Drawn by: RKM 11.18.2014; CEC Project# 782 Polk County, North Carolina He 0 Paoler ,O'e O x � Y C its Ln Oar /9r Rp �6 alearWater 224 South Grove Street, Suite F ndersonville, North Carolina 28792 108 N a � M II Rn Spring 0 0.25 0.5 1 Miles Site Vicinity Figure 1 a f, •rlT 0 Paoler ,O'e O x � Y C its Ln Oar /9r Rp �6 alearWater 224 South Grove Street, Suite F ndersonville, North Carolina 28792 108 N a � M II Rn Spring 0 0.25 0.5 1 Miles Site Vicinity Figure 1 f, •rlT y i hfa�� feR 9� l� a 0 Paoler ,O'e O x � Y C its Ln Oar /9r Rp �6 alearWater 224 South Grove Street, Suite F ndersonville, North Carolina 28792 108 N a � M II Rn Spring 0 0.25 0.5 1 Miles Site Vicinity Figure 1 Sunny View Elementary Water Line ( +/- 5.9 miles) ;- ��` �� ^.ice s v_•� �� - _a.� Proposed Water Line tow, t \I CE 6 ' J. qV 1. .� Legend v - - r-/ , •. T-T Proposed Water Line 0 0.25 .0.5 1 Drawn by: RKM 11- 16.2014, CEC Project# 7-6., F j Miles Polk County, CLear�/ater USGS Topographic Map Mill Spring Quad North Carolina 224 South Grove Street, Suite F Figure 2 Hendersonville, North Carolina 28792 Sunnv View Elementa +/- 5.9 Miles Impact S9 v Shee H Big Levu Rd Walk,` s CkgCJCt _ E OW10 McoOn R (1 Ra Impact S8 edle a Big L &ci ¢ shee u hlq�eR e� Ra �k ;v fi Y Impact S7 Shee 3F u V ' Impact S6 J N Shee E ec, � G 7 Impact S5 pants Shee Impact S4 �: a Impact S3 eet 3C Ga'� is Ln Impact S2 Martin Walker Shee 313 a Silver Cleo* Rd Legend Proposed Water Line Sheets Drawn bv: RKM 11.18.2014; Proiect# 782 Polk County, North Carolina Sh et 3A Impact S1 108 �r i F7 001 Rd. N l y Mill lane`l Rd Spring 0 0.375 0.75 1.5 Miles Le WaLer Impact Map 37- Figure 3 224 South Grove Street, Suite F Hendersonville, North Carolina 28792 Sunnv View Elementa ■ rx7, W CLearWaLer Impact Map Polk County, Sheet 3C North Carolina 224 South Grove Street, Suite F Hendersonville, North Carolina 28792 :� :� \may. \�� / \« -, . � ° \ ,� � � � ^� ..�� _«« �� [ < / \ �, � � , ? �� :a .. � � /\ �� � 2� � < !� :� ( . \� � \ \� J©. ��<,��: � y �� »< �� \ � . . \� 2 . . : � � «« \� !! � � \ \� :2 � /� �� � \� . : ?/� ®�: Sunny View Elementary Water Line ( +/- 5.9 miles) Legend ZMCM Proposed Water Line Soils MUSYM Bub - Buncombe CeB2 -Cecil ChA - Chewacla DoB - Dorian- Roanoke GrE - Grover HwC2 - Hiwassee MaC2; MaD2 - Madison PaC2; PaD2 - Pacolet Pi - Pacolet- Bethlehem RnE - Rion RoF - Rion - Ashlar RvA - Riverview SkB2 - Skyuka W - Water Project# 782 Polk County, North Carolina ftc2 CLearWater 224 South Grove Street, Suite F Hendersonville, North Carolina 28792 SkB2 N 0 0.25 0.5 1 Miles USDA Soils Figure 4 -I1 Al 14, J, 1 l Proposed loop n I s l J _ • 1 !Legend Proposed Water Line 0 0.25 0.5 Sunny View Elementary Water Line ( +/- 5.9 miles) FEMA Map Panels 3710055700J 37100558001 3710055900.1 371W65000J Legend ® 100 Year Roodplain Z:� Proposed Water Line yawn 11.18.2014; CEC Project# 782 Polk County, North Carolina CLearWater 224 South Grove Street, Suite F Hendersonville, North Carolina 28792 N 0 0.25 0.5 1 Miles FEMA Floodplain Map FEMA Map Service Center Figure 6 Attachment A Property Owner Information �O 110 �O l� V) 110 110 �lO N N - 'O �c �o 110 N 0. kn l- Wn l- v) l- v) l- O M Wn I- cr l- v) l- 00 I- N l- O\ t- to [- to l- v) [- W) l� - l� IV oo N 00 N 00 N 00 N O1 N 00 N 00 N 00 N 00 N 00 N 00 N 00 N 00 N 00 N 00 N 00 N ++ u U U U u U u z z z z w �u z �u z �u z yU z �u z �u z �u z yU z z yu z z CA ' a 0 N v C/1 Ln U) V) co En U W on C6 V) (A > o a CIO o b rx o ,Cd � o o, >, v) W) "o 0.04 — cz rn O, R' 3: — M 0 3 3 a� 00 xx> �zc��a°a gx zz'� 0 c3O000c u�o o - M — aao — = a o M o 0o a+ �C) �N�kn O M M N N M A M w QI $ O N � O\ ON 00 M O 00 ON It M O 00 N .--� M N kn v) ¢ 00 �O y -- N -- . • ^� -- -- �D \C z .�- Q A O O It M O "o [— M — W V) to O\ N 00 r ¢ O 00 �O v) O\ M l— 00 M O\ O\ 00 In %0 N b M M -- M N N M O — — .--+ — M N z N A 3 a o cn v N U) U Cl o E U s 0 of U P `3 N ' U 0 ¢ o H 3 GO x W So U Cd u¢. CA 0 0 3 c� °Q 3 ti v w ai o ° x W � Attachment B Construction Typicals 1 EXCAVATE BANKS TO WATER LEVEL PLACE RE- MOVED MATERIAL BEHIND SILT FENCE 2 INSTALL COFFER DAM 3 INSTALL WATER MAIN x' "x 4 REPEAT FROM OPPOSITE SIDE FOR SECOND —� ,. j ; , 'X /I< ; ° HALF OF PIPE INSTALLATION ' '' �' �' 6 _ —11 Toe �'�'��J 150 LF OF DUCTED IRON 5 INSTALL COCONUT -TYPE DITCH MATTING ALONG —� �y i � v y ✓ � '""Rt °t0 �"� DN PLANS) STREAM BANKS WITH CORRECT SEEDING AS ` �_� �— f Y ` = °- }`�"'_ — _ SPECIFIED BY NCDENR DLQ =� 7!- -�� �- Al OWRM DAM OF SAND BAGS �O>L II —III I I 1/2 MID7N OF VEF - II— III —II Odom V Engineerin PLLC 152 E., M.I. S, M Fo Cl. N C 28043 p5 828 247 X "f.. 829 247 J 8 / > 1•— 12' MIN –20' MAX RIVER / CREEK CROSSING TYPICAL HM COCONUT STRAW MATTING Pro Oeo ..uer s�. TYPICAL RIVER CROSSING ww POLK COUNTY HWY 9 SUNNY VIEW SCHOOL WATERLINE EXTENSION GREEN RIVER CROSSING COi'iER DAM SHALL DE 7 Hamm TNAN El"AMON OF MATER COCOLN7 STRAW MATTING SEPTEMBER 22, 2014 SCALE: N.T.5. COCONUT STRAW � MATTING CONCRETE DEADMAN, PER DETAILS . 3' -0' MINIMUM FROM BOTTOM OF CREEK 100 LF OF DUCTILE IRON PIPE WITH RESTRAINED JOINTS (MEGALUG OR OMITS OF CREEK CROSSING Odom Engineerin PLLC 152 F ft W, St-, F-i C81, N C 28041 ph 828 247 4491 4. 028 247 0498 crrrr•;r EPAA IRON 1110 MECALUC 350 PSI RATINC UL WMC RATED 175 PSI FOR USE ON DUC TILE IPON PIPE MADE IN THE USA TYPICAL CREEK CROSSING NOT TO SCALE POLK COUNTY HWY 9 SUNNY VIEW SCHOOL WATERLINE EXTENSION TYPICAL STREAM CROSSING SEPTEMBER 22, 2014 SCALE: N .T.5 Attachment C Impact Coordinates Stream Impact Coordinates Impact Latitude Longitude S1 35.306744 - 82.164377 S2 35.313923 - 82.171124 S3 35.314931 - 82.172244 S4 35.31687 - 82.174481 S5 35.32376 - 82.183385 S6 35.327953 - 82.184908 S7 35.33331 - 82.184837 S8 35.347821 - 82.180508 S9 35.368352 - 82.184229 c �earWater Department of the Army NCDENR Wilmington District, Corps of Engineers NC DWR, Webscape Unit Attn: Scott McLendon, Chief Regulatory Division Attn: Karen Higgins PO Box 1890 512 North Salisbury Street Wilmington, NC 28402 -1890 Raleigh, North Carolina 27604 I, the current landowner /m4naging partner of the property identified below, hereby authorize ClearWater Environmental Consultants, Inc. (CEC) to act on my behalf aS my agent during the processing of jurisdictional determination requests and permits to impact Wetlands and Water of the US subject to Federal jurisdiction under Section 404 of the Clean Water Act and /or Section 10 of the Rivers and Harbors Act of 1899. CEC is authorized to provide supplemental information as needed at the request of the USACE or DWR. Additionally, I authorize representatives of the Wilmington District, US Army Corps of Engineers to enter upon the property herein described for the purposes of conducting on- site investigations and issuing a determination associated with Wetlands and Waters of the US subject to Federal jurisdiction under Section 404 of the Clean Water Act and/or Section 10 of the Rivers and Harbors Act of 1899. Property Owner of Record: Property Owner of Address: _I Phone Number: Property Location: 1tJ d I'-� Owner/Managing Partner Printed Name: A?14'�paw Owner/Managing Partner Signature: Date: S '� 224 South Grove Street, Suite F Hendersonville, NC 28792 Phone: 828 -698 -9800 www.cwenv.com