Loading...
HomeMy WebLinkAbout20191702 Ver 1_Monitoring Report_20221024Y■�3.0 _, 'as Nor 1AIF WE . • NC Department of Environmental Quality Received OCT 2 4 2022 Winston-Salem Regional Office SECOND ANNUAL MONITORING REPORT CARDINAL GAS PIPELINE AT THE PROVIDING TRIBUTARY TO HAW RIVER ENVIRONMENTAL SERVICES TO STREAM STABILIZATION AND BUFFER RESTORATION LANDOWNERS, WAYNICK ROAD DEVELOPERS ROCKINGHAM COUNTY, NORTH CAROLINA AND INDUSTRY SAW-2020-00087 DWR# 20191702 October 2022 American Land Concepts, Inc. (ALC) has completed the second annual monitoring for the Stream Stabilization at the above referenced property. Approximately 245 linear feet of the tributary to Haw River was stabilized to protect the integrity of the pipeline. In addition, restoration was completed to mitigate for temporary impacts to the Jordan Lake Riparian Buffer. Stream and buffer restoration was completed in late 2020. The stream stabilization consisted of the construction of grade control structures and bank armoring. Jordan Lake Riparian Buffer restoration consisted of seeding and tree/shrub plantings. ALC, inspected the stream stabilization and buffer restoration the Cardinal Pipelines at the Tributary to Haw River numerous times since the completion of the stream stabilization. No deterioration was noted during the site inspections. The grade controlling structures are functioning as designed and the structures are stable. The riparian buffer restoration plantings are thriving and the planted material have a greater than 85% survival rate. 238 B MAIN STREET RFISTF16TOWN MARYLAND 21136 PHONE410/526-2688 FAX 410/526-2970 Photographic Documentation Waynick Road Stream Stabilization and Buffer Restoration October 2022 Photo 1: View downstream at photostation 1. Photograph was taken on October 18, 2022. Photo 2: View upstream at photostation 2. Photograph was taken on October 18, 2022. Photographic Documentation Waynick Road Stream Stabilization and Buffer Restoration October 2022 Photo 3: View of drop structures from photostation 3. Drop structures are stable and no deterioration was evident during site visits. Photograph was taken on October 18, 2022. Photo 4: View of buffer restoration from photostation 3. Photograph was taken on October 18, 2022. Photographic Documentation Waynick Road Stream Stabilization and Buffer Restoration October 2022 Photo 5: View of buffer restoration looking south at photostation 4. Photograph was taken on October 18, 2022. Photo 6: View of buffer restoration at photostation 4. Photograph was taken on October 18, 2022. Photographic Documentation Waynick Road Stream Stabilization and Buffer Restoration October 2022 Photo 7: View of drop structures looking upstream at photostation 5. Photograph was taken on October 18, 2022. Fps AMERICAN LAND CONCEPTS 238 B MAIN STREET KA REISTERSTOWN, MARYLAND 21136 north 72 PHONE: (410)-526-2688 Scale V=50' ROW J A + + A6, + A0 \A\ + 0 77V 11''11 it N,�I V +\ + + ++..+ + + + V + + + 'r-1 I + + ++. P,i�arian ki er Outside oaf ROW'\ N, \\A\' + + I + Waynick Road — . + ++++++ Attemporarily and + + .:.:+ Stream and Riparian Buffer Monitoring + + + +++pennattently seeded + + post construction Exhibit + + + + + + + + + + + + + Area planted wiffi + +: woody vegetation post + Cardinal Gas Pipeline '+'+*+'+'+++'+++++ construction I + + + at the Tributary to Haw River nj SAW-2020-00087 DVvTR# 20191702 Prepared For. Rockingham County, North Carolina Cardinal Operating Company, LLC 4300 NC 11WY 65 October 2021 Reidsville. Nordi Carolina 27320