Loading...
HomeMy WebLinkAboutNCC193123_NOT Closeout Documents_20221205North Carolina Department of Environmental Quality Land Resources: 943 Washington Square Mall, Washington, NC 27889 (252) 946-6481 County: Craven Project: Repair Asphalt Lot Building 3919 River basin: Neuse Person financially responsible: MARINE CORP AIR STATION CHERRY Project th CRAVE-2020-010 POINT - CHARLES E SCHULZ, DIRECTOR Address: PO BOX 8006, CHERRY POINT, NC 28533 1. Project Location: Range Rd, Cherry Point Pictures: No 2. Weather and soil conditions: sunny, cool, dry Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): Ms. Cheryl Murray Title: Environmental Manager Inspection report: Sent Report Date given/sent: March 29, 2022 9. Corrective action needed: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or 10. Comments: self -inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCG01) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: https:Hcdocs.deg.nc.gov/Forms/NCGOl-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: James Edwards Others present: No one. Date of inspection: March 23, 2022 Time arriving on site: 10:00 AM Time leaving site: 11:50 AM cc: