Loading...
HomeMy WebLinkAboutNCC224024_Site Plan or Location Map_20221205CITY OF WILSON LOWER BLOOMERY SWAMP SEWER IMPROVEMENTS WILSON COUNTY, NORTH CAROLINA SEPTEMBER, 2022 CITY OF WILSON MAYOR: COUNCIL MEMBERS CITY MANAGER DIRECTOR OF PUBLIC WORKS ASSISTANT DIRECTOR OF PUBLIC WORKS: CARLTON L. STEVENS GILLETTIA MORGAN MICHAEL S. BELL WILLIAM THOMAS FYLE JAMES M. JOHNSON, III DONALD I. EVANS LOGAN T. LILES DERRICK D. CREECH GRANT GOINGS BILL BASS IV,PE KYLE F. MANNING, PE Y u� SEAL '�: �I� e e n 922594 ; c ',� Engineering NC FIRM LICENSE: P-0115 a WATER, WASTEWATER, SURVEYING q- 13-zoZ2 PLANNING, PROJECT MANAGEMENT 303 GOLDSBORO ST. E., P.O. BOX 609, WILSON, NC 27893 TEL 252.237.5365 FAX 252.243.7489 office0greeneng.com I r"1� A TI /"1 A I K A A E) _t GENERAL SHT SHEETTITLE 1. COVER SHEET 2. INDEX, GENERAL NOTES AND ABBREVIATIONS 3. SHEETINDEX 3A. EROSION CONTROL OVERALL PLAN 4. CONTENTNEA LIFE STATION (EXISTING) SH SHEETTITLE STATIONING 5. LOWER BLOOMERY 0+00 TO 13+60 i SWAMP PLAN & PROFILE 6. LOWER BLOOMERY 13+50 TO 27+00 j SWAMP PLAN & PROFILE 7. LOWER BLOOMERY 27+00 TO 40+50 SWAMP PLAN & PROFILE 8. LOWER BLOOMERY 40+50 TO 54+00 SWAMP PLAN & PROFILE 9. LOWER BLOOMERY 54+00 TO 67+50 SWAMP PLAN & PROFILE 10. LOWER BLOOMERY 67+50 TO 73+50 SWAMP PLAN & PROFILE '.., 11. MARBLE CT. I SLATE CT. LATERAL 12. FLEDSPAR CT. BOYETTE DR. LATERAL 13. WIDGEON DR! MILLBROOK TOWNHOME LATERAL 14. GREENFIELD SCHOOL j UPPER BLOOMERY SWAMP LATERAL NPDES NOTES SH SHEET TITLE N-1 NPDES NCG01 CONSTRUCTION NOTES N-2 NPDES NCG01 CONSTRUCTION NOTES DETAILS o SH SHEETTITLE a v D-1 DETAIL v�i~O D-2 DETAIL } w Z D-3 DETAIL J�lr� i D4 DETAIL 3 m 0- o D-5 DETAIL 0 3 o of 'I GRAND TOTAL: 22 SHEETS U 0 3 RELEASED FOR CONSTRUCTION GREEN ENGINEERING \ ��--------- A GRE FIELD SCHOOL / 50'X700' CON TRUCTI,4\ I I F � � / M �� � j>• ENTRANCE I 1 I ---- Ip0 I \, O (II ad EROSION CONTROL CONSTRUCTION SEQUENCE (GRAVITY SEWER MAINS) a EROSION AIID SEDIMENT 00NTR0. (EaSC) PERMIT ANO A CERTFl[ATE 6 CO,ERA(£ (COL) NI6i of OBTNNEO Bffdif ANT LAND OSMRBINC ACTIIFS OCCUR- FAILURE l0 00 50 uqv RESULT IN FINES AND RESCISSION OF ME APPROVED PERMIT. A CDPY OF ME sell PERMIT, ME CO. AND A HARD COPY IF ME PLAN MUST SE KEPT ON SITE, PAEfERABLT IN A PEN- BOX AND ACCESSIBLE NNINO NSPECTKN. 2. CONTRACTOR FINAL NOISY ME NCDEO DEMUR MLEGN munor- OFFICE AT (919) 791-12m. AS VEIL AS ME OyMER. A MINIMUM OF M HOURS PRIOR TO INTATON OF CONSTRUCTION ACTNTES S. CONIRAOTON SNAML NRIFv LOLAnON OF ALL EXISTING UMMES PRON TO COMMENCING CONSMUCTON OF PNOJECT. DOTACT NORM GA.MARNA 811 Mu lt). 1. 91A11 INSTAML PR0. CONSTRUCTON BON TD NOD AS AIED PERMITS AND INSTALL PROTECT RAIN GAUGE NEARBY. CONTRACTOR SNAML MAINTAIN AN ACTMTY LW CONCERNING GRADNG > nON.. N11CH INCLUDES T,eNCHNG ANO .NOSION mNMa. MEASURES AND RECONONc RANFALL DATA. ME .-I NSPECTDR ON PROJECT REPRE9:Y.- SHAM FILL WT ME SELF -ASPECT. FORN FOR ME PROJECT, WMON IS TO REMAIN ON PROTECT 9fIE Ai ALL TINES. S.WNTRACTON SHALL ATTEND A PREOONSTRUCTION DONFERENLE YAM ALL NTERESTED PARBES N ATTENDANCE (CITY OF MLSON. CONTRACTION. Nm DUKE ENERGY, ETC.) E.INSTIL PERMETER EROSION CONTROL DEICES FIRST, INSTIL TEMPORARY STONE CONOTRUCacl ENTRANCES, SILT FENCING SILT FENCE o TILER, ROLN ch- DAMS. SILT MATTES, FILTER KAMS m OTHER MEASURES AS SHORN ON ME APPROKO PLAN. CLEAR OILY AS NECESSARY TO INSTALL MESE DEICES. INSTALL nNBER NAYS If NECESSARY TO PROD. ACCESS ALONG EXIE... -.1 EASEMENTS STORM DRANAO: STRUCTURES RECEMNG STORMAATER RUNOFF EVER MOM OR MRWGH TH PROTECT AREA $IIAIl BE Pf101EC1E0 SUCH MAT RDIMENL LADEN RUNOff DOES NOT ENTER THESE STRUCTURES. MANS AS�can ON DRARINGS AND BETAIUED IN PROJECT SPECIFlCATONS. ALL- BE PERFORMED - REFERENCE SNEET D-2 OF 22 ran DETAIL INSTALL CHECK DAMS IMMEDIATELY DORIN DUDE OF CURAENT CONSTRUCTION AREAS AT ME END OF EACH DAYS. ALL TRENCHES ISHALL BE SAO(FILIED. UEAGINTAKE. - TRENCHES OPEN. CONTRACTOR SHALL PLACE CHECK DA15 IN ALL DITUMES DOYNSTREAN OF ME DAYS DantURI ICE. AND P- I IF _ REaIpENENTTSS OF a1 w TEAR OUA1Itt cC A ADW AsµxIIlIE As M`Y SPECSIIAL CANpTans OF ME NAnO1M0E PERAIrO9s, PAPVROINcnunUtt�uxEHAcnN�TIEs FmAVMISPR0.ECT.�f ARY SEINER MIN REDMOVK/REPtAEENENT ACTIVITY, SUON SPEIES WLL BE OUTSOURCED FOR REPUNTNG ADMATY BY ME NEAREST NUIREEPY AND MANSPLAN ONOTOSRE-ESTABUSH ME SPEEES IN ME AFECrtD IPREAS. UNDER NO CIRWMETANCES ARE MET -AND AREAS TO BE CR0630 MMOUT ME PRESENCE OF REPRESENTATNES IS ME Ott OF ML<AN AND ME PROJECT ENDNEER. WHENE N PLACE. TM.M MAT CAmSINGS MAY BE UTUND TO MOSUS CONSTRUICTON EQUIPMENT DOWN ME EASEMENT. TEMPORARY STREAM CROSSINGS WLL FOLLOW ME OTY IS MLSON STANDARD SPEOFlCAnONSISANDTWU_ BE REMOVED AT ME END OF PROECT, ONCE ALL PROJECT AREAS HAVE BEEN RE -SEEDED AND SUFFIOENT GRWNDEOWt IS RE-ESTABLISHED. INSTALL AODh TEMPORARY CONSTRUCTION ENTRANCES AS REWIRED (AS SED) AIDDRIDING TO ME PRO.ECT EROSION DONTI O. PLAN AND THE OrAmALL Ocesn UCnaN SEDURAns. mNTRACTOR SHALL BE REWIRED TO MAINTAIN EACH ENTRANCE FNSURNG SEDNENT DOESN'T TRACK ONTO STREETS AND ROA➢S. j 0. PON ME NPDES PERMIT, DRWND STAdUEAMXN RILL BE APPLIED MMIN 1♦ CALENDAR DAYS FROM ME LAST LAID M IS ING ACTITY. FOR STEEP 9.OPES, MAT AREA MUST BE STdIH AMIN 7 CALENDAR S DAYS SMffiRCnSI AS AREASY��E CHT UP N FINISH GRADE NM VECETATON. TEMPDANY MATTING. OTON DINGS, ETC. ENSURE SEdNENT IS CONFINED PAID ODES NOT TRAVEL 0011NSMEN.1 N STORM 1. NT (L-JNaR 0R OREATER RAINFALL) AND MANE R sin AS NFOESsua To ENSURE CWFUANcs. ANY NTO1E5Im,wm ON scouRED AS A RESIILT aF mxsmucTON SHALL BE REST _ TO (IRIONN. FORM, REIN=. MM SUITABLE NECP ON IF NECESSARY, STONE UNING, AND SEEEED APPROPRUTE-1 12. PERMANENT DRWNDWVER SHAD. BE ESTABLISHED IN 90 CALENDAR DAYS HONfVER, NPOES GROUNDCOVER REQUIREMENTS SHALL ALWAYS TAKE PRECEDENCE. 1]. EN CONSTRUCTION IS WMPLETE. ME GINNER SHALL CONTACT DEMUR TO CLOSE OUT ME EaSG PLAN. M'TER DESUR INFORMS ME PERMITTEE OF ME PROJECT CL UUT, NA INSPEODDN REPORT, ME PERMITTEE SHALL WSIT DEO.NC.GOVMCG01 TO SUBMIT AN ELECTRONIC NOTE OF TERMINATION (E-NOT) A S1DO ANNUAL GENERAL PERMIT FEE WILL BE CHARGEY, UNTL THE E-NOT ALAS BEEN FLUE OUT. a. IF NCINTLEAN STEMPORARY SIONG SILT FEG AND OUTS„ FILTER BERMS, ETUI AND SLED OUT Y f I-MIG BARE AREAS. ALL REMAINING PERMANENT EROSION CONTROL CH OEICES (SU ASVIIOCItt DISSIPATERS) SINWLDDEINGTALIID NOW. 1e. WREN VEGLIANON HAS BECOME ESTA _'U. CALL FOR FINAL EI- INSPECTION BY ENIRONUENTAI ar-C AR. cnNMACTOR SHALL BE RESPONSIBLE FOR ME SITE UNTIL BOB mOWM 18 AC11IE\fD, OR ME PR 1 SITE IS RELEASED BY ME III OF WLEON AND ME N 11o. UPON FINK INEPECTON. op�Fresso�%y ` GREEN ENGINEERING ftlrb SEAL �9°•'' WATER, WASTEWATER, SURVEYING, PLANNING, PROJECT MANAGEMENT rg, r• - 022596 ; ' NORTH CAROLINA FIRM LICENSE P-0115 303 GOLDSBORO STREET EAST, P.O. BOX 609 WILSON, N.C. 27893 TEL (252) 237-5365 FAX (252) 243-7489 OFFICE 00 GREENENG.COM \ 41 j GPEG/ AEN'TRAN CONSiRUC \ WNTENTNEA / LIFT STATION INSTALLGPERMIT BOX \ \ \\ / TOTAL AREA OF DISTURBANCE = 76 0 eC EROSION AND SEDIMENTATION CONTROL control measures, including but not necessenly limited to. A over I4 dare. 2. Maintain all seeded areas arbil urdom, stand is wcaplabla, NARRATIVE hUdkn MrOhnoe, sill farm, pctedwn of l siamnaubuf am. dawn up and reskration of.. to the 4. ConshuGun shall be ple... dsn NAUMsdlMOpN.Rom. 3. If gNNnh NmA,stablished by final project inspedion, satiehction Of both the Own., antl the DEMLR, Lantl Can begin and end as quickly as Dossible. con ram specifletl atknlion until the stantl s acceptable. I. PROJECT DESCRIPTION Q,.Uly Sesson. 5, SIR Penn- shall also he installed prior to ar ass first dap 4. COrectamd re pair, all undue settling and a Ul wMlnt The pumoee oflhi. project is lee#end app-thasly 7.000lines, feet of 24", 145 LF of 8- and 39 LF of 10° 2. Vehicle wheels shall be dean when leaving Me site to In mnstrudmn. yearafterfinali..InAUon. PVCIDIP.awer main and, 32 manholes and ...... d prevent the braking d hurl on Daved mad.. 6. The Contractor shall be responsible for the installation and 5. Remaua hom the site, all erosion control Structures after appu lah'a ces along Card ... me Creek, as, Forest Hill 3- C. lon Road SUANI Construction trar;c maintenance of all erosion and sediment control practices. temple. Ambfumu.n at and of .....,an period. Sireal. Tha ealendetl uDlity win be owned by the Cfty of warm aadon: shaft Wcoi^son. ApDroximalely ]saes will be disturbed during strudian. All BY workwill be whin an existing sanitary be Iknfted t0 stabllMed areas. At a minimum, a Temporary grave con ebucti0n entrance shall be provided as shown D. VSONflYe Ground Cover 6. Remo W sift from sediment pfts and from behind check dams when sib s within hell depth of the N II p pit spi l. sewereasement, on his dhueing. Immediafely knowing grading, all areas shall receNe DLvpcas......... he. It ..nor -enter plWrap. 4. Sift Fence' Sill fences shall be provoed where shown and either permanent or temporary seeding, as T. Place rok Dom rok chek dams and 9,,,Vrip rap filter The project Is scheduled to begin construction in January es needed on Me site plan. Thee bartlers shell ba used applicable, in acoortlance with the Cfty of WBson's basins in tlRG, Nne as armor protection. Do not dispose of 2022 wfth prged completion and final umbil¢aton by k contain sediment. seeding spedficaton. See Detail 350.01. mk. All atone armor pr01ec1ion is 10 ft contour of drennel. December. The erosion and Sedimentl,timON#f program for Do not dump but hand.pmad. this pajeq will Include Me installation of siafence aM rok 5. Rip Rep Check Dams: Plain okra and filter media k the E. Seed Bed Preparation chak dams, with temporary seetlinll antl permanent seeding and/or sodding of the I. dimensions and shape of ,datiq ditches onaite. 1. The a.it IM be amrRed or othNwse loosened to a depth Win` nd leas Man 5 inches except As smarwise directed by G. Calculefwns II, EXISTING SITE CONDITIONS R. Vegetative Practices the Engineer. Clads Shall be broken and Me top three The predic. utilU.d for M. proposed Site did not The is I. Temporary Seetling. All denuded area .,..a.. be inches &..it Shall De wodred ink an acceptable samdoso require kraal c.I.I.Igas. N...I.lians have ml msposed sfte c,Nay urban/developed antl zoned hmam Tel. Thesite hairy tlreinskihe south of Me graded during the commUcdion phases Mat are not to be by the use of Sol pulverizers, drags, or harrows. been provided. propmy, flowing into a Con -lass Creek, which is pad of brought to all grsda "`m 7 days hall receive kmpormy 2 On 2A slopes A Mane tl prepNaeon will be required Mat Me Neuse Rive, Basin. Beetling wihin T days of mmPlelkg mitial-mmaork. is the same depth As that required on ft," areas, VI. OWNERS ADDRESS Gmdad slopes and fills shall receive temporary or although to degrea of smoothness may be reduced hom III. ADJACENTPROPERTY permanent Reading within the required calendar days age, Mat required on he Ratter areas. City of Wilson All adjacent properly lines andpropedy On,,are shown completion of any phase Of grading in amwdance with the Dept, of Public Works I Entreating on the site Plan. stabilzabon chad. Temporary seeding shall also De used 3. Seedbed prep-.n within two feet of Me edge of any IV. SOILS k smbdi., finished grade Min if the fire of year ie ousoe the spad6ed mmarmnt seeding pedOds. pavement shall be limited to a depth of Iwo to three inches. 4. The Meparalon of seedbeds shall not be done when Me AMn: Kyle Manning, PE The soils at th', site s mainly Sandy loam with Altavista Temporary seeding shall be in emon ence with paragraph soil s ho2en, exlremey wet, or when Me Engineer A.at. Director of Public WOMB! (AaA) as me predominant ..it type. D belaN. determines Mat ft la in an omemuse unfavorable wor IN C' En condition. 112 Golden— Street East V. EROSION AND SEDIMENT CONTROL MEASURES All Yeg UMN, and structural erosion and sediment control C. Mthrum enT ...... 6. Before mulch N applied, the COnt2Gor All remove and Wilson, NC 37894 (262) 29&3418 ,,ad -.hall be constructed and maintained by the I. Pc,imater coca..... c to be installed prior to grubbing or di -A, of all exposed alone. in exmss of on. inch in C-tractoraoce,ding W these plans and siocifical and grading. diameter and all mots orother U-1a wh. prevent proper the minimum standards of the DEMUR, Land Dusky 2. Tail Difh shall be ADANIrmd ihhadmI knowing their c..red OfthanallhwiMthlean Segregarnofexposed Ga.... The Canumaor shall a Ma fmv onany edtlftional construction. Assn Musante, rock chek dams may be alone underoreinch shall avoided and, if found, requannarle as curial by the Project Engineer provided at their outlets and/or the terminal tlowmtream dspersed or disposed of at the dlrecul of Me Engineer. andof dldurbance until ground cover is implemented. A. StruduraL PA c 1. The contractor is responsible for wining a material ley 3. Stock pile a,lor waste areas must be maintained within F. Maintenance down antl Stockpile skre9e area for the contract. As such. the Ill Of the areas protected by the mopoeetl measures 1. Reseed and molest bare sp la larger than 9 square feet me conractor is responsible for the necessary erosion and otherwise temporary seeded R to be left stockpiled (limited to 5%maximum 0 Sim area.) CITY OF WILSON EROSION CONTROL LOWER BLOOMERY SWAMP SEWER IMPROVEMENTS OVERALL PLAN CITY OF WILSON WILSON COUNTY, NORTH CAROLINA - - - - LIMITS OF DISTURBANCE �--�� SILT FENCE SILT FENCE OUTLET (USE AT LOW SPOTS ALONG SILT FENCE AS NEEDED) O TEMP. ROCK CHECK DAM DEWATERING SILT BAG (TRENCHES, AS NEEDED) ® CONCRETE WASHOUT AND STOCKPILE CDSTAGING AREAS AS DESCRIBED NEW STABILIZATION TIMEFRAMES (EFFECTIVE AUG. 3, 2011) SITE AREA DESCRIPTION STABILIZATION TIMEFRAME EXCEPTIONS Q) PERIMETER DIKEff.-ES,.-H.S. IDAY. NONE SLOPES {y It YJ HIGH QUALITY WATER(HOW) ZONES TDAYB NONE SLOPES STEEPER THAN 3A TDAYS IFSLOPESARE10-0R LESSINLENGTHAND ARE STEEPER THAN 2.1,14 DAYS ARE ALLOWED SLOPES 3:1 OR FLATTER 14 DAYS T DAYS FOR SLPES GREATER THAN SO IN LENGTH ALL OTHER AREAS WITH SLOPES FLATTER THAN 4A 14 DAYS NONE, EXCEPT FOR PERIMETERS AND HOW ZONES RELEASED FOR CONSTRUCTION REVISION DATE BY I DATE; SEPTEM13Ei 2022 GRAPHIC SCALE CLIENT CODE: WILSO JOB NUMBER: 22-140 0 150 300 Goo FIELD BOOK: XXX CADFILE: 22140-B M-R E V ASCII FILE: SCALE IN FEET LAST MODIFIED: 25-Oct-22 MODIFIED BY: GLB ENO. 3A OF 22