Loading...
HomeMy WebLinkAboutNCC203141_NOT Closeout Documents_20221205North Carolina Department of Environmental Quality Land Resources: 450 W. Hanes Mill Road, Suite 300, Winston-Salem, NC 27105 (336) 776-9800 County: Caswell Project: Zuma Solar, LLC Solar Electric Power River basin: Roanoke Person financially responsible: CS Energy, LLC - Gary Gamet, Senior Project Project #: CASWE-2020-003 Manager Address: 2045 Lincoln Highway, Edison, NJ 08817 1. Project Location: Shady Grove Rd., Providence Pictures: No 2. Weather and soil conditions: Sunny, no activity Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): Inspection report: Sent Report 9. Corrective action needed: Title: Date given/sent: December 02, 2022 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCGO1) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: https://edocs.deq.nc.gov/Fonns/NCGOI-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. If you have any questions, please contact me at LilyKayAncdenr.gov or by phone at (336) 776-9655. Reported by: Lily Kay Others present: Date of inspection: November 29, 2022 Time arriving on site: 12:15 PM Time leaving site: 12:40 PM cc: