CONSTRUCTION SPECIFICATIONS
1. CLEAR, GRUB & STRIP TOPSOIL FROM AREAS UNDER THE EMBANKMENT TO
REMOVE TREES, VEGETATION, ROOTS AND OTHER OBJECTIONABLE MATERIAL.
PLACE TEMPORARY SEDIMENT CONTROLS BELOW THE BASIN AS NEEDED.
2. ENSURE THAT FILL MATERIAL FOR THE EMBANKMENT IS FREE OF ROOTS,
WOOD VEGETATION, ORGANIC MATTER AND OTHER OBJECTIONABLE MATERIAL
PLACE THE FILL IN LIFTS NOT TO EXCEED 9 INCHES AND MACHINE COMPACT IT.
OVER FILL THE EMBANKMENT 6 INCHES TO ALLOW FOR SETTLEMENT.
3. SHAPE THE BASIN TO THE SPECIFIED DIMENSIONS. PREVENT THE SKIMMING
DEVICE FROM SETTLING INTO THE MUD BY EXCAVATING A SHALLOW PIT UNDER
THE SKIMMER OR PROVIDING A LOW SUPPORT UNDER THE SKIMMER OF STONE
OR TIMBER.
4. PLACE THE BARREL ON A FIRM, SMOOTH FOUNDATION OF IMPERVIOUS SOIL.
PLACE THE FILL MATERIAL AROUND THE PIPE SPILLWAY IN 4 INCH LAYERS AND
COMPACT IT UNDER AND AROUND THE PIPE TO AT LEAST THE SAME DENSITY AS
THE ADJACENT EMBANKMENT. PLACE A MINIMUM OF 2 FEET OF COMPACTED
BACKFILL OVER THE PIPE SPILLWAY BEFORE CROSSING IT WITH CONSTRUCTION
EQUIPMENT.
5. ASSEMBLE THE SKIMMER FOLLOWING THE MANUFACTURER'S INSTRUCTIONS
6. LAY THE ASSEMBLED SKIMMER ON THE BOTTOM OF THE BASIN WITH THE
FLEXIBLE JOINT AT THE INLET OF THE BARREL PIPE. ATTACHED THE FLEXIBLE
JOINT TO THE BARREL PIPE AND POSITION THE SKIMMER OVER THE EXCAVATED
PIT. ATTACH A ROPE TO THE SKIMMER AND ANCHOR IT TO THE SIDE OF THE
BASIN.
7. INSTALL THE SPILLWAY IN UNDISTURBED SOIL TO THE GREATEST EXTEND
POSSIBLE. THE SPILLWAY SHOULD BE LINED WITH LAMINATED PLASTIC OR
IMPERMEABLE GEOTEXTILE FABRIC. THE FABRIC MUST BE WIDE AND LONG
ENOUGH TO COVER THE BOTTOM AND SIDES AND EXTEND ONTO THE TOP OF
THE DAM FOR ANCHORING IN A TRENCH. THE EDGES MAY BE SECURED WITH 8
INCH STAPLES. THE FABRIC MUST BE LONG ENOUGH TO EXTEND DOWN THE
SLOPE AND EXIT ONTO STABLE GROUND. THE WIDTH OF THE FABRIC MUST BE
ONE PIECE. IF MULTIPLE SECTIONS AREA REQUIRED, THE UPPER SECTION
SHOULD OVERLAP THE LOWER SECTION SO THAT WATER CANNOT FLOW UNDER
THE FABRIC.
Z
Ld
Y
Z
a
w
EMERGENCY
SPILLWAY
STONE BEDDING'
SEDIMENT
STORAGE ZONE
8. DISCHARGE WATER INTO THE BASIN TO PREVENT EROSION. USE TEMPORARY
SLOPE DRAINS OR DIVERSIONS WITH OUTLET PROTECTION TO DIVERT SEDIMENT
LADEN WATER TO THE UPPER END OF THE POOL AREA TO IMPROVE BASIN TRAP
EFFICIENCY.
9. CONSTRUCT THE STRUCTURE SO THAT THE DISTURBED AREA IS MINIMIZED.
DIVERT SURFACE WATER AWAY FROM BARE AREAS. COMPLETE THE
EMBANKMENT BEFORE THE AREA IS CLEARED.
10. INSTALL POROUS BAFFLES AS SPECIFIED.
11. AFTER ALL SEDIMENT PRODUCING AREAS HAVE BEEN STABILIZED, REMOVE
THE STRUCTURE AND ALL THE UNSTABLE SEDIMENT. SMOOTH THE AREA TO
BLEND WITH THE ADJOINING AREAS AND STABILIZE PROPERLY.
1' FREEBOARD /
66" MIN.
ELEVATION OF
��EMERGENCY SPILLWAY
EMERGENC'
SPILLWAY
SCH 40 PVC **SKIMMER CAN BE PURCHASED FROM J.W. FAIRCLOTH & SON INC.
PIPE SKIMMER CHOSEN SHALL BE EQUAL TO THE FAIRCLOTH SKIMMER.
SKIMMER
MAINTENANCE
INSPECT SKIMMER SEDIMENT BASINS WEEKLY AND AFTER EACH PERIOD OF
SIGNIFICANT RAINFALL. REMOVE SEDIMENT AND RESTORE TRAP TO ITS ORIGINAL
DIMENSIONS WHEN THE SEDIMENT HAS ACCUMULATED TO ONE-HALF THE HEIGHT
OF THE FIRST BAFFLE. EXCAVATE SEDIMENT FROM THE ENTIRE BASIN. MAKE SURE
VEGETATION GROWING IN THE BOTTOM OF THE BASIN DOES NOT HOLD DOWN THE
SKIMMER. PLACE THE SEDIMENT THAT IS REMOVED IN AN AREA WITH SEDIMENT
CONTROLS.
REPAIR THE BAFFLES IF THEY ARE DAMAGED. RE -ANCHOR THE BAFFLES IF WATER
IS FLOWING UNDERNEATH OR AROUND THEM.
UNCLOGGED THE SKIMMER AS NEEDED. CHECK TO MAKE SURE ORIFICE INSIDE OF
THE SKIMMER IS NOT CLOGGED; IF SO, REMOVE THE DEBRIS. IF SKIMMER ARM OR
BARREL IS CLOGGED REMOVE THE ORIFICE AND CLEAR THE DEBRIS.
CHECK THE FABRIC LINED SPILLWAY FOR DAMAGE AND MAKE ANY REQUIRED
REPAIRS WITH FABRIC THAT SPANS THE FULL WIDTH OF THE SPILLWAY. CHECK
THE EMBANKMENT, SPILLWAYS AND OUTLET FOR EROSION DAMAGE. MAKE ALL
NECESSARY REPAIRS IMMEDIATELY. REMOVE TRASH AND DEBRIS FROM THE
SKIMMER AND POOL AREAS.
NTS
PIPE OUTLET TO FLAT AREA -
NO WELL-DEFINED CHANNEL
A Q o A
0
L�� ==i� t
M 0
PLAN
L
I I=1 I I=1 I =1 I I Q' =1 I=111=1 11=
=J11 J11=llJ= II III-ll D
11-1 11-1 11-1 I I, ' I-1 I I
FILTER LAYER
GRAVEL OR FABRIC
SECTION A -A
PIPE OUTLE
WELL-DEFINED
PLAN
GRAVEL OR FABRIC
SECTION A -A
NOTES
1. LA IS THE LENGTH OF THE RIPRAP
APRON.
2. D = 1.5 TIMES THE MAXIMUM
STONE DIAMETER BUT NOT LESS
THAN 6
3. IN A WELL-DEFINED CHANNEL EXTEND
THE APRON UP THE CHANNEL
BANKS TO AN ELEVATION OF 6"
ABOVE THE MAXIMUM TAILWATER
DEPTH OR TO THE TOP OF THE BANK,
WHICHEVER IS LESS.
4. A FILTER FABRIC OR BLANKET SHOULD BE
INSTALLED BETWEEN THE RIPRAP
AND SOIL FOUNDATION.
FILTER LAYER
GRAVEL OR FABRIC
MAINTENANCE
INSPECT RIPRAP OUTLET STRUCTURES WEEKLY
AND AFTER SIGNIFICANT 6 INCH OR GREATER)
RAINFALL EVENTS TO SEE IF ANY EROSION
AROUND OR BELOW THE RIPRAP HAS TAKEN
PLACE, OR IF STONES HAVE BEEN DISLODGED.
IMMEDIATELY MAKE ALL NEEDED REPAIRS TO
PREVENT FURTHER DAMAGE.
1 TEMPORARY SKIMMER BASIN 2 TYPICAL RIP RAP APRON
GRASSED OR RIP RAP LINED SWALE ® 4.00'[1.22M]
NOTE: THIS CROSS SECTION IS TO BE USED FOR THE
ENTIRE LENGTH OF THE SWALE.
8.00' [2.44M] I•
SEE PLAN FOR WIDTH I -I 2.00' [0.61M]
EXISTING L 4.00' [1.22M]
GRASS OR RIP RAP LINING GROUND •
SEE PLAN 0.7 STAPLES PER SO. YD.
(0.8 STAPLES PER SQ. M)
SEE PLAN FOR ® L
1 DEPTH /S�PLAN
-2.00' [0.61 M] 3.00' [0.91 M] • 1.50' [0.46M]
SEE PLAN a.oa' [1.zzM] • L 2.00'[0.61MI
-111 III III-11 CONSTRUCTION SPECIFICATIONS: 2.00'[0.61M]
4.00' [1.22M]
-III- 1. REMOVE ALL TREES, BRUSH, STUMPS, AND OTHER
4.00' [1.22M]
COMPACTED SEE PLAN OBJECTIONABLE MATERIAL FROM THE FOUNDATION AREA. • •
SUBGRADE 2. EXCAVATE THE CHANNEL AND SHAPE IT TO NEAT LINES
AND DIMENSIONS SHOWN ON THE PLANS PLUS 0.2 FT
OVERCUT AROUND THE CHANNEL PERIMETER TO ALLOW 1.3 STAPLES PER SQ. YD. 1.7 STAPLES PER SQ. YD.
FOR BULKING DURING SEEDBED PREPARATIONS AND SOD (1.5 STAPLES PER SQ. M) (2.0 STAPLES PER SQ. M)
BUILDUP.
3. REMOVE AND PROPERLY DISPOSE OF ALL EXCESS SOIL
SO THAT SURFACE WATER MAY ENTER THE CHANNEL
FREELY. I
4. ESTABLISH GRASS IN THE CHANNEL IMMEDIATELY. J- 1.5a' [o.asM] 1.50' [0.46M]
3.00' [0.91 M] • 3.00' [0.91 M] • •
• 2.00' [0.61 M] •
• 4.00' [1.22M] • • • 1.00' [0.30M]
MAINTENANCE & CONSTRUCTION: 2.00' [0.61M]
• • •
4.00' [1.22M]
1. INSPECT THE SWALE FOR EROSION ONCE A WEEK AND AFTER EVERY RAINFALL. • • •
2. IMMEDIATELY REPAIR AND/OR REPLACE ANY DAMAGED AREAS. • •
3. MAINTAIN PROPER CROSS SECTION UNTIL THE SWALE IS STABLE. 3.4 STAPLES PER SQ. YD. 3.6 STAPLES PER SQ. YD.
4. KEEP THE GRASS IN A HEALTHY, VIGOROUS CONDITION AT ALL TIMES. NTS (4.1 STAPLES PER SQ. M) (4.3 STAPLES PER SQ. M)
5 TYPICAL SWALE CROSS SECTION 6 STAPLE PATTERN FOR 4' ROLLS
0
t
PLAN VIEW
7
TRENCH
WIDTH
GRADE
DA lIK
III
IIII
I
� I II I II II �uTILITYLINE
ilI IIIII II l (DIAMETER ill II
"VARIES
ANTI-SEEP -IIII
COLLAR
- a
,r' d�'ll=lil.,all
ANTI -SEEP COLLAR. I1=
CLASS B CONCRETE.
SECTION A -A
ANTI -SEEP COLLAR
DRIVE POSTS 24" INTO THE GROUND
MAXIMUM 4' O.C. AND EXCAVATE A 4" X 8"
TRENCH UPHILL ALONG THE LINE OF
POSTS.
STEP 1
ATTACH THE JUTE NETTING OR OTHER FABRIC
APPROVED BY THE ENGINEER TO THE STAY WIRE
AND POSTS, EXTEND THE BOTTOM OF THE FABRIC
8" INTO THE TRENCH AND TURNED OUT 4" IN THE
TRENCH OR USE 8" EROSION CONTROL MATTING
STAPLES.
STEP 3
3
ATTACH WIRE FENCE TO POSTS AND EXTEND
THE BOTTOM OF THE FENCE 8" INTO THE
EXCAVATED TRENCH AND TURNED OUT 4" IN
THE T P11 .
BACKFILL THE TRENCH AND COMPACT THE SOIL
FIRMLY TO ANCHOR THE BOTTOM OF THE SILT
FENCE. BURIED FABRIC SHALL NOT BE VISIBLE.
THE TOP OF THE FABRIC SHALL BE 6" HIGHER
THAN THE WEIR.
STEP 4
NOTES:
1. GRADE THE BASIN SUCH THAT THE BOTTOM IS LEVEL
2. INSTALL THE BAFFLES AS SHOWN ON THE GRADING PLAN.
BAFFLES SHALL EXTEND THE FULL WIDTH OF THE BASIN.
3. DO NOT SPLICE THE FABRIC, USE A CONTINUOUS PIECE
ACCROSS THE BASIN OR TRAP.
4. POSTS FOR THE BAFFLES SHALL BE 4' OC.
MAINTENANCE
1. INSPECT THE BAFFLES EACH ACTIVE DAY ON SITE BUT IN
NO CASE LESS THAN ONCE PER WEEK AND AFTER EACH
RAINFALL EVENT. MAKE ANY REPAIRS IMMEDIATELY.
2. REMOVE SEDIMENT DEPOSITS WHEN THE MEASURE
REACHES HALF FULL. TAKE CARE TO AVOID DAMAGING THE
BAFFLES WHEN THE SEDIMENT IS REMOVED.
3. TEMPORARY MEASURE SHALL NOT BE REMOVED BY THE
CONTRACTOR UNTIL THIS ACTION IS APPROVED BY AN
NCDENR REPRESENTATIVE. THE ACTION WILL BE
APPROVED WHEN THE CONTRIBUTING DRAINAGE AREA IS
STABLE.
4. PLACEMENT OF BAFFLES:
INLET ZONE- 35 % OF LENGTH FROM ENTRY POINT
FIRST CELL - 25 % OF LENGTH FROM INLET ZONE
SECOND CELL - 25 % OF LENGTH FROM FIRST CELL
OUTLET ZONE - 15 % OF LENGTH FROM SECOND CELL
POSTS MAX 4' O.C.
TOP STAY WIRE OR ROPE
JUTE NETTING OR EQUIVILENT
xQ BOTTOM OF FABRIC BURIED 8"
g IN EXCAVATED TRENCH &
= TURNED OUT 4" IN THE
�9 TRENCH, OR PINNED WITH 8"
w EROSION CONTROL MATTING
= STAPLES.
FLOW
STEEL POST DRIVEN
24" INTO GROUND
SECTION A -A
BOTTOM ANCHORE
POROUS BAFFLES
PERSPECTIVE VIEW
POTENTIALLY BELOW WATER SURFACE
COMMON NAME SIZE SPACING
N
GE OF NORMAL P00
UPLANDS (ABOVE WATER SURFACE)
SHALLOW WATER PLANTS
SHALLOW LAND PLANTS
COMMON NAME
BOTANICAL NAME
COMMON NAME
BOTANICAL NAME
BEAUTYBERRY
CALLICARPA AMERICANA
SWEET GRASS
MUHLENBERGIA FILIPES
RED CHOKEBERRY
ARONIA ARBUTIFOLIA
SWITCHGRASS
PANICUM VIRGATUM
VIRGINIA SWEETSPIRE
ITEA VIRGINICA
RIVER OATS
CHASMANTHIUM LATIFOLIUM
SILKY DOGWOOD
CORNUS AMOMUM
1
LITTLE BLUESTEM
SCHIZACHYRIUM SCOPARIUM
BEAUTYBERRY
#3 CONTAINER
48" O.C. MAXIMUM
RED CHOKEBERRY
#3 CONTAINER
48" O.C. MAXIMUM
VIRGINIA SWEETSPIRE
#3 CONTAINER
36" O.C. MAXIMUM
SILKY DOGWOOD
#3 CONTAINER
60" O.C. MAXIMUM
GOLDENROD
#3 CONTAINER
48" O.C. MAXIMUM
SWEET GRASS
PLUGS
18" O.C. MAXIMUM
SWITCHGRASS
PLUGS
24" O.C. MAXIMUM
RIVER OATS
PLUGS
18" O.C. MAXIMUM
LITTLE BLUESTEM
PLUGS
18" O.C. MAXIMUM
INDIANAGRASS
PLUGS
18" O.C. MAXIMUM
INLET ZONE
25% OF SURFACE AREA
MBER
URFACE AREA
A
NTS
*MUST INCLUDE A MINIMUM
OF 3 DIVERSE SPECIES AT
A MINIMUM PLANTING RATE
OF 50 PLANTS PER 200 SF.
* GOLDENROD SOLIDAGO * INDIANAGRASS SORGHASTRUM NUTANS
PLANT SUPPLIERS
NOTES * ALTERNATE PLANTS CAROLINA GREENERY, WEST END, NC 910-947-3150
MELLOW MARSH FARM, PITTSBORO, NC 919-742-1200
1. PLANT SPACINGS SHALL BE A MAXIMUM OF 18 INCHES ON CENTER. PLANT DELIGHTS NURSERY, RALEIGH, NC 919-772-4794
2. PLANTS CAN AND SHOULD BE MIXED MATCHED DURING THE PLANTING PROCESS. CILL IDE NATIVE PLANT NURSERY, RALEIGH, NC 877-479-2673
SHALLOW LAND PLANTS AND SHALLOW WATER PLANTS CAN BE MIXED TOGETHER.
3. SOIL SAMPLE SHOULD BE TAKEN PRIOR TO SAMPLING AND FERTLIZE AT RECOMMENDATION
FROM SOILS ANALYSIS. **VEGETATED SHELF AND SLOPES ABOVE THE PERMANENT POOL ELEVATION SHALL HAVE A MINIMUM
NTS 4. ALL SLOPES AND AREAS ADJACENT TO THE WET POND SHALL BE SEEDED WITH BERMUDA OF 6" TOPSOIL, SUBGRADE SHALL BE ADJUSTED TO ACCOUNT FOR ADDITION OF TOPSOIL IN THESE
GRASS FOR A PERMANENT GROUNDCOVER. AREAS SUCH THAT THE ELEVATIONS SHOWN ABOVE ARE TO THE FINISHED GRADE OF THE TOPSOIL.
5. ALL INSTALLATIONS SHALL BE FROM A QUALIFIED PROFESSIONAL.
4 VEGETATED SHELF PLANTING DETAIL
CHANNEL INSTALLATION [-12
TRM INSTALLATION
NTS
1. PREPARE SOIL BEFORE INSTALLING BLANKETS, INCLUDING ANY NECESSARY APPLICATION OF LIME, FERTILIZER, AND SEED.
NOTE: WHEN USING CELL-O-SEED DO NOT SEED PREPARED AREA. CELL-O-SEED MUST BE INSTALLED WITH PAPER SIDE DOWN
4.00' [1.22M]
2. BEGIN AT THE TOP OF THE SLOPE BY ANCHORING THE BLANKET IN A 6" (15 CM) DEEP X 6" (15 CM) WIDE TRENCH
8.00'[2.44M] • •
WITH APPROXIMATELY 12" (30cm) OF BLANKET EXTENDED BEYOND THE UP -SLOPE PORTION OF THE TRENCH. ANCHOR THE
BLANKET WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12" (30 CM) APART IN THE BOTTOM OF THE TRENCH.
2.00' [0.61M]
BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. APPLY SEED TO COMPACTED SOIL AND FOLD REMAINING 12" (30 CM)
•
PORTION OF BLANKET BACK OVER SEED AND COMPACTED SOIL. SECURE BLANKET OVER COMPACTED SOIL WITH A ROW OF
_ITT _
STAPLES/STAKES SPACED APPROXIMATELY 12" (30 CM) APART ACROSS THE WIDTH OF THE BLANKET.
=
4.00' [1.22M]
11E
• •
3. ROLL THE BLANKETS (A.) DOWN OR (B.) HORIZONTALLY ACROSS THE SLOPE. BLANKETS WILL UNROLL WITH APPROPRIATE SIDE
-III
AGAINST THE SOIL SURFACE. ALL BLANKETS MUST BE SECURELY FASTENED TO SOIL SURFACE BY PLACING STAPLES/STAKES
II -I.
0.7 STAPLES PER SQ. YD.
(0.8 STAPLES PER SQ. M)
n
IN APPROPRIATE LOCATIONS AS SHOWN IN THE STAPLE PATTERN GUIDE. WHEN USING THE DOT SYSTEM STAPLES/STAKES
-III-
SHOULD BE PLACED THROUGH EACH OF THE COLORED DOTS CORRESPONDING TO THE APPROPRIATE STAPLE PATTERN.
4. THE EDGES OF PARALLEL BLANKETS MUST BE STAPLED WITH APPROXIMATELY 2" - 5" (5 CM - 12.5 CM) OVERLAP DEPENDING
-III-
ON BLANKET TYPE.
I I -III
-III I
T [0.61M] • • so' [o.asM]
4.00'[L22M] • -- 3.00' [0.91M]
5. CONSECUTIVE BLANKETS SPLICED DOWN THE SLOPE MUST BE PLACED END OVER END (SHINGLE STYLE) WITH AN APPROXIMATE
II_
•
3" (7.5 CM) OVERLAP. STAPLE THROUGH OVERLAPPED AREA, APPROXIMATELY 12" (30 CM) APART ACROSS ENTIRE
2.00' 0.61 M
41 • [ ]
BLANKET WIDTH.
�{ 2.00' [0.61M] • •
NOTE:
• • • 4.00'[1.22M]
*IN LOOSE SOIL CONDITIONS, THE USE OF STAPLE OR STAKE LENGTHS GREATER THAN 6" (15 CM) MAY BE NECESSARY TO
6„
• • •
PROPERLY SECURE THE BLANKETS.
4.00' [1.22M] •
• 4 40 •
1.3 STAPLES PER SO. YD. 1.7 STAPLES PER SQ. YD.
I-_
-I I I-
(1.5 STAPLES PER SQ. M) (2.0 STAPLES PER SQ. M)
I
-I I M
(a ®I
lII -
MAINTENANCE:
I_-
46M]
3.00' [0.91 M] • • 0 1
1.50' [0.46M] 3.00' [0.91 M]T_-_-12.00'[0.61MI
1. INSPECT THE EROSION CONTROL BLANKET ONCE A WEEK AND AFTER EVERY RAINFALL.
• • • 2.00' [0.61M] •
2. IMMEDIATELY REPAIR AND/OR REPLACE ANY DAMAGED BLANKET.
a.00'[1.z2M] 30M]
3. IF GROUND COVER IS NOT ESTABLISHED THROUGH THE BLANKET WITHIN 2 WEEKS, THE BLANKET
SHOULD BE REMOVED AND THE AREA RESEEDED. AFTER RESEEDING, THE BLANKET SHOULD BE
30M]
REINSTALLED.
NTS
3.4 STAPLES PER SQ. YD. 3.6 STAPLES PER SQ. YD. NTS
NTS
(4.1 STAPLES PER SQ. M) (4.3 STAPLES PER SQ. M)
8 STAPLE PATTERN FOR 8' ROLLS
9 EROSION CONTROL BLANKET INSTALLATION
NTS
_W6
( h-
]
�• •.. I
�^ T�
O
•
1. PREPARE SOIL BEFORE INSTALLING BLANKETS, INCLUDING ANY NECESSARY APPLICATION OF LIME, FERTILIZER, AND SEED.
NOTE: WHEN USING CELL-O-SEED DO NOT SEED PREPARED AREA. CELL-O-SEED MUST BE INSTALLED WITH PAPER SIDE DOWN.
2. BEGIN AT THE TOP OF THE CHANNEL BY ANCHORING THE BLANKET IN A 6" (15 CM) DEEP X 6" (15 CM) WIDE TRENCH WITH
APPROXIMATELY 12" (30 CM) OF BLANKET EXTENDED BEYOND THE UP -SLOPE PORTION OF THE TRENCH. ANCHOR THE BLANKET
WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12" (30 CM) APART IN THE BOTTOM OF THE TRENCH. BACKFILL AND COMPACT
THE TRENCH AFTER STAPLING. APPLY SEED TO COMPACTED SOIL AND FOLD REMAINING 12" (30 CM) PORTION OF BLANKET BACK
OVER SEED AND COMPACTED SOIL. SECURE BLANKET OVER COMPACTED SOIL WITH A ROW OF STAPLES/STAKES SPACED
APPROXIMATELY 12" (30 CM) ACROSS THE WIDTH OF THE BLANKET.
3. ROLL CENTER BLANKET IN DIRECTION OF WATER FLOW IN BOTTOM OF CHANNEL. BLANKETS WILL UNROLL WITH APPROPRIATE SIDE
AGAINST THE SOIL SURFACE. ALL BLANKETS MUST BE SECURELY FASTENED TO SOIL SURFACE BY PLACING STAPLES/STAKES IN
APPROPRIATE LOCATIONS AS SHOWN IN THE STAPLE PATTERN GUIDE. WHEN USING THE DOT SYSTEM STAPLES/STAKES SHOULD BE
PLACED THROUGH EACH OF THE COLORED DOTS CORRESPONDING TO THE APPROPRIATE STAPLE PATTERN.
4. PLACE CONSECUTIVE BLANKETS END OVER END (SHINGLE STYLE) WITH A 4" - 6" (10 CM -15 CM) OVERLAP. USE A DOUBLE
ROW OF STAPLES STAGGERED 4" (10 CM) APART AND 4" (10 CM) ON CENTER TO SECURE BLANKETS.
5. FULL LENGTH EDGE OF BLANKETS AT TOP OF SIDE SLOPES MUST BE ANCHORED WITH A ROW OF STAPLES/STAKES
APPROXIMATELY 12" (30 CM) APART IN A 6" (15 CM) DEEP X 6" (15 CM) WIDE TRENCH. BACKFILL AND COMPACT THE TRENCH
AFTER STAPLING.
6. ADJACENT BLANKETS MUST BE OVERLAPPED APPROXIMATELY 2" - 5" (5 CM -12.5 CM) (DEPENDING ON BLANKET TYPE) AND
STAPLED.
7. IN HIGH FLOW CHANNEL APPLICATIONS, A STAPLE CHECK SLOT IS RECOMMENDED AT 30 TO 40 FOOT (9 M - 12 M) INTERVALS.
USE A DOUBLE ROW OF STAPLES STAGGERED 4" (10 CM) APART AND 4" (10 CM) ON CENTER OVER ENTIRE WIDTH OF THE
CHANNEL.
8. THE TERMINAL END OF THE BLANKETS MUST BE ANCHORED WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12" (30 CM)
APART IN A 6" (15 CM) DEEP X 6" (15 CM) WIDE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING.
NOTE: * IN LOOSE SOIL CONDITIONS, THE USE OF STAPLE OR STAKE LENGTHS GREATER THAN 6" (15 CM) MAY BE NECESSARY TO
PROPERLY ANCHOR THE BLANKETS.
A NOTE:
B C CRITICAL POINTS * HORIZONTAL STAPLE SPACING SHOULD BE ALTERED
IF NECESSARY TO ALLOW STAPLES TO SECURE THE
A. OVERLAPS AND SEAMS CRITICAL POINTS ALONG THE CHANNEL SURFACE.
B. PROJECTED WATER LINE
C. CHANNEL BOTTOM/SIDE ** IN LOOSE SOIL CONDITIONS, THE USE OF STAPLE
SLOPE VERTICES OR STAKE LENGTHS GREATER THAN 6" (15 cm) MAY
BE NECESSARY TO PROPERLY ANCHOR THE BLANKETS.
MAINTENANCE:
1. INSPECT THE EROSION CONTROL BLANKET ONCE A WEEK AND AFTER EVERY RAINFALL.
2. IMMEDIATELY REPAIR AND/OR REPLACE ANY DAMAGED BLANKET.
3. IF GROUND COVER IS NOT ESTABLISHED THROUGH THE BLANKET WITHIN 2 WEEKS, THE BLANKET
SHOULD BE REMOVED AND THE AREA RESEEDED. AFTER RESEEDING, THE BLANKET SHOULD BE NTS
REINSTALLED.
10 EROSION CONTROL BLANKET INSTALLATION
4Dsite
solutions
civil engineering I land surveying
409 Chicago Drive, Suite 112, Fayetteville, NC 28306
office 910-426-6777 fax 1910-426-5777 license number I C-2354
www.4Dsitesotutions.com
`` IN,
y\CARo,Z/,'
O^ '••�L
SE02
A
. C I NE .•:/j�a���
,O
03-10-22
REVISIONS
PROJECT NAME
WOODSHIRE
SUBDIVISION
PHASE 7
SITE & EROSION
CONTROL
DETAILS
CLIENT
1041 B Robeson Street
Fayetteville, North Carolina 28305
Phone: (910) 339-6330
Fax: (910)964-9089
PROJECT INFORMATION
DESIGNED BY:
CALEB
DRAWN BY:
CALEB
CHECKED BY:
SCOTT
PROJECT NUMBER:
1070
DRAWING SCALE
NOT TO SCALE
DATE RELEASED
MARCH 10, 2022
SHEET NUMBER
C-601