Loading...
HomeMy WebLinkAboutNCC205734_NOT Closeout Documents_20221205North Carolina Department of Environmental Quality Land Resources: 943 Washington Square Mall, Washington, NC 27889 (252) 946-6481 County: Craven Project: P-199 BUILDING 1700 UTILITY River basin: Neuse Person financially responsible: Marine Corps Air Station Cherry Point - George Project #: CRAVE-2021-010 Radford, Mr Address: Environmental Affairs Dept, Marine Corps Air Station, 1. Project Location: 6th Street, Cherry Point Pictures: No 2. Weather and soil conditions: sunny, cool, dry Initial inspection: Yes 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): Ms. Cheryl Murray Title: Environmental Manager Inspection report: Sent Report Date given/sent: March 29, 2022 9. Corrective action needed: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance and released under the SPCA. Termination of coverage 10. Comments•_ under the NPDES General Stormwater Permit for Construction Activities (NCG01) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: https://edocs.de(i.nc.gov/Forms/NCG0l-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: James Edwards Others present: No one. Date of inspection: March 23, 2022 Time arriving on site: 10:00 AM Time leaving site: 11:50 AM cc: