Loading...
HomeMy WebLinkAbout20221406 Ver 1_More Info Requested_20221206From: Snider, Holley To: "Williams, Kim" Cc: Beecher, Gary H CIV USARMY CESAW (USA) Subject: RE: [External] Fwd: Corps comments for Malmo Loop Tract Phase 1B PCN application in Brunswick County, NC (SAW-2022-02188) Date: Tuesday, December 6, 2022 11:29:00 AM Attachments: image002.pnq Thank you Kim, The DWR is placing the project on hold until the cross section drawings for the pipe crossing at wetland impact #7 have been provided. Please feel free to call or email me if you have any questions or need my assistance. Sincerely, Holley Snider .• ,><((((2>•, ...,,..><((((°>.•— Environmental Specialist II Division of Water Resources North Carolina Department of Environmental Quality Phone: (910) 796-7303 NO' TIC I l�1.��Lk Ospuimsnt el Ernireduraritd WFIK 127 Cardinal Drive Ext. Wilmington, NC 28405 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties From: Williams, Kim <Kim.Williams@davey.com> Sent: Tuesday, December 6, 2022 11:22 AM To: Snider, Holley <holley.snider@ncdenr.gov> Subject: [External] Fwd: Corps comments for Malmo Loop Tract Phase 1B PCN application in Brunswick County, NC (SAW-2022-02188) CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Hi Holley As discussed, here are Gary's comments on Malmo Loop. Thanks! Kim Forwarded message From: Beecher, Gary H CIV USARMY CESAW (USA) <Gary.H.Beecher@usace.army.mil> Date: Tue, Dec 6, 2022 at 7:36 AM Subject: Corps comments for Malmo Loop Tract Phase 1B PCN application in Brunswick County, NC (SAW-2022-02188) To: Williams, Kimberlee <Kim.Williamsc davey.com> Kim, Please see my comments below for the Malmo Loop Tract Phase 1B project in Brunswick County, NC USACE Project ID: SAW-2022-02188 1. RCW Slopes Agreement: This project will be located in a RCW circle, so a RCW Slopes agreement will need to be filed out. (See attached form and slopes map). 2. Mitigation: The applicant proposes to restore 0.299 acres of wetlands and 89 LF of stream by removing an old road. The original Phase 1A project did not require mitigation since it was below the .10 acre threshold. The new Phase 1B wetland impacts =0.103 acres. At a 2:1 ratio this would = 0.206 acres of required wetland mitigation. The Corps has determined that the proposed 0.299 acre onsite wetland restoration will adequately provide the required 2:1 mitigation requirement for this phase/project. The proposed 0.299 restoration work will be listed as a special condition for this permit. 3. Work within the Flood Zone: Documentation will be required from the Brunswick County Flood Manager that the proposed 0.043 acres of work (impacts 1-2) within the flood zone is acceptable. 4. Wetland Impact #7: Please send me a diagram of what this crossing will look like (profile & dimensions) 5. Amount of trees that will be cut for NLEB situation 1 review: Looks like some areas have already been logged on this project, do you have a rough idea how many acres of remaining trees will be cut? Thanks for your assistance with this project Respectfully, Gary lei US Army Corps: of Engineers Wrlminaton Dist[I4t Gary Beecher USACE Wilmington Field Office Regulatory Project Manager Office (910) 251-4694 Cell (910) 473-7045 gary.h.beecherl@usace.army.mil