Loading...
HomeMy WebLinkAbout20220790 Ver 1_NCW_Micrositing Changes_2022-11-04_20221204 (2)Timbermill Wind Energy, LLC November 04 2022 RE: Description of Micrositing Changes referenced in 11/04/22 Mr. Seltzer email to Mr. Scarbraugh Description of the micrositing changes follows: • Dominion Switchyard — shifted the footprint southwest approx. 60' and resized to smaller dimensions. Shortened length of access road. • Turbines — several turbines were shifted to avoid the proposed turbine foundations encroaching on nearby existing ditches. All turbine shifts were within the FAA allowable 1aresec buffer to avoid having to refile for FAA approvals. Upland turbines Turbine T-40 (uplands) - shifted 60' southeast to avoid farmer's irrigation pivot that was installed after recent irrigation pivot equipment was installed. No change in wetland or ditch impact amounts. Nudged within FAA allowable 1aresec buffer. Turbine T-20 - shifted 25' southeast to avoid permanent ditch disturbance with turbine foundation. Turbine T-44 - shifted 40' south to avoid permanent ditch disturbance with turbine foundation. Wetland Turbines Turbine T-18 (WY tract) - shifted 25' northwest to avoid permanent ditch disturbance with turbine foundation. Turbine T-21 (WY tract) - shifted 40' northwest to avoid permanent ditch disturbance with turbine foundation. Turbine T-29 (WY tract) - shifted 50' northwest to avoid permanent ditch disturbance with turbine foundation. MET Tower southeast of T-33 — truncated gravel pad bringing disturbance Limit Of Disturbance 5' back away from ditch edge.