HomeMy WebLinkAboutNCC203141_NOT Closeout Documents_20221205North Carolina Department of Environmental Quality
Land Resources: 450 W. Hanes Mill Road, Suite 300, Winston-Salem, NC 27105 (336)
776-9800
County: Caswell Project: Zuma Solar, LLC Solar Electric Power River basin: Roanoke
Person financially responsible: CS Energy, LLC - Gary Gamet, Senior Project Project #: CASWE-2020-003
Manager
Address: 2045 Lincoln Highway, Edison, NJ 08817
1. Project Location: Shady Grove Rd., Providence
Pictures: No
2. Weather and soil conditions: Sunny, no activity Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name):
Inspection report: Sent Report
9. Corrective action needed:
Title:
Date given/sent: December 02, 2022
10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional
self -monitoring or self -inspections are required. Project is in compliance and released under
the SPCA. Termination of coverage under the NPDES General Stormwater Permit for
Construction Activities (NCGO1) must be requested by the permittee via a Notice of
Termination (NOT). The NOT is available at:
https://edocs.deq.nc.gov/Fonns/NCGOI-Termination. Please note that this correspondence
must be uploaded as part of completing the NOT process. If you have any questions, please
contact me at LilyKayAncdenr.gov or by phone at (336) 776-9655.
Reported by: Lily Kay Others present:
Date of inspection: November 29, 2022 Time arriving on site: 12:15 PM Time leaving site: 12:40 PM
cc: